Copyright @ 2014 Jindal Steel & Power Limited 1 Copyright @ 2014 Jindal Steel & Power Limited 1 November, 2014 Jindal Steel and Power Ltd Investor Presentation

Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

  • Upload
    phamnhu

  • View
    221

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 1 Copyright @ 2014 Jindal Steel & Power Limited 1

November, 2014

Jindal Steel and Power Ltd

Investor Presentation

Page 2: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 2 Copyright @ 2014 Jindal Steel & Power Limited 2

Index

S. No Particulars Slide No

1 JSPL at a Glance 3-5

2 Strengths & Opportunities 6

3 Group Executive Committee - JSPL 7-10

4 Shareholding Pattern - JSPL 11-12

5 Operational Capacity at a Glance 13-16

6 Indian Economy at Glance 17-21

7 Industry Development - Steel 22-31

8 Industry Development - Power 32-40

9 Operations 41-57

10 Performance Highlights 58-66

11 Power- JPL 67-71

12 Global Ventures 72-81

13 Financials 82-90

14 Way Forward 91-92

15 Sustainability - Awards & Accolades 93-99

16 Projects 100-115

Page 3: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 3 Copyright @ 2014 Jindal Steel & Power Limited 3

Jindal Steel & Power Limited Building the Nation of Our Dreams

Aerial View of Raigarh Plant

Page 4: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 4 Copyright @ 2014 Jindal Steel & Power Limited 4

O P Jindal Group

Jindal Saw Mr. P.R. Jindal

JSL Limited Mr. Ratan Jindal

JSW Steel/JSW Energy Mr. Sajjan Jindal

Jindal Steel & Power (JSPL) Mr. Naveen Jindal

Copyright @ 2014 Jindal Steel & Power Limited 4

Ownership Structure - O P Jindal Group

Page 5: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 5 Copyright @ 2014 Jindal Steel & Power Limited 5

Annual turnover of JSPL

US$ 3.3 bn+

Future investments committed across continents

US$ 30 bn

Steel making capacity Mining capacity

22.56 MTPA

Power capacity

4,485 MW

Pellet making capacity

9 MTPA 29 Countries

Ensuring pan-India presence, covering 400 districts for retail

business

People strengths

16000+

Lives impacted by JSPL’s social endeavours

9 Lakh+

Saplings planted

7.4 mn+

7.75 MTPA

Export presence

1,550 Dealers

JSPL at a Glance - Part of US$ 18 bn OP Jindal Group

Page 6: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 6 Copyright @ 2014 Jindal Steel & Power Limited 6

Strengths & Opportunities

• Enhanced capacities in steel & power :

– Steel 3 MTPA to 7.75 MTPA

– JPL Power 1000MW to 3400 MW

– -Pellets 4.5 MTPA to 9 MTPA

• Proven track record of High utilization of resources

• Professional management & robust internal systems

• Harness higher revenues from enhanced capacities

• Steel & Power sector at inflexion point

• Demand for Power expected to grow

• Well placed to capture growing demand in overseas markets especially MENA Countries

Strengths Opportunities

* Includes 600 MW which will be commissioned in FY15

Page 7: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 7 Copyright @ 2014 Jindal Steel & Power Limited 7 Copyright @ 2014 Jindal Steel & Power Limited 7

Mr. Naveen Jindal – Chairman

• Ranked amongst the Asia’s 25 Hottest People in Business by the Fortune Asia magazine for turning a struggling steel company into one of Asia’s blue-chip giants

• India’s Best CEO by the BT-INSEAD-HBR Study of the top value creators for the period 1995 to 2011 by the Business Today

• Featured among the top ten of India Inc's Most Powerful CEOs 2011 by IMRB survey for Economic Times-Corporate Dossier

• Conferred with the Ernst and Young Entrepreneur of the Year Award 2010 in the field of Energy and Infrastructure

Mr. Ravi Uppal – Managing Director & Group CEO

• Over 37 years of experience in engineering and infrastructure

• Previously whole-time Director and President & CEO – Power at Larsen & Toubro Group. Also held senior positions at ABB and Volvo

• Advanced MBA from Wharton, MBA from IIM Ahmedabad, and B.Tech. from IIT Delhi

Mr. Anand Goel – Chief Advisor

• Over 37 years of experience with the O.P. Jindal Group

• Master's Degree in Business Administration from BITS, Pilani

• Member of the National Steel & National Mining committees of FICCI and National Mining Committee of CII

Group Executive Committee - JSPL

Page 8: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 8 Copyright @ 2014 Jindal Steel & Power Limited 8 Copyright @ 2014 Jindal Steel & Power Limited 8

Mr. Rajesh Bhatia – CEO Global Ventures

• Over 21 years of experience in the field of Finance, Accounts, Taxation, Administration and Commercial

• Played an important role in JSPL's overseas acquisitions in Australia, Indonesia, South Africa, Mozambique, Madagascar, Mongolia & Oman, apart from arranging financing for greenfield expansion in Orissa and Jharkhand in India.

Group Executive Committee - JSPL

Mr. R S Sharma – Managing Director & CEO, JPL

• Over 40 years of experience in the power sector

• Previously he was the Chairman and Managing Director, NTPC Ltd.

• He has been honoured with several awards including honorary fellowship from International Project Management Association, fellowship of World Academy of Productivity Science

Mr. K Rajagopal – Director & Group CFO

• A Chartered Accountant by qualification, Mr. Rajagopal has extensive background into the whole gamut of Finance across organizations.

• He brings with him more than 31 years of experience out of which about 21 years has been with ABB.

• He is a strategist, a policy maker, and has strived to continuously improve the profitability through strategic and highly efficient business portfolio evaluation.

Page 9: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 9 Copyright @ 2014 Jindal Steel & Power Limited 9

Mr. V K Mehta – ED Marketing

• Over 37 years of experience in marketing

• Previously, he was working with SAIL, Kolkata as its Executive Director, Marketing and was also on the Board of Directors of Mjunction and SAIL-SCI Shipping Co.

