    Painting Methods

    at Boiler StructurePaiton Expansion Project

    (815MW Coal Fired Power

    Plant

    Prepared by,

    A. Aris HidayatCoating Advisor_Protective Segment

    PT. Jotun Indonesia

  • 7/24/2019 Jotun Presentation English

    2/8

    !" Sur#ace Preparation

    !"1" $a%aged !rea& 'ust !rea )*ncoated !rea

    Fresh ater ashing

    I! oi" # grease on the ob$ect, !resh aterashing add ith detergent and then c"eanith !resh ater ashing

    Poer too" c"eaning to min SSPC%SP&

  • 7/24/2019 Jotun Presentation English

    3/8

    !"+" Coated !rea

    Fresh ater ashing

    I! oi" # grease on the ob$ect, !resh aterashing add ith detergent and then c"ean

    ith !resh ater ashing 'a(e roughness ith sand paper

  • 7/24/2019 Jotun Presentation English

    4/8

    B" Paint Mixing'i) the paint in the container *comp A #

    comp + by mechanica" stirring rod

  • 7/24/2019 Jotun Presentation English

    5/8

    -se the proper thinner *re!er to Jotunstechnica" data sheets

    +e aare !or term /pot "i!e0 o! paints +arrier 11 2 34 hrs *3& deg C

    Penguard 'idcoat 'I5 2 3 hrs *3& deg C Hard Top 6P 2 7.8 hrs *3& deg C

  • 7/24/2019 Jotun Presentation English

    6/8

    C" Paint !pplication9o not use ro""er !or the primer coat

    app"ication

    The temperature o! the substrate shou"dbe min & deg C above de point o! the air

    :e"ative humidity ma) ;8 m

    Cross Cut Test *IS5 34>@, c"assi=cation o!resu"t min />0

    isua" Chec( !rom sagging, dry spray, orangepee" and other !ai"ure coating.

    Fabricator must issue painting report, itnessby Jotun