Development Timeline1998:

Business Decision to Implement

an IEP

2001: IEP revised to include daily

functional managers

2002: Decision to implement AS9100

QMS

2003: AS9100

Registered

2005: Decision to

formally implement

NATA Standard &

SMS

2007: 1st Internal

GAP Analysis

2008: - 2nd GAP Analysis

-NATA/ACSF Audit-- FAA,

evaluation visit

2009: -Response to

ACSF-- Awaiting registration-- Awaiting

FAA response-Moving forward

Page 3: Jet Solutions On-Site Operations Control

• The implementation of SMS evolved over a 10 year time frame.– Foundation work with IEP and QMS programs

started years before formal implementation of SMS.

Page 4: Jet Solutions On-Site Operations Control

• SMS implementation accomplished in stages, or steps.– Change did not happen overnight.– Senior management remained committed

throughout process.– Many other benefits resulted from management

system(s) implementation.

Page 5: Jet Solutions On-Site Operations Control

• Monitoring and measurement of management systems, to improve the functions, and profitability – nothing new –the 5th principle of the 14 principles of management.– First drafted by Henry Foyal in 1889

Page 6: Jet Solutions On-Site Operations Control

1998: IEP implemented using quality management techniques, based on AC120-59. Developed first version of scorecard system, primarily compliance oriented.

Implemented as a separate department for compliance auditing.Bombardier Flexjet required to actively participate.

2001: IEP revised to include as part of functional departments daily management. Training of managers and supervisors in basic auditing and data collection.

Reporting format changed to administrators meeting, with department managers and Senior Managers.

2002: Decision to implement AS9100 QMS.Development of QMS and associated programs and processes, training of personnel.

IEP program and data collection and reporting become part of the QMS process.

2003: ISO 9000/2000 AS9100 Registered

2005: Decision to formally implement SMS, and explore available standards and programs, to include IS-BAO; Selected NATA/ACSF

2007: First internal GAP analysis to draft NATA/ACSF standards, and proposed FAA AC120-92. – Flexjet implements ASAP

2008: 2nd GAP Analysis – NATA/ACSF audit – FAA visit

2009: Response to ACSFAwaiting registration determination

FAA acknowledgementMove forward to ensure everyone is included

Page 7: Jet Solutions On-Site Operations Control

Director of Maintenance

Functional Responsibility

Director of Operations

Functional Responsibility

Director Quality Assurance

Functional Responsibility

Management Controls Systems

QMSSMSIEP

ASAPAudit Functions

Senior Management

Organizational Responsibility

Page 8: Jet Solutions On-Site Operations Control

• Original structure was traditional – Safety, IEP, QMS was the responsibility of a stand alone department.– Only senior management got briefed on the system– Functional managers were left out, and did not receive

the benefit of the information being gathered.• Information to make decisions, was not available to the day to

day operational decision makers.

• Decision to include functional departments in the monitoring, measuring, analysis, and decision making process.– The result!!

Page 9: Jet Solutions On-Site Operations Control

Senior Management

Organizational Responsibility

Director of OperationsFunctional

Responsibility

Director of Maintenance

Functional Responsibility

Director Quality Assurance Functional

Responsibility

Level 3ProcessesSystems

Level 2Management

Oversight

Level 1Operational Performance

Measures

External Audits

SafetyFunctional

Responsibility

Process M

easures and Audits

Page 10: Jet Solutions On-Site Operations Control

• How it works basically

Page 11: Jet Solutions On-Site Operations Control

Surveillance/Audits

Surveillance Area's

Routine HighRisk

IdentifiedProblemArea's

Data Collection - Audits

Data Reduction - Scorecards

Data/Trend Analysis - Scorecards

Analysis of Identified Problem Area's

Identification of Corrective/Preventive Actions

Flight & Duty Records

Manuals(CASS)

Ops RecordsFligt Logs

Ops RecordsCrew Records

Ops RecordsCrew Training

FOMCompliance

ReleaseRecords

Ops TrainingCenter Audits

RTS(CASS)

Ramp Checks(CASS)

Facility Audits(CASS)

GMM Compliance

(CASS)

Quality Assurance

(CASS)

MaintenanceRecords(CASS)

CMTS(CASS)

MaintenanceTraining(CASS)

Drug & AlcoholProgram

ASAP(Safety)

IEP(SYSTEMS)

(CASS)

TSASecurity

AccidentsIncidents(SFTY)(CASS)

ExternalAudits

(CASS)

AS9100

FAA Audits(CASS)

Monthly ReportingBi-Monthly Administrators Meetings

CAR'sandAccepted DAR's

Safety

CASS

FAR's

Functions

Driver's

SDR/MIS(SFTY)(CASS)

Page 12: Jet Solutions On-Site Operations Control

• Where does all of the information go?