Mr. Rajeev Bhadauria – Director Group HR

• More than 29 years as a HR professional across Public and Private sectors

• Previously Regional HR head – NTPC and President HR – Reliance ADA Group

• Post Graduate in Industrial Relations from the Power Management Institute, NTPC and LLB from Allahabad University

Group Executive Committee - JSPL

Page 10: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 10 Copyright @ 2014 Jindal Steel & Power Limited 10

Group Executive

Committee

Senior Management Committee

Core Management

Team

UniCo

For each Location

ManCo

For each Business

Business Segments

Global Ventures

Mines & Minerals

Power

Steel & Cement

Moving Towards Plural Leadership

Strategic Governance Structure Operational Governance Structure

Implementation of Strategic & Operational Governance Structure

Page 11: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 11 Copyright @ 2014 Jindal Steel & Power Limited 11

Shareholding Pattern - JSPL

31-Mar-11 31-Mar-12 31-Mar-13 31-Mar-14 30-Jun-14 30-Sep-14

Promoters 58.41% 58.91% 59.13% 60.41% 60.41% 60.48%

Institutional Investors 29.54% 28.96% 27.45% 26.45% 27.15% 25.91%

Public and other share holding 12.05% 12.13% 13.42% 13.14% 12.44% 13.61%

Total 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Number of share holders 1,23,842 1,26,678 1,32,311 1,35,593 1,35,237 155,060

123,842 126,678 132,311 135,593 135,237 155,060

-

50,000

100,000

150,000

200,000

31-Mar-11 31-Mar-12 31-Mar-13 31-Mar-14 30-Jun-14 30-Sep-14

Number of share holders

Number of share holders

Number of share holder s (Retail /HNI) increases by 15% in 2Q FY15

Page 12: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 12 Copyright @ 2014 Jindal Steel & Power Limited 12

March, 2012 March, 2013 March, 2014 June, 2014 Sept, 2014

Foreign Inst’ Investors 22.14% 20.76% 22.32% 22.38% 21.38%

Insurance 4.09% 3.23% 2.47% 3.17% 3.07%

Mutual funds 2.71% 3.41% 1.61% 1.49% 1.36%

Others -financial institutions

0.02% 0.05% 0.05% 0.11% 0.10%

Total Inst’ share holding 28.96% 27.45% 26.45% 27.15% 25.91%

Institutional Shareholding - JSPL

Institutional Investors still hold Majority stake amongst the Minority Shareholders

Page 13: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 13 Copyright @ 2014 Jindal Steel & Power Limited 13

Steel & Cement Power

Mines & Minerals

Business segments

Global Ventures

JSPL

Steel 7.75 MTPA

Mining 22.56 MTPA

Power 4485 MW

Current Capacities – Domestic & Global

Business Segments

Page 14: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 14 Copyright @ 2014 Jindal Steel & Power Limited 14

Capacity in deail

Raigarh

SMS 3.25MTPA

BF 2.01 MTPA

DRI 1.37 MTPA

Plate Mill 1.00 MTPS

RUBM 0.75 MTPA

MLSM 0.60 MTPA

CPP 851 MW

Angul

SMS 2.5 MTPA

DRI 1.8 MTPA

CGP 225,000 Nm3/Hr

Plate Mill 1.2 MTPA

CPP 810 MW

Barbil

Pellet Plant

9 MTPA

Patratu

WRM 0.6 MTPA

Rebar Mill 1.0 MTPA

Oman

SMS 2.0 MTPA

HBI 1.5 MTPA

JPL

Tamnar 2800 MW

Mining

Iron Ore 3.11 MTPA

Coal Domestic

12.25 MTPA

Coal Overseas

7.20 MTPA

Operational Capacity at a Glance

Page 15: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 15 Copyright @ 2014 Jindal Steel & Power Limited 15

Raigarh

3.25 MTPA Steel Plant

Thermal Coal 6MTPA: Gare IV / 1

Iron Ore: 3.11 MTPA Tensa Mine & Pellet from Barbil

Coking Coal: Import

Angul

2.5 MTPA Steel Plant

Thermal Coal: Either Linkage/ e-auction/Imported

Iron Ore: Pellet from Barbil

Coking Coal: Not Required

Barbil

9 MTPA Pellet Plant

Thermal Coal: NA

Iron Ore: External

Coking Coal: NA

Oman

2 MTPA Steel Plant

Natural Gas: MoU with Govt of Oman

Pellet: Local sources

Coking Coal: Not Required

Raw Material Sourcing - Steel

Page 16: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 16 Copyright @ 2014 Jindal Steel & Power Limited 16

Overview of Mines

Mines State Annual extraction

(Approved capacity as per mine plan)

End Use

Iron Ore Reserves

Tensa Odisha 3.11 MT Raigarh steel

For Existing Operation

*Gare IV / 1 Chhattisgarh 6.00 MT Raigarh DRI & Captive power plant

*Gare IV / 2 & 3 Chhattisgarh 6.25 MT JPL Power Plant

Overseas Coal Mine

South Africa Operating

Mozambique, Africa Operating

Wollongong Coal Limited, Australia

Operating

* As per Supreme Court directives these coal mines will continue to operate till 31.03.2015

Page 17: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 17 Copyright @ 2014 Jindal Steel & Power Limited 17

Page 18: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 18 Copyright @ 2014 Jindal Steel & Power Limited 18

Indian Economy –A Mixed Half Year So Far A Buoyant Q1 followed by a Struggling Q2

World Bank pegs India’s Growth at 5.60% in 2014-15

Avg. IIP Growth in Q1 : 3.80% Vs Avg IIP Growth in Q2 : 0.45%

CPI dropped to 6.46% in Sep’14, while WPI dropped to a five year low of 2.38%

Indian Rupee remained stable in the band of Rs. 60-62/USD during the quarter

Page 19: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 19 Copyright @ 2014 Jindal Steel & Power Limited 19

Indian Economy –A Mixed Half Year So Far A Buoyant Q1 followed by a Struggling Q2

Economic Growth: RBI expects Indian economy to grow by 5.5% this fiscal

Manufacturing Sector exhibited growth in Q1 but slowed down in Q2: 3.8% / -1.2%

Mining Sector exhibited growth in Q1 but tapered in Q2: 2.9% / 1.9%

Electricity Sector exhibited growth in both Q1 & Q2: 11.43% / 12.3%

Page 20: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 20 Copyright @ 2014 Jindal Steel & Power Limited 20

Green Shoots

FDI: Indian Govt has recently cleared 25 FDI proposals worth Rs 1,546.12 crores

Standard & Poor has upgraded outlook for India from Negative to Stable

Crude oil prices continue to plummet, touched 2-years low – A big plus for India

Page 21: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 21 Copyright @ 2014 Jindal Steel & Power Limited 21

New Policy Initiatives Announced by Government of India

Ordinance for Coal allocation

Relaxed norms for foreign direct investment in key sectors like Defence, Railways and Insurance

Identified focus sectors to boost manufacturing in India

Page 22: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 22 Copyright @ 2014 Jindal Steel & Power Limited 22

Page 23: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 23 Copyright @ 2014 Jindal Steel & Power Limited 23

1070

723

110 79 73

31 17 10

1096

742

113 81 72

30 18 11

World Asia EU North America CIS South America Middle East Africa

2013 2014 Fig in Mt

Global Steel performance

2.4%

2.7%

3.4% 0.9%

7.6 7.2%

2.3%

1.1%

• World Crude Steel Production up

by 2.4% in Jan – Aug’ 14 (y-o-y), led by higher Asian output.

