Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
2
JSC «RAO Rosneftegazstroy» - an engineering holding of
international level which provide services in the field of construction
of oil and gas complex facilities based on experience of previous
years with application of intellectual systems of project management,
new technologies and resources, creating new and unique facilities,
wholly meet the requirements of international standards.
Effective management of total production, financial and
intellectual resources which allows the company to hold intensive
policy on development of new projects where “RAO
Rosneftegazstroy” plays the key role is catalyst of its development
and implements the work on beneficial conditions.
RNGS – engineering holding international level
3
Main activities:
(Certification ISO 9001 & ISO 14000)
complex engineering projects
IT
project management
oil and gas construction, energy
construction of oil and gas industry
industrial and civil construction
design and development of oil, gas, gas condensate
fields
industrial production
logistic
financial and investment activities
INVESTMENT
ENGINEERING
CONSTRUCTION
RNGS BRANCHES
UK, Ukraine, Belarus, Latvia, Russia, Poland, Slovakia, Croatia,
Hungary, Venezuela, Ghana, China, Kazakhstan, Tajikistan, Iran,
Iraq, UAE, Nigeria, Libya, Colombia, Ecuador
4
Беларусь
Китай
Колумбия
Эквадор
Венесуэла
Нигерия
Гана
Ливия
ОАЭ
Великобритания
Россия
Хорватия
Германия
Иран
Ирак
Польша
Казахстан
Таджикистан
Словакия
Венгрия
Латвия
Украина
Equity structure
Offices in 19
countries
600 engineers
2000 workers
870 million
consolidated
annual revenue
Portfolio on $ 50
billion of projects
until 2025
450,000,000
shares
67%
Entities
5
33%
Top
managers
The production, intellectual and
financial resources of company
The potential success of the present-
future
Structure of RAO «RNGS»
Board of Directors General meeting
Board Chairman
Oil and gas construction
Industrial and
civil
construction
Production, oil and gas
construction
Machine and mechanism
leasing
Industrial production
Service
Executive body
Head office - Moscow
Branches and regional representative offices
RUSSIA
Saint-Petersburg, Kaliningrad,
Novosibirsk
Common Wealth Belorussia, Ukraine, Kazakhstan, Tajikistan
OVEARSEAS
Great Britain, Germany, Latvia, Poland,
Slovakia, Croatia, Hungary, Venezuela,
Ghana, China, Iran, Iraq, UAE, Nigeria,
Libya, Columbia, Ecuador
Audit committee
Engineering
Financial monitoring
and consulting
Informational services
Intellectual
services
Legal services
Social funds
6
RNGS – INTEGRATED GROUP: KEY STRUCTURES
“RNGS International” (UK)
“RNGS Clean Energy” (Великобритания)
“RNGS Energy” (Latvia)
“RNGS Construction” (Кипр)
«RNGS – ASIA» (Tajikistan \ Kazakhstan)
«Interneftegazinvest» (Hong Kong,
Austria)
«RNGS – AMICS» (UAE\Iran)
“RNGS Curacao Trade” (Venezuela)
«Interecoplant» (Belarus)
RNGS - Libya
RNGS - Minfepep (Colombia)
RAO «Rosneftegazstroy» RNGS –
«East» (Moscow) RNGS –
«Trading» (Moscow)
RNGS – «Engineering» (Moscow)
«Promgragdanstroy» (Moscow)
«Specnefteburgaz» (Moscow)
«Interneftegazspecstroy»
(Moscow)
«Ecorusprom» (Crimea)
RNGS – «Invest» (St. Petersburg)
«Interinvestservice»
(Moscow\Kiev)
RNGS - Energoil (Moscow)
RNGS Immobilien AG (Germany)
Москв
а
7
PARTNERSHIPS WITH LEADING
INTERNATIONAL COMPANIES IN THE WORLD
– BLACK & VEATCH (USA)
– PWS (USA)
– HUNDAI (SOUTH KOREA)
– Yenigun (TURKEY)
– Group of companies "Arhirodon" (Greece)
– Dongying Qihai Shiyou Gongcheng Company (China)
– China Geahouba Group International Engineering (China)
– Shandong Kerui Holding Group Co. (China)
– NPC International Ltd (Iran)
– National Iranian Oil Engineering and Construction Company
(Iran)
– Ministry of Petroleum (Iran)
– National oil company NOC (Libya)
– Grupo Viatelix S.L. (Spain)
8
Main historical milestones of RNGS
Mission: providing comprehensive world-class
engineering in areas of key competence of
services
2015
Successfully breaking
the 15 year milestone
RNGS continues to
expand its sphere of
competence and to
improve
knowledge base
Joint-stock company established on
the basis of oil and gas enterprises
of the former Ministry of oil and gas
construction
Ministry of oil
gas and
construction
of the USSR
Dr. Ivan Mazur
President
2001
ISO
9001
ISO
1400
EPCM-Контрактинг
Проектные инвестиции
9
Restructuring of the
company structure
and functions
1970
1999
2006
RNGS offers unsurpassed historical
experience
199516 padded main pipelines
563150 km of secondary and distribution pipelines
12068 km international pipelines
16 million cubic meters warehousing
