Joint Mission Environment Test Capability
(JMETC)
Improving Distributed Test Capabilities
NDIA Annual TampE Conference
Chip Ferguson
Program Manager
March 16 2011
Agenda
bull TRMC
bull Distributed Testing
bull What is JMETC
bull JMETC Testing Successes
bull JMETC Sites
bull JMETC Customers and Events
bull JMETC Users Group
bull Summary
2
3
DoD Strategic Plan
for TampE Resources
Service
TampE Needs and
Solutions Process
Service
TampESampT
Working Groups
Relationship within TRMC
Synergy through Aligned Investment
Quadrennial Defense Review
Strategic Planning Guidance
Service Improvement
amp Modernization
Programs
Acquisition Programs
Advanced Concept
Technology Demonstrations
TampE Multi-Service
Agency
Capabilities
Risk mitigation needs Technology shortfalls
Risk mitigation solutions
Advanced development
Requirements
Capabilities
DoD Corporate
Distributed Test
Capability
TRMC Joint Investment Programs
63 64 65
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated Live Virtual and
Constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems
GOAL Near Real-Time Test-Fix-Test
4
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated Live Virtual and
Constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems
A new way of thinking for many in the
Test and Evaluation enterprise
5
Distributed Testing Impacts
bull Distributed Testing has already demonstrated
bull Time savings risk reduction cost savings
bull Efficiencies across the development and TampE process
bull Early identification of issues
bull Move datamdashnot people
bull Near real-time Test-Fix-Test
bull Distributed Testing when fully implemented also
bull Provides for agile persistent TampE
bull Supports early integration of DT and OT
bull Gives SMErsquos an ―Intensive Lab and connective relationship with
other entities in the systems-of-systems environment that they
wouldnrsquot have otherwise
6
Why Consider Distributed Test
bull Do you have data exchange requirements within your
system or within a system-of-systems (SoS)
bull Do you have a requirement to address SoS interoperability
issues early in the acquisition process
bull Do you have adequate numbers of systems under test for
live testing
bull Do you have adequate numbers of ―supporting cast
(supporting systems C4ISR assets etc) for live testing
bull Do you have adequate threat types fidelity and density in
realistic numbers at realistic ranges for live testing 7
When Is Distributed Test Appropriate
bull Examples Where Appropriate
ndash Interoperability testing
bull C4 Interoperability with higher lower and adjacent Joint force organizations
ndash Data exchange in early DT testing
bull Interaction between sub-systems (latency may be a consideration)
bull Interaction between systems in a realistic environment
o Provide the most realistic environment possible from concept exploration through
Follow-On TampE
ndash When it is too costly to bring all the player systems together on a single
range
ndash Gain or increase operational relevance
bull Virtual and Constructive capabilities to supplement live systems (eg red
forces white forces terrain immobile test assets)
bull Examples Where Inappropriate
ndash System performance tests that do not include other systemssubsystems
ndash Reliability testing
8
Reduces Cost Risk and Time
Distributed Testing Challenges
9
Not unique to JMETC but we are working
bull Classification
ndash Multi-level security issue to peer to networks of higher classification levels
ndash Solution
bull Short Term Create separate enclaves for each level
ndash Time and dollars issue to operate at higher levels of classification
bull Long Term Develop an enterprise solution
ndash Current CTEIP Project
bull DOD Information Assurance Certification and Accreditation Process
ndash Information Assurance Requirements for higher levels of classification
bull Time and dollars issue
ndash DIACAP Tiger Team
bull Common lexicon and reciprocal acceptance
bull RDTampE Community won a mechanism for their voice to be heard by the policy
makers
bull TRMC is now a non-voting member of the DIACAP Technical Advisory Group (TAG)
where next-generation policy is being developed
The JMETC Mission
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate live virtual
and constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
10
11
What is JMETC
bull DoD enterprise approach for linking distributed facilities
currently being used by over 60 test facilities
bull A core reusable and easily reconfigurable infrastructure
bull Consists of the following products bull Persistent connectivity
bull Middleware
bull Standard interface definitions and software algorithms
bull Distributed test support tools
bull Data management solutions
bull Reuse repository
bull Provides customer support team for JMETC products and distributed Live Virtual amp Constructive DT and OT
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
Agenda
bull TRMC
bull Distributed Testing
bull What is JMETC
bull JMETC Testing Successes
bull JMETC Sites
bull JMETC Customers and Events
bull JMETC Users Group
bull Summary
2
3
DoD Strategic Plan
for TampE Resources
Service
TampE Needs and
Solutions Process
Service
TampESampT
Working Groups
Relationship within TRMC
Synergy through Aligned Investment
Quadrennial Defense Review
Strategic Planning Guidance
Service Improvement
amp Modernization
Programs
Acquisition Programs
Advanced Concept
Technology Demonstrations
TampE Multi-Service
Agency
Capabilities
Risk mitigation needs Technology shortfalls
Risk mitigation solutions
Advanced development
Requirements
Capabilities
DoD Corporate
Distributed Test
Capability
TRMC Joint Investment Programs
63 64 65
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated Live Virtual and
Constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems
GOAL Near Real-Time Test-Fix-Test
4
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated Live Virtual and
Constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems
A new way of thinking for many in the
Test and Evaluation enterprise
5
Distributed Testing Impacts
bull Distributed Testing has already demonstrated
