FINAL REPORT TASK 002 SUBCONTRACT 9-X52-W7423-1 JVED UC? 0 5 @#J OSTr OVERALL TASK OBJECTIVE: The overall objective of the work on Task 002 of Subcontract 9-X52-W7423-1 was to provide LANL with support to the DOE High-Level Waste Tank Safety Program. The objective of the work was to develop safety documentation in support of the d e tank mitigation activities at H d o r d . The work includes the development of safety assessment and an environmental assessment. TASKS COMPLETED: All tasks which were assigned under this Task Order were completed. Descriptions of the objectives of each task and effort performed to complete each objective is provided below. Task 2.1 Safety Assessment for Instrumentation Insertion The objective of this task was to assist LANL in the preparation of a safety assessment for the insertion of instrumentation for the mitigation of episodic gas releases in Tank 10 1 -SY at Hanford. A safety assessment report was developed in support to the staff of N-6 in their support of the DOE Waste Tank Mitigation Program. Support was provided in the areas of facility and operations descriptions, comparison to criteria, ancillary analysis, and report development. Publications Produced A Safety Assessment for Evaluating the Eficacy of Pump Miring to Mitigate Episodic Gas Releases in Tank 241-SY-101: Hanford Site, Richland, Washington, Prepared for Los Alamos National Laboratory in Support of the U.s Department of Energy High-Level Waste Tank Mitigation Program. Task 2.2 Environmental Assessment The objective of this task was to assist LANL. in the preparation of an environmental assessment for the insertion of instrumentation for the mitigation of episodic gas releases in Tank 101-SY at Hanford. An environmental assessment report was developed in support to the staff of N-6 in their support of the DOE Waste Tank Mitigation Program. Support was provided in the areas of facility and operations descriptions, regulatory compliance, ancillary analysis, and report development.

JVED FINAL REPORT UC? 0 5 002 SUBCONTRACT OSTr · FINAL REPORT TASK 002 SUBCONTRACT 9-X52-W7423-1 JVED UC? 0 5 @#J OSTr OVERALL TASK OBJECTIVE: The overall objective of the work on

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: JVED FINAL REPORT UC? 0 5 002 SUBCONTRACT OSTr · FINAL REPORT TASK 002 SUBCONTRACT 9-X52-W7423-1 JVED UC? 0 5 @#J OSTr OVERALL TASK OBJECTIVE: The overall objective of the work on

FINAL REPORT TASK 002

SUBCONTRACT 9-X52-W7423-1

JVED UC? 0 5 @#J

OSTr OVERALL TASK OBJECTIVE: The overall objective of the work on Task 002 of Subcontract 9-X52-W7423-1 was to provide LANL with support to the DOE High-Level Waste Tank Safety Program. The objective of the work was to develop safety documentation in support of the d e tank mitigation activities at Hdord . The work includes the development of safety assessment and an environmental assessment.

TASKS COMPLETED: All tasks which were assigned under this Task Order were completed. Descriptions of the objectives of each task and effort performed to complete each objective is provided below.

Task 2.1 Safety Assessment for Instrumentation Insertion The objective of this task was to assist LANL in the preparation of a safety assessment for the insertion of instrumentation for the mitigation of episodic gas releases in Tank 10 1 -SY at Hanford.

A safety assessment report was developed in support to the staff of N-6 in their support of the DOE Waste Tank Mitigation Program. Support was provided in the areas of facility and operations descriptions, comparison to criteria, ancillary analysis, and report development.

Publications Produced A Safety Assessment for Evaluating the Eficacy of Pump Miring to Mitigate Episodic Gas Releases in Tank 241-SY-101: Hanford Site, Richland, Washington, Prepared for Los Alamos National Laboratory in Support of the U.s Department of Energy High-Level Waste Tank Mitigation Program.

Task 2.2 Environmental Assessment The objective of this task was to assist LANL. in the preparation of an environmental assessment for the insertion of instrumentation for the mitigation of episodic gas releases in Tank 101-SY at Hanford.

An environmental assessment report was developed in support to the staff of N-6 in their support of the DOE Waste Tank Mitigation Program. Support was provided in the areas of facility and operations descriptions, regulatory compliance, ancillary analysis, and report development.

Page 2: JVED FINAL REPORT UC? 0 5 002 SUBCONTRACT OSTr · FINAL REPORT TASK 002 SUBCONTRACT 9-X52-W7423-1 JVED UC? 0 5 @#J OSTr OVERALL TASK OBJECTIVE: The overall objective of the work on

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied. or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product. or proctss disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spe- cific commercial product, process, or service by trade name, trademark, manufac- turer, or otherwise does not ncccssarily constitute or imply its endorsement, recom- mendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

Page 3: JVED FINAL REPORT UC? 0 5 002 SUBCONTRACT OSTr · FINAL REPORT TASK 002 SUBCONTRACT 9-X52-W7423-1 JVED UC? 0 5 @#J OSTr OVERALL TASK OBJECTIVE: The overall objective of the work on

DISCLAIMER

Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

Page 4: JVED FINAL REPORT UC? 0 5 002 SUBCONTRACT OSTr · FINAL REPORT TASK 002 SUBCONTRACT 9-X52-W7423-1 JVED UC? 0 5 @#J OSTr OVERALL TASK OBJECTIVE: The overall objective of the work on

f

Publications Produced An Environmental Assessment for Evaluating the Eflcacy of Pump Mixing to Mitigate Episodic Gas Releases in Tank 241 -SY-I 01: Hanford Site, Richland, Wmhington, Prepared for Los Alamos National Laboratory in Support of the U.s Department of Energy High-Level Waste Tank Mitigation Program.

Page 5: JVED FINAL REPORT UC? 0 5 002 SUBCONTRACT OSTr · FINAL REPORT TASK 002 SUBCONTRACT 9-X52-W7423-1 JVED UC? 0 5 @#J OSTr OVERALL TASK OBJECTIVE: The overall objective of the work on

'3

SUBCONTRACT 9-X52-W7423-1 TASK 2 EXPENDITURES

0 I I I I I I I I I 1

MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR MONTH

1 - BUDGET - ACTUAL 1