1500 compressor and pumping stations
10
11
KEY COMPETENCE
12
Engineering
Material-technical
supply
Finance and Investment activity
Pipeline building
Onshore and special facilities oil and gas industry
Industrial and civil building
KEY COMPETENCE
13
Leasing of machinery
Ensuring environmental safety
Consulting services
Development and adaptation information technologies
Industrial and civil construction
Property management
HEALTH, SAFETY AND ENVIRONMENT
One of the main requirements is RNGS implementation and continuous improvement of
our health systems, safety and the environment (the HSE)
A fundamental condition underlying
successful achievements in this f ield
is to create a permanent,
does not stop the process,
characterized by simple principles:
13
Watch
Listen
Learn
Think
Decide
Achieved
Bring to a conclusion and checks
The priority task of the company - to ensure safe working conditions,
health care personnel and people living on the territory of
work, seeking to minimize the negative impact on the environment
PIPELINE CONSTRUCTION
Gas pipelines of high
and low pressure
Pipelines
Pipelines for the
transport of water
Water conduits of
high and low
pressure
14
Oil and gas refineries
Complex gas and oil
Compressor stations
Gas distribution station
Pumping stations
Tank Farms
Power plants
CONSTRUCTION LAND AND SPECIAL FEATURES OF
FUEL AND ENERGY COMPLEX
15
Industrial and civil construction
Development of real estate projects
Engineering survey
Design
Construction and equipping
Reconstruction of Buildings
Organization of supply of construction
materials
16
Development and construction of oil and gas
fields
In a "turnkey" RNGS develops and field development
17
Industrial infrastructure
construction
Exploration and production drilling
Trial operation
Project investment
Financial advisory
RNGS-ENGINEERING
Complex engineering services for fuel and energy
complex enterprises with application of leading engineer
and information technologies.
18
Design and development works
Scientific works
Development of price documentations
Development of new technological processes
ИНЖИНИРИНГ
Marketing
Material requirement planning
Strategy development and procurement procedures
Logistics
Project planning
Project control
Quality control
Procurement management
Safety measures, environmental protection
Commissioning planning
Organization of adjustment works
ADJUSTMENT WORKS PROCUREMENT
CONSTRUCTION MANAGEMENT
Information Technology for Development
of Regions
Information analysis support systems
Preparation, editing and printing activities
Design executive systems
Management
Advertising Services
20
Purchasing and delivery
Supply of materials and equipment
Supply of steel, plastic and enameled pipes for oil and gas projects under
construction
Deliveries to customers a full range of petrochemical and building products,
including welding equipment, mobile power station, cutting tools, press-
forging equipment, pipe fittings and other technical products
Warehousing, wholesale and agency services production and financial
activities
20
COMPETENCE IN LEASING SECTOR
Marketing services in the field of project oriented leasing of oil and gas equipment,
construction machines and mechanisms
Organization of leasing operations
Interaction management with leasing obtain companies in the field of oil and gas
Import outsourcing /export of industrial equipment , components and spare parts,
transport and technics for oil and gas complex enterprises
21
INVESTMENT AND FINANCIAL SECTOR ACTIVITIES
Marketing of financial markets
Financial and investment activities on loans and investment funds
Direct investment in realization of investment projects of RNGS
Mobilization of attracted and loans for financing huge investment projects
Services in the field of consulting investment
22
PRODUCTION OF OIL AND GAS EQUIPMENT
Group of companies «ROSNEFTEGAZSTROY-PROM»
Production and supply «EPC» of industrial and oil and gas equipment, as well as
provision of financing of production areas of water participants of financial-
industrial group RNGS-PROM
GC «RNGS-PROM»
СТРОЙПРОМГРУПП
23
GROUP OF COMPANIES
ROSNEFTEGAZSTROY-PROM
25
Petrochemical industry Oil and Gas construction Resources production Trade
Complex engineering, supply, construction of energy oil complex (EPC)
Production of industrial equipment (petrochemical, , energy industrial refining plants, steel
structures)
We identify an optimal technology and coordinate the constructional and installation works
selling individual equipment and technological installation.