bull Time savings risk reduction cost savings
bull Efficiencies across the development and TampE process
bull Early identification of issues
bull Move datamdashnot people
bull Near real-time Test-Fix-Test
bull Distributed Testing when fully implemented also
bull Provides for agile persistent TampE
bull Supports early integration of DT and OT
bull Gives SMErsquos an ―Intensive Lab and connective relationship with
other entities in the systems-of-systems environment that they
wouldnrsquot have otherwise
6
Why Consider Distributed Test
bull Do you have data exchange requirements within your
system or within a system-of-systems (SoS)
bull Do you have a requirement to address SoS interoperability
issues early in the acquisition process
bull Do you have adequate numbers of systems under test for
live testing
bull Do you have adequate numbers of ―supporting cast
(supporting systems C4ISR assets etc) for live testing
bull Do you have adequate threat types fidelity and density in
realistic numbers at realistic ranges for live testing 7
When Is Distributed Test Appropriate
bull Examples Where Appropriate
ndash Interoperability testing
bull C4 Interoperability with higher lower and adjacent Joint force organizations
ndash Data exchange in early DT testing
bull Interaction between sub-systems (latency may be a consideration)
bull Interaction between systems in a realistic environment
o Provide the most realistic environment possible from concept exploration through
Follow-On TampE
ndash When it is too costly to bring all the player systems together on a single
range
ndash Gain or increase operational relevance
bull Virtual and Constructive capabilities to supplement live systems (eg red
forces white forces terrain immobile test assets)
bull Examples Where Inappropriate
ndash System performance tests that do not include other systemssubsystems
ndash Reliability testing
8
Reduces Cost Risk and Time
Distributed Testing Challenges
9
Not unique to JMETC but we are working
bull Classification
ndash Multi-level security issue to peer to networks of higher classification levels
ndash Solution
bull Short Term Create separate enclaves for each level
ndash Time and dollars issue to operate at higher levels of classification
bull Long Term Develop an enterprise solution
ndash Current CTEIP Project
bull DOD Information Assurance Certification and Accreditation Process
ndash Information Assurance Requirements for higher levels of classification
bull Time and dollars issue
ndash DIACAP Tiger Team
bull Common lexicon and reciprocal acceptance
bull RDTampE Community won a mechanism for their voice to be heard by the policy
makers
bull TRMC is now a non-voting member of the DIACAP Technical Advisory Group (TAG)
where next-generation policy is being developed
The JMETC Mission
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate live virtual
and constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
10
11
What is JMETC
bull DoD enterprise approach for linking distributed facilities
currently being used by over 60 test facilities
bull A core reusable and easily reconfigurable infrastructure
bull Consists of the following products bull Persistent connectivity
bull Middleware
bull Standard interface definitions and software algorithms
bull Distributed test support tools
bull Data management solutions
bull Reuse repository
bull Provides customer support team for JMETC products and distributed Live Virtual amp Constructive DT and OT
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
3
DoD Strategic Plan
for TampE Resources
Service
TampE Needs and
Solutions Process
Service
TampESampT
Working Groups
Relationship within TRMC
Synergy through Aligned Investment
Quadrennial Defense Review
Strategic Planning Guidance
Service Improvement
amp Modernization
Programs
Acquisition Programs
Advanced Concept
Technology Demonstrations
TampE Multi-Service
Agency
Capabilities
Risk mitigation needs Technology shortfalls
Risk mitigation solutions
Advanced development
Requirements
Capabilities
DoD Corporate
Distributed Test
Capability
TRMC Joint Investment Programs
63 64 65
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated Live Virtual and
Constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems
GOAL Near Real-Time Test-Fix-Test
4
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated Live Virtual and
Constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems
A new way of thinking for many in the
Test and Evaluation enterprise
5
Distributed Testing Impacts
bull Distributed Testing has already demonstrated
bull Time savings risk reduction cost savings
bull Efficiencies across the development and TampE process
bull Early identification of issues
bull Move datamdashnot people
bull Near real-time Test-Fix-Test
bull Distributed Testing when fully implemented also
bull Provides for agile persistent TampE
bull Supports early integration of DT and OT
bull Gives SMErsquos an ―Intensive Lab and connective relationship with
other entities in the systems-of-systems environment that they
wouldnrsquot have otherwise
6
Why Consider Distributed Test
bull Do you have data exchange requirements within your
system or within a system-of-systems (SoS)
bull Do you have a requirement to address SoS interoperability
issues early in the acquisition process
bull Do you have adequate numbers of systems under test for
live testing
bull Do you have adequate numbers of ―supporting cast
(supporting systems C4ISR assets etc) for live testing
bull Do you have adequate threat types fidelity and density in
realistic numbers at realistic ranges for live testing 7
When Is Distributed Test Appropriate
bull Examples Where Appropriate
ndash Interoperability testing
bull C4 Interoperability with higher lower and adjacent Joint force organizations
ndash Data exchange in early DT testing
bull Interaction between sub-systems (latency may be a consideration)
bull Interaction between systems in a realistic environment
o Provide the most realistic environment possible from concept exploration through
Follow-On TampE
