JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or Group Manager in charge of the work, with work group member participation. The goal of preparing a JHA is for those responsible for or performing any work to review the risks and possible complications of that work and to consider ways of mitigating those risks and complications. A JHA shall be completed for all work executed. The JHA## is to be incremented when a procedure requires more than one JHA form. “Standing” should be marked if job or task is performed regularly and work group members are always the same individuals. Supervisors are responsible for getting the work group members sign off completed and a copy sent to the safety officer for each JHA. JHA Change Instructions: If changes to the content of this JHA are required, follow the KPNO ETS Engineering Change Process. The master copy of the document must be checked out of the Document Vault, an Engineering Change form must be completed, and the Revision Table (see last page) must be updated. Note that periodic reviews of this JHA that do not result in content changes require only entry of the review date and the name of the reviewer in the Revision Table; the document revision should not be advanced in this case. Tammie Lavoie 23 March 2018 Tammie Lavoie, Safety Manager Date JHA Number: 2100-AD-015-0084-JHA Rev: - Standing: N/A Date Completed: 9 February 2018 Title of Job or Task: Installation of DESI Fiber View Camera Location/Facility: KPNO 4 Meter Supervisor or Person Completing this JHA: Miranda Saucedo Person(s) Assisting with this JHA: Tammie Lavoie, David Sprayberry Recommended Personal Protective Equipment (PPE): select area above line to make entry Head Protection Eye Protection X Hand and body Protection X Fall Protection X Foot Protection X Hearing Protection X Respiratory Protection Special PPE: N/A Notes: *Hard hats must be used whenever someone is working above you or at your head height, or when working with suspended loads. ** Safety Shoes are mandatory in the area during construction, maintenance, heavy or complex work. Equipment or tools needed to perform the job: tab or select to make entry in next location, only use if not listed in procedure. N/A N/A N/A

JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

JOB HAZARD ANALYSIS (JHA)

INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13

JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or Group Manager in charge of the work, with work group member participation. The goal of preparing a JHA is for those responsible for or performing any work to review the risks and possible complications of that work and to consider ways of mitigating those risks and complications. A JHA shall be completed for all work executed. The JHA## is to be incremented when a procedure requires more than one JHA form. “Standing” should be marked if job or task is performed regularly and work group members are always the same individuals. Supervisors are responsible for getting the work group members sign off completed and a copy sent to the safety officer for each JHA. JHA Change Instructions: If changes to the content of this JHA are required, follow the KPNO ETS Engineering Change Process. The master copy of the document must be checked out of the Document Vault, an Engineering Change form must be completed, and the Revision Table (see last page) must be updated. Note that periodic reviews of this JHA that do not result in content changes require only entry of the review date and the name of the reviewer in the Revision Table; the document revision should not be advanced in this case.

Tammie Lavoie 23 March 2018 Tammie Lavoie, Safety Manager Date

JHA Number: 2100-AD-015-0084-JHA Rev: - Standing: N/A

Date Completed: 9 February 2018

Title of Job or Task: Installation of DESI Fiber View Camera

Location/Facility: KPNO 4 Meter

Supervisor or Person Completing this JHA:

Miranda Saucedo

Person(s) Assisting with this JHA:

Tammie Lavoie, David Sprayberry

Recommended Personal Protective Equipment (PPE): select area above line to make entry

Head Protection Eye Protection X Hand and body Protection X Fall Protection X Foot Protection X Hearing Protection X Respiratory Protection

Special PPE: N/A

Notes: *Hard hats must be used whenever someone is working above you or at your head height, or when working with suspended loads. ** Safety Shoes are mandatory in the area during construction, maintenance, heavy or complex work.

Equipment or tools needed to perform the job: tab or select to make entry in next location, only use if not listed

in procedure.

N/A N/A N/A

Page 2: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 2 of 13

HAZARD ANALYSIS

Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions to control the hazards for each step. Tab will move to next column; to add rows place cursor outside table on the right, and press ENTER. Basic Job Steps: Review the activity and divide it into basic steps. Hazards Present in Each Job Step: Identify the hazards or the possible danger present for each basic job step. Correct and Safe Procedures and Precautions: Decide what actions or procedures are necessary to control and minimize the hazards present.

