José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011 Infrastructure Portfolio Water and Sanitation Projects 2010 - 2011

José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

Embed Size (px)

Citation preview

Page 1: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation

Mexico City, January 20, 2011

Infrastructure PortfolioWater and Sanitation Projects 2010 - 2011

Page 2: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

Infrastructure Projects

2. Wastewater Treatment Plant“El Caracol”.

1. “El Zapotillo” Aqueduct, Jalisco and Guanajuato.

3. Seawater Desalination Plant in Ensenada, Baja California

22

Page 3: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

Project

Total Investment(Millions of

USD)

PSP Bid Issue Decision

El Zapotillo Aqueduct, Jalisco – Guanajuato

420 51% September, 2010

2nd Quarter

2011

“El Caracol” WWTP 165 51%2nd Quarter

20113rd Quarter

2011

Seawater Desalination Plant in Ensenada, Baja California

35 60%2nd Quarter

20113rd Quarter

2011

Total Investment 1,000 61%

33

Infrastructure Projects

Page 4: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

4

This project will benefit 1.5 million people from both states

1. Zapotillo Aqueduct Project, for drinking water supply

to Jalisco and Guanajuato

Page 5: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

Concept Data

Aqueduct 140 km / ø 98” (2,5 m)

Pumping Plants 2 plants to overcome a 500 m - height

Desinfection Plant Capacity of 87 mgd * (3,8 m3/s)

Storage Tank 26,3 mg (100 000 m3)Macro-circuit forwater distribution

42,4 km

Overview

Construction Period 2,5 yearsOperation Period 22,5 yearsInvestment, (% PSP) 420 m USD, (51%)

55

This works will benefit to 1,5 million residents from both states

1. Zapotillo Aqueduct Project, for drinking water supply

to Jalisco and Guanajuato

* US Gallons

Page 6: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

Expected Benefits

66

1. Zapotillo Aqueduct Project, for drinking water supply

to Jalisco and Guanajuato

Meeting the current and future drinking water demands of 1,1 million inhabitants in León, Guanajuato, and 400 000 more in Los Altos de Jalisco.

To achieve sustainability for the regional aquifers by reducing water extraction for human consumption.

Page 7: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

7

2. “El Caracol” Wastewater Treatment Plant

Land

for

the

WW

TP

31 h

as.

Outer circuit

State of Mexico

Gra

nd D

rain

age

Can

al

Las Américas mall

LyFC

1 ha

Polygon 222 ha

Pumping plant

State of Mexico D.F.

Location map

Page 8: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

8

2. “El Caracol” Wastewater Treatment Plant

Description:1. Catchment of 91 mgd* (4 m³/s) of wastewater from the

Grand Canal and the Eastern Drainage Tunnel and piping to the treatment plant in El Caracol inTexcoco.

2. Wastewater treatment plant with two modules:

• Secondary treatment:for irrigation and soil restoration (23 mgd* - 1m3/s), for the Ecological Park of Texcoco Lake (23 mgd* - 1 m3/s), and for commercial, industrial and municipal reuse (23 mgd* - 1 m3/s).

• Advanced treatment:for the injection and recharge of aquifers (23 mgd* - 1 m3/s).

Expected

Benefits

To restore the good conditions of the surface water bodies and streams that receive wastewater

Page 9: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

9

2. “El Caracol” Wastewater Treatment Plant

Conventional treatment module for irrigation

(68 mgd*)

Advanced treatment module for recharge

(23 mgd*)

Headworks

Schematic water diagram

* US Gallons

Page 10: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

10

2. “El Caracol” Wastewater Treatment Plant

Components of the Project Investment

Wastewater Treatment Plant• for the Lake Texcoco Ecological Park and agricultural

irrigation37

• for municipal, commercial and industrial reuse 25• for aquifer recharge 103

Total 165

Summary of investments

Investment, (% PSP) 165 m USD, (51%)

Page 11: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

11

Océano Pacífico

Pacific Ocean

3. Seawater Desalination Plant in Ensenada, Baja California

Page 12: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

Concept Data

Desalination Plant (DP)

Supplying of 6 mgd (0,25 m3/s)

Conduction lines:

DP to El Gallo

El Gallo to Revolution

Rejected water

17,5 Km

17,5 Km

3,2 Km

Underwater Discharge pipe 0,9 Km

Overview

Construction Period 2,5 yearsOperation Period 22,5 yearsInvestment, (% PSP) 35 m USD, (60%)

1212

3. Seawater Desalination Plant in Ensenada, Baja California

Page 13: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

1313

3. Seawater Desalination Plant in Ensenada, Baja California

Expected Benefits

Meeting the current and future drinking water demands of 96 000 inhabitants in Ensenada, Baja California.

To achieve sustainability of regional aquifers by reducing water extraction from pumping wells.

Page 14: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

There are more than 800 municipalities in Mexico with more than 20 000 inhabitants, which can be considered in this PSP scheme.

It is possible to promote the operation and management of municipal water systems.

A number of municipalities can be grouped together to obtain savings.

1414

PSP in Integral Management at Water Utilities

Page 15: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

1515

ProjectCapacit

y(mgd)

Capacity

(m3/s)

Total Investment

(million dollars)

PSP(%)

Desalination Plant in La Paz, Baja

California Sur5 0,2 30 70%

Desalination Plant in Guaymas, Sonora 10 0,4 45 70%

Desalination Plants in Tijuana and

Rosarito, Baja California57 2,5 250 60%

Efficiency Improvement Programs:

Tuxtla Gutierrez, Chiapas;

San Luis Potosí, SLP;

Celaya, Guanajuato;

Zihuatanejo, Guerrero.

- 180 60%

Total Investment, (% PSP) 670 59%

Other Potential Projects 2010 - 2011

Page 16: José Ramón Ardavín, Deputy Director General for Water Supply, Sewerage and Sanitation Mexico City, January 20, 2011

Thank you for your attention.

www.conagua.gob.mx

Proyectos Estratégicos(Strategic projects)

http://www.conagua.gob.mx/CONAGUA07/Noticias/SeguimientoPNI.pdf