GE 159 Plastics Avenue Pittsfield, MA 01201 USA Transmitted via Overnight Courier February 9, 2011 Mr. Dean Tagliaferro Mr. Michael Gorski U.S. Environmental Protection Agency Regional Director Region I - New England Western Regional Office 10 Lyman Street, Suite 2 Depaliment of Environmental Protection Pittsfield, MA 01201 436 Dwight Street Springfield, MA 01103 Re: GE-Pittsfield/Housatonic River Site Monthly Status Report Pursuant to Consent Decree for January 2011 (GECD900) Dear Mr. Tagliaferro and Mr. Gorski: Enclosed are copies of General Electric's (GE's) monthly progress report for January 2011 activities conducted by GE at the GE-Pittsfield/Housatonic River Site. This monthly repmi is submitted pursuant to Paragraph 67 of the Consent Decree (CD) for this Site, which was entered by the U.S. District COUli on October 27,2000. The enclosed monthly report includes not only the activities conducted by GE under the CD, but also other activities conducted by GE at the GE-Pittsfield/Housatonic River Site (as defined in the CD). The repmi is formatted to apply to the various areas of the Site as defined in the CD, and to provide for each area, the information specified in Paragraph 67 of the CD. The activities conducted specifically pursuant to or in connection with the CD are marked with an asterisk. GE is submitting a separate monthly report to the Massachusetts Depatiment of Environmental Protection (MDEP), with a copy to the United States Environmental Protection Agency (EPA), describing the activities conducted by GE at propeliies outside the CD Site pursuant to GE's November 2000 Administrative Consent Order from MDEP. The enclosed monthly repmi includes, where applicable, tables that list the samples collected during the subject month, summarize the analytical results received during that month from sampling or other testing activities, and summarize other groundwater monitoring and oil recovery information obtained during that month. Also, enclosed for each of you (and for Weston) is a CD-ROM that contains these same tables of the analytical data and monitoring information in electronic form. Please call me if you have any questions. Sincerely, Richo..td IN. Go.+es /D6 N Richard W. Gates Remediation Project Manager Enclosure Corporate EnVironmental Programs

JANUARY 2011 MONTHLY REPORT PURSUANT TO CONSENT … · Port Arthur, Texas for incineration and to the Chemical Waste Management (CWM) facility in Emelle, Alabama for disposal.* These

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • GE 159 Plastics Avenue Pittsfield, MA 01201 USA

    Transmitted via Overnight Courier

    February 9, 2011

    Mr. Dean Tagliaferro Mr. Michael Gorski U.S. Environmental Protection Agency Regional Director Region I - New England Western Regional Office 10 Lyman Street, Suite 2 Depaliment of Environmental Protection Pittsfield, MA 01201 436 Dwight Street

    Springfield, MA 01103

    Re: GE-Pittsfield/Housatonic River Site Monthly Status Report Pursuant to Consent Decree for January 2011 (GECD900)

    Dear Mr. Tagliaferro and Mr. Gorski:

    Enclosed are copies of General Electric's (GE's) monthly progress report for January 2011 activities conducted by GE at the GE-Pittsfield/Housatonic River Site. This monthly repmi is submitted pursuant to Paragraph 67 of the Consent Decree (CD) for this Site, which was entered by the U.S. District COUli on October 27,2000.

    The enclosed monthly report includes not only the activities conducted by GE under the CD, but also other activities conducted by GE at the GE-Pittsfield/Housatonic River Site (as defined in the CD). The repmi is formatted to apply to the various areas of the Site as defined in the CD, and to provide for each area, the information specified in Paragraph 67 of the CD. The activities conducted specifically pursuant to or in connection with the CD are marked with an asterisk. GE is submitting a separate monthly report to the Massachusetts Depatiment of Environmental Protection (MDEP), with a copy to the United States Environmental Protection Agency (EPA), describing the activities conducted by GE at propeliies outside the CD Site pursuant to GE's November 2000 Administrative Consent Order from MDEP.

    The enclosed monthly repmi includes, where applicable, tables that list the samples collected during the subject month, summarize the analytical results received during that month from sampling or other testing activities, and summarize other groundwater monitoring and oil recovery information obtained during that month. Also, enclosed for each of you (and for Weston) is a CD-ROM that contains these same tables of the analytical data and monitoring information in electronic form.

    Please call me if you have any questions.

    Sincerely,

    Richo..td IN. Go.+es /D6N

    Richard W. Gates Remediation Project Manager

    Enclosure

    Corporate EnVironmental Programs

  • Mr. Dean Tagliaferro and Mr. Michael Gorski February 9, 2011

    Page 2 of2

    cc: Richard Fisher, EPA Robeli Cianciarulo, EPA (cover letter only) Tim Conway, EPA (cover letter only) Rose Howell, EPA (cover letter and CD-ROM ofrepOli) Holly Inglis, EPA (hard copy and CD-ROM of repOli) Susan Svirsky, EPA (Items 7, 15, and 20 only) M. Otis, USACE (CD-ROM of report)

    John Ziegler, MDEP (hard copy and CD-ROM of report)

    Eva Tor, MDEP (cover letter and CD-ROM ofreport)

    Karen Pelto, MDEP

    Nancy E. Harper, MA AG

    Susan Peterson, CT DEP

    Field Supervisor, US FWS, DOl

    Kenneth Finkelstein, Ph.D., NOAA (Items 13, 14, and 15 only)

    Mayor James Rubelio, City of Pittsfield

    William Hines, Director, Pittsfield Economic Development Authority

    Linda Palmieri, Weston

    Jack Yablonsky, Berkshire Gas (CD-ROM ofrepOlt)

    Richard Nasman, P.E., Berkshire Gas (cover letter only)

    Michael Carroll GE (CD-ROM of report)

    Andrew Silfer, GE (cover letter only)

    Rod McLaren, GE (CD-ROM ofrepOlt)

    James Nuss, ARCADIS

    James Bieke, Goodwin Procter

    Kevin Russell, Anchor QEA (narrative only)

    Teresa Bowers, Gradient

    Public Information Repositories (1 hard copy,S copies of CD-ROM)

    GE Internal Repository (1 hard copy)

    (wlo separate CD-ROM, except where noted)

    G:\GE\GE _Pittsfield __General\Reports and Presentations\Monthly Reports\20 J J \0 1-11 \Letter.doc

  • January 2011

    MONTHLY STATUS REPORT

    PURSUANT TO CONSENT DECREE

    FOR

    GE-PITTSFIELD/HOUSATONIC RIVER SITE

    GENERAL ELECTRIC COMPANY

    PITTSFIELD, MASSACHUSETTS

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Background.doc

  • Background

    The General Electric Company (GE), the United States Environmental Protection Agency (EPA), the Massachusetts Department of Environmental Protection (MDEP), and other governmental entities have entered into a Consent Decree (CD) for the GE-Pittsfield/Housatonic River Site, which was entered by the U.S. Court on October 27, 2000. In accordance with Paragraph 67 of the CD, GE is submitting this monthly report, prepared on GE’s behalf by ARCADIS (formerly Blasland, Bouck & Lee, Inc.), which summarizes the status of activities conducted by GE at the GE-Pittsfield/Housatonic River Site ("Site") (as defined in the CD).

    This report covers activities in the areas listed below (as defined in the CD and/or the accompanying Statement of Work for Removal Actions Outside the River [SOW]). Only those areas that have had work activities for the month subject to reporting are included. The specific activities conducted pursuant to or in connection with the CD are noted with an asterisk.

    General Activities (GECD900)

    GE Plant Area (non-groundwater) 1. 20s, 30s, 40s Complexes (GECD120) 2. East Street Area 2 – South (GECD150) 3. East Street Area 2 – North (GECD140) 4. East Street Area 1 – North (GECD130) 5. Hill 78 and Building 71 Consolidation Areas (GECD210/220) 6. Hill 78 Area – Remainder (GECD160) 7. Unkamet Brook Area (GECD170)

    Former Oxbow Areas (non-groundwater) 8. Former Oxbow Areas A & C (GECD410) 9. Lyman Street Area (GECD430) 10. Newell Street Area I (GECD440) 11. Newell Street Area II (GECD450) 12. Former Oxbow Areas J & K (GECD420)

    Housatonic River 13. Upper ½-Mile Reach (GECD800) 14. 1½-Mile Reach (only for activities, if any, conducted by GE) (GECD820) 15. Rest of the River (GECD850)

    Housatonic River Floodplain 16. Current Residential Properties Adjacent to 1½-Mile Reach (Actual/Potential Lawns)

    (GECD710) 17. Non-Residential Properties Adjacent to 1½-Mile Reach (excluding banks)

    (GECD720) 18. Current Residential Properties Downstream of Confluence (Actual/Potential Lawns)

    (GECD730)

    Other Areas 19. Allendale School Property (GECD500) 20. Silver Lake Area (GECD600)

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Background.doc

  • Groundwater Management Areas (GMAs) 21. Plant Site 1 (GECD310) 22. Former Oxbows J & K (GECD320) 23. Plant Site 2 (GECD330) 24. Plant Site 3 (GECD340) 25. Former Oxbows A&C (GECD350)

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Background.doc

  • GENERAL ACTIVITIES GE-PITTSFIELD/HOUSATONIC RIVER SITE

    (GECD900)

    JANUARY 2011

    a. Activities Undertaken/Completed

    b.

