JUSTIFYING SMALL LNG SHIPPING FOR INTER-ISLAND
TRANSPORTATION AND DISTRIBUTION: FACTORS AND
PRACTICAL APPLICATIONS FOR A BUSINESS CASE
Eduardo Perezwww.Small-LNG.com
small-lng.com1
Intro
● Why me?○ Dow 14 years in Spain, The Netherlands, Argentina
and USA○ Norgas Carriers 2 years in the USA and Singapore○ Lauritzen Kosan 7 years in Denmark and Spain○ Own consultancy firm on small scale LNG shipping
● PLEASE ASK QUESTIONS
small-lng.com2
The world today
3
LNG Trade Flows
small-lng.com
Source: http://www.openstreetmap.org/
4
LNG Trade Flows
small-lng.com
Source: http://www.openstreetmap.org/
5
The world tomorrow
How Shale gas will change the world in the near-future
9
World Shale gas reserves
12
US Natural Gas Pipelines: 3 million miles of pipelines, about the same amount of paved roads
13
European Natural Gas Pipelines
Source: http://www1.inogate.org/inogate_programme/inogate_resource_center/maps/gas_map_big.gif14
Opportunities
● Shale gas will grow at different paces due to political restrictions
● Lack of pipelines will force Asia to use more ships
● Global price gaps now, regional price gaps in the near future
15
A quick look at Asia
16
Singapore LNG terminal
● Current capacity: 6 MM MTs per annum● 3 tanks with capacity for 540,000 cbms LNG● 4th tank in 2018 will increase it to 11 MM
MTpa● Singapore as a hub for the region● Terminal can handle 2 Q-Max and 1 "smaller
LNG tanker" at a time
Source: http://www.power-eng.com/news/2013/04/23/corporate-singapore-lng-terminal-on-track-for-2q-launch-gets-ready-for-global-suppliers.html18
LNG Infrastructure to support Small LNG Shipping and Distribution
● Hubs and receiving terminals as market facilitators
● Singapore terminal● South China Sea carriers 50% of the world
LNG● Asia LNG consumption about 170 MM MTs
(2012)● Major producers in the area
small-lng.com19
How will the development of Small LNG Shipping change trade in Asia?
small-lng.com20
SEA: 600 MM ppl / 20,000 islands
Source: http://www.openstreetmap.org/#map=4/6.84/123.75&layers=T 21
Indonesia LNG facilities & pipelines
22
Bali - Small LNG terminal
● Bontang LNG (East Kalimantan) to Bali● Shuttle ship: Surya Satsuma (23,000 cbms)● Receiving terminal: FRU + FSU (Chinese NB
26,000 cbms)● FSU to be replaced by a new FSU from
Korea in 2017● Second small LNG plant in Bali ?
23
Small LNG Challenges & Opportunities
● Local cabotage laws● Indonesia: importer and exporter of LNG● Competing terminals● End of fuel subsidies● Newcomers to the market: Australia
24
A quick look at the Americas
So
Source: http://www.openstreetmap.org/#map=5/21.166/-77.080&layers=T25
Island States and US territories
Source: http://www.eia.gov/todayinenergy/detail.cfm?id=17611
26
Residential electricity prices
Source: http://www.eia.gov/todayinenergy/detail.cfm?id=17611
27
Gas Carriers
28
Types of tanks in Gas Carriers: Membrane
● Best for bigger ships● Best for shallow draft
29
Types of tanks in Gas Carriers: Moss
● Best for bigger ships
30
Types of tanks in Gas Carriers: Type-C tanks
31
● Best for smaller ships● Multiproduct
Small Gas Carriers
● Fully Pressurized: ambient● SemiRefs and FullyRefs: - 48 deg C● LEGs (ethylene/ethane carriers): -104 deg C● LNG carriers: -162 deg C
32
Gas Carriers Pyramid (Type C)
- 48 º C (PPL) Semi-Ref Carriers (LPG, But, PPL)
- 104 º C (Ethylene) LEG Carriers (Semi-Ref+Ethylene)
- 88 º C (Ethane)
- 163 º C (LNG) Small LNG Carriers (LEG+LNG)
Ambient temp. Pressurized Carriers
+15-20%
+15-20%
33Small-LNG.com
What is a Small LNG Carrier
● From 0 to 40,000 cbms● Not a standard. Some people will use other
ranges.● -162 degC
34
Shipping is only part of the SC cost
PipelineLiquefaction Plant
LNG Tanker
LNG Storage
VaporizersPipeline
LNG Storage
35
When and where to use Small LNG carriers
● Islands● Seasonal consumption● Isolated places / expensive pipelines● Pipeline expansions● Pre-marketing / new markets● Inland waterways● LNG as fuel● Pollution restrictions
36
Small LNG Carriers - world's fleet
● Very small fleet, less than 40 ships worldwide
● Most of them already in a long term deal
37
Strictly confidential38
39
40
41
42
43
44
45
46
47
48
49
50
Subscribe to our newsletter
51
small-LNG.com/subscribe
Small size LNG shipping market
52
54
55
56
57
Recent Developments in Small Scale Shipping
● Type C tanks and petchem ShipOwners● Multi-product carriers● LNG as fuel● Advances in design bring new flexibility at
load and disports.
