3
two-day WORKSHOP An outstanding INTERACTIVE on JBCC Contracts July 2019 REGISTER INTERACTIVE WORKSHOP facilitated by Adv Tanya Greef 17-18 BEE Level 4 Contributor Accredited Training Provider – MERSETA Central Supplier Database: MAAA0321383 Adv Tanya Greef has in-depth knowledge of the standard forms of contract, including FIDIC, NEC, GCC and JBCC. This includes lecturing on, draing of contracts, negoang contracts, necessary sub-contracts, supply agreements, and any other ancillary or related agreements such as joint venture agreements and guarantees). She advises management and represents clients in various dispute resoluon procedures (adjudicaon, arbitraon and court ligaon), including draing of statements of claim/defence, opinions, preparaon of all documentaon required and management of negoaon with the view of amicable selement, where required. Tanya is rounely called upon to act as an adjudicator in construcon and engineering disputes, she specialises in Construcon Law for CSSI. TRAINING SERVICES www.indunatraining.co.za [email protected] OR They are one of the four contracts prescribed by the CIDB for infrastructural work in South Africa. Therefore, any person involved in building construcon, whether you are the Main contractor or a subcontractor will benefit from aending this interacve workshop. The JBCC Contracts are the preferred contracts for building works in South Africa. WHO SHOULD ATTEND Register by 1 MAY 2019 and receive Early Bird Discount of R1000 JBCC PRINCIPAL BUILDING AGREEMENT & N/S SUBCONTRACT AGREEMENT Country Club Johannesburg WOODMEAD Ÿ Change in scope and variaons Ÿ Noces and claims Ÿ Payment cerficates Ÿ Praccal and final compleon Also covered in the course is preparaon and submission of contract document at tender stage, securities and guarantees. Ÿ Extensions of me Delegates will be introduced to the very stringent procedures for: Ÿ Employer Ÿ Principal agent Ÿ Subcontractor Ÿ Main contractor This two day workshop emphasises the roles of the: The JBCC Suite of Contracts is used for major building works as well as smaller works such as houses and factories. Therefore, any person involved in building construcon, whether you are the main contractor or a subcontractor will benefit from aending this interacve workshop. This is parcularly prevalent in the building industry where the project is normally undertaken by the main contractor and a host of subcontractor’s, be they domesc, selected or nominated. COURSE OVERVIEW The construcon industry is known to be riddled with disputes, arguments and claims.

JBCC PRINCIPAL BUILDING AGREEMENT & N/S SUBCONTRACT …

  • Upload
    others

  • View
    40

  • Download
    0

Embed Size (px)

Citation preview

two-day WORKSHOP

An outstandingINTERACTIVE

on JBCC Contracts

July2019

REGISTER

INTERACTIVE WORKSHOP facilitated by

Adv Tanya Greef

17-18

BEELevel4ContributorAccreditedTrainingProvider–MERSETA

CentralSupplierDatabase:MAAA0321383

AdvTanyaGreefhasin-depthknowledgeofthestandardformsofcontract,includingFIDIC,

NEC,GCCandJBCC.Thisincludeslecturingon,dra�ingofcontracts,nego�a�ngcontracts,

necessarysub-contracts,supplyagreements,andanyotherancillaryorrelatedagreementssuch

asjointventureagreementsandguarantees).Sheadvisesmanagementandrepresentsclientsin

variousdisputeresolu�onprocedures(adjudica�on,arbitra�onandcourtli�ga�on),including

dra�ingofstatementsofclaim/defence,opinions,prepara�onofalldocumenta�onrequiredand

managementofnego�a�onwiththeviewofamicablese�lement,whererequired.Tanyais

rou�nelycalledupontoactasanadjudicatorinconstruc�onandengineeringdisputes,she

specialisesinConstruc�onLawforCSSI.

T R A I N I N G S E R V I C E S

www.indunatraining.co.za [email protected] OR

TheyareoneofthefourcontractsprescribedbytheCIDBforinfrastructuralworkinSouthAfrica.

Therefore,anypersoninvolvedinbuildingconstruc�on,whetheryouaretheMaincontractorora

subcontractorwillbenefitfroma�endingthisinterac�veworkshop.

TheJBCCContractsarethepreferredcontractsforbuildingworksinSouthAfrica.

WHOSHOULDATTEND

Registerby1MAY2019andreceiveEarlyBirdDiscountofR1000

JBCCPRINCIPALBUILDINGAGREEMENT&N/SSUBCONTRACTAGREEMENT

Country Club JohannesburgWOODMEAD

Ÿ Changeinscopeandvaria�onsŸ No�cesandclaimsŸ Paymentcer�ficatesŸ Prac�calandfinalcomple�on

Alsocoveredinthecourseisprepara�onandsubmissionofcontractdocument at tender stage, securities and guarantees.

Ÿ Extensionsof�meDelegateswillbeintroducedtotheverystringentproceduresfor:

Ÿ EmployerŸ PrincipalagentŸ SubcontractorŸ MaincontractorThistwodayworkshopemphasisestherolesofthe:

TheJBCCSuiteofContractsisusedformajorbuildingworksaswellassmallerworkssuchashousesandfactories.Therefore,anypersoninvolvedinbuildingconstruc�on,whetheryouarethemaincontractororasubcontractorwillbenefitfroma�endingthisinterac�veworkshop.