    Continued GE-EPA electronic data exchanges for the Housatonic River Watershed.*

    Sampling/Test Results Received

    - Sample results were received for routine sampling conducted pursuant to GE’s NPDES Permit for the GE facility. Sampling records and results are provided in Attachment A to this report.

    - NPDES Discharge Monitoring Reports (DMRs) for the period of December 1 through December 31, 2010, are provided in Attachment B to this report.

    c. Work Plans/Reports/Documents Submitted

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Continue NPDES Permit-related sampling and monitoring activities.

    - Submit to EPA and MDEP the 2011 Stormwater Pollution Prevention Plan (SWPPP) revisions in accordance with GE’s NPDES Permit Modification.

    - Submit to EPA and MDEP the Baseline Monitoring Plan (BMP) Final Report in accordance with GE’s NPDES Permit Modification.

    - Submit to EPA and MDEP a summary of 2010 BMP and SWPPP activities in accordance with GE’s NPDES Permit Modification.

    - Submit the 64G Groundwater Treatment Facility PCB Optimization Study Report in accordance with GE’s NPDES Permit Modification.

    - Attend public and Citizens Coordinating Council (CCC) meetings, as appropriate.

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    GE’s August 3, 2010 follow-up plan relating to the finding in October 2009 of residual oil in certain pipes located north of Building OP-2 is under EPA review.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • ITEM 1

    PLANT AREA

    20s, 30s, 40s COMPLEXES (GECD120)

    JANUARY 2011

    a. Activities Undertaken/Completed

    - Continued discussions with the Pittsfield Economic Development Authority (PEDA) relating to activities associated with future transfer of the former 40s Complex to PEDA.

    - Received EPA approval of the Final Completion Report (FCR) for the 40s Complex Removal Action (see Item 1.c below) and EPA’s Certification of Completion of the 40s Complex Removal Action (January 24, 2011).*

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    - Submitted the FCR for the 40s Complex Removal Action to EPA (January 7, 2011).*

    - Submitted a copy of the recorded Grant of Environmental Restriction and Easement (ERE) for the former 40s Complex, as well as associated documents (subordinations, survey plans, final title insurance policy) to EPA and MDEP (January 19, 2011).*

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Transfer the former 40s Complex to PEDA – anticipated to occur on February 16, 2011.

    - Jointly with PEDA, submit a request to EPA for an extension of the 5-year duration for retention of the temporary stockpile of crushed building demolition materials, as well as continuation of the structural embankments consisting of such materials as a temporary feature, in the former 40s Complex.*

    - It is anticipated that PEDA will prepare draft amended EREs for the former 20s Complex and the former 30s Complex, as well as a draft amended ERE covering the portion of Woodlawn Avenue adjacent to the former 20s Complex.*

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    None

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • ITEM 2

    PLANT AREA

    EAST STREET AREA 2-SOUTH

    (GECD150)

    JANUARY 2011

    a. Activities Undertaken/Completed

    - Continued to ship certain materials excavated during remediation actions and subject to regulation under the Toxic Substances Control Act (TSCA) and the Resource Conservation and Recovery Act (RCRA), which were temporarily stored at Building 65, to the Veolia facility in Port Arthur, Texas for incineration and to the Chemical Waste Management (CWM) facility in Emelle, Alabama for disposal.* These shipments were suspended in January for the winter season, and will resume in spring 2011.

    - Performed ambient air monitoring for PCBs and particulate matter in conjunction with loading of previously excavated materials stored at Building 65 into trucks for off-site transport, as indicated in Table 2-1.*

    - Collected and transferred approximately 4,049,711 gallons of water generated during remediation activities to Building 64G Groundwater Treatment Facility for treatment.*

    - Conducted sampling of excavated material stored in drums, as indicated in Table 2-1.

    - Continued water sampling as part of the NPDES Permit-related Optimization Study, as indicated in Table 2-1.

    - Conducted routine sampling of oil used in maintenance activities, as indicated in Table 2-1.

    b.

    - Performed January 2011 dry weather flow inspection activities associated with Drainage Basins 005 and 006 under GE’s NPDES Permit-related Baseline Monitoring Plan.

    Sampling/Test Results Received

    See attached tables.

    c. Work Plans/Reports/Documents Submitted

    Submitted revised Planting Plan to EPA (submitted by electronic mail on January 17, 2011 and in hard copy on January 28, 2011).*

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    Perform February 2011 dry weather flow inspection activities associated with Drainage Basins 005 and 006 under GE’s NPDES Permit.

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • ITEM 2

    (cont’d)

    PLANT AREA

    EAST STREET AREA 2-SOUTH

    (GECD150)

    JANUARY 2011

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    f.

    Remediation activities were suspended in December 2010, and shipments of excavated material stored in Building 65 were suspended in January 2011. These activities will resume in spring 2011.*

    Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • TABLE 2-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    EAST STREET AREA 2 - SOUTH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    Excavation Drum Sampling D0222 1/4/11 Soil SGS PCB, TCLP - Excludes Pest, Herb 1/11/11 Excavation Drum Sampling D0723 1/4/11 Soil SGS PCB, TCLP - Excludes Pest, Herb 1/11/11 Excavation Drum Sampling D0725 1/4/11 Tar SGS PCB, TCLP - Excludes Pest, Herb 1/11/11 Excavation Drum Sampling D0727 1/4/11 Soil SGS PCB, TCLP - Excludes Pest, Herb 1/11/11

    Optimization Study OPT-A-010211 1/2/11 Water Columbia TSS, TSS (f) 1/21/11 Optimization Study OPT-A-010211 1/2/11 Water SGS PCB 1/13/11 Optimization Study OPT-A-010911 1/9/11 Water Columbia TSS, TSS (f) 1/25/11 Optimization Study OPT-A-010911 1/9/11 Water SGS PCB 1/24/11 Optimization Study OPT-A-011811 1/18/11 Water Columbia TSS, TSS (f) Optimization Study OPT-A-011811 1/18/11 Water SGS PCB, PCB (f) 1/31/11 Optimization Study OPT-A-012611 1/26/11 Water Columbia TSS, TSS (f) Optimization Study OPT-A-012611 1/26/11 Water SGS PCB Optimization Study OPT-A-120510 12/5/10 Water Columbia TSS, TSS (f) 1/4/11 Optimization Study OPT-A-121210 12/12/10 Water Columbia TSS, TSS (f) 1/4/11 Optimization Study OPT-A-122110 12/21/10 Water Columbia TSS, TSS (f) 1/21/11 Optimization Study OPT-A-122110 12/21/10 Water SGS PCB, PCB (f) 1/6/11 Optimization Study OPT-A-122710 12/27/10 Water Columbia TSS, TSS (f) 1/21/11 Optimization Study OPT-A-122710 12/27/10 Water SGS PCB 1/5/11 Optimization Study OPT-B-010211 1/2/11 Water SGS PCB 1/13/11 Optimization Study OPT-B-010911 1/9/11 Water SGS PCB 1/24/11 Optimization Study OPT-B-011811 1/18/11 Water SGS PCB Optimization Study OPT-B-012611 1/26/11 Water SGS PCB Optimization Study OPT-B-122110 12/21/10 Water SGS PCB 1/6/11 Optimization Study OPT-B-122710 12/27/10 Water SGS PCB 1/5/11 Optimization Study OPT-C-010211 1/2/11 Water SGS PCB 1/13/11 Optimization Study OPT-C-010911 1/9/11 Water SGS PCB 1/24/11 Optimization Study OPT-C-011811 1/18/11 Water SGS PCB 1/31/11 Optimization Study OPT-C-012611 1/26/11 Water SGS PCB Optimization Study OPT-C-122110 12/21/10 Water SGS PCB 1/6/11 Optimization Study OPT-C-122710 12/27/10 Water SGS PCB 1/5/11 Optimization Study OPT-CO-010211 1/2/11 Water SGS PCB 1/13/11 Optimization Study OPT-CO-010911 1/9/11 Water SGS PCB 1/24/11 Optimization Study OPT-CO-011811 1/18/11 Water SGS PCB 1/31/11 Optimization Study OPT-CO-012611 1/26/11 Water SGS PCB Optimization Study OPT-CO-122110 12/21/10 Water SGS PCB 1/6/11 Optimization Study OPT-CO-122710 12/27/10 Water SGS PCB 1/5/11 Optimization Study OPT-D-010211 1/2/11 Water Columbia TSS, TSS (f) 1/21/11 Optimization Study OPT-D-010211 1/2/11 Water SGS PCB 1/13/11 Optimization Study OPT-D-010911 1/9/11 Water Columbia TSS, TSS (f) 1/25/11 Optimization Study OPT-D-010911 1/9/11 Water SGS PCB 1/24/11 Optimization Study OPT-D-011811 1/18/11 Water Columbia TSS, TSS (f)

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 2-1 1 of 4 2/9/2011

  • TABLE 2-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    EAST STREET AREA 2 - SOUTH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    Optimization Study OPT-D-011811 1/18/11 Water SGS PCB, PCB (f) 1/31/11 Optimization Study OPT-D-012611 1/26/11 Water Columbia TSS, TSS (f) Optimization Study OPT-D-012611 1/26/11 Water SGS PCB Optimization Study OPT-D-120510 12/5/10 Water Columbia TSS, TSS (f) 1/4/11 Optimization Study OPT-D-121210 12/12/10 Water Columbia TSS, TSS (f) 1/4/11 Optimization Study OPT-D-122110 12/21/10 Water Columbia TSS, TSS (f) 1/21/11 Optimization Study OPT-D-122110 12/21/10 Water SGS PCB, PCB (f) 1/6/11 Optimization Study OPT-D-122710 12/27/10 Water Columbia TSS, TSS (f) 1/21/11 Optimization Study OPT-D-122710 12/27/10 Water SGS PCB 1/5/11 Optimization Study OPT-DUP-37 (OPT-D-010911) 1/9/11 Water SGS PCB 1/24/11 Optimization Study OPT-DUP-38 (OPT-A-012611) 1/26/11 Water Columbia TSS Optimization Study OPT-DUP-39 (OPT-A-012611) 1/26/11 Water Columbia TSS (f) Optimization Study OPT-DUP-40 (OPT-CO-012611) 1/26/11 Water SGS PCB Optimization Study OPT-IT-010211 1/2/11 Water SGS PCB 1/13/11 Optimization Study OPT-IT-010911 1/9/11 Water SGS PCB 1/24/11 Optimization Study OPT-IT-011811 1/18/11 Water SGS PCB 1/31/11 Optimization Study OPT-IT-012611 1/26/11 Water SGS PCB Optimization Study OPT-IT-122110 12/21/10 Water SGS PCB 1/6/11 Optimization Study OPT-IT-122710 12/27/10 Water SGS PCB 1/5/11

    Routine Maintenance Oil Sampling C2337-1 1/17/11 Oil SGS PCB 1/28/11 Routine Maintenance Oil Sampling C2338-1 1/17/11 Oil SGS PCB 1/28/11 Routine Maintenance Oil Sampling C2339-1 1/17/11 Oil SGS PCB 1/28/11 Routine Maintenance Oil Sampling C2739-1 1/17/11 Oil SGS PCB 1/28/11 Routine Maintenance Oil Sampling F4765-1 1/17/11 Oil SGS PCB 1/28/11

    Ambient Air Particulate Matter Sampling ES2S-2R 1/3/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/3/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/3/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling Background Location 1/3/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/4/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/4/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/4/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling Background Location 1/4/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/5/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/5/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/5/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling Background Location 1/5/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/6/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/6/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/6/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling Background Location 1/6/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/7/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/7/2011 Air Berkshire Environmental Particulate Matter 1/10/2011

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 2-1 2 of 4 2/9/2011

  • TABLE 2-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    EAST STREET AREA 2 - SOUTH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    Ambient Air Particulate Matter Sampling ES2S-8 1/7/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling Background Location 1/7/2011 Air Berkshire Environmental Particulate Matter 1/10/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/10/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/10/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/10/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling Background Location 1/10/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/11/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/11/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/11/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling Background Location 1/11/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/12/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/12/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/12/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling Background Location 1/12/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/13/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/13/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/13/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling Background Location 1/13/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/14/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/14/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/14/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling Background Location 1/14/2011 Air Berkshire Environmental Particulate Matter 1/17/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/17/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/17/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/17/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling Background Location 1/17/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/18/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/18/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/18/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling Background Location 1/18/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/19/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/19/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/19/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling Background Location 1/19/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling ES2S-2R 1/20/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling ES2S-3 1/20/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling ES2S-8 1/20/2011 Air Berkshire Environmental Particulate Matter 1/24/2011 Ambient Air Particulate Matter Sampling Background Location 1/20/2011 Air Berkshire Environmental Particulate Matter 1/24/2011

    PCB Ambient Air Sampling ES2S-2R 01/11/11-01/12/111 Air NEA PCB 1/20/2011 PCB Ambient Air Sampling ES2S-2RCO (colocated) 01/11/11-01/12/111 Air NEA PCB 1/20/2011 PCB Ambient Air Sampling ES2S-3 01/11/11-01/12/111 Air NEA PCB 1/20/2011 PCB Ambient Air Sampling ES2S-8 01/11/11-01/12/111 Air NEA PCB 1/20/2011

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 2-1 3 of 4 2/9/2011

  • TABLE 2-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    EAST STREET AREA 2 - SOUTH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Project Name PCB Ambient Air Sampling

    Field Sample ID Sample Date Background - East of Building 9B 01/11/11-01/12/111

    Matrix Air

    Laboratory NEA

    Analyses PCB

    Date Received by GE or ARCADIS

    1/20/2011

    Notes: 1. The parent sample location associated with the field duplicate is presented in parenthesis. 2. (f) - Indicates filtered analysis requested.

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 2-1 4 of 4 2/9/2011

  • TABLE 2-2 PCB DATA RECEIVED DURING JANUARY 2011

    EXCAVATION DRUM SAMPLING EAST STREET AREA 2-SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in dry weight parts per million, ppm)

    Sample ID Date

    Collected Aroclor-1016, 1221, -1232, -1242, -1248 Aroclor-1254 Aroclor-1260 Total PCBs

    D0222 1/4/2011 ND(0.35) ND(0.35) 2.6 2.6 D0723 1/4/2011 ND(310) 2400 ND(310) 2400 D0725 1/4/2011 ND(56) 130 280 410 D0727 1/4/2011 ND(6.7) 36 22 58

    Notes: 1. Samples were collected by Veolia ES Technical Solutions, L.L.C. and submitted to SGS

    Environmental Services, Inc. for analysis of PCBs and TCLP constituents. 2. Please refer to Table 2-3 for a summary of TCLP constituents. 3. ND - Analyte was not detected. The number in parenthesis is the associated detection limit.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 2-2 2/9/2011

  • TABLE 2-3 TCLP DATA RECEIVED DURING JANUARY 2011

    EXCAVATION DRUM SAMPLING EAST STREET AREA 2-SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID: Sample Depth(Feet):

    Date Collected:

    TCLP Regulatory

    Limits D0222

    1/4/2011 D0723

    1/4/2011 D0727

    1/4/2011 Volatile Organics 1,1-Dichloroethene 0.7 ND(0.010) ND(0.010) ND(0.20) 1,2-Dichloroethane 0.5 ND(0.010) ND(0.010) ND(0.20) 2-Butanone 200 ND(0.25) ND(0.25) ND(5.0) Benzene 0.5 0.0020 J ND(0.010) 0.024 J Carbon Tetrachloride 0.5 ND(0.010) ND(0.010) ND(0.20) Chlorobenzene 100 ND(0.010) ND(0.010) 0.046 J Chloroform 6 ND(0.010) ND(0.010) 1.7 Tetrachloroethene 0.7 0.0067 J ND(0.010) 0.16 J Trichloroethene 0.5 0.0041 J ND(0.010) 0.47 Vinyl Chloride 0.2 ND(0.010) ND(0.010) ND(0.20) Semivolatile Organics 1,4-Dichlorobenzene 7.5 ND(0.050) ND(0.050) ND(0.050) 2,4,5-Trichlorophenol 400 ND(0.050) ND(0.050) ND(0.050) 2,4,6-Trichlorophenol 2 ND(0.050) ND(0.050) ND(0.050) 2,4-Dinitrotoluene 0.13 ND(0.050) ND(0.050) ND(0.050) Cresol 200 ND(0.050) ND(0.050) 0.10 Hexachlorobenzene 0.13 ND(0.050) ND(0.050) ND(0.050) Hexachlorobutadiene 0.5 ND(0.050) ND(0.050) ND(0.050) Hexachloroethane 3 ND(0.050) ND(0.050) ND(0.050) Nitrobenzene 2 ND(0.050) ND(0.050) ND(0.050) Pentachlorophenol 100 ND(0.25) ND(0.25) ND(0.25) Pyridine 5 ND(0.050) ND(0.050) ND(0.050) Inorganics Arsenic 5 ND(0.200) ND(0.200) ND(0.200) Barium 100 7.20 1.18 B 0.178 B Cadmium 1 0.0305 B 0.0335 B 0.0916 B Chromium 5 ND(0.100) 0.0747 B 2.11 L dLead 55 ND(0 100) ND(0.100) 24 5 24.5 140140 Mercury 0.2 ND(0.000570) ND(0.000570) 0.000367 B Selenium 1 0.0481 B ND(0.200) ND(0.200) Silver 5 ND(0.100) ND(0.100) ND(0.100)

    Notes: 1. Samples were collected by Veolia ES Technical Solutions, L.L.C. and submitted to SGS Environmental

    Services, Inc. for analysis of PCBs and TCLP constituents. 2. Please refer toTable 2-2 for a summary of PCBs. 3. ND - Analyte was not detected. The number in parenthesis is the associated detection limit. 4. Shading indicates that value exceeds the TCLP Regulatory Limits.

    Data Qualifiers:

    Organics (volatiles, semivolatiles) J - Indicates an estimated value less than the practical quantitation limit (PQL).

    Inorganics B - Indicates an estimated value between the instrument detection limit (IDL) and PQL.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 2-3 2/9/2011

  • TABLE 2-4 DATA RECEIVED DURING JANUARY 2011

    OPTIMIZATION STUDY EAST STREET AREA 2-SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID: Parameter Date Collected:

    OPT-A-120510 12/05/10

    OPT-A-121210 12/12/10

    OPT-A-122110 12/21/10

    OPT-A-122710 12/27/10

    OPT-A-010211 01/02/11

    OPT-A-010911 01/09/11

    PCBs-Unfiltered Aroclor-1248 DR DR 0.00020 0.00022 J 0.00013 0.000099 Aroclor-1254 DR DR 0.00055 0.0018 0.00033 0.000090 Aroclor-1260 DR DR 0.00041 0.0045 0.00016 0.000027 Total PCBs DR DR 0.00116 0.00652 0.00062 0.000216 PCBs-Filtered Aroclor-1248 NA NA 0.000099 NA NA NA Aroclor-1254 NA NA 0.00019 NA NA NA Aroclor-1260 NA NA 0.000037 NA NA NA Total PCBs NA NA 0.000326 NA NA NA Conventional-Unfiltered Total Suspended Solids ND(1.00) 1.60 3.60 6.70 2.90 2.00 Conventional-Filtered Total Suspended Solids ND(1.00) 1.40 3.20 4.50 2.20 1.40

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 2-4 Page 1 of 6 2/9/2011

  • TABLE 2-4 DATA RECEIVED DURING JANUARY 2011

    OPTIMIZATION STUDY EAST STREET AREA 2-SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID: Parameter Date Collected:

    OPT-A-011811 01/18/11

    OPT-B-122110 12/21/10

    OPT-B-122710 12/27/10

    OPT-B-010211 01/02/11

    OPT-B-010911 01/09/11

    PCBs-Unfiltered Aroclor-1248 0.00064 ND(0.0000095) 0.000041 ND(0.0000095) 0.000013 Aroclor-1254 0.00059 ND(0.0000095) 0.00012 ND(0.0000095) 0.000020 Aroclor-1260 ND(0.000047) ND(0.0000095) ND(0.0000095) ND(0.0000095) ND(0.0000095) Total PCBs 0.00123 ND(0.000016) 0.000161 ND(0.000015) 0.000033 PCBs-Filtered Aroclor-1248 0.00030 NA NA NA NA Aroclor-1254 0.00015 NA NA NA NA Aroclor-1260 ND(0.0000095) NA NA NA NA Total PCBs 0.00045 NA NA NA NA Conventional-Unfiltered Total Suspended Solids NA NA NA NA NA Conventional-Filtered Total Suspended Solids NA NA NA NA NA

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 2-4 Page 2 of 6 2/9/2011

  • TABLE 2-4 DATA RECEIVED DURING JANUARY 2011

    OPTIMIZATION STUDY EAST STREET AREA 2-SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID: Parameter Date Collected:

    OPT-C-122110 12/21/10

    OPT-C-122710 12/27/10

    OPT-C-010211 01/02/11

    OPT-C-010911 01/09/11

    OPT-C-011811 01/18/11

    PCBs-Unfiltered Aroclor-1248 ND(0.0000096) ND(0.0000095) ND(0.0000095) ND(0.0000095) ND(0.0000095) Aroclor-1254 ND(0.0000096) ND(0.0000095) ND(0.0000095) ND(0.0000095) ND(0.0000095) Aroclor-1260 ND(0.0000096) ND(0.0000095) ND(0.0000095) ND(0.0000095) ND(0.0000095) Total PCBs ND(0.000016) ND(0.000016) ND(0.000015) ND(0.000013) ND(0.000015) PCBs-Filtered Aroclor-1248 NA NA NA NA NA Aroclor-1254 NA NA NA NA NA Aroclor-1260 NA NA NA NA NA Total PCBs NA NA NA NA NA Conventional-Unfiltered Total Suspended Solids NA NA NA NA NA Conventional-Filtered Total Suspended Solids NA NA NA NA NA

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 2-4 Page 3 of 6 2/9/2011

  • TABLE 2-4 DATA RECEIVED DURING JANUARY 2011

    OPTIMIZATION STUDY EAST STREET AREA 2-SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID: Parameter Date Collected:

    OPT-CO-122110 12/21/10

    OPT-CO-122710 12/27/10

    OPT-CO-010211 01/02/11

    OPT-CO-010911 01/09/11

    OPT-CO-011811 01/18/11

    OPT-D-120510 12/05/10

    PCBs-Unfiltered Aroclor-1248 0.0078 ND(0.00048) ND(0.0000095) 0.00012 0.0013 DR Aroclor-1254 0.027 0.0016 0.00017 0.00011 0.0028 DR Aroclor-1260 0.0053 0.0043 0.00014 0.000023 0.00057 DR Total PCBs 0.0401 0.0059 0.00031 0.000253 0.00467 DR PCBs-Filtered Aroclor-1248 NA NA NA NA NA NA Aroclor-1254 NA NA NA NA NA NA Aroclor-1260 NA NA NA NA NA NA Total PCBs NA NA NA NA NA NA Conventional-Unfiltered Total Suspended Solids NA NA NA NA NA ND(1.00) Conventional-Filtered Total Suspended Solids NA NA NA NA NA ND(1.00)

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 2-4 Page 4 of 6 2/9/2011

  • TABLE 2-4 DATA RECEIVED DURING JANUARY 2011

    OPTIMIZATION STUDY EAST STREET AREA 2-SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID: Parameter Date Collected:

    OPT-D-121210 12/12/10

    OPT-D-122110 12/21/10

    OPT-D-122710 12/27/10

    OPT-D-010211 01/02/11

    OPT-D-010911 01/09/11

    OPT-D-011811 01/18/11

    PCBs-Unfiltered Aroclor-1248 DR ND(0.0000095) ND(0.0000095) ND(0.0000095) ND(0.0000095) [ND(0.0000095)] ND(0.0000095) Aroclor-1254 DR ND(0.0000095) ND(0.0000095) ND(0.0000095) ND(0.0000095) [ND(0.0000095)] ND(0.0000095) Aroclor-1260 DR ND(0.0000095) ND(0.0000095) ND(0.0000095) ND(0.0000095) [ND(0.0000095)] ND(0.0000095) Total PCBs DR ND(0.000016) ND(0.000015) ND(0.000015) ND(0.000013) [ND(0.000013)] ND(0.000015) PCBs-Filtered Aroclor-1248 NA ND(0.0000095) NA NA NA ND(0.0000095) Aroclor-1254 NA ND(0.0000095) NA NA NA ND(0.0000095) Aroclor-1260 NA ND(0.0000095) NA NA NA ND(0.0000095) Total PCBs NA ND(0.000015) NA NA NA ND(0.000015) Conventional-Unfiltered Total Suspended Solids ND(1.00) ND(1.00) ND(1.00) ND(1.00) ND(1.00) NA Conventional-Filtered Total Suspended Solids ND(1.00) ND(1.00) ND(1.00) ND(1.00) ND(1.00) NA

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 2-4 Page 5 of 6 2/9/2011

  • Samples were collected by ARCADIS and submitted to Columbia Analytical Services, Inc. and SGS Environmental Services, Inc. for analysis of PCBs and total suspended solids (TSS).NA Not Analyzed.ND Analyte was not detected. The number in parenthesis is the associated detection limit.DR Data received and reported in Table 2-3 of the December 2010 CD Monthly Report.

