JEMGUM Underground Gas Storage Project
IPLOCA Regional Meeting, Schrobenhausen, 19 th March 2014
Presentation, Oliver BARTEIT – Head of Proposals
JEMGUM Project_ IPLOCA Regional Meeting2
Table of contents
1. Project Introduction
2. View of Salt Caverns
3. Technip’s Scope / Battery limit
4. EPCM Project Schedule, Milestones, Project Manageme nt & Execution
5. Key Figures / Technical Data
6. Video Show
1. Project Introduction
3 JEMGUM Project_ IPLOCA Regional Meeting
4
Underground Natural Gas StorageGas Plant Phase 1a & b - JemgumProject Introduction
Client: WINGAS GmbH & Co. KG
Contractor: TECHNP GERMANY GmbHin Düsseldorf
Operator: ASTORA GmbH & Co. KG
JEMGUM Project_ IPLOCA Regional Meeting
5
Underground Natural Gas StorageGas Plant Phase 1a & b - Jemgum
Project Introduction & EPCM Service Scope:
AG Facilities for storage and production of Natural Gas in salt caverns.
The Plant is designed for 2 well pads with 5 caverns each.
Further extensions are possible.
Scope: 2 storage areas with5 caverns each
Capacity: 1,2 blnNm³ process gas
Injection rate: 2 Injection unitswith 150.000 Nm³/h each
Gas withdrawal rate: 2 gas withdrawal strandswith 465.000 Nm³/h each
Operating pressure: up to 207 barg
Features:Remote control by the headquarter in Kassel. Parallel Injection as well as Withdrawal into two different gas networks MIDAL und GTS-AL.
JEMGUM Project_ IPLOCA Regional Meeting
6
Underground Natural Gas StorageGas Plant Phase 1a & b - JemgumProject Site Location
JEMGUM Project_ IPLOCA Regional Meeting
2. View of Salt Caverns
7 JEMGUM Project_ IPLOCA Regional Meeting
8
Underground Natural Gas StorageGas Plant Phase 1a & b - JemgumView of Salt Caverns
• At current stage designed for 2 Well pads
• 5 caverns per well pad
• Further extension of 2 well pads with additional 10 caverns foreseen
JEMGUM Project_ IPLOCA Regional Meeting
3. Technip’s Scope / Battery Limit
9 JEMGUM Project_ IPLOCA Regional Meeting
10
Limit of Supply - from Pipeline Tie In ���� to Well Head
Well Pad 2
Well Pad 1Process Area
Pipeline Tie Ins to
MIDAL + GTS-AL
Field Lines
Underground Natural Gas StorageGas Plant Phase 1a & b - Jemgum
4. Project Schedule, Milestones, Project Management & Execution
11 JEMGUM Project_ IPLOCA Regional Meeting
12
Underground Natural Gas StorageGas Plant Phase 1a & b - JemgumProject Execution Schedule with critical Milestones
Challanging Task to meet Milestone Dates for:
- Civil Works- Heavy Equipment Installation- Mechanical and piping- Instrumentation and control system
- Commissioning
JEMGUM Project_ IPLOCA Regional Meeting
13
Underground Natural Gas StorageGas Plant Phase 1a & b - JemgumProject Management & Execution Services
EPCM Services consisting of:
- Project Management
- Conceptual and Detailed Design & Engineering
- Procurement and Subcontracting Services
- Construction Management / Site SupervisionServices by Secondment of Site Personnel
JEMGUM Project_ IPLOCA Regional Meeting
5. Key Figures – Technical Data
14 JEMGUM Project_ IPLOCA Regional Meeting
15
Underground Natural Gas StorageGas Plant Phase 1a & b - JemgumKey figures – Technical Data
Injection : 2 injection lines 150.000 Nm³/h each
Production : 2 withdrawal lines465.000 Nm³/h each
Capacity : 1.2 billion Nm³ working gas volume
OperatingPressure : up to 207 barg
Piping: 1.200 to AG
1.900 to UG
Structural Steel: 1.250 to
Concrete: 18.000 m³
Construction: 700.000Mhrs
JEMGUM Project_ IPLOCA Regional Meeting
16
Underground Natural Gas StorageGas Plant Phase 1a & b - Jemgum
Various Working Areas at same Time
JEMGUM Project_ IPLOCA Regional Meeting
17
Underground Natural Gas StorageGas Plant Phase 1a & b - Jemgum
Heavy Equipment Installation incl. various pipe bri dges
JEMGUM Project_ IPLOCA Regional Meeting
18
Underground Natural Gas StorageGas Plant Phase 1a & b - Jemgum
Works completed
JEMGUM Project_ IPLOCA Regional Meeting
19
Underground Natural Gas StorageGas Plant Phase 1a & b - Jemgum
CAD 3D showing all Details for Heavy Equipment
JEMGUM Project_ IPLOCA Regional Meeting
7. View of Video Show
20 JEMGUM Project_ IPLOCA Regional Meeting
21
Underground Natural Gas StorageGas Plant Phase 1a & b - JemgumThe View of Video Show
JEMGUM Project_ IPLOCA Regional Meeting
www.technip.com