ndash When it is too costly to bring all the player systems together on a single
range
ndash Gain or increase operational relevance
bull Virtual and Constructive capabilities to supplement live systems (eg red
forces white forces terrain immobile test assets)
bull Examples Where Inappropriate
ndash System performance tests that do not include other systemssubsystems
ndash Reliability testing
8
Reduces Cost Risk and Time
Distributed Testing Challenges
9
Not unique to JMETC but we are working
bull Classification
ndash Multi-level security issue to peer to networks of higher classification levels
ndash Solution
bull Short Term Create separate enclaves for each level
ndash Time and dollars issue to operate at higher levels of classification
bull Long Term Develop an enterprise solution
ndash Current CTEIP Project
bull DOD Information Assurance Certification and Accreditation Process
ndash Information Assurance Requirements for higher levels of classification
bull Time and dollars issue
ndash DIACAP Tiger Team
bull Common lexicon and reciprocal acceptance
bull RDTampE Community won a mechanism for their voice to be heard by the policy
makers
bull TRMC is now a non-voting member of the DIACAP Technical Advisory Group (TAG)
where next-generation policy is being developed
The JMETC Mission
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate live virtual
and constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
10
11
What is JMETC
bull DoD enterprise approach for linking distributed facilities
currently being used by over 60 test facilities
bull A core reusable and easily reconfigurable infrastructure
bull Consists of the following products bull Persistent connectivity
bull Middleware
bull Standard interface definitions and software algorithms
bull Distributed test support tools
bull Data management solutions
bull Reuse repository
bull Provides customer support team for JMETC products and distributed Live Virtual amp Constructive DT and OT
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated Live Virtual and
Constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems
GOAL Near Real-Time Test-Fix-Test
4
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated Live Virtual and
Constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems
A new way of thinking for many in the
Test and Evaluation enterprise
5
Distributed Testing Impacts
bull Distributed Testing has already demonstrated
bull Time savings risk reduction cost savings
bull Efficiencies across the development and TampE process
bull Early identification of issues
bull Move datamdashnot people
bull Near real-time Test-Fix-Test
bull Distributed Testing when fully implemented also
bull Provides for agile persistent TampE
bull Supports early integration of DT and OT
bull Gives SMErsquos an ―Intensive Lab and connective relationship with
other entities in the systems-of-systems environment that they
wouldnrsquot have otherwise
6
Why Consider Distributed Test
bull Do you have data exchange requirements within your
system or within a system-of-systems (SoS)
bull Do you have a requirement to address SoS interoperability
issues early in the acquisition process
bull Do you have adequate numbers of systems under test for
live testing
bull Do you have adequate numbers of ―supporting cast
(supporting systems C4ISR assets etc) for live testing
bull Do you have adequate threat types fidelity and density in
realistic numbers at realistic ranges for live testing 7
When Is Distributed Test Appropriate
bull Examples Where Appropriate
ndash Interoperability testing
bull C4 Interoperability with higher lower and adjacent Joint force organizations
ndash Data exchange in early DT testing
bull Interaction between sub-systems (latency may be a consideration)
bull Interaction between systems in a realistic environment
o Provide the most realistic environment possible from concept exploration through
Follow-On TampE
ndash When it is too costly to bring all the player systems together on a single
range
ndash Gain or increase operational relevance
bull Virtual and Constructive capabilities to supplement live systems (eg red
forces white forces terrain immobile test assets)
bull Examples Where Inappropriate
ndash System performance tests that do not include other systemssubsystems
ndash Reliability testing
8
Reduces Cost Risk and Time
Distributed Testing Challenges
9
Not unique to JMETC but we are working
bull Classification
ndash Multi-level security issue to peer to networks of higher classification levels
ndash Solution
bull Short Term Create separate enclaves for each level
ndash Time and dollars issue to operate at higher levels of classification
bull Long Term Develop an enterprise solution
ndash Current CTEIP Project
bull DOD Information Assurance Certification and Accreditation Process
ndash Information Assurance Requirements for higher levels of classification
bull Time and dollars issue
ndash DIACAP Tiger Team
bull Common lexicon and reciprocal acceptance
bull RDTampE Community won a mechanism for their voice to be heard by the policy
makers
bull TRMC is now a non-voting member of the DIACAP Technical Advisory Group (TAG)
where next-generation policy is being developed
The JMETC Mission
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate live virtual
and constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
10
11
What is JMETC
bull DoD enterprise approach for linking distributed facilities
currently being used by over 60 test facilities
bull A core reusable and easily reconfigurable infrastructure
bull Consists of the following products bull Persistent connectivity
bull Middleware
bull Standard interface definitions and software algorithms
bull Distributed test support tools
bull Data management solutions
bull Reuse repository
bull Provides customer support team for JMETC products and distributed Live Virtual amp Constructive DT and OT
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
What is Distributed Testing
A process preferably persistent and continuous for linking
various geographically separated Live Virtual and
Constructive sites and capabilities together in a distributed
