JIT/Lean Production Chapter 13

JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to: Describe JIT/Lean

Embed Size (px)

Citation preview

Page 1: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

JIT/Lean Production

Chapter 13

Page 2: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 2

13 Chapter ObjectivesBe able to:Describe JIT/Lean and differentiate between the Lean philosophy and kanban systems.Discuss the Lean perspective on waste and describe the eight major forms of waste, or muda, in an organization. Discuss the Lean perspective on inventory and describe how a kanban system helps control inventory levels and synchronize the flow of goods and material across a supply chain. Describe how the concepts of the Lean supply chain and Lean Six Sigma represent natural extensions of the Lean philosophy. Explain how a two-card kanban system works. Calculate the number of kanban cards needed in a simple production environment. Show how MRP and kanban can be linked together and illustrate the process using a numerical example.

Page 3: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 3

13 Just-in time/Lean

Just-in-time – A philosophy of manufacturing, applicable to manufacturing and services based on planned elimination of all waste and on continuous improvement of productivity

Lean – A philosophy of production that emphasizes the minimization of the amount of all resources (including time) used in the various activities of an enterprise. It includes identifying and eliminating non-value-adding activities. © 2010 APICS Dictionary

Page 4: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 4

13 Performance Advantage of a Lean Plant Circa 1986

Kicked off the JIT/Lean Production Revolution in the late 1980’s/early 1990’s

Figure 13.1

Page 5: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 5

13 Lean Philosophy

The Lean philosophy can be applied to a wide range of production and service environments.

Companies following the Lean philosophy can and do use a wide range of planning and control techniques, not just kanban.

The Lean philosophy is consistent with business process improvement, quality improvement, and supplier management initiatives.

Page 6: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 6

13 Lean Waste

Lean Waste – Any activity that does not add value to the good or service in the eyes of the consumer. Called “muda” in Japanese Identification of lean wastes began with Taiichi

Ohno, a Toyota engineer.

© 2010 APICS Dictionary

Page 7: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 7

13 Eight Lean Wastes

Overproduction Waiting Unnecessary transportation Inappropriate process Unnecessary inventory Unnecessary/excess motion Defects Underutilization of employees

Page 8: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 8

13 Lean Perspective on Inventory

Triangles represent inventory between work centers A, B, and C.

The buildup of inventory hides problems (at a cost) that may occur.

Figure 13.2

Page 9: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 9

13 Lean Perspective on Inventory

After a Lean transformation, wasted movement and space are eliminated and work centers are moved closer together.

Inventory levels are reduced dramatically and work centers make only what is needed when it is needed.

Figure 13.3

Page 10: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 10

13 Lean Perspective on Inventory

Process of reducing inventory leads to reduction of the other “wastes” and exposes problems in order of severity (‘water and rocks’ analogy)

Figure 13.4

Page 11: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 11

13 Recent Developments in Lean Thinking

Lean Six Sigma – A methodology that combines the organizational elements and tools of Six Sigma with Lean’s focus on waste reduction.

Lean Supply Chain Management – An extension of the Lean philosophy to supply chain efforts beyond production. Lean supply chain management seeks to minimize the level of resources required to carry out all the supply chain activities.

Page 12: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 12

13 Kanban System Kanban system – A production control approach that uses

containers, cards, or visual cues to control the production and movement of goods through the supply chain.

Key characteristics: Uses simple signaling mechanisms to indicate when specific items

should be produced or moved. Can be used to synchronize activities either within a plant or between

different supply chain partners. Are not considered planning tools, but rather control mechanisms that

are designed to pull parts or goods through the supply chain based on downstream demand.

Page 13: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 13

13 Kanban System

Two-card kanban system – Uses one card to control production and another card to control movement of materials.

Page 14: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 14

13 Kanban System for Two Work Centers

Figure 13.5

Page 15: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 15

13 Release of Finished Materials from Work Center B

Figure 13.6

Page 16: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 16

13 Pulling of Raw Materials into Production at Work Center B

Figure 13.7

Page 17: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 17

13 Removal of Finished Materials from Work Center A

Figure 13.8

Page 18: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 18

13 Two-card System Summary

A downstream system station pulls finished material out of work center B.

Work center B pulls raw material into production.

Demand for more raw material in work center B pulls finished material out of work center A.

Page 19: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 19

13 Pull System

Pull system – A production system in which actual downstream demand sets off a chain of events that pulls material through the various process steps. A kanban system is also called a pull system.

Page 20: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 20

13 Kanban System

Other signaling methods: Single-card systems Color coding of containers Designated storage spaces Computerized bar-coding systems

Page 21: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 21

13 Controlling Inventory Levels Using Kanbans

Calculating the number of kanbans:

Page 22: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 22

13 Kanban - Example 13.2

Determine the number of production cards needed using the following information:

Page 23: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 23

13 Kanban - Example 13.2

Convert the number of kanbans into the number of subassemblies and hours work:

Page 24: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 24

13 Kanban - Example 13.3

After a Lean initiative, the following improvements, were made: Production lead time has been cut from 2.6 hours

to a constant 1.6 hours. Demand from final assembly has been stabilized at

300 subassemblies per hour. Smaller, standardized containers that hold just 25

subassemblies are now being used.

Page 25: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 25

13 Kanban - Example 13.3

If the safety factor is reduced to 4%

Page 26: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 26

13 Synchronizing the Supply Chain Using Kanbans

To synchronize the supply chain, there must be a smooth, consistent flow of material through the supply chain links.

Figure 13.9

Page 27: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 27

13 Using MRP and Kanbans Together Example 13.4

Combine the planning capabilities of MRP with the control capabilities of kanban.

Figure 13.11

Page 28: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 28

13 Using MRP and Kanbans Together Example 13.4

There is no projected ending inventory. Consistent with Lean philosophy of having no more

inventory in the system than is needed. Planned orders all occur in the same week as the planned

receipts. Because planning lead time is just 1.6 hours, orders

released in a week should be completed in that week. Planned order quantities can be used to calculate the

demand rates and kanban cards for each week.

Page 29: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 29

13 Using MRP and Kanbans Together Example 13.4

Calculate D values

Calculate the number

of production

cards

Page 30: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

13 - 30Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall

JIT/Lean Production Case Study

Supply-Chain Challenges in Post-Earthquake Japan

Page 31: JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall13 - 2 Chapter Objectives Be able to:  Describe JIT/Lean

Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall 13 - 31

All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or

otherwise, without the prior written permission of the publisher. Printed in the United States of America.