• Middle East & Africa continue to record higher production

Page 24: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 24 Copyright @ 2014 Jindal Steel & Power Limited 24

77

55

81

56

CY '12 Vs '13 8 Month CY '13 Vs '14

India

1.8

%

5.1% India: - India recorded impressive

Crude production growth of 5.1% in CY 13 (y-o-y).

- However, for Jan-Aug ‘14 steel

production rate was only 1.8% (y-o-y) due to raw material unavailability and mining clampdown

Production trend of Indian Steel Industry

Page 25: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 25 Copyright @ 2014 Jindal Steel & Power Limited 25

Steel Demand: Short Range Outlook for 2014 and 2015

India:

India’s outlook is improving following new Government formation.

Steel demand expected to grow by 3.4% (In 2014) and 6% (in 2015)

MENA:

In the MENA region, steel demand expected to grow by 3.3% (CY 14)

and revive to 6.6% (CY15)

Page 26: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 26 Copyright @ 2014 Jindal Steel & Power Limited 26

April- Sept'14 Sept '14

(Qty in million MT) Qty % Change

(y-o-y) Qty % Change (m-o-m)

Production: Crude Steel 41.8 2.4 7.1 0.9

Finished Steel (Non Alloy+Alloy)

Import 3.9 26.9 0.8 3.3

Export 2.7 0.4 0.3 (33)

Real Consumption 37.2 0.5 6.0 (9.2)

How the Indian Steel Industry fared

Crude Production: During April-Sept’ 14, crude steel production grow by 2.4% (y-o-y)

Real Consumption of Steel: India’s consumption of finished steel grow by 0.5% in April-Sept ’14 (y-o-y)

Page 27: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 27 Copyright @ 2014 Jindal Steel & Power Limited 27

2679

356

3309

547

Flat Non-Flat

Share of Flat/Non Flat Imports (‘000 MT)

Apr-Sep '13 Apr-Sep '14 (Prov.)

23%

53%

3036

3856

Apr-Sep '13 Apr-Sep '14 (Prov.)

Imports of Total Finished Steel ('000 MT)

26.9%

India: Steel Imports grow significantly

- Imports of total finished steel jumped by 27% in April – Sept ‘14 (y-o-y) due to • Impact of Relative Prices • Impact of Policy Measures ( like concessional import duty to items from South Korea and

Japan under CEPA)

- Import of Non-Flat steel jumped 53% in April – Sept’ 14 (y-o-y)

Page 28: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 28 Copyright @ 2014 Jindal Steel & Power Limited 28

Price trend – Raw Material (International)

• International Iron ore price fails to get a support from the demand side and have stayed low, in the range of US 79-81/tonne (CFR China) in the last 2 months

• Coking coal mkt attains downward stability, Prices are found to hover in the range between USD 107 to 112/tonne (FOB Australia)

60.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

US$

/MT

International Market

Fine 62, CFR, China HCC, FOB, AU

Page 29: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 29 Copyright @ 2014 Jindal Steel & Power Limited 29

Price trend – Raw Material (Domestic)

2600

2800

3000

3200

3400

3600

3800

5500

6000

6500

7000

7500

8000

8500

9000

9500

10000

Fin

es

pri

ces

in R

s/to

nn

e

Pe

llets

& L

um

p P

rice

s in

Rs/

ton

ne

Domestic Market

Pellet 63.5, Barbil Lump 63, Barbil Fines 63, Barbil

Page 30: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 30 Copyright @ 2014 Jindal Steel & Power Limited 30

400

420

440

460

480

500

520

10000

15000

20000

25000

30000

35000

40000

45000

50000

55000

Jul-14 Aug-14 Sep-14 Oct-14 Last week Latest

Price Movements: TMT & WIre rod Domestic (Delhi-Rs/MT) Vs International ($/MT)

TMTRebar-Delhi

Wire Rod-Delhi

TMTRebar- FOBChina

Wire Rod -FOB China

Price trend – Long products

July ‘14 – Oct ‘14: Price

movement:

Domestic Prices: - ~6-9 % decrease in TMT

- ~5-8 % decrease in wire rod

International Prices: - ~ 6% decrease in TMT (FOB

China)

- ~ 8 % decrease in Wire rod (FOB

China)

Conclusion:

Long product:

• Falling international prices created

pressure on domestic prices.

• Imbalance in relative pricing created

spurt in imports of Long finished steel

$/MT

International

Domestic

Rs/M

T

Page 31: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 31 Copyright @ 2014 Jindal Steel & Power Limited 31

450

460

470

480

490

500

510

520

530

540

30000

32000

34000

36000

38000

40000

42000

Jul-14 Aug-14 Sep-14 Oct-14 Last week Latest

HRC & Plate Price Movement: Domestic (Delhi -Rs/MT) & Internatioanal (FOB China- $/MT)

HR Coil-Delhi

HR Plate-Delhi

HR Coil-FOBChinaHR Plate-FOBChina

Price trend – Flat product

July‘14 – Oct ‘14: Price

movement:

Domestic Prices: - ~ 3 % decrease in HRC

- ~ 4 % decrease in Plate

International Prices: - 6-7 % decrease in HRC & Plate

(FOB-China)

Conclusion:

Flat product: Falling international prices has

created pressure on domestic

Flat prices,

Outlook:

Domestic prices to recover,

since Chinese domestic prices

has started firming up

$/MT

Domestic

International

Rs

/MT

Page 32: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 32 Copyright @ 2014 Jindal Steel & Power Limited 32

Page 33: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 33 Copyright @ 2014 Jindal Steel & Power Limited 33

Power – Recent Developments

CEA has recommended retiring of 4,000 MW capacity in the National Electricity Plan of the 12th Plan (2012-17).

GoI is planning to create public sector energy giants with a massive restructuring exercise that will amalgamate all state-run hydropower firms and transfer their thermal projects to NTPC to create strong companies that can take on the rapidly growing private conglomerates

765 kV Ranchi-Dharamjaygarh-Sipat Inter-regional transmission line was dedicated to nation on 21st Aug ‘14.

