Upload
dinhkhanh
View
265
Download
1
Embed Size (px)
Citation preview
Orion Solar Racking specializes in Engineering, designing, development and Manufacturing of PV Mounting solutions. Since its foundation Orion has released a wide range of quality and innovative mounting systems. We provide roof mount; ground mount; Pole mount; single axis trackers; car-ports for Commercial, agriculture, industrial, government & educational as well as utility grade projects. Each and every day we endeavor to make simple yet innovative solar racking solution, Orion provides LIVE technical support for all of distributors, dealers and contractors.
Here at OSR You can trust our knowledge of installation, code compliance and necessary technical documentation to always be above the rest.
Online tools like our On-line calculator, installation videos and our In-House Research & Design teams are eager to help you solve your toughest Construction challenges. We now play a leading role in the solar industry and have a rapidly gained recognition amongstsystem integrators, installers and distributors across the world..
Our Company
Our mission has always been to provide quality products and promote green renewable energy Solutions, that reduce our dependency on earth depleting methods that may contaminate our environment
Mission Statement
-Compatible with pre-cast, helical screwor formed footings (As shown above)
-A superior solution that is cost effective-Innovative design-Engineered to work with any 2” SCH 40 pipe-Suitable for wind speeds up to 150 mph-Quick & simple installation-Code Compliant
Blank S
erie
s
Blank System
C US
TM
TM
CAUTION: Refer to pages 13-14 Before attempting installation. Failure to correctly establish the requirements at proposed installation site is dangerous and will void the product warranty.
141
Handling & Installing Orion Solar Racking
Rail Calculation & Design
Features
Jupiter Tech Specifications
Before Installing
It is critically important to observe standard safety practices when installing Orion Solar Racking:
Stop work during stormy weather. Solar modules can be blown in high windsNever step or sit on the glass surface of a solar module. The glass may break, resulting in shockor bodily injuryDo not throw or roughly handle any Orion Solar Racking componentsDo not bring Orion Solar Racking into contact with sharp or heavy objectsDo not modify Orion Solar Racking components in any way. The exchange of bolts, drilling ofholes, bending and any other physical changes not intended in standard installation procedurewill void the warrantyProducts should be installed and maintained by quali�ed personnel. Keep unauthorized personnelaway from solar modulesIt is the installer’s responsibility to verify the integrity of the structure to which Orion SolarRacking is �xed. Roofs or structures with rotten/rusted bearers, undersized bearers, excessivelyspaced bearers or any other unsuitable substructure cannot be used with Orion Solar RackingInstallation on such structures could result in death or serious injury and will void the warranty
Rail Calculations based on code approved stress equations, and allowable margins of safety. Beam calculations have been conservatively performed under wind loads, snow, dead loadsComponents have had full envelope forces applied to each component.
For more detailed information regarding our products and site specific data please visit ourWeb-site www.OrionRacking.com or give our customer service department a call to assist you with any documentation that might be necessary for submittal, plan check or building permit appli-
Orion Racking Code- Jupiter Series Ground Mount System
Aluminum 6005A-T5 extrusion
Static load capacity from 20 N to 1800 NSignificantly higher strength-to-weight ratio than other racking products,providing improved efficiency due to greater frame spans, inherent corrosionLow ongoing maintenance and an extended product life. Complies with ASCE 7-05 guidance for wind load design.
Compliant Installation manual
2”Inch SCH40 Pipe can be purchased near job-siteLow impact on surrounding environment
ITEM DESCRIPTION1234
2" SCHEDULE 40 STEEL PIPE (HORIZ.)
2" SCHEDULE 40 STEEL PIPE (VERT.)ALUMINUM RT 1.5 x 1.5 x 1/8 (DIAG.)
1 TYP
3 TYP
3 TYP
1 TYP
2 TYP
CIDH PIER, TYP
4 TYP
2" STEEL PIPE COUPLER
214
1/2” Socket Head Rope Laser Theodolite
Measuring Tape
6mm & 8mm Metric Allen Key/6mm & 8mm Hexagonal Driver Bit
Adjustable Wrench Construction Hard Hat
Construction Gloves Drill or Impact Driver
Tools
Installer should pay close attention and properly align all PV module frames keeping them square and level to avoid a uneven array.
The use of a string line level is recommended but not necessary.