environment for use across the acquisition life cycle to
support and conduct the Test and Evaluation (TampE) of a
system or systems-of-systems
A new way of thinking for many in the
Test and Evaluation enterprise
5
Distributed Testing Impacts
bull Distributed Testing has already demonstrated
bull Time savings risk reduction cost savings
bull Efficiencies across the development and TampE process
bull Early identification of issues
bull Move datamdashnot people
bull Near real-time Test-Fix-Test
bull Distributed Testing when fully implemented also
bull Provides for agile persistent TampE
bull Supports early integration of DT and OT
bull Gives SMErsquos an ―Intensive Lab and connective relationship with
other entities in the systems-of-systems environment that they
wouldnrsquot have otherwise
6
Why Consider Distributed Test
bull Do you have data exchange requirements within your
system or within a system-of-systems (SoS)
bull Do you have a requirement to address SoS interoperability
issues early in the acquisition process
bull Do you have adequate numbers of systems under test for
live testing
bull Do you have adequate numbers of ―supporting cast
(supporting systems C4ISR assets etc) for live testing
bull Do you have adequate threat types fidelity and density in
realistic numbers at realistic ranges for live testing 7
When Is Distributed Test Appropriate
bull Examples Where Appropriate
ndash Interoperability testing
bull C4 Interoperability with higher lower and adjacent Joint force organizations
ndash Data exchange in early DT testing
bull Interaction between sub-systems (latency may be a consideration)
bull Interaction between systems in a realistic environment
o Provide the most realistic environment possible from concept exploration through
Follow-On TampE
ndash When it is too costly to bring all the player systems together on a single
range
ndash Gain or increase operational relevance
bull Virtual and Constructive capabilities to supplement live systems (eg red
forces white forces terrain immobile test assets)
bull Examples Where Inappropriate
ndash System performance tests that do not include other systemssubsystems
ndash Reliability testing
8
Reduces Cost Risk and Time
Distributed Testing Challenges
9
Not unique to JMETC but we are working
bull Classification
ndash Multi-level security issue to peer to networks of higher classification levels
ndash Solution
bull Short Term Create separate enclaves for each level
ndash Time and dollars issue to operate at higher levels of classification
bull Long Term Develop an enterprise solution
ndash Current CTEIP Project
bull DOD Information Assurance Certification and Accreditation Process
ndash Information Assurance Requirements for higher levels of classification
bull Time and dollars issue
ndash DIACAP Tiger Team
bull Common lexicon and reciprocal acceptance
bull RDTampE Community won a mechanism for their voice to be heard by the policy
makers
bull TRMC is now a non-voting member of the DIACAP Technical Advisory Group (TAG)
where next-generation policy is being developed
The JMETC Mission
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate live virtual
and constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
10
11
What is JMETC
bull DoD enterprise approach for linking distributed facilities
currently being used by over 60 test facilities
bull A core reusable and easily reconfigurable infrastructure
bull Consists of the following products bull Persistent connectivity
bull Middleware
bull Standard interface definitions and software algorithms
bull Distributed test support tools
bull Data management solutions
bull Reuse repository
bull Provides customer support team for JMETC products and distributed Live Virtual amp Constructive DT and OT
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
Distributed Testing Impacts
bull Distributed Testing has already demonstrated
bull Time savings risk reduction cost savings
bull Efficiencies across the development and TampE process
bull Early identification of issues
bull Move datamdashnot people
bull Near real-time Test-Fix-Test
bull Distributed Testing when fully implemented also
bull Provides for agile persistent TampE
bull Supports early integration of DT and OT
bull Gives SMErsquos an ―Intensive Lab and connective relationship with
other entities in the systems-of-systems environment that they
wouldnrsquot have otherwise
6
Why Consider Distributed Test
bull Do you have data exchange requirements within your
system or within a system-of-systems (SoS)
bull Do you have a requirement to address SoS interoperability
issues early in the acquisition process
bull Do you have adequate numbers of systems under test for
live testing
bull Do you have adequate numbers of ―supporting cast
(supporting systems C4ISR assets etc) for live testing
bull Do you have adequate threat types fidelity and density in
realistic numbers at realistic ranges for live testing 7
When Is Distributed Test Appropriate
bull Examples Where Appropriate
ndash Interoperability testing
bull C4 Interoperability with higher lower and adjacent Joint force organizations
ndash Data exchange in early DT testing
bull Interaction between sub-systems (latency may be a consideration)
bull Interaction between systems in a realistic environment
o Provide the most realistic environment possible from concept exploration through
Follow-On TampE
ndash When it is too costly to bring all the player systems together on a single
range
ndash Gain or increase operational relevance
bull Virtual and Constructive capabilities to supplement live systems (eg red
forces white forces terrain immobile test assets)
bull Examples Where Inappropriate
ndash System performance tests that do not include other systemssubsystems
ndash Reliability testing
8
Reduces Cost Risk and Time
Distributed Testing Challenges
9
Not unique to JMETC but we are working
bull Classification
ndash Multi-level security issue to peer to networks of higher classification levels
ndash Solution
bull Short Term Create separate enclaves for each level
ndash Time and dollars issue to operate at higher levels of classification