Page 13: Jet Solutions On-Site Operations Control

Mx Ctrl RTS Audits

AS9100 Audits

IEP Audits

Release Audits (A008)

Safety Data Reporting

Ops Records Audits

MX Records AuditsQA CASS Audits

Safety DepartmentOperations Department

Maintenance Department

CASS Data

CASS Program IEP Audits

Senior Management

IEP Program / ProcessesEffectiveness of Controls

Page 14: Jet Solutions On-Site Operations Control

Lessons Learned (1)

• Senior Management commitment and support imperative:– System would not be where it is today

otherwise.• Continuous education process

– For and to mangers as well as employees• Concepts, theories, & application of techniques

Page 15: Jet Solutions On-Site Operations Control

Lessons Learned (2)

• Program Manager, must work directly for senior management:– To guide and manage program– Functional application must be from the

functional department managers.• They are the experts in their departments and are the

people able to implement change in their departments.

Page 16: Jet Solutions On-Site Operations Control

Lessons Learned (3)

• Administrators meeting– Success depends on the structure of the meeting

• Accountable and responsible mangers must participate (process owners/operational mangers)

• Directors and senior managers must participate• This meeting has the decision makers and the

operational managers analyzing the data, and making corrective and preventive action decisions.

Page 17: Jet Solutions On-Site Operations Control

Lessons Learned (4)

• Program must be scaleable to operation– Small operators will not have thousands of

operations per month, so measures in thousands or higher meaningless for them.

– Current measures, practices are not life cycle, so true indication of risk exposure not accurately measured.

Page 18: Jet Solutions On-Site Operations Control

Obstacles and Barriers (1)

• Standardization (covers many subject areas)– Implementation guidance

• Many organizations, many standards?– Risk Matrices– Risk Assessment/Assignment Codes– Training

• Evaluators/auditors– Industry– Government

Page 19: Jet Solutions On-Site Operations Control

Obstacles and Barriers (2)

• Standardization– Acceptance by Principle Inspectors

• Acceptance of self-reporting by operator(s), without punitive actions if operator can/does demonstrate corrective or preventive actions are being taken.

Page 20: Jet Solutions On-Site Operations Control

Level 1Unknown

Level 2Defined

Level 3Repeatable

PerformanceManagement

Standardization

Value BasedEngineering

Level 4Capable

Adaptation

Level 5Efficient

Standard Procedures

Level 6Adaptive

WasteReduction

ProblemSolving

ProblemSolving

Defect Elimination

ManagementVariations

Time BasedEngineering

SPCSpecial Causes

SPCCommon Causes

Adaptive DesignTechniques

LearningOrganizations

Mgmt Systems

Development Flow

Strategy

Method

Tools

And

Techniques

InputRequirementsmonitoring

ManualsRegulatory

ManualsCompany

Policies andProcedures

PDCA

Root CauseAnalysis

Theory ofConstraints

DepartmentSOP’s

Error rateReporting & Monitoring

ProcessMapping

ErrorProofing

LocalizeRecurringerrors

InternalComplianceAudits

HR Mgmt &Development

FederalAviation

Regulations

CustomerStandards orContracts

DefineProcedures/Instructions

InternalControlsManagement

ProcessInput

Management

RealityBased

Analysis

ValueAnalysis

Constraint IDManagement

CycleReductions

ProcessTime

Reduction

ChangeMgmt

Empowerment

LearningCycles

Adoption ofPer. Measures

MassCustomization

AlternativePathing

ReduceHidden

Frustrations

Process Improvement Initiatives

Stan

dard Procedures

Perf

ormance

Mana

gement

Page 21: Jet Solutions On-Site Operations Control

End

J7SA150H

Discussion /Questions