Page 34: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 34 Copyright @ 2014 Jindal Steel & Power Limited 34

Power Scenario – Installed Capacity (30th Sep 2014)

176,779

4,780

40,799 31,692

254,050

-

50,000

100,000

150,000

200,000

250,000

300,000

3,804

21,136

4,014

107 2,632

Small Hydro Wind BM/Cogen Waste to Energy Solar

(in MW)

Source: CEA

(in GW)

60.2% 8.9%

0.5%

1.9%

16.1%

12.5%

Coal Gas Diesel Nuclear Hydro RES

148 159

174

200

223

243

0

50

100

150

200

250

300

FY09 FY10 FY11 FY12 FY13 FY14

All India – Installed Capacity

Renewable Sources All India –

Installed Capacity (in MW)

Page 35: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 35 Copyright @ 2014 Jindal Steel & Power Limited 35

Private Sector contribution in Generation

11 12 13 14 15 18 20 27 31 34 36

89 88 87 86 85 82 80 73 69 66 64

0%

20%

40%

60%

80%

100%133 125 113 160 149 174 200 144 224

Private Government

Source: CEA; Planning commission; Infraline; Analyst report; Company Web sites

Increasing share of private sector

GW

243 254

Page 36: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 36 Copyright @ 2014 Jindal Steel & Power Limited 36

Growth in Thermal Capacity vs PLF%

Source: CEA

94 102

112

132

152

168 177

77.20% 77.50%

75.07%

73.32%

69.95% 65.55% 65.35%

50.00%

55.00%

60.00%

65.00%

70.00%

75.00%

80.00%

0

20

40

60

80

100

120

140

160

180

200

FY09 FY10 FY11 FY12 FY13 FY14 Q2FY15

Inst.Cap (in GW) PLF (in %age)

Page 37: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 37 Copyright @ 2014 Jindal Steel & Power Limited 37

India’ s Per Capita Consumption of Electricity

Source: CEA

World Average – 2782 Kwh

631 672

717 734 779

819 879

917 951

0

100

200

300

400

500

600

700

800

900

1000

2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14

Annual Per Capita Consumption (Kwh)

Page 38: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 38 Copyright @ 2014 Jindal Steel & Power Limited 38

Power Deficit States

5.0% 6.7% 6.8% 7.0%

8.3% 9.9% 10.5%

13.1% 14.0%

20.0%

23.6%

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

2.5% 5.5% 5.6%

7.1% 8.1% 8.4% 9.6% 9.9%

14.4% 16.4%

20.0%

Source: CEA

Peak Deficit

All India Avg. 4.7%

(Apr’14 to Sep’14)

All India Avg. 4.0%

(Apr’14 to Sep’14)

Base Deficit

Page 39: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 39 Copyright @ 2014 Jindal Steel & Power Limited 39

Challenges faced by Indian Power Industry

•Lack of sufficient growth in domestic coal Production • Regulatory changes in markets such as Indonesia • Shortage of gas supply

Fu

el

Ge

ne

rati

on

• Inordinate delays in environmental clearances • Tightening of norms from financial institutions

Page 40: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 40 Copyright @ 2014 Jindal Steel & Power Limited 40

Challenges faced by Indian Power Industry

•Network not sufficient to meet growth • Several Transmission projects developing slowly • Success of Southern Grid integration and open access depends on expansion of Transmission capacity • Development of Regional & National Grids

Tra

nsm

issi

on

D

istr

ibu

tio

n • SEBs financial losses

• High AT&C losses • SEBs resorting to load shedding in peak hours • Entry of Private players in T&D

Page 41: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 41 Copyright @ 2014 Jindal Steel & Power Limited 41

Page 42: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 42 Copyright @ 2014 Jindal Steel & Power Limited 42

12,100 Cr. 3.25 MTPA Liquid Steel 2.35 MTPA Finished Steel 851 MW 5200 Investment Capacity Steel Power Workforce

JSPL at Raigarh

Page 43: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 43 Copyright @ 2014 Jindal Steel & Power Limited 43

Flow Diagram of Process in Raigarh

Page 44: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 44 Copyright @ 2014 Jindal Steel & Power Limited 44

18500 Cr. + 2.5 MTPA Steel 1.2 MTPA Finished Steel 810 MW 2723 Investment Capacity Capacity Power Workforce

JSPL at Angul

Page 45: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 45 Copyright @ 2014 Jindal Steel & Power Limited 45

Product usage

Ship Building Line Pipes High End Structural

Boilers Wind Mills Engineering Pressure Vessels

Coal Gasification Gas Based DRI EAF

Plates Plate Mill Slab Caster

Link Link Link

Link Link Link

Flow Diagram of Process in Angul

Page 46: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 46 Copyright @ 2014 Jindal Steel & Power Limited 46

2,388Cr. 9 MTPA Pellet 660 Investment Capacity Workforce

JSPL at Barbil

Page 47: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 47 Copyright @ 2014 Jindal Steel & Power Limited 47

Flow Diagram of Process in Barbil

Page 48: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 48 Copyright @ 2014 Jindal Steel & Power Limited 48

Process of Pelletisation

Page 49: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 49 Copyright @ 2014 Jindal Steel & Power Limited 49

1,764 Cr. 1.6 MTPA Finished Steel 1,373 Investment Capacity Workforce

JSPL at Patratu

Page 50: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 50 Copyright @ 2014 Jindal Steel & Power Limited 50

Bar Mill Processing Panther TMT Rebar

WRM Processing Wire Rod

Rebar Service Centre Processing Taking Shape Cut & Bend

Flow Diagram of Process in Patratu

Page 51: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 51 Copyright @ 2014 Jindal Steel & Power Limited 51

Plant Installed

Capacity (Ton)

Covered area (Sq. Mts)

Angul (Odisa)

84,000 32,000

Plant Installed

Capacity (Ton)

Covered area (Sq. Mts)

Punjipatra (Raigarh)

1,20,000 60,000

Structural Steel Division

Page 52: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 52 Copyright @ 2014 Jindal Steel & Power Limited 52

At Angul

• Widest Plate Mill (5m) in India with 4th generation Heat Reversible Treat Plate Leveler

• Roll Trip-steel/Silicon Steel/DD/EDD/IF grades : opens up opportunity for new and high margin product segments.

• Further processing to address value added markets: Galvanized & Coated Steel

• Largest BF in India (4554 m3), few among the world

Investing in State-of-the-Art Technologies & manufacturing system for high margin products

New Products & Technology Initiatives

Page 53: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 53 Copyright @ 2014 Jindal Steel & Power Limited 53

At Raigarh

• RUBM to be leveraged with Head Hardened Rail Facility: To cater to metro boom in Indian cities.