Thisispar�cularlyprevalentinthebuildingindustrywheretheprojectisnormallyundertakenbythemaincontractorandahostofsubcontractor’s,betheydomes�c,selectedornominated.

COURSEOVERVIEW

Theconstruc�onindustryisknowntoberiddledwithdisputes,argumentsandclaims.

COURSEOUTLINE

ThePrincipalBuildingAgreement

Session1Introduc�onandOverview

Ÿ PreparingaContractDocument

Ÿ StructureandEssen�alDocuments

Ÿ ProcedureinSouthAfrica

Session2OverviewoftheJBCCAgreement

Ÿ Overviewofchangesfrom2007Edi�on

Ÿ ContractOp�ons

-PrincipalBuildingAgreement

-MinorWorksAgreement

-N/SSubcontractAgreement

Ÿ Par�esandtheirdu�es

Ÿ InsuranceandSecurity

Ÿ Subcontrac�ng

Ÿ Comple�on–Prac�calandFinal

Ÿ DefectsLiability

Session3TimeandChangeManagement

Ÿ Sequencesandprogrammes

Ÿ Delays

Ÿ Revisionofthedateforprac�cal

comple�on

Ÿ Claimprocedure

Ÿ Adjustment

Ÿ Penal�es

Session4Payment

Ÿ InterimPaymentCer�ficates

Ÿ Prepara�onoftheFinalAccount

Ÿ Recoveryofexpensesand/orloss

TheN/SSubcontractAgreement

Session5Prepara�onofContractDocuments

Ÿ Nominatedandselectedsubcontractors

Ÿ Domes�csubcontractors

Session6

Par�esandtheirDu�es

Ÿ Synergywithmaincontractor'sprogramme

Ÿ Roleoftheprincipalagent

Ÿ Guaranteesfromsubcontractors

Ÿ Defectsliabilityandwarran�espassedonto

employerbysubcontractors

Session7

Comple�on-Prac�calandFinal

Session8

SuspensionandTermina�on

Ÿ No�ces

Ÿ Groundsforsuspension

Ÿ Groundsfortermina�on

DisputeResolu�onSession9

Ÿ Amicablese�lement

Ÿ Adjudica�on

Ÿ Arbitra�on

CaseStudiesSession10

DAY ONE

DAY TWO

R5,850 EXCL. VAT

CPDCREDITS

COURSEINCLUDES*IncludesacopyoftheJBCCPrincipalBuildingAgreement*Precourseques�onnaire*Postcourseassessmentsandcasestudiesfortheyear

COURSE COST

T R A I N I N G S E R V I C E S

TERMS&CONDITIONS

v REGISTRATION

o Par�cipantsmayregisterbye-mailwith

paymentsbyEFT.

o Pleasecompleteandsendthisformto:

[email protected]

PAYMENTis1week beforethecourse

begins.

v COURSECOSTRegistra�onFEEperpar�cipant

� ZAR5,850EXCLVAT

v PAYMENTDETAILS

Ø EFT

INDUNACONSULTING(PTY)LTD

NEDBANK-IRENE

BRANCHCODE:198765

ACCNO.:1075331765

v CANCELLATION&TRANSFERS

o Cancella�onsbydelegatesmustbeinwri�ng

andreceived1weekbeforethecoursebegins.

o Itisregre�edthatnorefundswillbemadeor

invoicescancelleda�erthe1-weekperiod

o Subs�tu�onsmaybemadeatany�me

o Wereservetherighttocanceltheeventifitis

undersubscribedorforanyotherreason.

o Intheeventofcancella�on,wewillendeavour

togivedelegates2weeks’no�ceandpayments

receivedwillberefundedinfull.

o INDUNACONSULTINGcannotbeheldliablefor

anypre-bookedtraveloraccommoda�oncosts.

v PERSONALDETAILSTitle ________________________________________

Surname ________________________________________

Name ________________________________________

Cellular ________________________________________

E-mail ________________________________________

v COMPANYDETAILS

CompanyName ________________________________________

VATNumber ________________________________________

PostalAddress ________________________________________

PhysicalAddress ________________________________________

v INVOICEDISSUEDTO:

CompanyName ________________________________________

Par�cipant ________________________________________

v SPECIFICREQUIREMENT

Dietary ________________________________________

DisabilityAssistance ________________________________________

Addi�onalNo�ce ________________________________________

DECLARATION

I,____________________________________________________(Name/Surname)

havereadandaccepttheTERMS&CONDITIONSass�pulatedinthis

REGISTRATIONform.

SIGNATURE

DATE

REGISTRATION FORMT R A I N I N G S E R V I C E S

COURSE

DATE

VENUE

JBCCPRINCIPALBUILDINGAGREEMENT&N/SSUBCONTRACTAGREEMENT

CountryClubJohannesburg,WOODMEAD

WEDNESDAY17��-THURSDAY18�� July2019

SWIFT:NEDSZAJJ