Completed Array/Landscape
123
Component List
Universal End ClampClear&Black AnodizedOSR-EC
Steel Angle Bracket
Attaches fromBottom of rear legto top of front leg
to provide reinforcementfor lateral movement
Attaches to rear leg and U-boltwhen using 2”SCH40 pipe
Attaches to bottomof rear leg or topof front leg whenusing 2” SCH40
at base of pouredfooting
Steel Cap 3
Steel Cap 2
RailClear&Black AnodizedOSR-R
Mid Clamp Clear&Black AnodizedOSR-MC
Steel Cap 1
Slips onto bottom of rear leg only
when using direct burial of 2” SCH40
pipe
Attachment of mid-clamp & end clampAttach End or Mid-clamp to rails by using channel nut on top side
channel of rail
Tilt in channel nut Set channel nut Tighten channel nut Complete
1. 2. 3. 4.Grip End Clamp(optional)OSR-GEC
Grip Mid Clamp(optional)OSR-GMC
INTEGRATED GROUNDING CLIP
411
Orion Solar RackingP:(310) 409-4616 F:(310) 409-4617 E. [email protected] www.OrionRacking.com
Check that the Orion Solar Racking equipment is undamaged and that the order is complete.
Module Installation
Once module installation is complete, if the rails are uneven the installer can trim the excess off the rail with a portable band-saw or reciprocating saw to achieve flush even look
It is recommended to file down any sharp edges after all cuts are complete to avoid any injuries due to sharp or jagged edges
Component List
Micro Inverter ConnectorClear&Black AnodizedOSR-MIC
Splice BarOSR-SPL
Cable TrayClear&Black AnodizedOSR-CT
Grounding LugClear&Black AnodizedOSR-MGL
Smart Ground Lug
105
Installing PV Modules
Installer should start by setting the first row of PV modules straight, level and square, the corners of all module frames should be flush and clamps should set at specified attachment points**
**Always refer to PV module manufacturer installation instructions for clamping procedures.
1.
2.
3.
It is recommended to set rows first, then set column height
The use of a theodolite, straight edge or string line is Strongly recommended
Layout & Assembly of rear Leg
Steel Cap#2
Steel Cap#1
Steel Cap#2
Steel
Steel Cap#3
Rear leg Assembly
2”2”
6”
FootingDiameter
concretegroundlevel
steel schedule40/80 pipe
Footin
g D
epth
Refer to chart on page 14for proper pier spacing
Direct Burial Option
Slip-in 2” inch Rear leg and tighten*the three bolts on the base & top cap to fasten and secure leg into place
base cap notch for angle steel bracket attachment
point must be facing forward.
Base cap #2 notch for angle steel bracket attachment point must be facing forward
(As shown above in Figure #A)
Figure#A
Embedded Anchor bolts /J-hooks are not supplied by Orion Racking Please refer to bolt manufacturers maximum torque
69
Installation & layout front leg
Refer to Pg. 14 for proper
footing spacing
Rear Leg Assembly
Front Leg Assembly
Figure#A
Top # cap 2 notch for angle steel bracket attachment point must be facing rear leg
(As shown above in Figure #A)
Slip-in 2” inch Front leg and tighten the three bolts on the base & top cap to fasten and secure leg into place
Steel Cap#1
Steel Cap#1
Steel Cap#2
Steel Cap#2
Attachment of rails
U- bolt comes fully assembled, slip in 2” inch pipeand fasten U-bolt
Attach rails using the two channel nuts provided with angle splice kit
(As shown above)
87
Installing Angle Steel Bracket
The angle steel bracket attaches from the bottom cap of the rear leg to thev cap of the front leg and is fastened by a single bolt and nut that should be torqued down to 10-15Ft Lbs of torque.
The notch where the angle bracket attaches to the bottom cap (rear Leg) and top cap (front leg) should be set to the correct orientation before torquing down the main bolts that hold the legs in place.
Insert bolt and fasten to both top cap of front leg &
bottom cap rear leg
Rear L
eg
Assembly
Front l
eg
Assembly
Steel Cap#1
Steel Cap#1
Steel Cap#2Steel Cap#2
Attachment of Horizontal Pipe
Torque nuts to 15 Ft Lbs
Attach and fasten the two U-bolts provided per top cap to the 2”SCH40 Pipe legs that will be horizontal support frame for rails and modules
PZSE, INC. - STRUCTURAL ENGINEERS
* Solar Rack System/Footing requires custom design due to high loading condition. Consult with a Structural Engineer.
TABLE 2: CIDH PIER SPACING (WIND EXP C)TABLE 1: CIDH PIER SPACING (WIND EXP B) TABLE 3: CIDH PIER SPACING (WIND EXP D)