• Only manufacturer of high margin HH rail in India.

• Galvanizing facility of structures: Catering to high margin TLT segment.

At Patratu

• State-of-the-art Wire-Rod Mill: Forward integrated with wire-drawing

New Products & Technology Initiatives

Page 54: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 54 Copyright @ 2014 Jindal Steel & Power Limited 54

At Oman • Commissioned its 2-MTPA ISP in Oman: Rode into the league of the three biggest steel

makers in the Arab peninsula. • SMS complex : EAF (200MT) largest in Middle East, a Ladle Furnace (200MT), Continuous

Billet Caster and Vacuum Degassing Furnace Facility • The new steel plant is among the most compact and advanced anywhere in the world:

commissioned from scratch in an astounding 23 months flat.

New Products & Technology Initiatives

Page 55: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 55 Copyright @ 2014 Jindal Steel & Power Limited 55

• Expanding Geographical reach of Steel sales – New offices setup in South Africa, Dubai,

Indonesia

• Launch of Channel financing in retail segment and Increasing the turnover by 3 times.

• Revamping “Key Account Managers" concept for steel business

New Initiatives

Page 56: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 56 Copyright @ 2014 Jindal Steel & Power Limited 56

Fabricated Structures Hot Rolled Plates

and Coils Parallel Flange Beams

Wire Rods Power

Angles and Channels

TMT Rebars Rails

JSPL Product Range

Page 57: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 57 Copyright @ 2014 Jindal Steel & Power Limited 57

Presence in 27 states and 5 Union Territories covering 500 districts

Over 41 distributors

More than 1,550 dealers across country

27 Retail Sales Managers and 207 Distributors ASOs

731 Hoardings installed

450 Shop boards installed across country. More underway

Panther Brand was launched on 5th August 2013 (National Event Organized)

Training sessions for Distributors & Dealers being organized across country

Panther TMT Bars Brand

Page 58: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 58 Copyright @ 2014 Jindal Steel & Power Limited 58

Performance Highlights – Q2 FY 2014-15

Page 59: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 59 Copyright @ 2014 Jindal Steel & Power Limited 59

Performance Highlights - Steel

6.3 6.8

7.9

9.7

7.2 8.0 8.1 8.2

7.4 6.9

Q1 Q2 Q3 Q4

Total Sales (in Lakh MT)

FY13 FY14 Fy 15

6.9 lakh MT sold domestic and 1.92 lakh MT in Q2 FY 15

Page 60: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 60 Copyright @ 2014 Jindal Steel & Power Limited 60

Key Financial Highlights: Q2 FY14-15

Consolidated EBITDA improves from 30% to 32%

Consolidated Cash Profit jumps by 44%

3 fold growth in retail sales over H1 FY14

Over 25% growth in Retail Dealer network from March 2014

Oman plant improves its EBITDA

Page 61: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 61 Copyright @ 2014 Jindal Steel & Power Limited 61

Key Operational Highlights: Q2 FY14-15

Focus on Inventory reduction continues

BF - 1 Production Stabilized

DRI achieved quality of avg. 94% metallization at Angul

Hot DRI Charging from DRI plant to EAF was successfully started at Angul

Process Boiler # 3 commissioned at Angul and taken into service on 12th Sept’14

Commercial Prod from Central Dundas at South Africa started on 14th Sept’14

Floatation Plant commissioned at Mozambique in the month Aug’ 2014

Page 62: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 62 Copyright @ 2014 Jindal Steel & Power Limited 62

• Modernization of BF – 1 completed

• Revamp of EAF - 1 completed in 15 days

• Slag Processing plant commissioned

Performance Highlights – Raigarh

Page 63: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 63 Copyright @ 2014 Jindal Steel & Power Limited 63

Investing in State-of-the-Art Technologies & manufacturing system for high margin products

• Coal Gasification plant commissioned.

• DRI plant commissioned - Production started

• Use of syn gas in Re heating furnace Plate Mill, Lime and Dolo Kilns & SMS in

place of LDO/HSD.

• Started dispatch of CGP By products in the market

Performance Highlights – Angul

Page 64: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 64 Copyright @ 2014 Jindal Steel & Power Limited 64

• Jindal Shadeed commissioned its state of the art 2 MTPA Steel Melting Shop, first &

largest integrated Steel Plant in Oman. Selling HBI and Billets in the overseas markets.

Performance Highlights – Oman

Page 65: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 65 Copyright @ 2014 Jindal Steel & Power Limited 65

Retail Distribution Network

Growth in Distributor Network (from 5 – 41)

Growth in Dealer Network (from 267 to 1550)

0

20

40

0200400600800

100012001400

267

1550

5

41

Page 66: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 66 Copyright @ 2014 Jindal Steel & Power Limited 66

Retail – Growth

682 3,534

7,359

17,845 17,092 19,832

35,315

51,899

65,773

51,661

-

10,000

20,000

30,000

40,000

50,000

60,000

70,000

Q1 FY 13 Q2 FY 13 Q3 FY 13 Q4 FY 13 Q1 FY 14 Q2 FY 14 Q3 FY 14 Q4 FY 14 Q1 FY 15 Q2 FY 15

117,434 MT Channel sales in H1 FY 15

3 fold growth in Retail Sales volume

over H1 FY14

Page 67: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 67 Copyright @ 2014 Jindal Steel & Power Limited 67 Power Plant at Tamnar

POWER

Page 68: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 68 Copyright @ 2014 Jindal Steel & Power Limited 68

96.43% subsidiary of JSPL

Existing Units Phase I - 1000MW (4 X 250) Phase II - 1800MW (3 X 600)

Under Implementation 600MW (1 X 600)

JINDAL POWER LIMITED

Page 69: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 69 Copyright @ 2014 Jindal Steel & Power Limited 69

Particulars Net Sales

(Cr.) PAT (Cr.)

