JK_BBP_PM_BP_0600

Embed Size (px)

Citation preview

  • 8/17/2019 JK_BBP_PM_BP_0600

    1/6

    Project Name

    Title

    JK Cement

    Preventive Maintenance

    Version

    Document ID

    1.0s

    JK_BBP_PM_BP_0600_V1.0 Author Akhilesh Kumar Singh

    Reviewed By XXXXXXX XXXXX

    Date 01.11.2012

    T r a n s f o r m i n g E n t e r p r i s e s

    Consulting

  • 8/17/2019 JK_BBP_PM_BP_0600

    2/6

    Business Blue Print- Business Process- Plantaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 2 of 6

    IMPLEMENTATION_BLUE PRINT

    Business Process Details

    ModulePlant Maintenance

    Process Preventive MaintenanceSub Process /o

    Managing Preventive, Running ,Shut Down &aintenance Logging JK_BBP_PM_BP_

    600Description Managing Preventive, Running ,Shut Down & Refractory Maintenance,

    aintenance Logging

    Sro

    Business Process Explanation

    1.1 As Is Process General Explanation1.2 Explanation of Proposed Process

    ask list Master data will have to be created which incorporates all predefined operations to beerformed & spare parts planning which will be required to perform the activity.

    Maintenance Plan has to be created which decides time based or performance based planningas to be done for the technical object. All scheduling parameters have to be defined on basis ofhich schedule has to be generated.Task List to be attached with this maintenance plan

    Also the call object i.e. Notification, Maintenance Order, Service Entry SheetWhich should be created for processing on due date has to be defined.

    Schedule the maintenance plan.Call object will be generated on the due date.

    If the equipment is not free on the due date, it can be planned for some other date. All maintenance activity performed can be recorded in the notification. Catalog master will becreated for this.

    Measuring point Master data will have to created against which specific readings have to bemeasured for the standard checks to be performed.In Performance based maintenance plan Measuring point is Counter, which has to be updatedregularly with actual reading on basis of which maintenance date is decided.

    Measurement document has to be created for the Measuring points (associated with object)that record all values of checks performed on the equipment. Other wise it will have to bewritten down in text.

  • 8/17/2019 JK_BBP_PM_BP_0600

    3/6

    Business Blue Print- Business Process- Plantaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 3 of 6

    Shift factor & Tolerance will be used to control generation of future calls if the currentcall has been delayed due to any reason

    All information regarding Break down & other details will prompt automatically on thescreen while processing order of that particular object.

    All cost analysis on labor & material used in preventive maintenance can be done.The Maintenance schedule will be available online.

    All the records of work analysis and material & labor used, cost will be same as of

    break down process.

    Sr.o.

    Activity Description T Code

    01 Creation of task list Task list is created for the technical objecthose maintenance plan has to be created

    IA01/ I05/ IA11

    02 Creation ofaintenance Plan(Based on the

    xisting maintenance

    lan, it is proposed toave single cycle plan)

    The cycle time is mandatory field to fill.If it’s a counter based plan then the counter

    o. has to be given and initial counter readinghould be entered by measuring documents.

    The technical object is assigned for whichaintenance plan is required.The respective task list is assigned.

    All the scheduling parameters is filled such asall horizon depending on time factor requiredr the call object to be called in advance,

    cheduling period etc.

    IP41 /42/ IP43

    03 Schedulingaintenance Plan

    Maintenance plan is scheduled so that thelanned dates and call dates are displayed

    IP10

    04 Deadline Monitoring Select the maintenance plans, which are to becheduled or released.

    Enter the numbers of days in call objects fore next ‘n’ days field to generate the call for theext specified days.

    IP30

    Process Flowchart :

  • 8/17/2019 JK_BBP_PM_BP_0600

    4/6

    Business Blue Print- Business Process- Plantaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 4 of 6

    OperationMaintenanceMaintenance Planner

    Preventive Maintenance

    START

    End

    Creation of Tasklists

    Creation ofmaintenance plan

    Maintenance planscheduling

    Release Order.Call Object

    ProcessNotification

    Issue permit

    Executethe job

    Executethe job

    Update thenotification and

    measuring point ifany

    Technicallycomplete the

    order

    Confirm theoperation and

    entermeasurementreading if any

    Return the permit

    Complete thenotification

    End

    Order

    Notification

    Order

    Notification

    Material Issuedby stores

    MaterialRequirement

    Stores

    Yes

    No

    Issue permit

    Return the permit

    Externalservicesrequired

    No

    Yes

    1Refer tonext page

    2Refer next

    page

    Maintenance Purchase

    Contract Exists

    Enter contractnumber in the

    externaloperations with

    services inmaintenance order

    yes

    No Release the orderand get the PR no.Create PO on thebasis of PR

    F & A

    1refer prev

    page

  • 8/17/2019 JK_BBP_PM_BP_0600

    5/6

    Business Blue Print- Business Process- Plantaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 5 of 6

    Sr No Topics3.1 Changes Management Issues

    Not Applicable.

    3.2 Description of Improvements

    Standard maintenance procedures will be available to all maintenance users as a readyeference.

    Repetitive task list can be copied to similar technical objects.Task lists can be directly adopted into a maintenance order therefore reduced data punching and

    lanning while preparing an order. All related aspects like maintenance strategy, frequency of operations to be performed, material

    equired for performing task, counter readings etc could be directly linked with task list for besttilization.

    Sr No Topics4.1 Interface / Enhancements considerations

    Not Applicable4.2 Reporting considerations

    Sr. No. Reports T- Codes1. Maintenance Plan selection criteria IP162. Maintenance item selection criteria IP183. Graphical Scheduling Overview IP194. Maintenance Scheduling Overview IP245 Dead line Monitoring for Maintenance Plans IP306 Monthly Maintenance Schedule list IW28,IW38

    1.3 Special Organizational ConsiderationsNA

    Sr No Gap Analysis

    2.1 Gap Identified in proposed solution against Requirements & ExpectationsNot applicable

    2.2 Impact of RequirementNot applicable

    2.3 Solution ProposedNot applicable

  • 8/17/2019 JK_BBP_PM_BP_0600

    6/6

    Business Blue Print- Business Process- Plantaintenance

    File Name: Release: ECC 6.0

    Responsibility: PM Status: Closed

    Copyright © 2011 JKT Page 6 of 6

    Business Process Signoff

    ModulePlant Maintenance

    Process Preventive MaintenanceSub Process /o

    Managing Preventive, Running ,Shut Down &aintenance Logging JK_BBP_PM_BP_0600

    Description Managing Preventive, Running ,Shut Down & Maintenance Logging