Things to consider: Use designations in the “Hazards Present” column: Do employees know how to do the job? AX – Asphyxiation HS – Heat stress What are the hazards? Include people and equipment. BR – Burn Hazard R – Repetitive Motion How can injuries or accidents occur? CB – Caught Between SA – Struck Against How can injuries or accidents be prevented? CBY – Contacted By SB – Struck By Are there obvious unsafe conditions? CI – Caught In SE – Stored Energy Are special tools needed? CO – Caught On SL – Suspended Load Do people need personal protective equipment? CW – Contact With TH – Trip Hazard

How would we rescue people if something went wrong? E – Exposure to Chemicals, Noise, Vibration, Radiation

Do we have the equipment to rescue? EL – Electrical ER – Ergonomics FB – Fall to Below FH – Fire Hazard

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

1.

Remove and set aside for later use the covers on the FVC camera mount port and the four (4) circular access ports surrounding it. Set all the cover mounting screws aside with their respective covers.

FB, SB, TH

-Examine covers for abnormal wear or structural damage. -Inspect screws for rust and wear to ensure a proper fit in the equipment. -To minimize a tripping hazard, keep covers out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 3: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 3 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

2.

Position the jacking cart under the telescope to the SE of the mirror cell, where the 5T dome crane hook can reach it from above. Put the wooden box/height extension on top of the jacking cart with the jack fully lowered, center the adapter plate on the wooden box, and lash the adapter, box and top of cart together for stability using the nylon ratcheting straps. Be sure not to cover or obstruct any bolt holes with the straps.

CI, CO, FB, SB, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -To minimize a tripping hazard, keep straps out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

3.

Install two eyebolts into the upper flange of the base baffle tube section using any two diametrically opposed bolt holes. Thread a lifting sling through the eyebolts. Lower the 5T crane hook and attach the lifting sling ends to the hook.

CI, CO, FB, SB, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Inspect eyebolts for rust and wear to ensure a proper fit in the equipment. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -To minimize a tripping hazard, keep straps out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 4: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 4 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

4.

Lift the base baffle tube section high enough to clear the adapter plate on the cart. Position the cart under the baffle tube section. Lower the baffle tube section onto the adapter plate, taking care to align the bolt circle (10mm through holes) in the baffle tube section bottom flange with the corresponding holes on the adapter plate. Bolt the base tube section securely to the plate. Detach the lifting sling ends from the crane, remove the sling, and remove the eyebolts from the tube flange.

CI, CO, FB, SB, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Inspect bolts for rust and wear to ensure a proper fit in the equipment. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -To minimize a tripping hazard, keep straps out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

5.

Roll the jacking cart back to its starting position and place the upper baffle tube section under the crane hook by hand, oriented vertically with the aperture flange facing up.

CI, CO, FB, SB, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -To minimize a tripping hazard, keep straps out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 5: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 5 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

6.

Install two eyebolts into the aperture flange of the extension baffle tube section using any two diametrically opposed bolt holes. Thread a lifting sling through the eyebolts. Lower the 5T crane hook and attach the lifting sling ends to the hook.

CI, CO, FB, SB, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Inspect eyebolts for rust and wear to ensure a proper fit in the equipment. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -To minimize a tripping hazard, keep straps out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 6: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 6 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

7.

Lift the extension baffle tube section high enough to clear the adapter+base section assembly. Position the cart under the suspended baffle tube section. Lower the extension baffle tube section onto the top flange of the base baffle tube section, taking care to align the bolt holes on the mating flanges of the tube sections (will require personnel on step ladders or movable work platforms on either side of the baffle tubes). Bolt the extension baffle tube section securely to the base baffle tube section at the mating flanges. Detach the lifting sling ends from the crane, remove the sling, and remove the eyebolts from the extension tube section aperture flange.

