WELCOME…WELCOME…
• Thank you for joining us• Please sign in• Tonight’s topic…
How we plan to meet the County’s future water needs while protecting
the aquifer for generations to follow.
Key requirements of Key requirements of WRAP Part IIWRAP Part II
• Descriptions of new water supply sources and strategies to meet projected water demands;
• Description of infrastructure requirements for each new water supply source;
• Timelines for design/construction of infrastructure projects;
• A letter from a surface water or alternative source supplier indicating availability of water and willingness to meet the LVGUs’ demands, as applicable;
Key Requirements of Key Requirements of WRAP Part IIWRAP Part II
• Description of costs and methods of financing water supply and infrastructure;
• Preliminary engineering of infrastructure necessary to meet water demands for the January 1, 2015;
• Conceptual engineering of the infra-structure necessary to meet future
water demands beyond the 1/1/2015 initial conversion date;• A copy of the written agreements for participants in a Joint WRAP.
Continued…
Section 2 -- Section 2 -- Water DemandWater Demand
Existing and Future WRAP Customer Water Demand
0
50,000
100,000
150,000
200,000
2005 2015 2025 2035 2045
Wa
ter
De
ma
nd
(a
fpy
)
Section 3 – Evidence of Availability Section 3 – Evidence of Availability and Willingness to Supply Waterand Willingness to Supply Water
Memorandum of Understanding is being developedbetween the City of Houston and SJRA.
Section 4 – InfrastructureSection 4 – Infrastructure
2015 – Raw water intake structure and water treatment plant at Lake Conroe.
In the first phase, begin delivering surface water to The Woodlands
and City of Conroe.
Section 5 – Program CostsSection 5 – Program Costs
Total Project CAPITAL Costs forPreferred Alternative T2C1W1
Future Costs ($ millions)
2015 2025 2035 2045
$480 $509 $712 $809
CAPITAL COSTS:• Planning, permitting, design and special studies/services• Construction• Construction management, testing and inspection• Environmental mitigation• Land/easements• Inflation• Legal and Financing• Contingencies
Section 5 – Program CostsSection 5 – Program Costs
• Debt Service• Operations and Maintenance• Purchased Water (Including reservation fees)• Reserve Costs
Total Project ANNUAL Cost for Preferred Alternative T2C1W1
Future Value ($ millions)
2015 2025 2035 2045
$56 $145 $284 $480
Section 6 – Section 6 – Financing AlternativesFinancing Alternatives
Potential Financing Alternatives Include:Potential Financing Alternatives Include:• Open Market Bonds• TWDB WIF Deferred Low Interest Loans• TWDB WIF Construction Loans• Other State/Federal Programs
Section 6 – Section 6 – Financing AlternativesFinancing Alternatives
Potential Payment Alternatives Include:Potential Payment Alternatives Include:• Legislated GRP fee• Long-term contract between SJRA and Customers
Section 7 – Program Schedule -- Traditional Project DeliverySection 7 – Program Schedule -- Traditional Project Delivery
Section 7 – Accelerated / Alternative Project DeliverySection 7 – Accelerated / Alternative Project Delivery
You are invited to attend an important meeting!You are invited to attend an important meeting!
Water Conservation Water Conservation WorkshopWorkshop
February 12, 2009February 12, 20099 a.m. – 4 p.m.9 a.m. – 4 p.m.
Hosted and co-sponsored Hosted and co-sponsored byby
SJRA,WJPA, LSGCDSJRA,WJPA, LSGCDFeaturing….Featuring….
