JOB SAFETY ANALYSIS ( HYDRO JETTING ) Date: Prepared by : Rajesh Operation / Process : Hydro Jetting of pipelines S/No OPERATION SEQUENCE POTENTIAL HAZARDS / RISKS CONTROL MEASURES ACTION BY 1 a. Ensure a valid work permit b. Refer to Hydro Jetting Procedure Client Rep/ Superviso r 2 Check the drawing & test pack / line no identified accordance with the requirement a. Hydro jetting of a wrong test pack / line no a. Check and ensure that the hydro jetting is carried on a correct test pack / line no. Client Rep/ Superviso r 3 To select & prepare all the hydro jetting equipment & pipe fittings a. Pipe Fitting / hose burst off, injury other a. Select the right materials and equipment. Superviso r Signature: Approved by: Signature: Rev 0 Reviewed by: Page 1 of 3

Jsa Hydro Jetting

Embed Size (px)

DESCRIPTION

HSE

Citation preview

Date: 11-02-04

JOB SAFETY ANALYSIS ( HYDRO JETTING )

Date: Prepared by : Rajesh

Operation / Process : Hydro Jetting of pipelines

S/NoOPERATION SEQUENCEPOTENTIAL HAZARDS / RISKSCONTROL MEASURESACTION BY

1a. Ensure a valid work permit

b. Refer to Hydro Jetting Procedure

Client Rep/

Supervisor

2Check the drawing & test pack / line no identified accordance with the requirementa. Hydro jetting of a wrong test pack / line noa. Check and ensure that the hydro jetting is carried on a correct test pack / line no.Client Rep/

Supervisor

3To select & prepare all the hydro jetting equipment & pipe fittingsa. Pipe Fitting / hose burst off, injury othera. Select the right materials and equipment.Supervisor

b. Unauthorized entry of personnela. Barricade testing area at least 1 meter and display warning sign. b. Highlight in the VSCCSupervisor

4To hydro jet the pipe lines to 100 bar (1500 psi) to check leakage( 1st inspection )a. Eyes / body injurya. Wear PPE (Safety goggle / Full face shield, Safety Helmet, Safety Boots, Overalls) Worker

b. Personnel hit by pressurized itemsa. Display warning signboard/barricade to be at least 1 meter to keep other personnel away.Supervisor

c. Failure of pressure gauge

a. Use calibrated pressure gauge. b. Watchman to check and ensure not to over pressurized Supervisor

d. Nearby Electrical items hit by water/pressurized items

a. Protect electrical items prior to start up Supervisor

5Increase to the required pressure ( 6,000 to 10,000 psi ) by inserting the nozzle into the piping system (full)a. Leakage and causing flooding onto the surroundinga. Line check prior to commencement of hydro jetting

b. Standby diaphragm pump to pump out the water.

c. Ensure containment tray and pump in good condition. Supervisor

b. Personnel hit by pressurized itemsa. Display warning signboard/barricade to be at least 1 meter to keep other personnel away.

b. Install Protective Barrier made of wooden material to block any pressurized items coming out at the open end of pipe. Supervisor

c. Failure of pressure gaugea. Use calibrated pressure gauge. b. Watchman to check and ensure not to over pressurized Supervisor

d. Working at heightsa. Ensure the Staging had been certified SAFE TO USE.

b. Wear safety harnessWorker

6Continue hydro jetting till the pipe lines are clear from debris and drain the clear water after collecting the debris through the filter bags. Finally the used filter bags will be disposed into the rubbish bin.a. Unauthorized entry of personnela. Highlight in the VSCC and display warning signboard/barricade to be at least 1 meter. Supervisor

b. Eyes / body injurya. Wear PPE (Boots, safety goggle and/ or Full face shield, overalls.)Worker

7Visual inspection on pipelinesa. Personnel in contact with flushing mediuma. Highlight in the VSCC and display warning signboard / barricade to be at least 1 meter.. Supervisor

b. Eyes / body injurya. Wear PPE (Boots, safety goggle and/ or Full face shield, overalls. Worker

8To remove temporary flanges from the pipe lines after flushinga. Personnel in contact with flushing mediuma. Highlight in the VSCC and display warning signboard/ barricade to be at least 1 meter.. Supervisor

b. Eyes / body injurya. Wear PPE (Boots, safety goggle and/ or Full face shield, overalls.) Worker

9To reinstate the piping system.c. Working at heightsa. Ensure the Staging had been certified SAFE TO USE.

b. Wear safety harness.Worker

a. Hand injury by improper use of tools and material handlingc. a. Wear hand gloves. b. Use right tool for the work.Worker

10House keeping a. Trip and fall a. Run hoses in proper manner

b. Keep all material and tools after work

Worker

11Review local conditions

Abbreviations:

1. VSCC Vessel Safety Coordination Committee

2. PPE - Personal Protective EquipmentSignature:

Approved by: Signature: