AVERAGE DISTANCE TO SHORE
12,631 MWCONNECTED TO THE
GRID IN EUROPE
67AVERAGE WATER DEPTH
29
mSUBSTRUCTURES Installed in 2016
Irish Sea16%
Baltic Sea12%
North Sea72%
44 km
338
3,589
4.8 MW
new grid-connected offshore wind turbines
turbines are installed and grid-connected
average size offshore wind turbines
6 wind farms
JANUARY 2017
380 MW
AVERAGE SIZE OF CONNECTED WIND FARMS
TOP 3 DEVELOPERS IN 2016
15 windfarms
24.2 GW of consented wind farms
NEW PROJECTS:
Work carried out in:
European market
CABLE SUPPLIERSTO OFFSHORE WIND FARMS
NSWPrysmian52% 17%
NexansNSW44% 30%
INTER ARRAY
EXPORT
Northland Power
23%
DONG Energy
20%
Global Infrastructure Partners
11%
THE EUROPEAN OFFSHORE WIND INDUSTRY Key trends and statistics 2016
IN
DOWNLOAD FULL REPORT PDF windeurope.org/stats/eu-offshore-2016
JacketsMonopiles493
Join the leaders in the offshore wind energy
10 EU Member States
offshore wind is now an international market including
get the best insights
network
Offshore wind statistics
Access to the offshore wind database
Direct access to the WindEurope offshore wind analyst
in the industry at a European level
with the partners that matter
Online Members directory
WindEurope private events
Offshore wind Working Group
Offshore wind in EU governance
Cost reduction
Regulatory practices
Increased brand exposure while reducing your marketing and communication budgets
A discount at leading WindEurope wind energy events:
• Offshore Wind Energy 2017 London, 6-8 June 2017
• WindEurope Conference & Exhibition 2017 Amsterdam, 28-30 November 2017
Join WindEurope windeurope.org/membership
Contact: [email protected]
How can we help you?
Become a member
grow your offshore wind business Join windeurope today
uk11.9 GW
3.1 GWde
914 MWbe
2.8 GWnl
in pipeline
in transitional tenders
in pipeline
3 GWfr
of projectssubmitted
the positions of the European wind offshore industry
influence
Offshore Wind Working Group
benefitfrom brand exposure and attractive savings
24.6 GW12.6 GW2016
from h1
to2020
a large and long-term market potential in europe
the 2 challenges
cost reduction post-2020 pipeline
require a united industry in Europe
1
2
Next CfD round in April 2017
Successful cost reduction at Borssele, next roundin Q3 2017
Three concessions in pipeline to 2020
Transitional tenders, 1.5 GW round opening April 2017
Dunkirk tender now open, and an energing floating industry
Ulrik StridbaekHead of Group, Regulatory AffairsDONG Energy
“Offshore wind is dependent on policy frameworks and WindEurope is in Brussels, at the heart of Europe, working with decision makers for solutions that work.”
24.2 GW*Data as of January 2017
pipeline of consented offshore proJects
IntErEStInG MarkEtS
connected