Upload
others
View
8
Download
1
Embed Size (px)
Citation preview
BELGRAVIAJUMEIRAH VILLAGE CIRCLE , DUBAI, UAE
www.ellingtongroup.com
- Family-friendly community which consists of villas, townhouses, apartments and offices. Over 300,000 people are expected to call JVC their home.
- Master Developer: Nakheel
- Location: This community is formed at the cross-roads of 3 major road networks of Dubai – Al Khail Road, Sheikh Mohammed Bin Zayed Road and Hessa Street.
- Access: 6 Entrance / Exit points into JVC with 2 major Entrance / Exit points already being used from Al Khail Road.
- Bordered by other landmark districts such as Motor City and Dubai Sports City, placing some of Dubai’s most desirable recreational activities within reach.
- 20 minute drive to Downtown Dubai, 8 to 10 minute drive to The Greens / Sheikh Zayed Road, Mall of the Emirates, 15 minute drive to Dubai Marina.
- Current Rental Rates: - Studio: AED 55,000 - 1 BR: AED 70,000 - 2 BR: AED 110,000 - 3 BR: AED 125,000
JUMEIRAH VILLAGE CIRCLE (JVC)
www.ellingtongroup.com
LOCATION
www.ellingtongroup.com
MAIN FAÇADE
www.ellingtongroup.com
POOL AREA
www.ellingtongroup.com
COURTYARD
www.ellingtongroup.comDUBAI
BELGRAVIA MODEL SUITE
www.ellingtongroup.comDUBAI 8
TYPICAL FLOOR PLANS
1 BEDROOM TYPICAL LAYOUT 2 BEDROOM TYPICAL LAYOUT
www.ellingtongroup.comDUBAI 9
TYPICAL FLOOR PLANS
3 BEDROOM TYPICAL LAYOUT
www.ellingtongroup.com
PROJECT DETAILS
Plot Area: 102,000 sqft
GFA: 255,000 sqft
BUA: 391,00 sqft
Structure: Basement + Ground + 4
Total Unit Count: 181 - 1 Bed: 94 - 2 Bed: 69 - 3 Bed: 18
Amenities: - Swimming pool - Gym - Children’s indoor & outdoor play area - Roof top lounge - Lawn area
Project Team: - Main Consultant: Al Wasl Al Jadeed Consultants - Interiors: Perkins + Will - Landscape: Desert Group - Façade Peer Review: Anarchitect
Enabling & Shoring Works: Sobha Engineers & Contractors - Main Contractor: Sobha Engineers & Contractors
www.ellingtongroup.com
KEY FEATURES
- Spacious rooms . Ensuite bathrooms with high standard sanitary ware; well planned and fitted kitchen, with option of open and closed kitchens.
- Interiors by International Interior Designers – Perkins & Will.
- Contemporary and vibrant façade.
- Well equipped gym.
- Pool and water bodies.
- Secure indoors and outdoors children play area.
- Vibrant and beautiful landscaped central court and exterior.
- Well planned parking.
- 24 hour security.
- Card access controls.
- Thermally insulated exterior façade.
www.ellingtongroup.com
MAIN CONSTRUCTION PROGRESS
Main Contractor: Sobha Mechanical Engineering
Main Construction commences in March 2015. 20 month construction program
Project completion scheduled for October 2016.
www.ellingtongroup.comDUBAI 13
MILESTONE % PAYMENT DUE
Down Payment 10%
Completion of 30% construction 10%
Completion of 40% construction 10%
Completion of 60% construction 10%
Completion of 80% construction 10%
Completion of Project 50%
PAYMENT PLAN
DUBAI
THANK YOU