1 Installation & Environment Division 26 Jul 2016 Joint Technology Exchange group MCLB Albany Energy Program

Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

1

Installation & Environment Division

26 Jul 2016

Joint Technology Exchange groupMCLB Albany Energy Program

Page 2: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

2

Installation & Environment Division

Marine Corps Logistics Base, Albany

2

Page 3: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

3

Installation & Environment Division

MCLB LFGE Project Dashboard Benefits for MCLB and County

3.3 Million BTU/Hr heat recovery steam generator produces steam from exhaust heat

10 Million BTU/Hr of steam production from renewable fueled boilers

Constructed facility for LEED Silver certified

20 year agreement with county government for Landfill Gas at a fixed rate

22 year performance guarantee with more than $64 million in guaranteed savings to the government

19% of MCLB Albany’s energy comes from renewable sources

Offsets 52,737 MMbtu of natural gas consumption annually

Offsets 42,006 MMbtu of electric power consumption annually

Exceeds EPACT05, EISA2007 and EO 13423 goals for renewable energy and on-site generation

Energy Security and Energy Reliability enhanced by dual-fuel generation capacity

Ability to operate in an “island mode” on natural gas

$5 million guaranteed revenue to Dougherty County

Reduces greenhouse gas emissions by 19,200 tons annually

• Scope Used DOE Energy Savings Performance Contract

(ESPC) Vehicle

Installed a dual fuel (LFG/NG) low-energy fuel

generator with a heat recovery steam generator

Installed two dual fuel (LFG/NG) boilers to burn

excess LFG

Installed a LFG compression/ dehydration station at

the County landfill

Installed over three miles of pipe between the

Landfill and LFGE Facility

Page 4: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

4

Installation & Environment Division

MCLB Biomass Project Dashboard

• Steps to Accomplish

– Complete application to do an ESPC (use ESPC for USG’s capital outlay – construct & operate 8.5MW steam to electric generator and distribute to MCLBA grid)

– Power Purchase Agreement (MCLBA purchase steam from P&G)

– No cost land lease for ESPC construction (same as LFGE lease with the County)

– Complete application for Distribution Interconnection with Georgia Power

– NEPA & permits (P&G and MCLBA shared)

• Benefits to USMC and P&G– 30 years of experience in feedstock and

logistics (P&G assumes 100% of risk)

– P&G responsible for biomass permitting

– MCLBA responsible for NEPA/air permit for generator

– P&G and USMC unable to construct and operate larger scale biomass separately, but economics should work in a joint effort

– Net-zero for MCLBA NLT 2017 (SECNAV, MCICOM & MCIEAST fully support project)

•Challenges •SECNAV approval for large capital development

on leased property

– ESPC legal determination

– ESPC scoping and design

– Distribution Interconnection with Georgia Power

Page 5: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

5

Installation & Environment Division

1) First ever cooperative interagency agreement (ESTCP-

NAVFAC/SE-MCLBA), the high level R&D, engineering and

monitoring effort of an ESTCP project was "wrapped around" an

conventional Milcon ECIP project.

2) First next generation GHP architecture known as Borehole

Thermal Energy Storage (BTES) utilized in the United States.

3) First large scale (550 Tons of cooling/heating capacity)

geothermal system implemented by the DOE ESTCP (program).

4) First system engineered to capture the "cold of winter" (winter

heat rejection) for summer use and provide "auto" well field energy

balancing to extend the geothermal well field life cycle beyond 30

years.

5) First US GHP use of Fiber Optic (FO) based Distributed

Temperature System (DTS) to sense temperature throughout the

GHX via 9000' long FO cable measuring temperature at 1500

locations.

6) Promised HVAC saving to ESTCP was 30% of the yearly BTUs

(gas+ kWh). The "after" metered data so far is August 15-

September 15, 2014 versus 2015 shows a 53% reduction.

Energy savings since July commissioning is 3 MMBTU/Hr. or 1266

MWH or about $100K (summer months).

7) There are significant water savings also, since the system is

closed loop and does not use or dispense process water. Annual

cooling tower water consumption as metered was about

3,000,000 gallons/year... but the cycles of concentration was very

high resulting in mineral precipitation on the cooling tower fill...it

probably "should have" been at least 4,500,000 gallons/year.

Water reduction over the next 12 months will be at least 80% or

240,000 gallons/year.

MCLB GSHP BTES Project Dashboard

Page 6: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

6

Installation & Environment Division

Page 7: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

7

Installation & Environment Division

Page 8: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

8

Installation & Environment Division

MCLB 31mW Solar Farm Project DashboardPartnership with

Georgia Power to

install a 31mW Solar

Farm on base.

Georgia Power to own

and operate the Solar

Farm and MCLB to

receive credit for the

generation.

MCLB will receive a

Payment in Kind to

build a distribution line

to the base to be used

during a system wide

power outage.

MCLB will also have a

Payment in Kind to

have a connection

point established so

that in the future when

battery storage

technology is

developed the base

can use this access

power from the

storage batteries

during outages to

power the base.