small-lng.com58
Key Success Factors for Leading players
● Multiproduct carriers● Building against long term T/C contracts● Controlled risk● Global fleet
small-lng.com59
Considerations
● Dual fuel engine● Position of manifolds● Multiproduct vs. LNG dedicated
○ Cost○ Time to change grades
60
Yes, but, how much?
The theoretical hire of a small LNG carrier is:Ethylene market rate + 20% extra for LNG capabilities
So in today’s market:- 8,250 cbms ethylene carrier: USD 525,000
pcm (Nov-2015 12 months hire rate)
- 8,250 cbms LNG carrier should be USD 630,000 pcm
Disclaimer: this is a theoretical calculation based on ship building costs and in a liquid market. This is not a proposal and not an offer.
61
Gas Carriers Pyramid (Type C)
- 48 º C (PPL) Semi-Ref Carriers (LPG, But, PPL)
- 104 º C (Ethylene) LEG Carriers (Semi-Ref+Ethylene)
- 88 º C (Ethane)
- 163 º C (LNG) Small LNG Carriers (LEG+LNG)
Ambient temp. Pressurized Carriers
+15-20%
+15-20%
62
Yes, but, how much? (cabotage)
In a domestic market, you have to add:Ethylene market rate + 20% extra for LNG capabilities
Plus:- Extra cost of legal requirements- Extra costs of local crew - Extra cost of reduced competition
63
64
Canary Islands’ random exercise
65
66
New ideas in Small LNG Shipping
67
68Source: http://www.tge-marine.com/files/lng_fuel_forum_north_america_march_2014_miami.pdf
69
70
GTT Membrane shallow draft bunker barge
Source: http://www.lngworldnews.com/gtts-lng-bunker-barge-design-receives-abs-approval/ 71
Jensen (Crowley) bunker barge
Source: http://www.lngworldnews.com/jensen-maritime-to-design-lng-bunker-barges-usa/
72
73
74
LNG Bunkering
75
Where are the ships today?
Main uses for small LNG carriers
● Bunker ships for LNG bunkering:○ Only in Northern Europe○ Why? ECA restrictions
● Virtual pipeline: bringing product to remote or isolated locations:○ Main driver in Asia○ Mainly in RICH countries (Japan & Norway)
LNG as fuel
● In 2015, seaborne traffic in North America, the US Caribbean, and European waters will be mandated to reduce fuel sulfur content.
● New barge and ship designs● There are 100 LNG fuelled ships today (90%
in Norway) (http://blogs.dnvgl.com/lng/2014/03/reached-100-lng-fueled-ships/)
● DNV predicts 1000 ships by 2020
78
Emission Control Areas
SOX limits:2014 - 1.0%2015 - 0.1%
79
LNG as fuel
● EU subsidies● European ports leading with “standard”
bunkering procedures: Dunkirk, Rdam, Zeebrugge, Antwerp (and Singapore)
● Spanish re-loads● Environmental vs economical motivations● The mighty USA
80
Contracts
81
Parties involved in a shipping contract
● Shipper● Charterer● Broker / consultant (please, never skip them)
● Ship Owner / Ship Operator● Receiver
82
Parties involved - let me sell the consultant's services● Shipping is normally a small part of the total
project● Shipping is a vital part of the project● Shipping has to be invisible and RELIABLE● The cost of consultants and brokers is
significant in absolute terms but minimal in relative terms
● A consultant will help to optimize, reduce costs and avoid unnecessary mistakes
● Can you afford NOT having a shipping consultant ?