CI, CO, FB, SB, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Inspect bolts for rust and wear to ensure a proper fit in the equipment. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -To minimize a tripping hazard, keep straps out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

8. Clear the area under the telescope of everything except the adapter+baffle tube assembly on the jacking cart.

FB, SB, TH

-To minimize a tripping hazard, keep jacking cart out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

9.

Roll the jacking cart underneath the telescope from the South East, taking care that the adapter plate is oriented roughly correctly North-South: North is marked on both sides of the adapter plate with silver Sharpie notations. Lock the wheels of the jacking cart.

FB, SB, TH

-To minimize a tripping hazard, keep jacking cart out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 7: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 7 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

10. Three people clip into fall restraints previously attached to the mirror cell bottom.

CI, CO, FB, SB, TH

-Inspect fall protection equipment and related components for abnormal wear or structural damage. -Ensure all straps, harnesses, lanyards, retractors, etc. are in working condition and applied to workers and equipment correctly. -When the use of fall protection is warranted, it must be properly secured before any work begins. -To minimize a tripping hazard, keep fall protection equipment out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

11.

Raise the mirror lift as far as possible. The three fall-restrained people ride up on the lift, stabilizing the cart and the subassembly as it rises and ensuring that the stovepipe is roughly centered in the central hole of the mirror cell.

CI, CO, FB, SB, TH

-Examine mirror lift for abnormal wear or structural damage. -Confirm no workers are standing underneath mirror lift as it is being raised or lowered. -Inspect fall protection equipment and related components for abnormal wear or structural damage. -Ensure all straps, harnesses, lanyards, retractors, etc. are in working condition and applied to workers and equipment correctly. -When the use of fall protection is warranted, it must be properly secured before any work begins. -To minimize a tripping hazard, keep fall protection equipment out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 8: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 8 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

12.

Once the mirror lift has reached the maximum height allowed by the Cass cage, jack up the jacking cart until the adapter plate is almost in contact with mirror cell.

FB, SB, TH

-Examine mirror lift and jacking cart for abnormal wear or structural damage. -Confirm no workers are standing underneath mirror lift as it is being raised or lowered. -To minimize a tripping hazard, keep fall protection equipment and jacking cart out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

13.

If needed, further raise the jacking cart to bring the plate close enough to allow the bolts to be threaded through the adapter plate and into the holes in the mirror cell.

FB, SB, TH

-Examine jacking cart for abnormal wear or structural damage. -Confirm no workers are standing underneath jacking cart as it is being raised or lowered. -To minimize a tripping hazard, keep jacking cart out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

14. Install the bolts, and tighten them sequentially, working around the bolt circle.

FB, SB, TH

-Inspect bolts for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

15. Lower the jacking cart fully. FB, SB, TH

-Examine jacking cart for abnormal wear or structural damage. -Confirm no workers are standing underneath jacking cart as it is being raised or lowered. -To minimize a tripping hazard, keep jacking cart out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 9: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 9 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

16. Lower the mirror lift back to the level of the Main floor.

FB, SB, TH

-Examine mirror lift for abnormal wear or structural damage. -Confirm no workers are standing underneath mirror lift as it is being raised or lowered. -To minimize a tripping hazard, keep fall protection equipment and jacking cart out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

17.

Using four ¼-20 socket head screws inserted through the counter-bored holes in the mounting plate (Detail D of YALE-DESI-FVC-SA1-P3), secure the camera to the adapter plate.

FB, SB, TH

-Inspect screws for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

18.

Fit each square strut into each square cutout in the camera adapter plate, making sure that the threaded hole pattern in the strut sides are closer to the adapter plate than the free end. Secure to the adapter plate with ¼ -20 socket head cap screws and tighten.

FB, SB, TH

-Inspect bolts for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

19. Attach gusset plates with 8-32 flat heads as shown in the 3D rendering in the Yale drawing package.

FB, SB, TH

-Inspect screws for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

20. Remove the rear (smaller) protective cover from the lens.

FB, SB, TH

-Examine protective cover for abnormal wear or structural damage. -To minimize a tripping hazard, keep protective cover out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

21. Remove the protective cover from the Birger adapter on the camera body.

FB, SB, TH

-Examine protective cover for abnormal wear or structural damage. -To minimize a tripping hazard, keep protective cover out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 10: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 10 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

22.

