JOB HAZARD ANALYSIS

HOW TO USE THIS FORM : Installation/Facility PLATFORM

1) Crew performing task reviews ALL generic JHA considerations. Location GOP-B

2) Review previous JHA update(s) for useful information w ic will elp t is task. Associated Work Permit Type HOT WORK

!) Create new JHA update wit generic form and ALL considerations for t is task. Associated Work Permit Number ") Carr# out task as per plan. $f an# conditions c ange ---STOP & RE-ASSESS. Electrical Isolation Certificate Number%) &ile JHA update for future reference. Physical Isolation Certificate NumberWORK ACTIVITY TO RUN HYDRAULIC POWER PACK !A Cross"#eference Number

JobStep

Description of Job Step

PotentialHazard/s L S R ontrol / Reco!er"

#eas$res L S R Res$lt

$ Preparation for PTW § To a%oid clash of &ork at platform ' ( )

§ Applicant* Authori+in,* Appro%al-i,natories be familiar &ith the .ob

§ Competent Personnel to conduct theoperation

§ Inform to all cre& on location anddescription of &orks

$ $ $ Acceptable

' Pre ob 0eetin, § 1ther party not a&are &here you are

&orkin,' ' 2

§ Inform to all cre& on location§ Inform the ha+ards in%ol%ed at place of

&ork

$ $ $ Acceptable

! Check Po&er 3ri%e 4nit § Connect &ith E5treme Temperature and

hi,h Pressure $ $ $

§ To follo& the standard procedure Checkall ,uide and loose fittin,s ' $ ' Acceptable

2 Check diesel le%el in po&er pack § 1%erheat* hit by debris* leakin, 6il Trip

and Fall !a+ard ' $ '§ -tandby P 3 C at &ork site

' $ ' Acceptable

Page 2: JHA Power Pack & Air Comp - Copy

8/10/2019 JHA Power Pack & Air Comp - Copy

http://slidepdf.com/reader/full/jha-power-pack-air-comp-copy 2/4

JOB HAZARD ANALYSIS

7 Check and function test &inch unit

§ 4nsecured and unprotected e8uipmentfailure and resultin, to personnel in.ury

§ Wire parted ' $ '

§ All rotatin, machinery to check and%erify All safety ,uard to secure ProperPPE to use

§ 0ake sure not to test if &ire still en,a,ein 1peration

' $ '

Acceptable

) Check hoses and fittin,s § Leakin, hydraulic oil ' $ ' § Ensure no si,nificant oil leak at hose

connection' $ ' Acceptable

9 Check Water coolant le%el § 1%erheated if &ater dry out ' $ ' § Ensure &ater le%el al&ays sufficient $ $ $ Acceptable

: -i,n off permit § 1ther party not a&are of .ob status ' ( )§ -ecure all e8uipment§ 0ention on the permit status of .ob

$ $ $ Acceptable

L % LI&'LIHOOD S ( S')'RI*Y R ( RA*IN+ R'S,L*CATE;1#< 3EFINITI1N CATE;1#< 3EFINITI1N- H - . . ( ,NA 'P*ABL'

L1W $ #emote L1W $ No In.ury No 3ama,e No Pollution # 0 1 . - ( 1 *OL'RABL'0E3I40 ' Possible 0E3I40 ' First Aid In.ury 0inor 3ama,e 0inor Pollution L 2 0 - 2 ( 0 A 'P*ABL'

!I;! ( Probable !I;! ( Lost Time In.ury 0a.or 3ama,e 0a.or Pollution L # H

Page 3: JHA Power Pack & Air Comp - Copy

8/10/2019 JHA Power Pack & Air Comp - Copy

http://slidepdf.com/reader/full/jha-power-pack-air-comp-copy 3/4

Page 4: JHA Power Pack & Air Comp - Copy

8/10/2019 JHA Power Pack & Air Comp - Copy

http://slidepdf.com/reader/full/jha-power-pack-air-comp-copy 4/4

JOB HAZARD ANALYSIS

Time =6>66!#- Time = 6>66!#- Time =