bull Long Term Develop an enterprise solution
ndash Current CTEIP Project
bull DOD Information Assurance Certification and Accreditation Process
ndash Information Assurance Requirements for higher levels of classification
bull Time and dollars issue
ndash DIACAP Tiger Team
bull Common lexicon and reciprocal acceptance
bull RDTampE Community won a mechanism for their voice to be heard by the policy
makers
bull TRMC is now a non-voting member of the DIACAP Technical Advisory Group (TAG)
where next-generation policy is being developed
The JMETC Mission
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate live virtual
and constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
10
11
What is JMETC
bull DoD enterprise approach for linking distributed facilities
currently being used by over 60 test facilities
bull A core reusable and easily reconfigurable infrastructure
bull Consists of the following products bull Persistent connectivity
bull Middleware
bull Standard interface definitions and software algorithms
bull Distributed test support tools
bull Data management solutions
bull Reuse repository
bull Provides customer support team for JMETC products and distributed Live Virtual amp Constructive DT and OT
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
Why Consider Distributed Test
bull Do you have data exchange requirements within your
system or within a system-of-systems (SoS)
bull Do you have a requirement to address SoS interoperability
issues early in the acquisition process
bull Do you have adequate numbers of systems under test for
live testing
bull Do you have adequate numbers of ―supporting cast
(supporting systems C4ISR assets etc) for live testing
bull Do you have adequate threat types fidelity and density in
realistic numbers at realistic ranges for live testing 7
When Is Distributed Test Appropriate
bull Examples Where Appropriate
ndash Interoperability testing
bull C4 Interoperability with higher lower and adjacent Joint force organizations
ndash Data exchange in early DT testing
bull Interaction between sub-systems (latency may be a consideration)
bull Interaction between systems in a realistic environment
o Provide the most realistic environment possible from concept exploration through
Follow-On TampE
ndash When it is too costly to bring all the player systems together on a single
range
ndash Gain or increase operational relevance
bull Virtual and Constructive capabilities to supplement live systems (eg red
forces white forces terrain immobile test assets)
bull Examples Where Inappropriate
ndash System performance tests that do not include other systemssubsystems
ndash Reliability testing
8
Reduces Cost Risk and Time
Distributed Testing Challenges
9
Not unique to JMETC but we are working
bull Classification
ndash Multi-level security issue to peer to networks of higher classification levels
ndash Solution
bull Short Term Create separate enclaves for each level
ndash Time and dollars issue to operate at higher levels of classification
bull Long Term Develop an enterprise solution
ndash Current CTEIP Project
bull DOD Information Assurance Certification and Accreditation Process
ndash Information Assurance Requirements for higher levels of classification
bull Time and dollars issue
ndash DIACAP Tiger Team
bull Common lexicon and reciprocal acceptance
bull RDTampE Community won a mechanism for their voice to be heard by the policy
makers
bull TRMC is now a non-voting member of the DIACAP Technical Advisory Group (TAG)
where next-generation policy is being developed
The JMETC Mission
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate live virtual
and constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
10
11
What is JMETC
bull DoD enterprise approach for linking distributed facilities
currently being used by over 60 test facilities
bull A core reusable and easily reconfigurable infrastructure
bull Consists of the following products bull Persistent connectivity
bull Middleware
bull Standard interface definitions and software algorithms
bull Distributed test support tools
bull Data management solutions
bull Reuse repository
bull Provides customer support team for JMETC products and distributed Live Virtual amp Constructive DT and OT
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
When Is Distributed Test Appropriate
bull Examples Where Appropriate
ndash Interoperability testing
bull C4 Interoperability with higher lower and adjacent Joint force organizations
ndash Data exchange in early DT testing
bull Interaction between sub-systems (latency may be a consideration)
bull Interaction between systems in a realistic environment
o Provide the most realistic environment possible from concept exploration through
Follow-On TampE
ndash When it is too costly to bring all the player systems together on a single
range
ndash Gain or increase operational relevance
bull Virtual and Constructive capabilities to supplement live systems (eg red
forces white forces terrain immobile test assets)
bull Examples Where Inappropriate
ndash System performance tests that do not include other systemssubsystems
ndash Reliability testing
8
Reduces Cost Risk and Time
Distributed Testing Challenges
9
Not unique to JMETC but we are working
bull Classification
ndash Multi-level security issue to peer to networks of higher classification levels
ndash Solution
bull Short Term Create separate enclaves for each level
ndash Time and dollars issue to operate at higher levels of classification
bull Long Term Develop an enterprise solution
ndash Current CTEIP Project
bull DOD Information Assurance Certification and Accreditation Process
ndash Information Assurance Requirements for higher levels of classification
bull Time and dollars issue
ndash DIACAP Tiger Team
bull Common lexicon and reciprocal acceptance
bull RDTampE Community won a mechanism for their voice to be heard by the policy
makers
bull TRMC is now a non-voting member of the DIACAP Technical Advisory Group (TAG)
where next-generation policy is being developed
The JMETC Mission
