Job Safety Analysis for the lifting of Oil filtration machine at SS-1@ MAADEN Infrastructure CompanyRas-Al-Khair
JSA Number: NE-JSA-003Type of Job being Analyzed : Lifting
Department/ Section Originating JSA : HSE Job Performers : NOUR Energy
Normal ApprovalsNameSignatureDateGENERAL JOB REQUIREMENT
JSA By :
Muhammad Jahangir Khan1. Permit to Work.2. HSE NE Induction for all.3. PPE as per Project Standard.4. Gas testing Equipment.5. Daily TBT talks before starting the daily activities.6. Adequate supervision and HSE coverage.7. Strictly no smoking. Smoking only in designated area.8. For Emergency First Aiders/ Certified Nurse, MIC-MPC contact number available at site.9. Welfare drinking Water, food, transport available.10. Valid SAG Licenses for drivers.
Approved by
Anwer Ali Al-Kahf
JSA Members
NameSignatureDate
NE Project Manager
Yazan Arif
NE Electric Supervisor/ Engineer
Umair Humayun
NE Safety Officer / Engineer
Muhammad Jahangir Khan
Changing Condition and Emergency Procedure: Stop Work, switch off Equipment, Supervisor Directs Personal to proceed to the nearestEmergency Exit and Assembly pointJob Safety Analysis for the lifting of Oil filtration machine at SS-1@ MAADEN Infrastructure CompanyRas-Al-Khair
JSA Number: NE-JSA-004Type of Job being Analyzed : Lifting
Department/ Section Originating JSA : Electrical Job Performers : NOUR Energy
S.NoTASKRISK MITIGATION CONTROL
RISPONSIBLE PARTY
8Lifting of Transformer bushings with mobile craneBodily injuries,Cuts, pinch points,Burns, sprains, Trapping.1. Personnel to wear suitable gloves and footwear properly during lifting.2. Mobile crane should be of sufficient capacity and place on an even surface for stability.3. Experience and competent operator.4. Personnel shall be properly trained in lifting load and know lifting techniques.5. Lifting load shall be carried out by trained and competent personnel using suitable tools.6. Outriggers should be extended.7. Housekeeping shall be performed after completing the work to prevent passage obstruction hazards.8. Use proper PPE
Safety OfficerPermit Receiver
Page 2 of 2