Cobbs Creek Viaduct (4.79) – Built in 1891
Jeffrey D. Knueppel, P.E. Deputy General Manager
And Robert L. Lund Jr. P.E.
Assistant General Manager March 25, 2014
What Will Happen Without Additional Funding
($ MILLIONS)
HIGHWAYS & BRIDGES
TRANSIT
MULTI-MODAL (AVIATION,
PORTS, BIKE/PED)
TOTAL
2013-14 $242 $55 $30 $327
2014-15 $756 $345 $97 $1,198
2015-16 $1,081 $431 $138 $1,650
2016-17 $1,352 $432 $138 $1,922
2017-18 $1,710 $487 $144 $2,341
NOTES: Funding levels presented as average of annual estimates SEPTA receives approximately 70% of statewide transit capital funding
Five-Year Plan Phase-In
Fundamentals:
Work to reduce SEPTA’S $5 Billion SGR backlog (attack core infrastructure/service realignment plan needs)
Model after SEPTA’s successful Stimulus Program
• Provide outreach to DBE firms
• Report on jobs created/retained • Opportunities for various size and types of contractors
Engineering Approach:
Design • In-house • 3rd Party (2 CSEC’s, 4 GEC’s, 6 GEC’s in the future) • Hybrid Mix • Bundling of Locations (RFP)
• Surveying GEC
Project Management • In-house • 3rd Party (3 CM Contracts) • Hybrid Mix • Maximization of Track Outages
NEAR TERM INTERMEDIATE UPCOMING
MBTA Bi-Level Cars Minneapolis Metro Transit Articulated LRV
New Electric Locomotives -- Specs
Bi-Level Coaches – Clearance Study & Specs
Articulated LRV Study & Specs
Silverliner VI New Electric Locomotives
Bi-Level Coaches
LRVs (Trolleys)
Amtrak Electric Locomotive
Jenkintown -- Built in 1931 Morton – Built in 1928 Lenni – Built in 1920’S
Market Substation (Last Overhaul 1970)
Castor Substation (Last Overhaul 1954)
Clifton Substation (Last Overhaul 1950)
NEAR TERM INTERMEDIATE UPCOMING
Crum Creek Viaduct 3 Media/Elwyn Viaducts CHW Bridge 0.35
9 Stone Arch Bridges
Elwyn to Wawa Bridges NHSL Bridge 0.15
NHSL Bridgeport Viaduct Mainline Schuylkill Bridges
Bridge 0.35 Built 1915
Crum Creek Viaduct Built 1895
Mainline Schuylkill Bridge Built 1929
MSHL Grade Crossing AVPA/Real-Time Service Info
Police Radio
Wire Train at Work 30th Street West ( to “K”)
Bus Washer Steel Wheel Lift Boiler Program Wheel Truing Machine
Berridge Callowhill 2nd and Wyoming
Margaret/Orthodox City Hall 19th Street
Erie 40th Street Levittown Secane
23rd and Venango Ridge and Summit Trolley Tunnel NHSL Track
69th Street North Wales Noble
NEAR TERM INTERMEDIATE UPCOMING
Vertical Transportation
CC Concourses – Phase 2 and 3
CC Concourses – Phase 4
Center City Concourses
NEAR TERM INTERMEDIATE UPCOMING
Washer Program (Frazer and Allegheny) Center City Concourses
(Phase 2-5) 30th West Catenary and
Structures 69th Street Transportation
Center and MSHL Shop Roofs RRD Substations Phase 1
– Lansdale, Bethayres, CHE and Hatboro Wayne Junction SFC
1 through 4
NHSL Bridge 0.15 Noble Station Including
Parking and Storage Track Overbrook and Frazer
Shop Roofs MFSE 5th Street Station
CTD Substations –
Castor, Ellen, Ranstead, Park, Broad and Louden
Conshohocken and East Falls Stations RRD Substations Phase 2
– Neshaminy, Yardley and Doylestown RRD Woodbourne Power
and Signal Substations
Background:
Constructed in 1895
17 Span girder and transverse trough
Open deck supporting 2 tracks
Spans 925 feet
At its greatest height over the valley – over 100 feet in height
Status:
Preliminary Engineering and Environmental Clearance Underway
Bid Fall 2014
Moving Ahead:
2 Step Bid Process
8 to 10 Week Outage – Summer 2016
Background:
3 Static Frequency Converters (SFC) were built in the 1980’s
Located adjacent to Wayne Junction Substation
Necessary to convert 230 kv 60 Hz power provided from PECO into a one-of-a-kind 24/12 kv 25 Hz auto transformer system
Work will include:
Construction of one new Static Frequency Converter (SFC)
Overhaul of 3 Static Frequency Converters
Status:
Development of RFP in progress
Moving Ahead:
Request for Proposals in Summer of 2014
Issue Notice to Proceed for Design in January 2015
Background:
Replacement and upgrade of Overhead Catenary System through 30th Street – “K” Interlocking and Powelton Yard Complex
Work will Include:
Replacing approximately 14 miles of Overhead Catenary
Replacing/installing approximately 150 structures
Status: Development of RFP in
progress
Moving Ahead: Issue Request for Proposals
in late Summer/Fall Issue Design Notice to
Proceed in January 2015 Phasing is a key element of
this project
“K” Interlocking
Background: SEPTA will take over
responsibilities from the City of Philadelphia Multi-Phase Improvements to
Center City Concourses Work will include Architectural,
Structural, Mechanical and Electrical Improvements
Phases: Phase I – Vertical Transportation
including escalator and elevator replacements.
Phase II – Walnut-Locust
Concourse Phase III – City Hall Loop and
Suburban Station Concourse Phase IV – Broad Ridge Spur
and Market Street Concourse
15th Street Escalators
Phase 3 City Hall Loop
Phase 3 Suburban Station Concourse
Phase 4 Broad Ridge Spur
Phase 4 Market Street Concourse
Moving Ahead: Phase I – Vertical Transportation –
Construction NTP Summer 2014 Phases II through IV:
• RFP – Bid late Fall 2014
• Initial Project Concepts and
Approvals
• Design for Phased Construction
“Catching Up” Plan Approval Resiliency Funding Possibility, I-95
GO!