© ABB Group Slide 1
NSP Maritime Link Project ABB Supplier Information Morning Session Presentation
Jeff Buckner – ABB Canada Project Manager
© ABB Group September 26, 2014 | Slide 2
~150,000 employees
Present in
countries +100
Formed in
1988 merger of Swiss (BBC, 1891) and Swedish (ASEA, 1883) engineering companies
In revenue (2013)
billion 42 $
NSP Maritime Link Project Introduction to ABB - Our Company
© ABB Group | Slide 3 February 13, 2014
As one of the world’s leading engineering companies, we help our customers to use electrical power efficiently, to increase industrial productivity and to lower environmental impact in a sustainable way.
NSP Maritime Link Project Introduction to ABB – Our Mission
© ABB Group | Slide 4 February 13, 2014
NSP Maritime Link Project Introduction to ABB – Five Global Divisions
© ABB Group Slide 5 PowDoc id
High Voltage Direct Current (HVDC)
Power Semiconductors
Power Cables
Offshore Wind Connections
Consulting
Service and Upgrades
NSP Maritime Link Project Introduction to ABB – Power Systems, Grid Systems
© ABB Group September 26, 2014 | Slide 6
Transmission and Distribution Substations
T&D Infrastructure and Grid Integration
Solutions Service
Flexible AC Transmission Systems
NSP Maritime Link Project Introduction to ABB – Power Systems, Substations
Trans. stn
Trans. stn
345 kV AC
230 kV AC
230 kV AC
1 km Underground Cable (Installation Only)
HVDC
HVDC
HVDC Light Converter Stations with AC Substation Bottom Brook, NL Woodbine, NS
3 Transitions stations Cape Ray, NL Point Aconi, NS Woodbine, NS
AC Substation Granite Canal, NL
NSP Maritime Link Project ABB Scope of Work
Our Commitment – Every ABB employee, as well as those of our suppliers, is responsible for creating a safe, healthy, and environmentally friendly culture which includes strict compliance with EH&S requirements.
Our passion and priority is to ensure everyone's health & safety while sustaining the environment.
NSP Maritime Link Project ABB Environmental, Health, and Safety Expectations
© ABB Group September 26, 2014 | Slide 8
ABB fully supports the local economic benefits for the Maritime Link project and is committed to all diversity targets established by NSPML.
ABB and all of our subcontractors will provide the following:
Opportunities for workers to self-identify as part of an underrepresented group.
Invite qualified applicants from NS and NL for supply and labor.
Ensure employees attend project orientation.
Immediate investigation of any and all complaints of harassment/discrimination.
NSP Maritime Link Project ABB Local Benefits Commitments
© ABB Group September 26, 2014 | Slide 9
NSP Maritime Link Project ABB Purchasing Processes
Purchases (Equipment/Material):
Two stage qualification process with second stage only required for major purchases.
Examples of information required in stage two are financial statements, insurance certificates, health and safety records, bonding limits, etc.
Services (Professional):
For subcontracted services prequalification occurs through the global supplier qualification process questionnaire.
© ABB Group September 26, 2014 | Slide 10
NSP Maritime Link Project ABB Purchasing Processes and Requirements
© ABB Group September 26, 2014 | Slide 11
Potential suppliers of services or components complete the prequalification process.
ABB will send a request for proposal or quotation package to applicable suppliers.
All submittals which meet the commercial terms will be evaluated based on the technical requirements, price, and experience with prior supply.
Suppliers must agree to ABB terms & conditions, which include signing and strictly abiding by the ABB Code of Conduct.
Environmental and Wildlife Management
Civil and Electrical Engineering Design
Geotechnical and Laboratory Testing
Signage and Jobsite Consumables
Personal Protective Equipment (PPE)
Accommodations for ABB Personnel
Ports of Entry for International Shipments
NSP Maritime Link Project ABB Procurement
Professional and Other Services
© ABB Group September 26, 2014 | Slide 12
NSP Maritime Link Project ABB Procurement – con’t
Station Service Systems
125 and 48 Volt DC Battery Systems
120 Volt AC UPS Inverter Systems
Diesel Generators and Related Control Equipment
Cables – Control, Power, and Fiber Optic
© ABB Group September 26, 2014 | Slide 13
NSP Maritime Link Project ABB Procurement – con’t
Other Materials
Galvanized Steel (Lattice, Tubular, and Plate)
Insulators
Tubular Bus, Conductors, Connectors, and Hardware
Outdoor Lighting
Cable Trench
Conduit
© ABB Group September 26, 2014 | Slide 14
NSP Maritime Link Project ABB Overall Project Schedule
© ABB Group September 26, 2014 | Slide 15
DESIGN
2014 2015 2016 2017
PROCURE
CONSTRUCT
COMMISSION
NSP Maritime Link Project ABB Supply Chain Contact
Peter Prahalis Supply Chain Manager Email: [email protected] Format email as follows: Subject Line: Maritime Link Project Supplier Interest Body of Email: Company name with contact information Business address Explain the type of supply you are interested in Provide any certifications, registrations, etc. Reference list for similar work/supply
© ABB Group September 26, 2014 | Slide 16
© ABB Group September 26, 2014 | Slide 17
© ABB Group September 26, 2014 | Slide 18
© ABB Group September 26, 2014 | Slide 19
© ABB Group September 26, 2014 | Slide 20
© ABB Group September 26, 2014 | Slide 21
© ABB Group September 26, 2014 | Slide 22
NSP Maritime Link Project ABB Closing
ABB is very proud to be a part of this historic project and appreciative of the warm welcome into your communities.
© ABB Group September 26, 2014 | Slide 23