We are the sales partner and related services in Russia and abroad
Module construction
We suggest solutions of assembly in accordance with requirements of Customer
RNGS-PROM provides services of industrial nature in Russia, Common Wealth, Middle East,
Africa and other regions
Equipment production
26
WATER TREATMENT FACILITIES Zelenograd. Moscow
Construction of sewage treatment plants with a complex full biological
treatment technology for SYMBIO
Performance of 140 thousand cubic meters. m.
The total cost of the project: 135 million Euro
Conditions of project realization : ВООТ
Payback: 13 years
26
Customer: Moscow water company
Investor: «SHV Helter Wassertechnik» (SHW)
EPC Contractor: RAO «Rosneftegazstroy»
DEVELOPMENT OF YURBENCHENSK BLOCK OF
YURBENCHENSK-TAKHOMSK OIL AND GAS
CONDENSATE FIELD IN THE EASTERN SIBERIA
Development of the field
Infrastructure facilities construction
Exploration and exploitation drilling
Industrial exploitation
Capital investment(I stage): 370 mln. USD
28
Customer: Eastern-Siberia oil and gas company,
RAO «Rosneftegazstroy»
EPC Contractor: RAO «Rosneftegazstroy»
Recoverable reserves НГК locations:
Oil: 280 mln. tn
Gas: 374 bln. cub. м3
Gas condensate: 30 mln. tn
PROJECT WATER SUPPLY MELEN
(Turkey)
In accordance with the agreement on
cooperation between ALARKO and JSC "RSP
Neftegazstroy" participated in the construction
of water pipe diameter 2540 mm from the tank
farm to the city of Melun Kinseli Viladis
29
The Customer- Ministry of Energy and Natural Resources
Кропоткино
Комсомольская
Астраханская
CASPIAN PIPELINE CONSORTIUM
Modernization "Astrakhan" existing pumping station
Demolition of existing production facilities, the construction
of a new pumping "Komsomolskaya" station
Construction of pump "Kropotkin" station
Contract Value: $ 120 million
30
The Customer Caspian Pipeline Consortium
EPC contractor: RAO "Rosneftegazstroy"
Construction of 3 pump stations on export oil pipeline
Tengiz - Novosibirsk
OIL PIPELINE «Zhulin-Nadvornaya» Ukraine
Contract cost: 78 mln. $
31
The Customer: "Ukrtransnafta" (Ukraine)
RNGS constructed pipeline "Zhulin-Nadvornaya" length of 80 km, with a
diameter of 20 ", including water obstacles
GAS PIPELINE DANEZH- VIDZHEAPUR (INDIA)
Length - 193 км
Diameter – 42”
Project cost - $ 127 mln.
32
Customer- GAS AUTHORITY OF INDIA LIMITED(GAIL)
Construction of the pipeline and facilities Danezh –
Vidzheapur infrastructure destination
CONSTRUCTION OF METANOL PLANT
Azerbaijan, Baku
Engineering
Project management / Construction
Equipment supply
Capacity - 500 tn/year
33
Customer - «AZ MENKO»
CIVIL ENGINEERING
Rosneftegazstroy as a developer,
investor and developer has
implemented a series of programs
and projects for housing and social
facilities in the regions of Russia and
CIS countries.
Over the past 15 years built and put
into operation more than 5 million.
M2.
12
35
Development of oil and gas licensed areas Orenburg region (Russia)
Construction Arhangelovskogo and Sunny license areas. Industrial
infrastructure construction.
Exploration and production drilling. Pilot operation.
The forecast of the production of hydrocarbons on Arhangelovskom and
sunny plot in the period 2016-2021 years
• Oil: 20,2 million bar
• Gas: 430 млн. м3
The total foreign currency fund: 63 units
Investment budget: $ 420 million
Arhangelovsky site. Recoverable reserves.
• Oil:. 30 million bar
• Gas: 0.3 billion m3
Sunny plot. Recoverable reserves.