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate live virtual
and constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
10
11
What is JMETC
bull DoD enterprise approach for linking distributed facilities
currently being used by over 60 test facilities
bull A core reusable and easily reconfigurable infrastructure
bull Consists of the following products bull Persistent connectivity
bull Middleware
bull Standard interface definitions and software algorithms
bull Distributed test support tools
bull Data management solutions
bull Reuse repository
bull Provides customer support team for JMETC products and distributed Live Virtual amp Constructive DT and OT
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
Distributed Testing Challenges
9
Not unique to JMETC but we are working
bull Classification
ndash Multi-level security issue to peer to networks of higher classification levels
ndash Solution
bull Short Term Create separate enclaves for each level
ndash Time and dollars issue to operate at higher levels of classification
bull Long Term Develop an enterprise solution
ndash Current CTEIP Project
bull DOD Information Assurance Certification and Accreditation Process
ndash Information Assurance Requirements for higher levels of classification
bull Time and dollars issue
ndash DIACAP Tiger Team
bull Common lexicon and reciprocal acceptance
bull RDTampE Community won a mechanism for their voice to be heard by the policy
makers
bull TRMC is now a non-voting member of the DIACAP Technical Advisory Group (TAG)
where next-generation policy is being developed
The JMETC Mission
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate live virtual
and constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
10
11
What is JMETC
bull DoD enterprise approach for linking distributed facilities
currently being used by over 60 test facilities
bull A core reusable and easily reconfigurable infrastructure
bull Consists of the following products bull Persistent connectivity
bull Middleware
bull Standard interface definitions and software algorithms
bull Distributed test support tools
bull Data management solutions
bull Reuse repository
bull Provides customer support team for JMETC products and distributed Live Virtual amp Constructive DT and OT
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
The JMETC Mission
JMETC provides the persistent and robust
infrastructure (network integration
software tools reuse repository) and
technical expertise to integrate live virtual
and constructive systems for test and
evaluation in a Joint Systems-of-Systems
environment
10
11
What is JMETC
bull DoD enterprise approach for linking distributed facilities
currently being used by over 60 test facilities
bull A core reusable and easily reconfigurable infrastructure
bull Consists of the following products bull Persistent connectivity
bull Middleware
bull Standard interface definitions and software algorithms
bull Distributed test support tools
bull Data management solutions
bull Reuse repository
bull Provides customer support team for JMETC products and distributed Live Virtual amp Constructive DT and OT
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
11
What is JMETC
bull DoD enterprise approach for linking distributed facilities
currently being used by over 60 test facilities
bull A core reusable and easily reconfigurable infrastructure
bull Consists of the following products bull Persistent connectivity
bull Middleware
bull Standard interface definitions and software algorithms
bull Distributed test support tools
bull Data management solutions
bull Reuse repository
bull Provides customer support team for JMETC products and distributed Live Virtual amp Constructive DT and OT
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
12
JMETC Enabled Distributed Testing
Systems
Under
Test
Joint Operational Scenarios
Virtual
Prototype
Range Environment
Generator
Threat
Systems
Integrated Test
Resources
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
TENA Standard Interface
Definitions
TENA
Common
Middleware
Reuse Repository
Distributed Test Support Tools
JMETC
Infrastructure
Hardware in the Loop Lab
TENA
Common
Middleware
Installed Systems
Test Facility
Basic Interface
Standard
TENA
Common
Middleware
Data Management Solutions
TENA
Standard Interface
Definitions
TENA
Standard Interface
Definitions
JMETC
Network on
SDREN
12
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
Sustainment Systems Acquisition (Engineering amp manufacturing development
demonstration LRIP amp production)
Pre-Systems Acquisition
14
IOC A B
Concept amp Tech Development
Concept
Exploration
Component
Advanced
Development
Decision
Review
System
Integration
Interim Progress Review
Production amp Deployment
LRIP
FRP Decision Review
Full-Rate Production amp Deployment
Operations
amp Support
C
Enables early verification that
systems work stand alone and in
a Joint Environment
Helps find problems early in
acquisition ndash when they are less
costly to fix
JMETC Allows You to ldquoTest Early and Test
Oftenrdquo Across the Acquisition Life Cycle
Rapid Acquisition Developmental Test Operational
Test Interoperability Certification Net-Ready Key
Performance Parameters testing Joint Mission
Capability Portfolio testing
bull Readily-available
persistent connectivity
with standing network
security agreements
bull Common integration
software for linking sites
bull Accredited test tools
for distributed testing
Outline Distributed
Testing requirements
in the TEMP
Support to Acquisition Programs with the expertise to integrate
distributed test facilities
JMETC enables testing across the acquisition life cycle JMETC can potentially reduce test time and cost By Providing
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
15
FY10 JMETC Events
Customer Event Record Event Dates
Air Force JEFX 10-1Spirit Ice (B2 Data Link Test) October ndash November 2009
Navy BAMS LVC DE October ndash December 2009
Air Force Battlefield Airborne Comm Node (BACN) JUON
(DTOT)
November 2009 to September 2010
Air Force Agile Fire 10-2 January 2010
Air Force JEFX 10-23 FebruaryApril 2010