    TABLE 2-4 DATA RECEIVED DURING JANUARY 2011

    OPTIMIZATION STUDY EAST STREET AREA 2-SOUTH

    GENERAL ELECTRIC COMPANY -P ITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID: Parameter Date Collected:

    OPT-IT-122110 12/21/10

    OPT-IT-122710 12/27/10

    OPT-IT-010211 01/02/11

    OPT-IT-010911 01/09/11

    OPT-IT-011811 01/18/11

    PCBs-Unfiltered Aroclor-1248 0.47 J 0.0022 J 0.00054 0.00097 0.0069 Aroclor-1254 2.9 0.021 0.0027 0.0035 0.031 Aroclor-1260 0.65 0.066 0.0011 0.0014 0.0073 Total PCBs 4.02 0.0892 0.00434 0.00587 0.0452 PCBs-Filtered Aroclor-1248 NA NA NA NA NA Aroclor-1254 NA NA NA NA NA Aroclor-1260 NA NA NA NA NA Total PCBs NA NA NA NA NA Conventional-Unfiltered Total Suspended Solids NA NA NA NA NA Conventional-Filtered Total Suspended Solids NA NA NA NA NA

    Notes: 1. Samples were collected by ARCADIS and submitted to Columbia Analytical Services, Inc. and SGS Environmental Services, Inc. for analysis of PCBs and total suspended

    solids (TSS). 2. NA -- Not Analyzed. 3. ND -- Analyte was not detected. The number in parenthesis is the associated detection limit. 4. DR -- Data received and reported in Table 2-3 of the December 2010 CD Monthly Report.

    O l h i d d i l i d 5. Only those constituents detected in one or more samples are summarized. Field duplicate sample results are presented in brackets.6.

    Data Qualifiers:

    J - Indicates an estimated value less than the practical quantitation limit (PQL).

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx -2 -4 Page 6 of 6 2/9/2011

  • TABLE 2-5 PCB DATA RECEIVED DURING JANUARY 2011

    ROUTINE MAINTENANCE OIL SAMPLING EAST STREET AREA 2-SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID Date

    Collected Aroclor-1016 Aroclor-1221 Aroclor-1232 Aroclor-1242 Aroclor-1248 Aroclor-1254 Aroclor-1260 Total PCBs C2337-1 1/17/2011 ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96) C2338-1 1/17/2011 ND(0.97) ND(0.97) ND(0.97) ND(0.97) ND(0.97) ND(0.97) ND(0.97) ND(0.97) C2339-1 1/17/2011 ND(0.97) ND(0.97) ND(0.97) ND(0.97) ND(0.97) ND(0.97) ND(0.97) ND(0.97) C2739-1 1/17/2011 ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96) F4765-1 1/17/2011 ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96) ND(0.96)

    Notes: 1. Samples were collected by Veolia ES Technical Solutions, L.L.C. and submitted to SGS Environmental Services, Inc. for analysis of PCBs. 2. ND - Analyte was not detected. The number in parenthesis is the associated detection limit.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 2-5 2/9/2011

  • TABLE 2-6 AMBIENT AIR PCB DATA RECEIVED DURING JANUARY 2011

    PCB AMBIENT AIR CONCENTRATIONS EAST STREET AREA 2-SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS

    Sampling Event Period

    Date Analytical Results Received by

    Berkshire Environmental

    Consultants, Inc.

    Field Blank (µg/m3)

    ES2S-2R (µg/m3)

    ES2S-2RCO (colocated)

    (µg/m3)

    ES2S-3 (µg/m3)

    ES2S-8 (µg/m3)

    Background -East of Building

    9B (µg/m3)

    01/11/11-01/12/111 01/18/11 0.157 0.0067 0.0073 0.0004 0.0030 ND (

  • TABLE 2-7 AMBIENT AIR PARTICULATE MATTER DATA RECEIVED DURING JANUARY 20111

    PARTICULATE AMBIENT AIR CONCENTRATIONS EAST STREET AREA 2 - SOUTH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS

    Sampling Date2 Sampler Location Average Site

    Concentration (mg/m3)

    Background Site Concentration

    (mg/m3)

    Average Period (Hours:Min)

    Predominant Wind Direction

    01/03/11 ES2S-2R ES2S-3 ES2S-8

    0.010 0.017 0.009

    0.011 5:00 5:00 5:00

    WNW

    01/04/11 ES2S-2R ES2S-3 ES2S-8

    0.027 0.027 0.028

    0.030 5:00 5:00 5:00

    Calm

    01/05/11 ES2S-2R ES2S-3 ES2S-8

    0.010 0.011 0.008

    0.013 5:00 5:00 5:00

    WNW

    01/06/11 ES2S-2R ES2S-3 ES2S-8

    0.012 0.014 0.009

    0.012 5:00 5:00 5:00

    Variable

    01/07/11 ES2S-2R ES2S-3 ES2S-8

    0.010 0.012 0.008

    0.010 5:00 5:00 5:00

    Variable

    01/10/11 ES2S-2R ES2S-3 ES2S-8

    0.009 0.007 0.002 *

    0.010 5:00 5:00 4:15

    WNW

    01/11/11 ES2S-2R ES2S-3 ES2S-8

    0.012 0.007 0.003 *

    0.006 5:00 5:00 5:00

    Variable

    01/12/11 ES2S-2R ES2S-3 ES2S-8

    0.009 ** 0.008 0.004 *

    0.005 4:45 5:00 4:30

    WNW, NNW

    01/13/11 ES2S-2R ES2S-3 ES2S-8

    0.006 * 0.002 * 0.002 *

    0.005 4:45 4:15 5:15

    WNW

    01/14/11 ES2S-2R ES2S-3 ES2S-8

    0.003 * 0.009 0.003 *

    0.005 5:00 5:00 4:45

    WNW, NNW

    01/17/11 ES2S-2R ES2S-3 ES2S-8

    0.006 * 0.012 0.004

    0.008 5:15 5:00 5:00

    WNW

    01/18/11 ES2S-2R ES2S-3 ES2S-8

    0.006 * 0.009 0.008

    0.009 5:30 5:00 5:00

    Variable

    01/19/11 ES2S-2R ES2S-3 ES2S-8

    0.005 * 0.005 * 0.005

    0.009 5:00 4:45 5:00

    W

    01/20/11 ES2S-2R ES2S-3 ES2S-8

    0.013 * 0.018 0.014

    0.015 5:00 5:00 5:00

    WNW

    Notification Level 0.120

    Notes: All concentrations measured with an EBAM unless otherwise noted. * Measured with a DR-4000. ** Measured with a DR-4000 and EBAM. Background monitoring station is located east of Building 9B, between Building 9B and New York Avenue (BK-3). Predominant wind direction determined using hourly wind direction data from the Pittsfield Municipal Airport Weather Station. 1 Monitoring was performed only on days when site activities occurred. 2 The particulate monitors obtain real-time data. The sampling data were obtained by Berkshire Environmental Consultants, Inc. on the sampling date.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 2-7 2/9/2011

  • ITEM 3

    PLANT AREA

    EAST STREET AREA 2-NORTH

    (GECD140)

    JANUARY 2011

    a. Activities Undertaken/Completed

    - Continued work on a draft revised proposal for the remaining concrete slabs of certain buildings in East Street Area 2-North.*

    - Continued work on a draft ERE for East Street Area 2-North and associated survey work.*

    - Continued survey work for a draft ERE (being prepared by PEDA) covering the portion of Woodlawn Avenue within this RAA, combined with the portion of that road adjacent to the former 20s Complex.*

    - Continued communications with PEDA relating to the above-listed items and other activities associated with future transfer of the former 19s Complex and Woodlawn Avenue to PEDA.

    - Continued work on a draft FCR for East Street Area 2-North.*

    - Performed January 2011 dry weather flow inspection activities associated with Drainage Basin 005 under GE’s NPDES Permit-related Baseline Monitoring Plan.

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted Impacts

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Complete draft proposal for the remaining concrete slabs of certain buildings in East Street Area 2-North (in coordination with PEDA) and provide that draft revised proposal to EPA for review.*

    - Complete draft ERE for East Street Area 2-North (in coordination with PEDA), complete the survey work for that ERE, and provide the draft ERE and survey plans to EPA and MDEP for review.*

    - Coordinate with PEDA in the preparation of a draft ERE (being drafted by PEDA) covering the portion of Woodlawn Avenue within this RAA, combined with the portion of that road adjacent to the former 20s Complex; continue survey work for that ERE; and provide the draft ERE and survey plan to EPA and MDEP for review.*

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • ITEM 3

    (cont’d)

    PLANT AREA

    EAST STREET AREA 2-NORTH

    (GECD140)

    JANUARY 2011

    d. Upcoming Scheduled and Anticipated Activities (next six weeks) (cont’d)

    - Prepare and send requests for subordination agreements for the above-referenced EREs to the holders of encumbrances on East Street Area 2-North.*

    - Continued discussions with PEDA relating to activities associated with future transfer of the former 19s Complex and Woodlawn Avenue to PEDA.