83
Shipping Contracts:Types of contracts
● Spot● CoA: Contract of Affreightment● T/C: Time Charter
84
Shipping Contracts: Cabotage
Cabotage adds complexity:● Building locally or importing
○ Building locally:■ Is it possible? (technically,economically) ■ How much?
○ Importing: taxes○ Temporary import
● Local company● Local flag● Local crew (training)● Added costs
85
Types of contracts: Spot
● Spot contract: ○ One cargo on one ship for specific dates from A to B○ Higher prices○ No long term commitment○ Extremely dangerous in Small LNG because of the
small size of today's world fleet
86
Typical Spot indicationWe are pleased to indicate as per following,01. Charterers: Charterer A02. Owners: ShipOwner B as Owners or as disponent Owners.03. Vessel: LNG X (descriptions as per SIGTTO Form) 04. Cargo: MIN 4.800 MTs CHOPT UPTO FULL CAP LNG05. Load: OSP/B Tarragona06. Discharge: OSP/B Dunkirk 07. Laycan: Laycan Sep 1-15, 2013 to be narrowed by owners to 10 days by 4th Aug and to 5 days by 23rd Aug08. Freight: USD 200 per metric ton09. Laytime: 100 mtph load/100 mtph disch shinc reversible10. Demurrage: USD 23,000 per day prorata.11. Last cargo: LNG12. Presentation: Under LNG vapours ready to load13. LoadTemp: Please indicate. In case cooling is required, additional costs will have calculated.14. Distchtemp: Please indicate. In case cooling is required, additional costs will have calculated.15. CP: Asbatankvoy Charter Party with logical amendments.16. Comms: 2pct comm to Broker C17. Agents: Owners’ agents both ends.18. Approvals: Big Corp D approval19 Other Terms: ShipOwner B stardard LNG termsend
87
Types of contracts: CoA
● CoA: Contract of Affreightment○ A contract for a certain number of cargoes in a
certain period among different ports.○ Better for complex trades with Ship Owners with big
fleets.○ Freight includes:
■ Port costs■ Bunkers■ Crew■ Ship maintenance
88
Typical CoA indicationCOA Indication:Date: 6 Aug 2013Subject: Charterer A reconfirmation latest within 22 July 2013.Charterers: Charterer A, FinlandOwners: ShipOwner B, GreeceContract Type: Contract of AffreightmentPeriod: 1st February 2014 – 31st December 2014Shipments: Minimum 1 charterers option up to 4 shipments during the contract period. Additional shipments by mutual agreement.Tonnage: ShipOwner B newbuilding LNG carriers (descriptions as per Gas Form C), suitable for both the carriage of refrigerated LNG and the ports covered in this COA. Vessels are to be subject to charterers suppliers receivers ship vetting acceptance.Product to be Shipped: Refrigerated LNGCargo Quantity per Shipment: Charterers option up to full cargo.Loading: OSP/B Tarragona at a temperature of approximately minus 161 degrees centigrade.Discharge: In charterers option 1 or 2 safe ports, one safe berth each port, in charterer’s option, from within the following ranges: A) MediterraneanFreight: A) Mediterranean: USD 888,000 LSIf a second discharge port is declared, then an additional USD 65,000 lumpsum will be added to the highest applicable freight rate.Laytime per Shipment: Loading : 100 mts per hour shincDischarging : 150 mts per hour shincLaytime fully reversibleAdditional 12 hours if second discharge port declared.Demurrage: USD 55,000 pdprShipment Schedule: TBALast cargo: TBAVessel Presentation: Vessel is to present all cargo tanks and associated systems at LNG loadport under shore supplied nitrogen atmosphere with max 0.2 pct oxygen content by volume with a dew point of max minus 45 degrees C.Ship Vetting: Owners agree to co-operate fully with charterers suppliers receivers ship vetting personnell, including any requests to physically inspect/visit vessels while at building yard, load and discharge ports.Asbatankvoy with usual ShipOwner B/Charterer A terms.End
89
90
Types of contracts: T/C