Joint Joint Surface Warfare JCTD February to September 2010
JS J8JIAMDO Joint Sensor Integration April to September 2010
Air Force B1-B Fully Integrated Data Link Testing April 2010
JFCOM J8489 (TEST WEEK) JCAS Distributed Test June 2010
JIAMDO (Navy Lead) CorrelationDecorrelation Interoperability Test
(CDIT) Integration Events (Continuous)
July to September 2010
Army (Lead) UAS in the National Airspace July to September 2010
Air Force Agile Fire 10-3 August 2010
Joint JITC Joint Interoperability Tests JIT 10-3 amp 11-1
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Joint Strike Fighter (JSF) JIAMDOJoint Track Manager
Brigade Combat Team (BCT)
Modernization
Multi-Function Adv Data Link (MADL) Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run 15
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
16
JMETC FY10 Accomplishments
JMETC Accomplishments
Supported 88 distinct customer test activities
Expanded network from 38 to 57 sites
ATIN and JTDL Networks transitioned to JMETC
Upgraded JMETC support applications and utilities to TENA R6
DIACAP Tiger Team report completed and recommendations being executed
Enhanced JMETC services and capabilities provided by leveraging InterTEC Services and Industry
Reuse Repository usability improvements
FY10 Example JMETC Customers
Joint Integrated Air amp Missile Defense Organization (JIAMDO)
Broad Area Communications Node (BACN) JUON
B1-B
Broad Area Maritime Surveillance System (BAMS)
Air-Ground Integrated Layer Exploration (AGILE)
Joint Interoperability Test Command (JITC)
Selected Benefits to the DoD
Integrated DT amp OT on a Joint Urgent Operational Need for the warfighter
Maximized usage of theater assets during limited maintenance windows
Improved Joint track information sharing to ensure interoperability of systems in theater operations
Coalition exchange and examination of real-time air picture data
Identification of Air Force Initiatives ready for warfighter transition
Investigated tactical UAS deployment in the National Airspace
Employment of Net-Enabled Weapons
JCAS immediate request amp end-to-end processes ―as-is characterization
Determined distributed system components were not ready for full live integration testing
Executed testing to support system-of-system interoperability certification
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
17
Customer Event Record Event Dates
Joint JIAMDO CorrelationDecorrelation Interoperability Test (CDIT)
Integration Events (Continuous) OCONUS October 2010
Navy UAS in NAS Runs for Record October 2010
Internal InterTEC Spiral 3 Systems Acceptance Test October - November 2010
Joint JITC Joint Interoperability Tests JIT 11-12345 (Continuous) October 2010 ndash September 2011
Air Force B1-B Fully Integrated Data Link Testing November 2010
Air Force AGILE Fire Phase III JEFX 2011 December 2010 - February 2011
Joint JTRS JPO -- JTRS Ground Mobile Radio January 2011
Navy Broad Area Maritime Surveillance (BAMS) (Continuous) January ndash September 2011
Joint Joint Track Manager Capability Demonstration (Continuous) January ndash September 2011
Joint JSF Initial MampS Interoperability (Continuous) February ndash March 2011
Air Force JSTARS Interoperability Test May 2011
Joint JS J8JIAMDO Joint Sensor Integration June ndash August 2011
FY11 JMETC Events
(More to Come)
Discussions for Future Teaming
Gerald R Ford Class (CVN-78) Global Hawk GATOR
Brigade Combat Team (BCT)
Modernization F-22 FY12 Testing Planned Multi-Mission Maritime Aircraft (MMA)
Each event is normally preceded by 1-3 spirals Connectivity Check Integration and Dry Run
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
18
JMETC Testing Success
B-2 Spirit ICE Data Link Test (Nov 2009)
bull JEFX assessment of B-2
Link-16 interoperability
challenges with AWACS
bull Connected live B-2 on ramp
at Whiteman AFB MO an
AWACS HITL at Tinker
AFB OK within a
distributed C2 environment
bull Time sensitive targeting
scenarios with combat ready
crews
IMPACT--Cost Savings and Better
Product
bullEarly testing led to early identification
and correction of Link 16
interoperability issues
bullNo range or flying costs
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
Army
Air Force
Navy
Marines
Joint
Industry
As of 14 Sep 2009
Tinker AFB AWACS
Whiteman B-2
Eglin 46TS
WPAFB SIMAF
JMETC
Langley GCIC
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
JMETC Testing Success
Joint Surface Warfare JCTD
bull Point Mugu Test Team
demonstrated Net Enabled
Weapon Link-16 capability
using FA-18EF as launch
platform JSOW C-1 as
weapon and JSTARS as 3rd
party target source
bull Distributed Tests
bull 09-11 Mar 2010
bull 04-05 May 2010
bull 17-19 Jun 2010
bull 31 Aug ndash 01 Sept 2010
IMPACT--Efficiency Lower
Technical Risk and Cost Savings
bull Program scheduled amp executed short
multiple tests for incremental software
update evaluation
bull Resources expended on test amp analysis
and not network setup and monitoring
China Lake FA-18 JSOW
19
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
20
JMETC Testing Success
Joint Integrated Air and Missile Defense Organization (JIAMDO)
bull CorrelationDecorrelation Integrated Test (CDIT-10) to improve interoperability of Aegis E2C CAC2S AWACS Patriot and FAAD
bull During Oct 2010 testing JMETC enabled multiple CDIT runs with an average turnaround time of 11 minutes ndash two shifts per day
IMPACTmdashEfficiency bull Near real time test-fix-test
bull CDIT FY-11 TampE events accelerated
into FY10 wno funding impacts to FY-
10
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
21
Interoperability Certification
Joint Interoperability Test Command (JITC) Joint Tactical Data Link (JTDL) Testing
JITC conducts interoperability assessments standards conformance and interoperability certification testing of joint tactical data links in HWIL and operationally realistic environments to validate the implementation of approved standards in a Joint environment
JITC uses JMETC Connectivity and tools for JTDL Testing
IMPACT--Test Commonality
bull JITC Interoperability Certification
is required for Net Ready KPP for
all ACAT Programs