Page 9: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

9

Installation & Environment Division

30

32

34

36

38

40

42

44

46

48

50

52

54

56

58

60

62

64

66

68

S-0

3

M-0

4

S-0

4

M-0

5

S-0

5

M-0

6

S-0

6

M-0

7

S-0

7

M-0

8

S-0

8

M-0

9

S-0

9

M-1

0

S-1

0

M-1

1

S-1

1

M-1

2

S-1

2

M-1

3

S-1

3

M-1

4

S-1

4

M-1

5

S-1

5

M-1

6

S-1

6

MM

Btu

/KS

F

Baseline MBtu/KSF = 64.72 4th Quarter, 2015 Reduction Goal: -30% Current Mbtu/KSF Anticipated Reduced Mbtu/KSF

MCLBA Energy Reduction (intensity) Progress

Completed ESPC

MCLBA Energy Reduction (intensity) Progress

Completed ESPC

Adjustment to iNFADS

Energy Intensity Reduction at - 43%

Page 10: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

10

Installation & Environment Division

60,000

80,000

100,000

120,000

140,000

160,000

180,000

S-0

7

M-0

8

S-0

8

M-0

9

S-0

9

M-1

0

S-1

0

M-1

1

S-1

1

M-1

2

S-1

2

M-1

3

S-1

3

M-1

4

S-1

4

M-1

5

S-1

5

M-1

6

S-1

6

kGal

Month

MCLB Albany Water Reduction Progress

EO 13423 Goal

Current Reduction Progress

44% Reduction as of Feb 2016

Page 11: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

11

Installation & Environment Division

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

500,000

Q1 Q3 Q1 Q3 Q1 Q3 Q1 Q3 Q1 Q3 Q1 Q3 Q1 Q3 Q1 Q3 Q1 Q3 Q1 Q3 Q1 Q3 Q1 Q3 Q1 Q3 Q1 Q3

FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17

MB

TU

FISCAL YEAR

NET ZERO ENERGY PLAN

Actual Renewable Energy Generation (MBtu) Forecast Renewable Energy Generation (MBtu)

Actual Energy Usage (Mbtu) Forcast Energy Usage (Mbtu)

Net Zero Energy is achieved

when the amount of energy

consumed (the red lines) equals

the amount of energy produced

(the green lines).

NET ZERO ACHIEVED

Q3 of FY 2017 forecast

energy usage is 268,900

MBtu and the forecast

renewable energy

generation is 270,939

MBtu.

Landfill Gas

Generator

1.9mW 1

Landfill

Gas

Generator

Biomass

Generator

8.5mW 3

NET ZERO

Page 12: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

12

Installation & Environment Division

Page 13: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

13

Installation & Environment Division

Adding 89 Gas and Water Meters to the AMI System

RetroCx 4 Buildings using Army COE at Huntsville, AL

Replacement of Industrial Wastewater Treatment Plant

Initiated ESPC DO# 3 to achieve Biomass Net-Zero by Summer 2017

Replacement of Water Distribution System Complete Nov 2015

Replacement of Gas Distribution System Underway Complete Jun 2016

GSHP Borehole Thermal Energy Storage (BTES) for B3700 under ESTCP project – First 6 months

shows 55% savings

Installation of second LFGE 2.1mW generator underway Complete April 2016

Expanded Direct Digital Control System (77 bldgs)

Update Building Facade & interior lighting to LED Fluorescent Base Wide

Completed 2nd Production Plant Albany Audit (Processes) Oct 2015

Signed contract with Georgia Power to install and operate a 31mW Solar Farm on MCLB

Ground Source Heat Pumps in 8 Buildings incorporating BTES Technology

Summary of Energy Initiatives

Page 14: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

14

Installation & Environment Division

Questions

Page 15: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

15

Installation & Environment Division

Backup Slides

Page 16: Joint Technology Exchange group MCLB Albany Energy Programjteg.ncms.org/wp-content/uploads/2016/07/2-USMC-JTEG-Energy-26… · 19% of MCLB Albany’s energy comes from renewable sources

16

Installation & Environment Division

MCLB Biomass Project Dashboard

– NAVFACSE Point Paper to propose way ahead Dec-2012

– LANT sent out RFI for Biomass project – May 2013

– Email from HQMC stating that they will pursue an alternate financing vehicle such as the Energy Savings Performance Contract (ESPC) for this renewable opportunity- Sep 2013

– Commanding Officer MCLBA sends initial ESPC project notification to met Net-Zero – Sep 2013

– MCLBA scheduling meeting w/ Georgia Power to discuss distribution interconnection agreement –Dec 2013

• MCLBA Timeline for P&G Biomass Project:– Entered direct discussions w/ P&G about

partnering to do a large scale Biomass project – Sep 2011

– MCLBA sent an email to HQMC, MCIEAST, & NAVFACSE advising of partnership wP/G that would result in MCLBA achieving Net-Zero -May 2012

– MCLBA working w/ NAVFACSE to get approval to send an RFP to all 16 ESCO’s–Jun 2012

– Request has been held up by NAVFAC EXWC due to concerns w/respect to language in the NDAA prohibiting “construction” on ESPC projects-Aug 2012