• State and National State and National SpeakersSpeakers
• No Admission ChargeNo Admission Charge• Additional Details, Additional Details,
Agenda, Agenda, Speaker Information OnlineSpeaker Information Online
• Register Online…Register Online…
www.WaterConservationWorkshops.www.WaterConservationWorkshops.comcom
The water we conserve today can serve us tomorrow…The water we conserve today can serve us tomorrow…
Potential Source Study
•
SJRA Water RightsSJRA Water Rights
LocationPermitted
Diversion (afpy)Permitted Use Priority
Lake Conroe
22,000 Municipal 1959, 1965
9,500 Industrial 1959, 1965
1,833 Mining 1959, 1965
Run-of-River at Lake Houston 55,000Municipal, Industrial, Irrigation
1942
Run-of-River at CWA Pump Station on Trinity River
56,000 Multiple Use1917 thru
1936
Run-of-River at CWA Pump Station on Trinity River
30,000 Multiple Use 1914, 2004
Reuse at Lake Houston from Wastewater Effluent from SJRA’s three Woodlands WWTPs
14,944 Multiple Use 2004
Lake Houston 14,000 Multiple Use 2003
Run-of-River at Lake Houston
(Pending)40,000 Multiple Use 2003
Tri
nit
y R
iver
Tri
nit
y R
iver
Trinity RiverTrinity River
West Fork
San Jacinto River
West Fork
San Jacinto RiverLuce Bayou
Luce Bayou
Highlands 80,000 afpy
Montgomery County25,000 afpy– 201550,000 afpy – 202575,000 afpy– 2035100,000 afpy- 2045
Surface Water Supply Surface Water Supply DemandsDemands
Tri
nit
y R
iver
Tri
nit
y R
iver
Trinity RiverTrinity River
West Fork
San Jacinto River
West Fork
San Jacinto River
Luce Bayou
Luce Bayou
SJRASJRA
COH
Water Rights TradeSJRA Trinity River Rights for
COH Lake Conroe Rights
SJRA Trinity Rights
COH LakeConroe Rights
Tri
nit
y R
iver
Tri
nit
y R
iver
Trinity RiverTrinity River
West Fork
San Jacinto River
West Fork
San Jacinto RiverLuce B
ayou
Luce Bayou
Water Rights TradeSJRA San Jacinto Rights for
COH Lake Conroe Rights
COH LakeConroe Rights SJRA
SJRA San Jacinto Rights COH
Tri
nit
y R
iver
Tri
nit
y R
iver
Trinity RiverTrinity River
West Fork
San Jacinto River
West Fork
San Jacinto River
Luce Bayou
Luce Bayou
Purchase of COH Lake Conroe Rights
$ COH COH LakeConroe Rights
SJRA
Tri
nit
y R
iver
Tri
nit
y R
iver
Trinity RiverTrinity River
West Fork
San Jacinto River
West Fork
San Jacinto River
Luce Bayou
Luce Bayou
SJRA $ COH
COH LakeConroe Water SJRA
SJRA Participation in Luce Bayou for COH Lake Conroe Water
Tri
nit
y R
iver
Tri
nit
y R
iver
Trinity RiverTrinity River
West Fork
San Jacinto River
West Fork
San Jacinto RiverLuce Bayou
Luce Bayou
Long-term Water Supply Contract With NHCRWA
COH
$
SJRA
NHCRWA
Tri
nit
y R
iver
Tri
nit
y R
iver
Trinity RiverTrinity River
West Fork
San Jacinto River
West Fork
San Jacinto River
Luce Bayou
Luce Bayou
Long-term Water Supply Contract For COH Lake Conroe Water
SJRA $ COH COH LakeConroe Water
Tri
nit
y R
iver
Tri
nit
y R
iver
Trinity RiverTrinity River
West Fork
San Jacinto River
West Fork
San Jacinto River
Luce Bayou
Luce Bayou
Long-term Water Supply Contract For TRA Trinity River Water
TRA Water
SJRA $ TRA
Tri
nit
y R
iver
Tri
nit
y R
iver
Trinity RiverTrinity River
West Fork
San Jacinto River
West Fork
San Jacinto River
Luce Bayou
Luce Bayou
Long-term Water Supply Contract For COH Lake Conroe Water and TRA
Replacement Water
$ TRACOH
TRA Water
COH LakeConroe Water SJRA
Trinity River
Trinity River
Trinity RiverTrinity River
West Fork San Jacinto River
West Fork San Jacinto River
Luce Bayou
Luce Bayou SJRA TrinityRights
SJRA Trinity River Rights for Montgomery County
Potential Source Study
•
Capital CostsCapital Costs