Generation (MU)

PLF

Year 2013-14 2457 1107 8282 92%

Year 2012-13 2510 1113 7973 91%

Year 2011-12 3,040 1765 8589 98%

JPL Financials

Page 70: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 70 Copyright @ 2014 Jindal Steel & Power Limited 70

JPL Financials – Q2 FY 15

Particulars FY Quarter 2

Growth (%) 2013-14 2014-15 2013-14

Turnover 2,457 927 665 39%

EBITDA 1,533 522 432 21%

EBITDA% 62% 56% 65% -

PBT 1407 377 381 -1%

PBT% 57% 41% 57% -

PAT 1107 295 301 -2%

PAT% 45% 32% 45% -

Depreciation + Amortization 274 129 67 91%

Cash Profit 1381 431 376 14%

Generation (million units) 8282 2799 2099 33%

PLF (%) - 4X250 MW 95% 95% 95% -

PLF (%) - 3X600 MW NA 18% NA NA

Page 71: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 71 Copyright @ 2014 Jindal Steel & Power Limited 71

These Transmission Lines would help in evacuation of Power for JPL

Transmission Lines

Region

Present Inter-Regional Transfer Capacity

Anticipated transmission capacity addition

Present Available Transfer Capacity

LTA/MTOA Transmission line name Additional Capacity

Time frame

Chhattisgarh Area (W#3) 9300 MW 6843 MW 765 kV D/C Raipur -Wardha Line-I 3000MW Dec'14

765 kV D/C Raipur -Wardha Line-II 3000 MW Jun'15

WR to NR* 4400 MW 4380 MW 2 nos. 765 kV Gwalior -Jaipur Lines 3000 MW Mar'15

Champa-Kurukshetra HVDC Line 3000 MW Dec'15

WR/ER to SR* 4000MW 4000 MW 765kV Pune- Solapur Line 900 MW Mar'15

765kV D/C Kolhapur-Narendra line 700MW* Dec'15

Page 72: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 72 Copyright @ 2014 Jindal Steel & Power Limited 72 Corporate Office, Jindal Africa

Page 73: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 73 Copyright @ 2014 Jindal Steel & Power Limited 73

Global Business – A Two Pronged Focus • A Platform to Enhance Backward Integration

• A Driver for Profitable Growth - New Markets & Strategic Beachheads

JSPL – The Global Footprint

Page 74: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 74 Copyright @ 2014 Jindal Steel & Power Limited 74

Developing a coal mine

(3 MTPA) in

Mozambique’s coal-rich

Moatize region

Coal resources

estimated at 1.2 bn

tonnes including coking

coal

Mozambique, Africa

JSPL’s Kiepersol Colliery produces about 1.2

MTPA of Anthracite coal, sold domestically and

internationally Plans to ramp up capacity to 2

MTPA

South Africa, Africa

Botswana, Africa Acquired CIC Energy in 2012 for 120 mn USD

Coal Mine with Resource of over 3 bn MT (high

grade thermal coal)

Proposed Cement Plant

Madagascar, Africa

Acquired 74.39% controlling

stake in Wollongong Coal

(Erstwhile Gujarat NRE coking

coal Limited)

Australia

1.5 MT HBI Plant – plan to make

it an Integrated Steel Plant

Shadeed, Oman Medium to large size

deposits of prime hard

coking and low ash – low

sulphur thermal coal for

open-cast operation

Indonesia, Asia

Summary of International Operations

Page 75: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 75 Copyright @ 2014 Jindal Steel & Power Limited 75

Global Ventures - Production & Sales – Q2 FY 14-15

Production HBI (MT) :356,886 Production Steel (MT): 185,369 Sales HBI (MT): 392,515 Sales Steel (MT) : 192,505 Sales (Million USD): 171.52 EBITDA (million USD): 37.99

OMAN

Production (MT) : 228,658 Sales (MT) : 245,886 Sales (Million USD): 17.59 EBITDA (million USD): 2.06

SOUTH AFRICA

Production (MT): 109,377 Sales (MT): 115,986 Sales (Million USD): 9.18 EBITDA (million USD): (2.17)

MOZAMBIQUE

Production (MT): 54,614 Sales (MT): 85,566 Sales (Million USD): 2.84 EBITDA (million USD): (24.57)

Wollongong Coal Ltd

Page 76: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 76 Copyright @ 2014 Jindal Steel & Power Limited 76

In July 2010, JSPL acquired Shadeed Iron & Steel Co. LLC, a company incorporated under

the laws of the Sultanate of Oman

• Gas-based 1.5 MTPA HBI plant at Sohar Industrial Port commenced production in January 2011

• Commissioned steelmaking facility of 2 MTPA in CY14

Investment

US$ 525 mn

Capacity

2 MTPA Steel

Jindal Shadeed – Oman

Page 77: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 77 Copyright @ 2014 Jindal Steel & Power Limited 77

• Potential Resource: 2 bn MT

• Grade: Semi Hard coking coal , High Grade Thermal Coal

• Current Mining @ 3 MTPA run rate

• 3 MTPA Coal Washery commissioned

Mozambique, Africa

Page 78: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 78 Copyright @ 2014 Jindal Steel & Power Limited 78

Mining Operations taken over with effect from 1st July 2014

Reverse Freight Contract finalized for carrying 3,00,000 Tonnes of cargo from Beira to Moatize

Floatation Plant commissioned in August, 14 which would reduce ash content in Coking coal

Mozambique - Key Operational Highlights

Page 79: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 79 Copyright @ 2014 Jindal Steel & Power Limited 79

Unique unmatched location with significant strategic advantages

Unique Geographic Location • Wollongong (80 kms. South of

Sydney) experienced mining community

available • Port Kembla: < 20 kms. with

sufficient coal handling and Cape size capacity

• Easy and reliable connectivity through Rail and Road

Activities :

Manpower reduced from 590 to 241

Restructuring of Bank Loans

Arrangement made with most of the suppliers for their past liabilities though phased payment plans(About A$ 24 million paid out of A$ 41 million)

Wollongong Coal Limited- Australia

Page 80: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 80 Copyright @ 2014 Jindal Steel & Power Limited 80

• Southern Africa head office is based in Johannesburg, South Africa

• Operations include Kiepersol Colliery outside the town of Piet Retief in Mpumalanga province

• The mine produces high-quality anthracite coal, sold nationally and internationally

• Underground mining with 1.2 MTPA capacity annually

South Africa, Africa

Page 81: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 81 Copyright @ 2014 Jindal Steel & Power Limited 81

Thermal Coal Asset

• Large size deposit of low ash – low sulphur thermal coal for open cast operation

• Coal mining license obtained in 2009 for 10 years till March 2018 for over 35.9 square Kilometres

• Permit received from the Ministry of Forest for the entire concession area

• MoU signed with Bupati Barito to develop road for coal hauling

• 139 hectares acquired for the first phase of mining

• Acquired 17.7 hectares for the development of captive coal terminal for coal handling and

barge loading at Barito River

Coking Coal Asset

Exploration License over 100 square kilometre in Central Kalimantan

Medium to large size deposits of prime hard coking and thermal coal for open-cast operation Pit Sampling

Indonesia, Asia

Page 82: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 82 Copyright @ 2014 Jindal Steel & Power Limited 82

Page 83: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 83 Copyright @ 2014 Jindal Steel & Power Limited 83

H1- FY15 vs FY14 – Cash Profits (Consl.)