    - Continue work on draft FCR for East Street Area 2-North and provide draft to EPA for review (after resolution of certain issues relating to the above-referenced draft proposal for the remaining concrete slabs of certain buildings in East Street Area 2-North, as well as the EREs for both East Street Area 2-North and Woodlawn Avenue).*

    - Perform February 2011 dry weather flow inspection activities associated with Drainage Basin 005 under GE’s NPDES Permit.

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    GE, PEDA, and EPA have agreed that a single ERE will be developed for East Street Area 2-North, excluding the portion of Woodlawn Avenue located within the RAA, which will be subject to a separate ERE.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • ITEM 5

    PLANT AREA

    HILL 78 & BUILDING 71 CONSOLIDATION AREAS

    (GECD210/220)

    JANUARY 2011

    * All activities described below for this item were conducted pursuant to the Consent Decree.

    a. Activities Undertaken/Completed

    - Transferred 5,580 gallons of leachate from Building 71 On-Plant Consolidation Area (OPCA) to Building 64G Groundwater Treatment Facility for treatment (see Table 5-1).

    - Continued work on draft FCR for the OPCAs.

    - In response to comments from EPA, revised draft ERE for the OPCAs and associated survey plans.

    - Requested a subordination agreement from the City of Pittsfield for the ERE for the OPCAs.

    - Transmitted information to Pittsfield Generating Company (PGC) relating to GE’s request for a subordination agreement for the ERE for the OPCAs.

    b. Sampling/Test Results Received

    See attached table.

    c. Work Plans/Reports/Documents Submitted

    - Submitted revised Post-Removal Site Control Plan for the OPCAs to EPA (January 6, 2011).

    - Provided revised draft ERE for the OPCAs and associated survey plans to EPA for review (January 26, 2011).

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Complete draft FCR for the OPCAs and provide it to EPA for review.

    - After receipt of any additional EPA comments, finalize ERE for the OPCAs and associated survey plans.

    - Obtain subordination agreements from the City of Pittsfield and PGC for the ERE for the OPCAs.

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • ITEM 5

    (cont’d)

    PLANT AREA

    HILL 78 & BUILDING 71 CONSOLIDATION AREAS

    (GECD210/220)

    JANUARY 2011

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    f.

    No issues.

    Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • TABLE 5-1 BUILDING 71 CONSOLIDATION AREA LEACHATE TRANSFER SUMMARY

    PLANT AREA - HILL 78 & BUILDING 71 CONSOLIDATION AREAS

    CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS

    January 2011

    Total Volume of Leachate Transferred

    Month / Year (Gallons) January 2010 5,000

    February 2010 6,000

    March 2010 0

    April 2010 7,100

    May 2010 4,000

    June 2010 0

    July 2010 6,000

    August 2010 6,000

    September 2010 6,000

    October 2010 6,000

    November 2010 6,000

    December 2010 0

    January 2011 5,580

    Note:1. Leachate is transferred from the Building 71 On-Plant

    Consolidation Area to Building 64G for treatment.

    Page 1 of 1 G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Monitoring Data\ OPCA.xlsActive

    2/9/2011

  • ITEM 6

    PLANT AREA

    HILL 78 AREA - REMAINDER

    (GECD160)

    JANUARY 2011

    a. Activities Undertaken/Completed

    - In response to comments from EPA, revised draft ERE for Hill 78 Area-Remainder and associated survey plans.*

    - Requested subordination agreements from the City of Pittsfield for the ERE for Hill 78 Area-Remainder, transmitted information to PGC relating to GE’s request for such a subordination agreement, and transmitted follow-up requests for such subordination agreements to the U.S. Department of the Navy and the Massachusetts Department of Transportation.*

    - Received comments from EPA on GE’s draft FCR for Hill 78 Area-Remainder.*

    - Installed AccQmin flow monitoring equipment at Yard Drains (YD) 13 and 16 in preparation of YD outfall sampling to be performed in accordance with GE’s NPDES Permit Modification.

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    Provided revised draft ERE for Hill 78 Area-Remainder and associated survey plans to EPA for review (January 26, 2011).*

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Revise draft FCR and provide it to EPA for review.*

    - After receipt of any additional EPA comments, finalize ERE and associated survey plans.*

    - Obtain subordination agreements from the City of Pittsfield and PGC for the ERE, and continue efforts to obtain subordination agreements from the U.S. Department of the Navy and the Massachusetts Department of Transportation.

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    No issues.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • ITEM 7

    PLANT AREA

    UNKAMET BROOK AREA

    (GECD170)

    JANUARY 2011

    a. Activities Undertaken/Completed

    - Conducted discussions with one of the owners of Parcel L12-1-5 regarding an ERE for that property, and provided him with a draft ERE.*

    - Requested owners of Parcels L12-1-4 and L12-1-101 to advise GE whether they still wish to execute EREs on those properties, and provided them with draft EREs.*

    - Performed January 2011 dry weather flow inspection activities associated with Drainage Basin 009 under GE’s NPDES Permit-related Baseline Monitoring Plan.

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    - Submitted second interim draft design submittal for Unkamet Brook Area-Remainder (Phragmites Soil Removal Activities and Proposed Removal Depth/Elevation Technical Drawings) to EPA via electronic mail (January 7, 2011).*

    - Submitted third interim draft design submittal for Unkamet Brook Area-Remainder (Former Interior Landfill Activities, Sanitary Sewer Re-Routing Activities, and Unkamet Brook Re-Routing Activities) to EPA via electronic mail (January 24, 2011).*

    - Submitted fourth interim draft design submittal for Unkamet Brook Area-Remainder (Scope of Sediment Removal and Site-Wide Material Staging/Dewatering Locations/Access Roads) to EPA via electronic mail (January 31, 2011).*

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Submit fifth interim draft design submittal for Unkamet Brook Area-Remainder (providing information on the culvert cleaning approach and the railroad spur beaver deterrent/debris diversion approach) to EPA for review and discussion.*

    - Conduct discussions with EPA regarding interim draft design submittals for Unkamet Brook Area-Remainder.*

    - Continue to develop Final RD/RA Work Plan for Unkamet Brook Area-Remainder.*

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • ITEM 7

    (cont’d)

    PLANT AREA

    UNKAMET BROOK AREA

    (GECD170)

    JANUARY 2011

    d. Upcoming Scheduled and Anticipated Activities (next six weeks) (cont’d)

    - Send letter to owners of Parcel L12-1-5 explaining the differences between the ERE and Conditional Solution approaches, requesting a conference call with them to discuss this issue, and requesting their decision on which option they wish to pursue.*

    - Send follow-up request to owners of Parcels L12-1-4 and L12-1-101 to advise GE whether they still wish to execute EREs on those properties.*

    - If owners of Parcels L12-1-4, L12-1-5, and/or L12-1-101 agree to EREs, provide draft EREs and associated survey plans to EPA for review.*

    - If owners of Parcels L12-1-4, L12-1-5, and/or L12-1-101 agree to EREs, send requests for subordination agreements to the holders of encumbrances on those properties.*

    - Prepare draft ERE and survey plan for GE-owned Parcel K11-7-2 and provide them to EPA for review.*

    - Send requests for subordination agreements to the holders of encumbrances on Parcel K11-7-2.*

    - It is anticipated that the City of Pittsfield will prepare an ERE for Parcel K11-7-9.*

    - Perform February 2011 dry weather flow inspection activities associated with Drainage Basin 009 under GE’s NPDES Permit.