Current SJRA Conroe Rights (Beginning 2015) + Contract COH
Water In Conroe (Beginning 2025)+ SJRA's Trinity River
Rights Via Luce Bayou (2055)
Current SJRA Conroe Rights (Beginning 2015) + Contract TRA
Water From Trinty U/S of Livingston (Beginning 2025) + SJRA's Trinity River Rights Via
Luce Bayou (2055)
Current SJRA Conroe Rights (Beginning 2015) + Contract COH Water In Lake Conroe and TRA
Water From Trinty U/S of Livingston (Beginning 2025) + SJRA's Trinity River Rights Via
Luce Bayou (2055)
Contract Imported Groundwater (Beginning 2015) + Current SJRA Conroe Rights (Beginning 2045) + SJRA's Trinity River Rights Via
Luce Bayou (2055)
Capital Costs (2008 Dollars) Capital Costs (2008 Dollars) Capital Costs (2008 Dollars) Capital Costs (2008 Dollars)
Phase
2009-2014 Planning $100,088,000 $100,088,000 $100,088,000 $80,510,0002015 $313,002,000 $313,002,000 $313,002,000 $246,547,0002025 $63,690,900 $321,172,950 $346,192,350 $68,652,1502035 $252,913,500 $252,913,500 $252,913,500 $269,415,3002045 $154,747,950 $154,747,950 $154,747,950 $209,321,7002055 $594,922,650 $594,922,650 $594,922,650 $594,922,650Total $1,479,365,000 $1,736,847,050 $1,761,866,450 $1,469,368,800
Capital Costs (Dollars in Year Constructed)
Capital Costs (Dollars in Year Constructed)
Capital Costs (Dollars in Year Constructed)
Capital Costs (Dollars in Year Constructed)
Phase2009-2014 Planning $110,347,000 $110,347,000 $110,347,000 $88,762,0002015 $399,479,000 $399,479,000 $399,479,000 $314,664,0002025 $132,409,000 $667,696,000 $719,709,000 $142,723,0002035 $856,455,000 $856,455,000 $856,455,000 $912,336,0002045 $853,592,000 $853,592,000 $853,592,000 $1,154,622,0002055 $5,345,385,000 $5,345,385,000 $5,345,385,000 $5,345,385,000
Present Worth Value (2015 thru 2060) (2008 Dollars)
Present Worth Value (2015 thru 2060) (2008 Dollars)
Present Worth Value (2015 thru 2060) (2008 Dollars)
Present Worth Value (2015 thru 2060) (2007 Dollars)
$2,996,691,827 $3,461,237,563 $3,900,374,038 $5,481,265,502
$0.00
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
$35.00
$40.00
$45.00
20
09
20
12
20
15
20
18
20
21
20
24
20
27
20
30
20
33
20
36
20
39
20
42
20
45
20
48
20
51
20
54
20
57
20
60
Wa
ter
Ra
te P
er
10
00
Ga
l
Year
Countywide Alternatives- Unit Cost Comparisons - Future Value
SJRA + CoH Surface Water
SJRA + TRA Surface Water
SJRA + CoH Surface Water +TRA Replacement Surface Water
Imported Groundwater + SJRA Surface Water
$0.00
$2.00
$4.00
$6.00
$8.00
$10.00
$12.00
$14.00
20
09
20
12
20
15
20
18
20
21
20
24
20
27
20
30
20
33
20
36
20
39
20
42
20
45
Wa
ter
Ra
te P
er
10
00
Ga
l
Year
Countywide Alternatives - Unit Cost Comparisons - Future ValueWithout Imported Groundwater Alternative
SJRA + CoH Surface Water
SJRA + TRA Surface Water
SJRA + CoH Surface Water +TRA Replacement Surface Water
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
$3.50
$4.002
00
9
20
12
20
15
20
18
20
21
20
24
20
27
20
30
20
33
20
36
20
39
20
42
20
45
20
48
20
51
20
54
20
57
20
60
Wa
ter
Ra
te P
er
10
00
Ga
l
Year
Countywide Alternatives- Unit Cost Comparisons - 2008 Dollars
SJRA + CoH Surface Water
SJRA + TRA Surface Water
SJRA + CoH Surface Water +TRA Replacement Surface WaterImported Groundwater + SJRA Surface Water
$0.00
$0.50
$1.00
$1.50
$2.00
$2.502
00
9
20
12
20
15
20
18
20
21
20
24
20
27
20
30
20
33
20
36
20
39
20
42
20
45
Wa
ter
Ra
te P
er
10
00
Ga
l
Year
Countywide Alternatives - Unit Cost Comparisons - 2008 DollarsWithout Imported Groundwater Alternative
SJRA + CoH Surface Water
SJRA + TRA Surface Water
SJRA + CoH Surface Water +TRA Replacement Surface Water