June 19, 2002
A Software Skeleton for the Full Front-End Crate Test at BNL
Goal: to pGoal: to provide a working data acquisition (DAQ) rovide a working data acquisition (DAQ) system for the coming full FE crate testsystem for the coming full FE crate test
In this talk, I will In this talk, I will
describe the overall system setupdescribe the overall system setup
cover various software components andcover various software components and
report their status and/or what we intend to doreport their status and/or what we intend to do
Kin Yip
June 19, 2002
Tri
gger
Tow
er B
oard
Rea
dO
ut
Car
d TT
C C
ontr
ol
PT
G
veto
Data (through optical link)
trigger
trigger
Signal from a pulser(triggered by TTC)
FE Crat
e
memory
PU
Host 2
Host 1
“Host 2” — single board in the same crate as the Read Out Card — is a diskless node booted from “Host 1” through the network
~VME
Cal
ib.
boar
d
FE
B
DAQ-1
June 19, 2002
Control Crate (Wiener VME with CERN extension)
To control : Workstation Control Crate configure various boards in
the FEC
By using a PCI/VME bridge “Bit3”, the PCI bus on the workstation “maia” and the remote VMEbus in the Control Crate share memory and I/O
Programmed IO (PIO)
Dynamic Memory Access (DMA)
We have upgraded the operating system and the software driver for Bit3 (now from SBS). We have tested :
PIO : 3 MBytes per second
DMA : 15-16 Mbytes per second the obvious way to go
PTG (Pulse Trigger Generator, BNL-made) has been used to generate triggers in this new set of OS and Bit3 driver.
Other electronic components including TTC (with TTCvx and TTCvi) and the SPAC will have to be integrated into this system.
June 19, 2002
Read-Out Crate [Wiener VME (9U/6U) ]
Different from before, the CPU (VMIC) board is in the same crate as the electronic boards (2 Read-Out Cards)
Similarly, there is also a PCI/VME bridge “Tundra-Universe” that we have used to allow the CPU board to communicate with the electronic boards through the VME backplane
We have also upgraded the operating system and the software driver for this PCI/VME bridge. We have also tested :
DMA : 15-16 Mbytes per second
PIO : almost the same as above
We will have to develop the software to configure and read from the two Read-Out Cards when they are available, presumably with the help from the board maker in a similar way that we have done with the ROD Demo Board
June 19, 2002
Data volume and storageA very rough estimate :
No. of channels ~ 16 128 = 2048
128 channels 2 K bytes
16 FEB 32K bytes per event
In a very rough estimation, if we take about 100 K events a day for 5 months, we will end up with ~500 GB of data.
We’ll use Magda (a distributed data manager prototype for Grid-resident data developed at BNL) to manage data transfer and storage
http://atlassw1.phy.bnl.gov/magda/info
We have tested and transferred data from our workstation through the USATLAS cluster to the HPSS (High Performance Storage System) at BNL.
The automatic procedures require two endless loops, one in our workstation (the one connected to the Control Crate) and one in the USATLAS cluster that has the appropriate read/write privilege from/to the HPSS
If desirable, we can replicate the data from BNL to CERN (Castor) which is said to have a cost of 2 SF per Gbyte.
June 19, 2002
Event Monitoring in DAQ-1
Basically, the “Event Sampler” process/interface in DAQ-1 gets the data and pass the data to the “Monitoring Task” process/interface
The “Monitoring Task” would unpack the data and analyze to produce, say, (Root) histogram and then
use the “Histogram Provider” to publish the histograms
The “User Histogram Task” would “receive” the histogram so that any user can examine
June 19, 2002
Data format will be essentially whatever the Read-Out Card maker provides
Each run will start with a new file and the run no. is part of the filename
We expect to have some configuration information in the header/trailer
For Channel mapping, we want to put the mapping in the database and I have started with the one in Athena
We have to take care of all the hardware components such as FeedThrough, preamplier, motherboard etc.
Anaysis code in the framework of a simple C program will materialize at the debugging stage, as we need to check whether the data read out is correct, just like what happened to the ROD Demo exercise
For the general users, we provide the I/O unpacking routine and 3 stage skeleton interface, namely, “initialization, execution and finalization” so that the users can develop their analysis code easily in this framework
Data format, channel mapping and analysis
Runbook, Bookkeeping and DCSThrough the Web and Database server, we will provide the “Runbook” from which users may search for the system configuration for each run.
We will set up a simple report logging system for the “run shifters” to write down their concern or any special features or problems at certain run or time.
We will probably use the OBK (Online BookKeeing) feature in the DAQ-1 as it has easy access to all the run information.
The OBK experts have promised to provide an updated version which provides a Web-based interface.
In any case, the information will be available through the Web server
The DCS (Detector Control System) measurements taken from the FEC will be done asynchronously with respect to the rest of data acquisition
We have sent a PC to CERN and the DCS software system is being set up
We have to figure out what parameters we need to measure
The DCS information will be transferred to the Database and Web servers so that it is readily available to all users