Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman/Ed O’Connor Aug 8, 2012

Joint Exchange / Interop Work Group Test Workgroup

  • Upload
    sunee

  • View
    36

  • Download
    0

Embed Size (px)

DESCRIPTION

Joint Exchange / Interop Work Group Test Workgroup. Eric Heflin/Judith Huntman /Ed O’Connor. Aug 8, 2012. Roll. Agenda. Roll Call – Admin Announcements – Eric (5 mins ) ‘Round-the-Room for Harmonized Specs – Eric (10 mins ) - PowerPoint PPT Presentation

Citation preview

Page 1: Joint Exchange / Interop Work Group Test Workgroup

Joint Exchange / Interop Work Group Test Workgroup

Eric Heflin/Judith Huntman/Ed O’ConnorAug 8, 2012

Page 2: Joint Exchange / Interop Work Group Test Workgroup

Roll

2

Name Organization RepresentationNick VanDuyne NYeC StateIvan Handler ILJohn Donnelly NJ Task Group Co-Chair - IWGMarty Prahl SSA

Federal agencyDennis Peterson, Curtus Browning, Elaine Hunolt, Taimur Aslam, Willie Singletary, Monica VanDyke VHA

Kevin Brady NIST NISTDavid Tao, Dan Huber Siemens

EHR VendorDave Cassel, Rob Klootwyk Epic Bill Howard, Charles Parisot GEJeff Cunningham, Tim Dunnington ICA

HIE vendor

Mike LaRocca Intersystems

Vladi Reznikov, Jennifer Puyenbroek CONNECT PMO

Matt Bell, Tom Wilson, Kathy Lin AxolotlTeddy Gedamu MedfxMelissa Owens Marshfield Clinic Health SystemSteve Leighty MedVirginia

Regional HIE Brian Bonnington, Dave Trepanier, Dave Smith, Steve Michael IHIE

Anuj Desai Interop WG Interop WGEric Heflin THSA Task Group Co-Chair - ExchangeMariann Yeager Exchange Exchange Ed O'Connor, Judith Hutman Nitor ONC Testing Contractor

Dennis Wilson, Alisa Ray, Sue Rieber CCHIT

ATCBs and Testing SMEs

Jim St. Clair IHE USA

Amit Trivedi, Kevin Brown, Michella Knighton ICSA Labs

Traci Mapps SLI Global SolutionsKyle Meadors, Timothy Bennett Drummond Group

Milton Padilla, Steve Wilson, Mark Shin, Doublas Biggs, Les Biggs InfoGuard

Page 3: Joint Exchange / Interop Work Group Test Workgroup

• Roll Call – Admin• Announcements – Eric (5 mins)• ‘Round-the-Room for Harmonized Specs – Eric (10 mins)• Phased Approach to Harmonization for Remaining Specs – Judith/Ed (10 mins) • ‘Round-the-Room for Phasing Approach – Eric (10 mins)• Test Execution and Test Architecture – Ed (10-15 mins)• Definition of Done – Ed (5 mins)• Test Case Metrics – Ed (7 mins)• Open Discussion – All• Wrap Up - Eric• RFP Schedule Review - Eric

Agenda

3

Page 4: Joint Exchange / Interop Work Group Test Workgroup

• Harmonized PRL (PD/QD/RD/MP/AF) Tests Are Drafted• No objections were received and are now candidates for “done” status• Future changes are possible, but will be incorporated into the next

phase of test cases design and implementation• We will do a ‘round-the-room next on the status

• RFP• Has 5 respondents• Bidder interviews have been conducted top few vendors• Analysis is nearing completion

Announcements

4

Page 5: Joint Exchange / Interop Work Group Test Workgroup

‘round-the-room

Do you object to the harmonized test specifications (presented over the last few weeks) being considered final? The scope of this question is the harmonized specifications for Patient Record Lookup (aka Patient Discovery, Query for Documents, and Retrieve Documents + Messaging Platform and Authorization Framework).