H1 FY15 H1 FY14

Cash Profit : 2,119 Cr.

Cash Profits continue to Rise

Interest, 1134

Depreciation , 1,317

PBT, 948

PAT, 802

EBITDA, 3,269

Interest, 648

Depreciation , 855

PBT, 1,297

PAT, 956

EBITDA, 2,762

Cash Profit : 1,811 Cr.

17

%

In Rs. Cr.

Page 84: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 84 Copyright @ 2014 Jindal Steel & Power Limited 84

Particulars (Rupees in Crores) For the Quarter ending %

30.09.2014 30.06.2014 30.09.2013 Y ON Y Q ON Q

Turnover-Total 5,143 4,687 4,852 6.0% 9.7%

EBITDA 1,640 1,629 1,457 12.6% 0.7%

Depreciation 650 667 434 49.9% -2.5%

Finance costs 599 535 380 57.3% 11.8%

PBT 431 517 627 -31.3% -16.6%

Profit after Tax 400 402 455 -12.1% -0.4%

Cash Profit 1,308 1,149 907 44.2% 13.8%

CAPEX 1,182 1,815 3,571

Net Debt 37,682 36,801 29,943

Ratio 2014-15 2014-15 2013-14 2013-14

Q2 Q1 Q2 Annual

Raw Material to Turnover (%) 26.7 31.5 27.4 30.1

EBITDA to turnover (%) 31.9 34.8 30.0 28.9

Profit before tax to turnover (%) 8.4 11.0 12.9 12.6

Profit after tax to turnover (%) 7.8 8.6 9.4 9.5

Debt Equity Ratio 1.8 1.7 1.4 1.7

Current Ratio 0.7 0.8 0.8 0.8

Interest Service Coverage Ratio 3.2 3.2 4.3 3.9

Debt Service Coverage Ratio 1.7 2.0 3.0 2.4

Financial Results & Ratios – Consolidated Q2 FY15

Page 85: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 85 Copyright @ 2014 Jindal Steel & Power Limited 85

Particulars (Rupees in Crores) For the Quarter ending %

30.09.2014 30.06.2014 30.09.2013 Y ON Y Q ON Q

Turnover-Total 3,197 3,324 3,524 -9.3% -3.8%

EBITDA 1,103 1,192 983 12.1% -7.5%

Depreciation 444 415 304 46.2% 6.9%

Finance costs 447 428 334 34.0% 4.4%

PBT 237 370 352 -32.7% -36.0%

Profit after Tax 287 306 257 11.9% -6.2%

Cash Profit 945 786 582 62.4% 20.2%

CAPEX 1,081 814 1,571

Net Debt 24,481 23,650 21,806

Ratio (%) 2014-15 2014-15 2013-14 2013-14

Q2 Q1 Q2 Annual

Raw Material to turnover 33.6. 32.2 28.9 33.3

EBITDA to turnover 34.5 35.9 27.9 27.6

Profit before tax to turnover 7.4 11.1 10.0 11.0

Profit after tax to turnover 9.0 9.2 7.3 8.9

Debt Equity Ratio 1.8 1.8 1.7 1.8

Current Ratio 0.7 0.7 0.9 0.9

Interest Service Coverage Ratio 2.7 2.8 3.8 3.1

Debt Service Coverage Ratio 1.4 1.7 2.0 1.8

Financial Results & Ratios – Standalone Q2 FY15

Page 86: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 86 Copyright @ 2014 Jindal Steel & Power Limited 86

Consolidated Financials at a Glance

 (Rupees in Crores)  FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 Q1 FY 15 Q2 FY 15 H1 FY 15

INCOME STATEMENT

Revenue 2,618 3,549 5,539 10,913 11,152 13,194 18,351 19,807 19,286 4,687 5,143 9,830

EBITDA 1,034 1,428 2,253 5,908 5,232 6,398 6,935 6,669 5,776 1,629 1,640 3,269

PAT 573 703 1,251 3,007 3,635 3,804 4,002 2,912 1,894 402 400 802

Cash Profit 858 1,170 1,810 4,194 4,760 5,115 5,575 4,593 3,876 1,149 1,308 2,457

BALANCE SHEET

Gross Block 5,198 8,690 10,680 14,928 21,109 29,317 35,802 45,912 63,056 65,181 67,965 67,965

Net Worth 1,899 2,540 3,824 7,021 10,387 14,088 17,931 21,150 21,191 21,564 21,580 21,580

Borrowings 2,745 3,507 6,996 8,113 8,605 13,987 17,058 24,618 36,368 37,111 38,966 38,966

Equity 15 15 15 15 93 93 93 93.48 91.49 91.49 91.49 91.49

SIGNIFICANT RATIOS

EBITDA Margin (%) 39% 40% 41% 54% 47% 48% 38% 34% 30% 35% 32% 33%

Net Profit to Sales (%) 22% 20% 23% 28% 33% 29% 22% 15% 10% 9% 8% 8%

Return on Net Worth (%) 31% 28% 34% 43% 35% 27% 22% 14% 9% 7% 7% 7%

Long Term Debt Equity Ratio 1.2 1.07 1.74 1.03 0.59 0.7 0.61 0.77 1.29 1.7 1.8 1.8

EPS (INR/Share) (a) (b) 6.31 7.64 13.54 32.44 39.05 40.75 42.42 31.13 20.53 4.57 4.83 9.40

Page 87: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 87 Copyright @ 2014 Jindal Steel & Power Limited 87

854 1,317 1,899 2,540 3,824

7,021

10,387

14,088

17,931

21,150 21,191

-

5,000

10,000

15,000

20,000

25,000

FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14

Net Worth

24 fold increase in Net Worth in last 10 Years

Net Worth

Rs. In Cr.

Page 88: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 88 Copyright @ 2014 Jindal Steel & Power Limited 88

CAGR 41% over last decade

1,967 2,876 5,1988,690 10,680

14,928

21,109

29,317

35,802

45,912

63,056

-

10,000

20,000

30,000

40,000

50,000

60,000

70,000

FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14

Gross Block

Gross Block

Rs. In Cr.

Page 89: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 89 Copyright @ 2014 Jindal Steel & Power Limited 89

1,2732,271 2,618

3,549

5,539

10,913 11,152

13,194

18,35119,807 20,004

0

5,000

10,000

15,000

20,000

25,000

FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14

15+ times Revenue increase in last 10 years

Revenue

Rs. In Cr.

