Jintang China Water management article

Embed Size (px)

Citation preview

  • 7/28/2019 Jintang China Water management article

    1/2American Planning Assciatin

    Party secretary Wang Bo of Jintang county, located in

    Chns Shun Provne, rsed mny questons durng hs three-week

    Myors rnng Study our to the U.S. n 2011. He ws eselly n-

    terested n how Amern lnners mnge wterronts, strems, nd

    rvers, nd he ws tvted by the suess story o Bltmores Inner

    Hrbor. APAs rnng Study ours hve hosted hundreds o Chnese

    leders sne 2002.ours oen led to n-deth ollow-u studes by

    APA-led tems o lnners nd desgners to suort rttng Chnese tes. Fol-

    lowng hs 2011 tour, Wng sked APA to ssst Jntng County ols n exlorng

    unque oortunty or ther growng jursdton: wter resoure mngement n-

    tegrted wth urbn desgn.

    s s ubqutous n Chn s t s n the U.S.,

    the tems ntegrted strtegy reort gves

    the APA Chn Progrm good se study

    to shre wth leders nd lnners n both

    ountres.

    Nel Wensten, aicp, hed o the Mry-

    lnd-bsed Low Imt Develoment Cen-

    ter, ws rt o the tem. We hve been

    workng on rtl ltons o green

    nrstruture or long tme, nd to nd

    Rethinking a ResourceJntng County shows the wy on wter resoure mngement.

    By Je Soule, faicp

    G

    ,

    G

    G

    ;

    G

    A sketch o Jintang, viewed rom downstream.

    In Chn,

    In 2012, tem o APA members nd

    Chnese exerts develoed Jntngs Wter

    Mngement nd Urbn Desgn Strtegy

    through roess tht nluded ste vsts,

    tem meetngs, nd extensve bkground

    work. Now, less thn yer er the tem

    resented ts reommendtons to Jntng

    ols, the ty s norortng the re-

    ommendtons nto ts lns nd onstru-

    ton hbts.

    Getting to great

    Wth n extensve rver system, Jntng

    County (ronouned s Jntng; o.

    750,000) wnts better ntegrton o ts w-

    ter lndse nd eologl helth; t s lso

    keen to use ths rojet to edute govern-

    ment ols nd the ubl on how to tret

    the wter system s n menty nsted o

    mere utlty.

    Beuse the ssue o wter mngement

    Sichuan

    Province

    CHINA

    Jintang County

  • 7/28/2019 Jintang China Water management article

    2/244 Planning octber 2013

    wy to shre some bs des n Chn

    mde lot o sense, he sys. Another tem

    member, m Vn E, aicp, dded ths: I

    hve been workng nterntonlly on env-

    ronmentl ssues or mny yers, nd Jn-

    tng oered gret hne or us to show-

    se lessons lerned rom the wtershed

    level ll the wy to the street nd blok.

    Te tems reort begns wth n nly-ss o the urrent stuton n Jntng nd

    ross ll o Chn. Fn Xo, the he eng-

    neer o the Bureu o Geology nd Mnerl

    Exlorton o Shun Provne, rovded

    vluble Chnese exertse. Severl ssues

    lk o eroson ontrol, trsh, urbn storm-

    wter runo, grulturl runo, dmmng

    or esthet resons, nd humn enroh-

    ment nto the foodlnhllenge Jntng

    wter resoures. remendous eroson t

    onstruton stes s not urrently mtgt-

    ed nd retes serous sedment roblems

    downstrem.

    Te next element o the tems reort

    showses lessons lerned n the U.S. over

    the lst 50 yers, wth exmles o how to

    mrove wter qulty nd mtgte threts

    rom foodng. One ont s stressed: the

    mortne o lookng omrehensvely t

    the ssues nd t ll slesthe regon, ty,

    nd ndvdul stes.

    Green nrstruture s the ous o the

    thrd rt o the reort. In exlnng the

    rtonle or nludng ths normton,

    Andy Fng, APAs rogrm ssote or

    nterntonl rs, sys tht whle green

    nrstruture s mlr term n Chn,

    most Chnese lnners thnk str lnt-

    ngs nd the osonl green roo grdens

    sue. Te vlue o ths reort, he sys, s

    to mke t ler tht green nrstruture re-qures muh more ntegrton nd vrety

    o tehnques.

    em member Joe MDonld, aicp,

    ormer APA senor reserh ssote now

    wth the Northest Oho Sustnblty

    Communtes Consortum, rovdes these

    detls bout the tems reommendtons

    on green nrstruture: Jntng ols n

    strt wth the bss, lke eroson ontrol on

    develoment stes, trsh mngement, nd

    estblshng nturl rrn buer res,

    he sys. Longer term needs, nludng re-

    movng rver brrers lke the rubber dm

    shown here, n ollow.

    ulne Unverstys Regonl Urbn

    Desgn Center, led by Grover Mouton nd

    Nk Jensh, rovded the reorts urbn

    desgn elements. Tey worked hnd n

    hnd wth the wter tem (Wensten, Vn

    E, MDonld, nd Fng) to nlude the

    onets o wlkblty, green nrstru-

    ture, nd desgn gudelnes nto the reort.

    Among those suggestons: more humn-

    sled street ross setons tht nlude

    green stormwter mngement systems nd

    dtng the street ttern to the rver th

    to rete more enggng urbn wterront.

    Te tems ntegrted strtegy reort lso

    nludes three demonstrton stes n Jn-

    tng: n exstng resdentl blok retrot,

    green street desgn n the new dstrt, nd rurl strem orrdor n hstor town.

    Tese stes re desgned to hel Jntng o-

    ls exln the des nd mlement them

    mmedtely. Te green street desgn hs l-

    redy been nluded n the engneerng ln

    or the new town.

    Te nl reorts on both wter resoure

    mngement nd urbn desgn were re-

    sented lst Deember nd were well reeved

    by Chnese exerts nd the lol govern-

    ment. As result, the reort s now rt o

    the ol lnnng reommendtons or

    Jntng, nd the ommunty s roeedng

    wth ts lns or mrovng wter mnge-

    ment ordngly. In ddton, the Preeture

    o Chengdu, where Jntng s loted, hs

    shred ths reort wth other munltes

    tht re ng the sme ssues.

    Jef Sule is APAs directr utreach andinternatinal prgrams.

    The Water Management and Urban Design Strategy recommends moving this rubber dam in Jintang, which prevents the natural fow o water.