• Oil:. 36 million bar
• Gas: 0.9 billion m3.
36
Project participants: INTERCOM GROUP \ RAO ROSNEFTEGAZSTROY
Development of oil and gas license areas
Construction Arhangelovskogo and Sunny license areas. Industrial
building infrastructure.
Exploration and production drilling. Pilot operation.
The forecast of hydrocarbon production
raw materials on Arhangelovskom and sunny plot
in the period 2016-2021 years
• Oil : 20,2 million barrels
• Gas: 430 million. M3
The total foreign currency fund: 63 units
Investment budget: $ 420 million
37
Arhangelovsky site • Recoverable reserves
• Oil:. 30 million bar
• Gas: 0.3 billion m3.
Sunny plot Recoverable reserves
Oil:. 36 million bar
Gas: 0.9 billion m3. Project participants: INTERCOM GROUP \
RAO ROSNEFTEGAZSTROY
Bitumen terminal in the Leningrad region \ Russia
BUILDING AUTOMATED BITUMEN TERMINAL
Terminal is aimed for receive, store, transfer, dozing and production of vast assortment of bitumen materials of 80
ths.tn. capacity
Polymer warehouse\containers\packing host
Tanks of bitumen storage: 30-40 ths. m
Tanks of end product: 20-40 ths. m
Production of bitumen mixtures: 10 tn\hour
Production of oxidative bitumen: 20-40
tn\hour
Project investment budget: 80-90 mln. $
Conditions of project realization: BOT
38
Customer: «Gazpromneft»
Investor: «CITIC Group» (China)
participants: RAO «Rosneftegazstroy» \
MARCON INGENIEURGESELLSCHAFT mbH
The investment project to build a plant for LNG production in Iran \ of Jask
RAO "Rosneftegazstroy" supported by National Iranian Gas Company (NIGC) the investor - developer to
build a plant for the production of LNG capacity of 600 thousand tons per year and logistic-distribution
infrastructure for the export of LNG and gas supply in remote areas.
LNG complex 600 ths. tn. capacity a
year, consits of two lines of 300 ths.
tn. LNG each a year
( I and II stages)
Systems of storage of 30 ths. м3
Gas pipelines: GTS – LNG plant 700 мм
diameter
Logistics and marketing infrastructure
Resource: natural gas from united
system of Iran’s gas supply
Project investment budget: 750 mln. $
39
Customer: National Iranian Gas Company
Project participants: RAO "Rosneftegazstroy» \ "Black & Veatch" (USA)
REFINERY PLANT
«Refinery Kirishi-2»
With the support of the Ministry of Energy (DOE order number 33-P on the
entry in the register of projected plants in the Russian Federation), RAO
"Rosneftegazstroy" takes part in the implementation of the project on
construction of a fuel and energy complex in Kirishi
Power refinery (Phase I) - 3 million tons / year
(II stage) – up to 12 mln. tn./year
Processing Depth: 85-95%
Square build on land: 130 hectares
Investment project budget (Phase 1): 3,6 billion USD
Project stage: Feasibility Study
40
Customer-Contractor: «ZAO NPZ KIRISHI-2» (51% stocks - RNGS)
Co-investor / Project participants: RAO «Rosneftegazstroy»
Leningrad region, Kirishi
STEAM GAS STATION «PERECHUGA» CROATIA
Within the Agreement with the Government energy company HEP
GROUP (Croatia) realization of the project of ebergy center in Osiek
city with construction of 2 new energy blocks in Perucha city.
The construction land area: 6,9 hectares
Capacity of 2 blocks: 450 mGW
Heat capacity : 160 mGW
Efficiency: 59,3%
Fuel: natural gas GTS
Project investment budget: 540 mln. €
41
Customer: HEP GROUP (Croatia)
Project participants: RAO «Rosneftegazstroy»\ “ANSALDO ENERGIA” (italy)
MODULAR INSTALLATION OF OIL REFINING OF UPN-20B
IRAN
Construction of low tonnage equipment for minimum volume of oil refining and
construction works for support of consumers by required resources in hardly accessible
provinces of the Islamic Republic of Iran.