Page 90: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 90 Copyright @ 2014 Jindal Steel & Power Limited 90

512908 1,034

1,428

2,253

5,908

5,232

6,398

6,9356,669

5,776

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14

Healthy EBITDA margin continues year after year

EBITDA

Rs. In Cr.

Page 91: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 91 Copyright @ 2014 Jindal Steel & Power Limited 91

Way Forward

Page 92: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 92 Copyright @ 2014 Jindal Steel & Power Limited 92

Going Forward: Prime Focus in FY15

• Securing Raw Materials

• Ramp up of Production in Angul and Patratu

• Removing Logistic Bottlenecks

• Development of Stockyards & building own Hub & Spoke Distribution

• Developing niche markets – API slabs, RUBM

• Expansion of Retail business (B2B to B2C)

• Enhanced exports to hedge global operations

Page 93: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 93 Copyright @ 2014 Jindal Steel & Power Limited 93

Making Sustainability a Focus Priority

Page 94: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 94 Copyright @ 2014 Jindal Steel & Power Limited 94

9 PILLARS OF CSR

A Responsible Corporate Citizen

Page 95: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 95 Copyright @ 2014 Jindal Steel & Power Limited 95

A Responsible Corporate Citizen

Page 96: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 96 Copyright @ 2014 Jindal Steel & Power Limited 96

JPL wins Dun & Bradstreet – Infra Award 2014 for exemplary performance in project execution of 4 X 600MW Thermal power Project in Tamnar, Chattisgarh.

JPL wins National Award for Excellence in Energy Management – 2014 given by CII. JPL wins National Safety Award from National Safety Council of India for developing and implementing effective occupational health and safety management system and processes.

Recent Award and Accolades for JPL in 2014

Page 97: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 97 Copyright @ 2014 Jindal Steel & Power Limited 97

2014 Shrishti Global Award -2014 Global HR Excellence Award-2014

2013 International Safety Award with merit 2014 by British Safety Council, UK. World CSR Congress Award 2013 Greentech CSR Award 2013

2012 Golden Peacock National CSR Award 2012

2011

Ranked No.1 as Wealth Creator in India over a 10- year period (Business World)

Awarded the Dun & Bradstreet- Rolta Corporate Awards 2011

Ranked 3rd in the Metals Category of Business World’s India’s Most Respected Companies Survey

Received the Forbes Asia’s ‘Fabulous 50’ International Award

Golden Peacock Innovation Management Awards

Greentech Award for 1st Position in Metal & Mining Industries

World HRD Congress CSR Award on women empowerment

2010

Rated the World’s 2nd Largest Value Creator by Boston Consulting Group (BCG), based on Total Shareholder Return from 2005-2009, and the largest Value Creator in Mining and Materials category

Received the Forbes Asia’s ‘Fabulous 50’ International Award

Golden Peacock Innovation Management Awards

CSR Excellence Award 2010 by ASSOCHAM for promoting and propagating Corporate Social Responsibility initiatives

2009

Received the CNBC’s Most Promising Entrant into the Big League at IBLA

National Energy Conservation Award

Golden Peacock Innovation Award 2009

Winner of ‘Shrishti Green Cube Award 2009

SAIL HR Excellence Award 2009

Other Award and Accolades

Page 98: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 98 Copyright @ 2014 Jindal Steel & Power Limited 98

SAFETY INDUCTION ON-THE-JOB SAFETY TRAINING

SAFETY REVIEWS SAFETY AUDITS / INSPECTIONS

Health & Safety Best Practices

Page 99: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 99 Copyright @ 2014 Jindal Steel & Power Limited 99

TOOL BOX MEETINGS SAFETY AWARDS/REWARDS

MEDICAL EXAMINATIONS/ WORLD CLASS PPEs MOCK DRILLS

Health & Safety Best Practices

Page 100: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 100 Copyright @ 2014 Jindal Steel & Power Limited 100

Page 101: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 101 Copyright @ 2014 Jindal Steel & Power Limited 101

Raigarh Blast Furnace - I

Page 102: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 102 Copyright @ 2014 Jindal Steel & Power Limited 102

Angul - Coal Gasification Plant

Page 103: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 103 Copyright @ 2014 Jindal Steel & Power Limited 103

Angul - DRI

Page 104: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 104 Copyright @ 2014 Jindal Steel & Power Limited 104

Angul – Steel Melting Shop (SMS)

Page 105: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 105 Copyright @ 2014 Jindal Steel & Power Limited 105

Angul – Plate Mill

Page 106: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 106 Copyright @ 2014 Jindal Steel & Power Limited 106

Angul – 6 x 135 MW Captive Power Plant

Page 107: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 107 Copyright @ 2014 Jindal Steel & Power Limited 107

Angul – 6 x 135 MW Captive Power Plant

Page 108: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 108 Copyright @ 2014 Jindal Steel & Power Limited 108

SMS - Jindal Shadeed, Oman

Page 109: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 109 Copyright @ 2014 Jindal Steel & Power Limited 109

Jindal Shadeed, Oman

Page 110: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 110 Copyright @ 2014 Jindal Steel & Power Limited 110

Jindal Shadeed, Oman – Rolling Mill under Construction

Page 111: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 111 Copyright @ 2014 Jindal Steel & Power Limited 111

Jindal Shadeed, Oman -Rolling Mill under Construction

Page 112: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 112 Copyright @ 2014 Jindal Steel & Power Limited 112

Barbil Pellet Plant

Page 113: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 113 Copyright @ 2014 Jindal Steel & Power Limited 113

JPL – 4x600 MW

Page 114: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 114 Copyright @ 2014 Jindal Steel & Power Limited 114

JPL – 4x600 MW

Page 115: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 115 Copyright @ 2014 Jindal Steel & Power Limited 115

Marketing Network

Page 116: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 116 Copyright @ 2014 Jindal Steel & Power Limited 116

Mr. D.Balasubramanyam Head of Investor Relations Tel: 011-26739109, Mobile: 8130755166 Email: [email protected]

Ms. Pallavi Kumari Investor Relations Tel: 011-26739165, Mobile: 8800094171 Email: [email protected]

For any information please contact : -

Mr. Nishant Baranwal Investor Relations Tel: 011-26739178, Mobile: 8800690255 Email: [email protected]

Page 117: Jindal Steel and Power Ltd @ 2014 Jindal Steel & Power Limited 15 Raigarh Iron Ore: 3.11 MTPA 3.25 MTPA Steel Plant Thermal Coal 6MTPA: Gare IV / 1 Tensa Mine & Pellet from Barbil

Copyright @ 2014 Jindal Steel & Power Limited 117 Copyright @ 2014 Jindal Steel & Power Limited 117

Thank You