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    - Based on agreement between GE and EPA, the submittal date for the Final RD/RA Work Plan for Unkamet Brook Area-Remainder has been postponed. In the meantime, GE agreed to submit various draft design submittals to EPA for review and discussion.*

    - Issues relating to GE’s Final RD/RA Work Plan for Unkamet Brook Area-West (submitted in July 2010) are under discussion with EPA.*

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • ITEM 12

    FORMER OXBOW AREAS J & K

    (GECD420)

    JANUARY 2011

    * All activities described below for this item were conducted pursuant to the Consent Decree.

    a. Activities Undertaken/Completed

    Conducted wipe sampling of bucket used in prior soil sampling at Parcel K10-11-2 (the former Hudpuckers property), as indicated in Table 12-1

    b. Sampling/Test Results Received

    See attached tables.

    c. Work Plans/Reports/Documents Submitted

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    None

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    GE has received permission from the owner of Parcel K10-11-5 for access to that property to perform inspections to date. GE still needs a long-term access agreement for that property, and will continue efforts to obtain such an agreement.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • TABLE 12-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    FORMER OXBOW AREAS J AND K GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    Hudpuckers Bucket Wipe Sampling Wipe-1 1/4/11 Wipe SGS PCB 1/14/2011 Hudpuckers Bucket Wipe Sampling Wipe-2 1/4/11 Wipe SGS PCB 1/14/2011

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 12-1 1 of 1 2/9/2011

  • TABLE 12-2 PCB DATA RECEIVED DURING JANUARY 2011

    HUDPUCKERS BUCKET WIPE SAMPLING FORMER OXBOW AREAS J AND K

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in μg/100cm2)

    Sample ID Date

    Collected Aroclor-1016, 1221, -1232, -1242, -1248 Aroclor-1254 Aroclor-1260 Total PCBs

    Wipe-1 1/4/2011 ND(1.0) 1.1 0.77 J 1.87 Wipe-2 1/4/2011 ND(1.0) ND(1.0) ND(1.0) ND(1.0)

    Notes: 1. Samples were collected by Veolia ES Technical Solutions, L.L.C. and submitted to SGS

    Environmental Services, Inc. for analysis of PCBs. 2. ND - Analyte was not detected. The number in parenthesis is the associated detection limit.

    Data Qualifiers:

    J - Indicates an estimated value less than the practical quantitation limit (PQL).

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 12-1 2/9/2011

  • ITEM 13

    HOUSATONIC RIVER AREA

    UPPER ½ MILE REACH

    (GECD800)

    JANUARY 2011

    * All activities described below for this item were conducted pursuant to the Consent Decree.

    a. Activities Undertaken/Completed

    None

    b. Sampling/Test Results Received

    None

    c. Work Plans/Reports/Documents Submitted

    Submitted 2010 Annual Monitoring Report for Upper ½ Mile Reach (January 28, 2011).

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    None

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    GE submitted a report evaluating the total organic carbon (TOC) content and effectiveness of the isolation layer on the river sediments on March 14, 2007. The Final Completion Report for the Upper ½-Mile Reach Removal Action will be submitted following EPA review and approval of that report.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • ITEM 14

    HOUSATONIC RIVER AREA

    1½ MILE REACH

    (GECD820)

    JANUARY 2011

    a. Activities Undertaken/Completed

    Provided comments to EPA on EPA’s draft FCR for 1½ Mile Reach Removal Action (January 31, 2011).*

    b. Sampling/Test Results Received

    See attached tables.

    c. Work Plans/Reports/Documents Submitted

    Submitted 2010 Annual Monitoring Report for 1½ Mile Reach (January 28, 2011).*

    d. Upcoming Scheduled and Anticipated Activities (next six weeks) Documents

    Continue Housatonic River water column monitoring.

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    No issues.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • TABLE 14-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    HOUSATONIC RIVER - 1 1/2 MILE REACH GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Project Name Monthly Water Column Sampling

    Field Sample ID Location-4

    Sample Date 12/17/10

    Matrix Water

    Laboratory NEA

    Analyses PCB, TSS, POC, Chlorophyll-A

    Date Received by GE or ARCADIS

    1/6/11

    Monthly Water Column Sampling Location-6A 12/16/10 Water NEA PCB, TSS, VSS, POC, Chlorophyll-A 1/6/11

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 14-1 1 of 1 2/9/2011

  • TABLE 14-2 SAMPLE DATA RECEIVED DURING JANUARY 2011

    MONTHLY WATER COLUMN SAMPLING HOUSATONIC RIVER - 1 1/2 MILE REACH

    GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID Location Date

    Collected Aroclor-1016, -1221,

    -1232, -1242, -1248, -1254 Aroclor 1260 Total PCBs POC TSS Chlorophyll (a) VSS LOCATION-4 Lyman Street Bridge 12/17/10 ND(0.0000220) ND(0.0000220) ND(0.0000220) 0.29 1.50 0.000700 NA LOCATION-6A Pomeroy Ave. Bridge 12/16/10 ND(0.00000550) ND(0.00000550) ND(0.00000550) 0.44 1.60 0.00120 ND(1.00)

    Notes: 1. Samples were collected by ARCADIS, and submitted to Northeast Analytical, Inc. for analysis of PCBs (unfiltered), total suspended solids (TSS), particulate

    organic carbon (POC), chlorophyll (a) and volatile suspended solids (VSS). 2. Sampling methods involved the collection of composite grab samples at each location, representative of three stations (25, 50, and 75 percent of the total river

    width at each location) at 50 percent of the total river depth at each station. 3. NA - Not Analyzed. 4. ND - Analyte was not detected. The number in parenthesis is the associated detection limit.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 14-2 2/9/2011

  • ITEM 15

    HOUSATONIC RIVER AREA

    REST OF THE RIVER

    (GECD850)

    JANUARY 2011

    a. Activities Undertaken/Completed

    None

    b. Sampling/Test Results

    See attached tables.

    c. Work Plans/Reports/Documents Submitted

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    Continue Housatonic River monthly water column monitoring.

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    GE’s Revised Corrective Measures Study Report, submitted in October 2010, is under EPA review.*

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • TABLE 15-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    HOUSATONIC RIVER - REST OF RIVER GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    2010 Housatonic River YOY Sampling GD-BG-323 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-BG-324 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-BG-325 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-BG-326 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-BG-327 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-BG-328 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-BG-329 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-LB-309 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-LB-310 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-LB-311 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-LB-312 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-LB-313 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-LB-314 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-LB-315 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-YP-316 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-YP-317 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-YP-318 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-YP-319 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-YP-320 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 15-1 1 of 5 2/9/2011

  • TABLE 15-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    HOUSATONIC RIVER - REST OF RIVER GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    2010 Housatonic River YOY Sampling GD-YP-321 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling GD-YP-322 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-BG-281 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-BG-282 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-BG-283 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-BG-351 10/27/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-BG-352 10/27/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-BG-353 10/27/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-BG-354 10/27/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-LB-274 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-LB-275 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-LB-276 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-LB-277 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-LB-278 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-LB-279 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-LB-280 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-YP-267 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-YP-268 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-YP-269 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 15-1 2 of 5 2/9/2011

  • TABLE 15-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    HOUSATONIC RIVER - REST OF RIVER GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    2010 Housatonic River YOY Sampling HR2-YP-270 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-YP-271 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-YP-272 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR2-YP-273 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-BG-344 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-BG-345 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-BG-346 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-BG-347 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-BG-348 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-BG-349 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-BG-350 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-LB-330 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-LB-331 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-LB-332 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-LB-333 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-LB-334 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-LB-335 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-LB-336 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-YP-337 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 15-1 3 of 5 2/9/2011

  • 1/4/11

    TABLE 15-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    HOUSATONIC RIVER - REST OF RIVER GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    2010 Housatonic River YOY Sampling HR6-YP-338 10/14/10 Biota Pace PCB, % Lipids

    2010 Housatonic River YOY Sampling HR6-YP-339 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-YP-340 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-YP-341 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-YP-342 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling HR6-YP-343 10/14/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-BG-288 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-BG-289 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-BG-290 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-BG-291 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-BG-292 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-BG-293 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-BG-294 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-LB-295 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-LB-296 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-LB-297 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-LB-298 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-LB-299 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-LB-300 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 15-1 4 of 5 2/9/2011

  • TABLE 15-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    HOUSATONIC RIVER - REST OF RIVER GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Date Received by Project Name Field Sample ID Sample Date Matrix Laboratory Analyses GE or ARCADIS

    2010 Housatonic River YOY Sampling WP-LB-301 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-YP-302 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-YP-303 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-YP-304 10/12/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-YP-305 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-YP-306 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-YP-307 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    2010 Housatonic River YOY Sampling WP-YP-308 10/13/10 Biota Pace PCB, % Lipids 1/4/11

    Monthly Water Column Sampling HR-D1 (Location-12) 12/16/10 Water NEA PCB, TSS, POC, Chlorophyll-A 1/6/11 Monthly Water Column Sampling Location-10 12/16/10 Water NEA PCB, TSS, POC, Chlorophyll-A 1/6/11 Monthly Water Column Sampling Location-12 12/16/10 Water NEA PCB, TSS, POC, Chlorophyll-A 1/6/11 Monthly Water Column Sampling Location-13 12/16/10 Water NEA PCB, TSS, POC, Chlorophyll-A 1/6/11 Monthly Water Column Sampling Location-2 12/17/10 Water NEA PCB, TSS, POC, Chlorophyll-A 1/6/11 Monthly Water Column Sampling Location-7 12/16/10 Water NEA PCB, TSS, POC, Chlorophyll-A 1/6/11 Monthly Water Column Sampling Location-9 12/16/10 Water NEA PCB, TSS, POC, Chlorophyll-A 1/6/11

    Note: 1. The parent sample location associated with the field duplicate is presented in parenthesis.