Equipment capacity: 500 ths. tn. A year
Stucture: modular eqiopment with possibility of container transportation
Construction: 100% over ground equipment with minimum fundamental
works
Launch date after contract signing: 2 years
Investment budget: 17 mln. $
42
Customer-Contractor: JV with participation of RAO «Rosneftegazstroy»
HIGH-TECH BITUMEN MATERIAL PRODUCTION COMPLEX ORENBURG PROVINCE
Project of heavy oil and fuel oil refining enterprise establishment in polymer-
bitumen-viscous (PBV), WFLH (wide fraction of light hydrocarbon), vessel engine
fuel
Location: Perevolotskiy village, Orenburg province
Land: 22 hectare
Project capacity on starting material:
Oil/Crude oil: I Stage of the complex: 50 thousand tn. per year
Project stage: Construction
Project total cost: 85 mln. USD
Cost of I stage : 50 mln. USD
Period of construction of I stage: 2 years
Period of return (not taking construction into account): 3,9 years
Participants:
LLC «Bitumen Eurasian company\ RAO
«Rosneftegazstroy»
43
COMPRESSOR STATION TURKMENISTAN
Integrated design and construction of a compressor station (CS) on the
Turkmenistan-Afghanistan-Pakistan-India "turnkey"
Performance for sales gas: 33 billion cubic meters per year
Compression of gas: 100 kg \ cm2
Pipe diameter pipeline: 1,420 mm
Gas compressor units: supplier of "General Electric Energy
Cost of Contract: $ 180 million
44
Customer: SC "Turkmengaz"
Participants: International EPC consortium with
the participation of RAO "Rosneftegazstroy
GAS-CHEMICAL COMPLEX IN THE REPUBLIC OF SAKHA Sakha
Investment project for the production of synthetic liquid products from
natural gas using GTL technology
Location: Aldan
Production volume 1150 tons per year
500 thousand tons of synthetic liquid fuels
450 thousand tons of methanol
200 thousand tons of ammonia
Electricity generation 200 MW
Natural gas conversion technology. Method HOLDOR TOPSOE
Raw materials: natural gas Chayandinskoye CC m \ p 1.2-1.5 billion m3
The investment budget for the project: 990 million USD
45
The base of the project: Agreement with the Republic of Sakha Yakutia
RAO "Rosneftegazstroy" for the organization of processing industries in the
region
GAS PIPELINE "TAJIKISTAN-CHINA" (LINE D)
RAO "Rosneftegazstroy" within the framework created by the company "Enigyun" (Turkey),
the International Consortium "TADZHIKGAZPROEKT" and republican companies taking part
(on EPC) in the construction of the gas pipeline China-Tajikistan in the territory of the
Republic of Tajikistan.
Length: 410 kilometers, pipe diameter 1219 mm
The project includes: driving of 73 km of tunnels, 17 km of river crossings, construction of
three compressor stations with a pressure of 12 MPa
Project cost: 3,2
bln. $
46
Customer:JV "Trans-Tajik Gas Pipeline
Company Ltd Ltd
REFINERY «RDF» Pacific Eloy Alfado (Ecuador)
Construction, technical maintanance,terminal exploitation and regasification in Monteverde
for provision the plant by gas on produc tion pf urea in Ecuador .
Project stage - Feasibility study
System capacity - 30 MMSCFD / 850 ths.м3/day
Cost - 280 mln. $
Payback - 6.3 years
Profitability - 14.44%
Financing - 100% attracted/
loan funds
47
Project participants: MINISTRY OF HYDROCARBONS (Ecuador)
JVA RNGS MINFEFE SA / ROSNEFTEGAZSTROY
LPG TERMINAL (Ecuador)
Operation and maintenance of the terminal and storage of LPG in Monteverde –Ecuador in
order to meet requirements in the southern region of the country
Facility operation :
• Coastal terminal of LPG
Platform
Tank park of Propane/Butane/LPG
Pump
Pipeline LPG L-124 km
Production - 6 tn./year
• Storage terminal
Tank park
Bunkering insfrastructure
Investment - 700 $
Operation period - 25 years
Project payback – 6-12 years
Profitability - 20%
48
Project participants: Ministry of hydrocarbon materials (Ecuador)
JVA RNGS MINFEFER SA / Rosneftegazstroy
REFINERY
«RDF» Pacific Eloy Alfado (Ecuador)
(Ecuador) Construction, management, maintenance and operation of
refinery «RDF» of capacity 18 mln. t/year
Project stage: Feasibility study
Location: Monta Montekristo
Project structure: Refinery – 300 ths. bbl a day
Oil terminal / tanks
Oil pipeline
Products pipeline
49
Refinery Project cost - $ 14.4 billion.