If not already present, apply a small amount of a mild thread-locking compound (blue Loc-Tite or similar) on the ends of the threaded studs that will tie the two halves of the clamp together. Allow the thread-locking compound to dry.

CW, E

-When working with or around thread-locking compounds, avoid contact with sensitive areas, such as the eyes, nose, and mouth. If contact occurs, follow the “First Aid Measures” on the applicable Safety Data Sheet (SDS). -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

23.

Fit one of the clamp halves around the lens at the free end so that the counter-bored holes face UP and line up with their threaded counterparts on the support struts. Loosely fit ¼-20 socket head cap screws.

FB, SB, TH

-Inspect screws for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

24.

Fit the second clamp half onto the threaded studs of the first clamp, apply both washers and nuts and tighten clamp. The second pair of counter-bored holes should line up with the remaining threaded holes in the two struts. Insert ¼ -20 socket head cap screws and tighten all four.

FB, SB, TH

-Inspect washers, nuts, and screws for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

25. (One person) CAREFULLY carry the camera-lens-support subassembly down the stairs and into the Cass cage.

FB, TH

-When using the stairs to transport equipment, workers must use caution. -An alternative solution must be used if workers are unable to safely transport equipment using the stairs.

26.

CAREFULLY insert the subassembly into the square hole in the adapter plate and lift it until the subassembly base plate aligns with the two 6mm diameter alignment pins on the adapter plate. It may help to have one person support the subassembly while another person guides it onto the pins.

FB, SB, TH

-Examine subassembly for abnormal wear or structural damage. -To minimize a tripping hazard, keep protective cover out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

27. Loosely install the three M6 mounting bolts through the subassembly base plate into the threaded holes on the adapter plate.

FB, SB, TH

-Inspect bolts for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

28.

At each of the M6 bolt locations, insert three (3) thickness of brass 0.010” shim stock between the subassembly base plate and the adapter plate, around the M6 bolts. Tighten the bolts sequentially.

FB, SB, TH

-Inspect bolts for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 11: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 11 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

29.

Install the round Delrin covers over the West and South access ports adjacent to the FVC. In the other two round Delrin covers, drill through-holes and attach brackets for mounting the NUC interface box (East cover) and the FVC power supply (North cover). Attach the NUC interface box and power supply using their respective brackets. Install the covers with electronics attached over the East (NUC) and North (Power) access ports.

E, EL, FB, SB, TH

-Examine covers and brackets for abnormal wear or structural damage. -When working with power tools, workers may experience vibration and noise hazards. -Adequate hearing protection is required for noise levels over 85 dbA. -To minimize a tripping hazard, keep covers and brackets out of working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 12: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 12 of 13

REVISION TABLE

Rev

Date Approved

Remarks and/or Change Details

Reason for Change

Name

- Mar. 22, 2018 Initial Release T. Lavoie

Page 13: JOB HAZARD ANALYSIS (JHA)...JOB HAZARD ANALYSIS (JHA) INSTALLATION OF DESI FIBER VIEW CAMERA Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or

2100-AD-015-0084-JHA PRINT DATE: 2018-03-23

INSTALLATION OF DESI FIBER VIEW CAMERA Page 13 of 13

WORK GROUP MEMBERS FOR THIS JHA

I understand & will adhere to the steps, hazards & controls as described in this JHA. I understand that performing steps out

of sequence may pose hazards that have not been evaluated, nor authorized. I will contact my supervisor prior to continuing

work, if the scope of work changes or new hazards are introduced. I understand I have the authority and responsibility to

stop work if I believe it to be unsafe.

N° NAME (print) SIGNATURE DATE

1

2

3

4

5

6

7

8

9

10

11

12

SUPERVISOR IN CHARGE

I have reviewed the steps, hazards & controls described in this JHA with all workers listed above and authorize them to perform the work. Workers are qualified (i.e. licensed or certified, as appropriate, & in full compliance with NOAO training requirement(s) to perform this activity.

N° NAME SIGNATURE DATE

1