● T/C: Time Charter○ A ship gets hired for a certain period of time.○ Most likely scenario for Small LNG in the short term○ The hire includes:
■ Crew■ Ship maintenance
○ The hire doesn't include:■ Bunkers■ Port costs
91
Building against a T/C
● A Charterer need a ship to move LNG● A ShipOwner agrees to build a ship against
a long-term T/C deal (15-25 years)● ShipOwner contracts a ShipYard and builds● Ships enters long term T/C● Charterer pays a monthly hire for the life of
the contract○ Purchasing option after a certain period○ Replacement option○ Early cancellation clauses and engines
92
Typical T/C indicationTIME CHARTER for Charterer: Charterer A (please provide full style) Owner: ShipOwner B, Greece. Vessels: 1,700 cbm LNG carrier LNG Carrier C (Basic specifications attached ) Period: Two years. Lay/can: Jan 1st, 2014 to Feb 31st 2014, to be narrowed down to 15 days by Charterers upon signature of the C/P. Owners to narrow down from 15 days to 10 days one month before delivery. Delivery: SEA Redelivery: SEA Trading range: Worldwide always within IWL Products: LNG Hire: US$ 666,000 pcm. Hire to be annually adjusted by a mutually agreeable inflation factor C/P: Shelltime 4 suitably and logically amended Description: Capacity 2 tanks total 1,700 cubic metres Commission: 3pct paid to Broker COther clauses: Charterer to have the option to redeliver the ships to Owners at any time after the end of year number one. Three months notice is required.
93
94
Considerations for small LNG shipping in South East Asia
● Lack of available tonnage● Have to look at the whole picture: Indonesia
+ Malaysia + Philippines + Singapore + Australia
● Using synergies and existing experience in other markets
● Innovation and right technology for each project
95
South East Asia - near future
● Many new opportunities for FSUs and FSRUs
● Lack of ships● Use of existing tonnage (Pavillion from
Singapore)● The importance of planning● Opportunities for international players
(Australia, Philippines, Indonesia, etc)
96
Floating LNG
97
FSRU / FLNG / FSPO / FRU / FSU
● FSRU: Floating Storage and Regasification Unit
● FLNG: Floating Liquified Natural Gas● FPSO: Floating Production, Storage and
Offloading● FRU: Floating Regasification Unit● FSU: Floating Storage Unit
98
Bali - Small LNG terminal
● Bontang LNG (East Kalimantan) to Bali● Shuttle ship: Surya Satsuma (23,000 cbms)● Receiving terminal: FRU + FSU (Chinese NB
26,000 cbms)● FSU to be replaced by a new FSU from
Korea in 2017● Second small LNG plant in Bali ?
99
Small scale FSRUs
● Pros:○ Low(er) costs than on-shore terminals (¿?)○ Faster deployment○ Flexibility○ Adaptability
● Cons:○ No transfer of expertise○ Smaller impact in local employment○ Only a handful of companies in the market (for now)
100
Small scale FSUs
● Pros:○ Great opportunities reconditioning existing tonnage○ Faster deployment○ Flexibility○ Adaptability
● Cons:○ No transfer of (limited) expertise○ Smaller impact in local employment
101
102
Considerations for FSRUs/FSUs in South East Asia
● Lack of available tonnage● Availability of older and bigger tonnage● Small scale LNG carriers acting as FSUs will
reduce the available fleet
103
Supply Chain Analysis
104
Supply Chain Analysis
● Load port(s): berth, storage and restrictions● FSU/FSRU/FLNG● Disport(s): berth, storage and restrictions● Ports congestions● Milk-runs vs. one-to-one distribution● Optimal tonnage vs. available tonnage
105
Supply Chain Analysis: items to consider
● Seasonality and scalability of the solution: will it survive the pass of time?
● One ship vs several ships solution:○ One ship:
■ More economical■ Less flexible■ More risky (vessel downtime)
○ Several ships:■ Redundancy■ Risk of delays■ Risk of failure■ Maintenance and drydocking
106
Your case, can we help
What is your case ?Do you want to share ?
Not ready to openly share ?Please contact me after the workshop if you want to discuss your options.
107