Building time - 4 years
Payback period - 8.5 years
Profitability - 16.7%
Useful life - 31 year
Terminal Project cost - 600-800 billion $
Building time - 4 years
Payback period - 9,9 years
Profitability - 12,9%
Useful life - 31 year
Financing of the project - 100% borrowed / loan funds of the investor
Project participants: MINISTRY OF HYDROCARBONS (Ecuador)
JVA RNGS MINFEFE SA / ROSNEFTEGAZSTROY
Gas-chemical complex on production of urea (Ecuador)
Construction, management, maintenance and operation of a gas-chemical complex for the
production of urea in Ecuador
Location: Monteverde
Capacity of the plant: 500 thousand tons / year
Technology: Holder Topsae / Linde / KBR
Need 30 MMSFD / 400 th. M3 / day
natural gas
Project cost - 1.1 billion $
Construction time - 3 years
Payback period - 7.4 years
Profitability - 11%
Useful life - 30 year
Financing - 100% borrowed / loans investor means
50
Project participants: MINISTRY OF HYDROCARBONS (Ecuador)
JVA RNGS MINFEFER SA / ROSNEFTEGAZSTROY
TECHNOLOGY TRANSFER (Key products)
Mini LNG plant
Russian regions for pilot realization :
S. Petersburg
Ekaterinburg
Murmansk
Kaliningrad
Yakutia
Irkutsk
Far East
Siberia
51
Plant’s production from 50,000 to 1,500,000 tn. a year
OIL LOADING TERMINAL – JASK \ ISLAMIC
REPUBLIC OF IRAN
Construction of oil loading terminal of 30 mln. bbl of global standards
on the shore of Oman Gulf
Tank farm: up to 30 millions of crude oil storage (3 stages by 10 million bbls.)
Tank loading units TLU systems CALM Coastal\Sea pipelines and facilities
Energy equipment
Tanker deadweight: 150 - 300 ths. tn. Investment
budget: 0,9 bln. $
Conditions of project realization:
Financial scheme: ВООТ
Complex rent by NIOC for transshipment of oil\oil
products
Project stage: Engineering
Customer: National Iranian Oil Company (NIOC)
52
Project participants: RAO «Rosneftegazstroy»/Marcon/ Pension fund
of the Islamic Republic of Iran as an international consortium
OIL TERMINAL – JASK \ IRAN
Participants of the investment project
53
National Iranian Oil Company (NIOC)
Agreement ВОТ \ leasing contract
for complex rent
RAO «Rosneftegazstroy» (Russia) \ “Marcon”
(Germany)
Complex engineering \ organization of
financing \ project management \ supply of
m\k RVS and equipment of Russia \ project
co-investors
Pension fund of Iran, «Zalvand» company
(Iran)
Private-government partnership\
Project co-investors
Zalvand company (Iran)
Project co-investor \ construction and special
works
Archirodon group of companies (Greece)
Construction of coastal and sea facilities
(port, terminal, pipeline)
Sberbank (Russia) Project financial consultant
Sberbank \ Vnesheconombank (Russia)
International and Asian banks
Potential creditors of the project based on the
matrix of supply \ services
Trade terminal complex
Moscow province, Solnechnogorskiy area 650000 m2
Construction of international free economic zone consists of 2 sections:
Trade-exhibition center
Center of sail and receive of goods
The land area – 17 hectares
Project cost – 0,9 bln. $
54
Customer: «RTEC Free Custom Zone»
Co-investor / Contractor: RAO «Rosneftegazstroy»
55
«RAO Rosneftegazstroy» is open for cooperation with representatives
of Russia and International business based on mutual respect and
economic efficiency and in this regard is solely attractive strategic
partner in Russia, Common Wealth and Far Abroad markets
Russia, 119049,
Moscow city, str.
Donskaya 15
Tel/Fax:
+7 (499) 213-34-08
E-mail: [email protected]
Great Britain, London 38
Park Street, Mayfair
London W1K 2JF, UK
Tel.: +44 (207) 297-43-56,
Fax: +44 (207) 297-43-50
E-mail: [email protected]
Russia, 199106, Saint-
Petersburg, В.О., 23 Line,
д. 2 «А»
Tel/Fax: +7 (812) 677-31-89
E-mail: mao@rngs-
invest.ru