Page 6: Joint Exchange / Interop Work Group Test Workgroup

Harmonization Phases

Phase 1 – SOAP Send/Receive

Phase 2 – Direct Send/Receive

Phase 3 – Secondary Methods, Service

Discovery, & Provider Directories

•Parent Use Cases (Done)•Test Case harmonization (Done)•Tests: Mess & Auth Framework (Done)•Tests: Patient Discovery (XCPD, PIX, PDQ), Query for Documents, Retrieve Documents (Done)

•Test Execution Guides (Done)

•Parent Use Cases•Test Case harmonization•Tests: Direct Applicability Statement (Done)

•Tests: Direct XDM/XDR-Bridge (Done)•Tests: Direct Certificate Discovery (Done)

•Test Execution Guide

•Parent Use Cases•Test case harmonization•Tests: Web Services Registry (Done)•Tests: HPD+•Tests: Document Submission (Done)•Tests: Administrative Distribution (Done)•Test Execution Guides

Unified Test Process – Has Been Proposed

Page 7: Joint Exchange / Interop Work Group Test Workgroup

Phase II Work Plan: Direct Test Specs

Body Status *

Parent Use Cases Done

Test Case harmonization- Top-down (use case)- Bottom-up (spec based) tests

In Process

Tests: Direct Applicability Statement Done

Tests: Direct XDM/XDR-Bridge Done

Tests: Direct Certificate Discovery Done

Test Execution Guide- Combine Mod Spec Phase II (messaging)- Phase III (cert discovery) documentation

Not Started

* More detailed status is should be posted on the Wiki

Page 8: Joint Exchange / Interop Work Group Test Workgroup

Phase III Work Plan: Secondary SpecsSecondary Methods, Service Discovery, & Provider Directories

Body StatusParent Use Cases In Process

Test case harmonization Not Started

Tests: Web Services Registry- Bottom-up (spec based) test package is complete

Done

Tests: HPD+- Top-down (use case) test package is complete

Not Started

Tests: Document Submission- Bottom-up (spec based) test package is complete

Done

Tests: Administrative Distribution- Bottom-up (spec based) test package is complete

Done

Test Execution Guides- Doc Sub and Admin Dist draft guides exist

In Process

Page 9: Joint Exchange / Interop Work Group Test Workgroup

‘round-the-room

What are your thoughts about the phased approach for harmonization? Feedback is needed, especially if you or your organizations to the proposed approach.

Page 10: Joint Exchange / Interop Work Group Test Workgroup

Test Case Execution

• Manual: Step-by-step instructions are included in written test packages

• Draft tracking worksheet for execution methods• What tests are the best candidates for tooling?• soapUI as a component, review different uses of it• Other utilities/components to research?• What about the conformance checklists?

Page 11: Joint Exchange / Interop Work Group Test Workgroup

• Refresh on Reference Toolkit concept• Check-in on feedback to high-level Toolkit architecture• Assumptions on prioritization at utility level

• Message simulation for High test cases in PD/QD/RD• Proof of concept of lightweight orchestration (BDD layer)• Integration of NIST content tools (c32 then CCDA)

• Ideas/volunteers for utilities, modules, or approaches?

Architecture Review

11

Page 12: Joint Exchange / Interop Work Group Test Workgroup

• Tracked through status (Unsorted, Untargeted, Research, in-Development, Peer Review or Pilot, Final) and Priority (High, Medium, Low, Zero)

• Written tests priority x ease/benefit of execution x importance of spec/functionality = Overall Priority*

Test Execution Metrics

12

PD QD RD M&A Direct HPD+/WSR

Doc Sub

Adm Distro

EUA+MR

Total High (Active/Done)

12(5)

21(18)

8(4)

70*(0)

31(19)

4(0)

6(0)

4(0)

10(0)

Total Possible: 82 189 36 119 181 26 50 25 10

• Execution tracker will be fleshed out with numbers for medium/low/zero priorities and detailed methods over time

Page 13: Joint Exchange / Interop Work Group Test Workgroup

Open Discussion

Page 14: Joint Exchange / Interop Work Group Test Workgroup

•RFP released — July 2nd •Questions received by 6 organizations•Answers distributed — July 13th•Bids due — July 20th•Expected award — August 15th•Contract start — TBD

RFP Schedule Review

14

We are here