bull JITs use JMETC infrastructure
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
Program (DiagramPic) Program StatusEvents BAMS planned sites are Bethpage ndash NGC MSSIL
(existing) Rancho Bernardo ndash (Installing) Dam Neck
C2SATCCMOC (existing) Palmdale NGC SIL
(TBD) NAS Patuxent River (existing)
Current BAMS schedule June 2012 (6-12 months)
NGC lead June 2013 ndash IOC Pax Lead
PSP signed by BAMS and JMETC August 6 2010
Program Description BAMS UAS is an integrated Systems of System
that will provide multi-sensor persistent
maritime ISR to the Maritime Patrol and
Reconnaissance Force
Program POC Jeff Sappington NAVAIR
Broad Area Maritime Surveillance
Unmanned Aircraft System (BAMS UAS)
Issues Working to peer with BAMS Classified Network (BCN) but
may be separate agreement with NGC
ESP for flight test needs to be completed ESP format
changes under review by ENGDOPS
Both BAMS and NGC are still discovering potential TampE
requirements including various networks that BAMS
interfaces with for flight
Last Contact BAMS Technical Exchange Meeting Rancho Bernardo CA
March 1-3 2011
System Architect v 10111 Encyclopedia BAMS_PBSS (11 Jan 07)v11
22
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
JMETC Users Group
bull Purpose is to focus on technical requirements and solutions relevant to current and future Distributed Testing needs
bull Technical and Management level representatives identify core infrastructure requirements and most importantly resolve issues
bull Quarterly meetings of 250-300 JMETC customers acquisition programs test events ranges LVC sites tools and network providers
23
Next JMETC Users Group Meeting bull Scheduled for March 22-23 2011 bull Location Norfolk VA bull Tracks
bull User Requirements bull Information Assurance
Security bull Data Management bull InterTEC (Current amp Planned) bull Networking
bull An established forum for the Distributed Test Community to
o Identify core infrastructure requirements and use cases
o Identify investigate amp resolve issues
o Identify opportunities to collaborate
o Discuss available solutions tools and techniques
o Share lessons learned
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
Summary
bull Distributed Testing can save Acquisition TampE Programs time and money and result in better more interoperable products while reducing technical risk
bull JMETC is here and proven
bull Many Sites and Systems already connected via JMETC and well versed in TENA and the InterTEC tools
bull Demonstrated reliability with the capability to execute multiple events simultaneously supporting high data rates and low latency requirements
bull Multiple examples of JMETC value added for customers
bull Provides Acquisition TampE Programs near real-time Test-Fix-Test capability
bull JMETC offers support to develop our customerrsquos distributed test requirements
24
You need only contact us
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
JMETC Program Points of Contact
25
JMETC Program Manager Chip Ferguson chipfergusonosdmil
703-601-5274
JMETC Principal Deputy PM Bruce Bailey brucebaileyosdmil
703-601-5208
JMETC Lead Operations Planning Marty Arnwine martemasarnwineosdmil
703-601-5215
JMETC Senior Technical Advisor George Rumford georgerumfordosdmil
703-601-5233
JMETC Lead Systems Engineer Ryan Norman ryannormanosdmil
703-601-5277
JMETC Lead Network Engineer Arjuna ldquoAJrdquo Pathmanathan
ArjunaPathmanathanosdmil
703-601-5214
JMETC Website wwwjmetcorg
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
Backup Slides
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
How an Air Force Customer Sees
Distributed Connectivity
Hardware-in-the-Loop (HWIL) Availability
Army
Air Force
Navy
Marines
Joint
Industry
Ft Huachuca JITC
Redstone (3) DTCC GMAN SED
Charleston (2) IPC MEF-MEU
Ft Hood (2) CTSF TTEC
WPAFB
SIMAF
Bethpage NG BAMS
Whiteman B-2
MHPCC
PMRF Bldg 105
Sites in Hawaii
All linked by JMETC
27
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
28
JMETC Planning With 20+ Customers
(Active and Prospective)
Joint and Service Initiatives
Joint Tactical Data Link (JITC JTDL)
Joint Expeditionary Forces Experiment (JEFX)
Joint Integrated Air and Missile Defense Organization CorrDecorr Interoperability Test and Joint Sensor Integration (JIAMDO CDIT amp JSI)
Air-to-Ground Integrated Layer Exploration (AGILE Phase III and IV)
Network Enabled Weapons Interoperability Working Group (NEW IWG)
Unmanned Aircraft Systems in National Airspace (UAS in NAS)
Digitally Aided Close Air Support (DACAS)
Space Threat Assessment Testbed (STAT)
Joint Unmanned Aircraft Systems Mission Environment (JUAS ME)
Joint UAS Digital Information Exchange (JUDIE) Joint Test and Evaluation Program
Acquisition ProgramsPEOs
Joint Strike Fighter F-22 Block 32 Link 16 Receive Testing Multi-Function Advanced Datalink (MADL) Battlefield Airborne Communications Node
(BACN) Joint Urgent Operational Need B-1 Fully Integrated Data Link (FIDL) PEO Integrated Weapons Systems CVN-78 Broad Area Maritime Surveillance System
(BAMS) ANSQQ-34 Combat System Brigade Combat Team Modernization
Program Joint Tactical Radio System (PEO JTRS) Joint Tactical Radio System Airborne
Maritime Fixed (JTRS AMF) GroundAir Task Oriented Radar (GATOR) Common Air Command and Control System
(CAC2S) Small Diameter Bomb Incr II (SDB II)
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft
29
JMETC Testing Success
Joint Expeditionary Force Experiment (JEFX)
bull Chief of Staff of the AF directed series of experiments that combines LVC forces to create an operationally representative environment to assess selected initiatives
bull Goal is to rapidly transition enhanced capability to the warfighter
bull Quarterly events some Live Fly some distributed LVC
bull JMETC Program support in place for two years
IMPACT--Cost Savings bullJEFX Reported saving $40M in FY
09 using JMETC Connectivity and
tools
bullUsing JMETC JEFX able to now
complete 3 or 4 distributed events per
year
SAM Site
JEFX 09 ndash STEALTH INTEGRATION DEVELOPMENT (SID)
F-16CM
HTS R7
Link-16
Rivet Joint AWACS
B-2 F-22
AOC
BACN OBJ GATEWAY
BIS
F-15C
Threat Aircraft