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 15-1 5 of 5 2/9/2011

  • Samples were collected by ARCADIS, and submitted to Northeast Analytical, Inc. for analysis of unfiltered PCBs, total suspended solids (TSS), particulate organic carbon (POC), and chlorophyll (a). Sampling methods involved the collection of composite grab samples at each location, representative of three stations (25, 50, and 75 percent of the total river width at each location) at 50 percent of the total river depth at each station. ND Analyte was not detected. The number in parenthesis is the associated detection limit.Field duplicate sample results are presented in brackets.

    Data Qualifiers:

    AG - Aroclor 1260 is being reported as the best Aroclor match. The sample exhibits an altered PCB pattern.

    TABLE 15-2 SAMPLE DATA RECEIVED DURING JANUARY 2011

    MONTHLY WATER COLUMN SAMPLING HOUSATONIC RIVER -RE ST OF RIVER

    GENERAL ELECTRIC COMPANY -P ITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID Location Date

    Collected Aroclor-1016, -1221,

    -1232, -1242, -1248, -1254 Aroclor 1260 Total PCBs POC TSS Chlorophyll (a) LOCATION-1 Hubbard Avenue Bridge 12/16/10 ND(0.0000220) ND(0.0000220) ND(0.0000220) 0.34 ND(1.00) 0.000480 LOCATION-2 Newell Street Bridge 12/17/10 ND(0.0000220) ND(0.0000220) ND(0.0000220) 0.37 4.00 0.000690 LOCATION-7 Holmes Road Bridge 12/16/10 ND(0.0000220) ND(0.0000220) ND(0.0000220) 0.35 3.50 0.00180 LOCATION-9 New Lenox Road Bridge 12/16/10 ND(0.0000220) 0.0000430 AG 0.0000430 0.52 5.60 0.00180 LOCATION-10 Headwaters of Woods Pond 12/16/10 ND(0.0000220) ND(0.0000220) ND(0.0000220) 0.37 2.80 0.00150 LOCATION-12 Schweitzer Bridge 12/16/10

    12/16/10 ND(0.0000220) [ND(0.0000220)]

    0.0000220 AG [0.0000240 AG]

    0.0000220 [ 0.0000240]

    0.27 [0.10]

    1.70 [1.30]

    0.00130 [0.00130]

    LOCATION-13 Division Street Bridge 12/16/10 ND(0.0000220) ND(0.0000220) ND(0.0000220) 0.28 2.10 0.00140

    Notes: 1. Samples were collected by ARCADIS, and submitted to Northeast Analytical, Inc. for analysis of unfiltered PCBs, total suspended solids (TSS), particulate

    organic carbon (POC), and chlorophyll (a).2. Sampling methods involved the collection of composite grab samples at each location, representative of three stations (25, 50, and 75 percent of the total river

    width at each location) at 50 percent of the total river depth at each station. 3. ND -- Analyte was not detected. The number in parenthesis is the associated detection limit. 4. Field duplicate sample results are presented in brackets.

    Data Qualifiers:

    AG - Aroclor 1260 is being reported as the best Aroclor match. The sample exhibits an altered PCB pattern.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx -1 5-2 2/9/2011

  • TABLE 15-3 PCB AND % LIPIDS DATA

    2010 HOUSATONIC RIVER YOY SAMPLING

    HOUSATONIC RIVER - REST OF RIVER GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS

    (Results are presented in parts per million, ppm)

    Sample ID Date

    Collected: Aroclor-1016, -1221, -1232, -1242,-1248 Aroclor-1254 Aroclor-1260 Total PCBs

    Percent Lipids (%)

    GD-BG-323 10/13/10 ND(1.2) 0.89 J 3.0 3.89 3.8 GD-BG-324 10/13/10 ND(1.3) 0.92 J 3.3 4.22 3.8 GD-BG-325 10/13/10 ND(1.3) 0.88 J 3.3 4.18 4.3 GD-BG-326 10/13/10 ND(1.4) 0.86 J 3.1 3.96 4.0 GD-BG-327 10/13/10 ND(1.3) 0.82 J 3.0 3.82 3.8 GD-BG-328 10/13/10 ND(1.3) 0.81 J 2.9 3.71 3.8 GD-BG-329 10/13/10 ND(1.4) 0.83 J 3.0 3.83 3.8 GD-LB-309 10/13/10 ND(1.0) 0.93 J 3.1 4.03 3.0 GD-LB-310 10/13/10 ND(1.0) 0.98 J 3.5 4.48 2.8 GD-LB-311 10/13/10 ND(1.0) 1.1 3.6 4.7 2.9 GD-LB-312 10/13/10 ND(1.0) 1.1 4.1 5.2 2.6 GD-LB-313 10/13/10 ND(1.0) 1.1 3.5 4.6 3.2 GD-LB-314 10/13/10 ND(1.0) 0.92 J 3.2 4.12 2.7 GD-LB-315 10/13/10 ND(1.0) 1.2 4.1 5.3 2.8 GD-YP-316 10/13/10 ND(1.0) 0.74 J 2.7 3.44 1.9 GD-YP-317 10/13/10 ND(1.0) 0.83 J 3.0 3.83 2.1 GD-YP-318 10/13/10 ND(1.0) 1.0 3.7 4.7 2.5 GD-YP-319 10/13/10 ND(1.0) 0.85 J 3.1 3.95 2.2 GD-YP-320 10/13/10 ND(1.0) 1.0 3.6 4.6 2.7 GD-YP-321 10/13/10 ND(1.0) 0.94 J 3.7 4.64 2.2 GD-YP-322 10/13/10 ND(1.0) 0.84 J 2.9 3.74 2.4

    HR2-BG-281 10/12/10 ND(6.2) 3.9 J 12 15.9 3.7 HR2-BG-282 10/12/10 ND(6.3) 3.7 J 12 15.7 4.0 HR2 BG 283 HR2-BG-283 10/12/10 10/12/10 ND(6 5) ND(6.5) 4 0 J4.0 J 1212 1616 4 04.0 HR2-BG-351 10/27/10 ND(2.9) 3.5 11 14.5 3.0 HR2-BG-352 10/27/10 ND(3.1) 3.0 J 8.9 11.9 3.4 HR2-BG-353 10/27/10 ND(2.9) 3.3 8.9 12.2 3.1 HR2-BG-354 10/27/10 ND(2.7) 3.4 11 14.4 2.7 HR2-LB-274 10/12/10 ND(5.0) 3.8 J 13 16.8 4.0 HR2-LB-275 10/12/10 ND(5.0) 4.5 J 15 19.5 3.6 HR2-LB-276 10/12/10 ND(5.0) 4.1 J 13 17.1 3.7 HR2-LB-277 10/12/10 ND(5.0) 4.2 J 15 19.2 3.2 HR2-LB-278 10/12/10 ND(5.0) 4.2 J 14 18.2 3.2 HR2-LB-279 10/12/10 ND(5.0) 4.3 J 14 18.3 3.4 HR2-LB-280 10/12/10 ND(5.0) 4.5 J 16 20.5 3.6 HR2-YP-267 10/12/10 ND(5.0) 5.1 15 20.1 2.8 HR2-YP-268 10/12/10 ND(5.0) 4.0 J 13 17 2.8 HR2-YP-269 10/12/10 ND(5.0) 4.0 J 13 17 2.5 HR2-YP-270 10/12/10 ND(5.0) 4.5 J 15 19.5 2.6 HR2-YP-271 10/12/10 ND(5.0) 4.5 J 15 19.5 2.8 HR2-YP-272 10/12/10 ND(5.0) 4.4 J 15 19.4 2.8 HR2-YP-273 10/12/10 ND(5.0) 3.8 J 12 15.8 3.0 HR6-BG-344 10/14/10 ND(0.28) 0.37 1.3 1.67 3.6 HR6-BG-345 10/14/10 ND(0.27) 0.29 1.1 1.39 2.9 HR6-BG-346 10/14/10 ND(0.30) 0.31 1.2 1.51 3.4 HR6-BG-347 10/14/10 ND(0.34) 0.44 1.7 2.14 3.4 HR6-BG-348 10/14/10 ND(0.64) 0.29 J 1.3 1.59 3.2 HR6-BG-349 10/14/10 ND(0.60) 0.31 J 1.2 1.51 3.2 HR6-BG-350 10/14/10 ND(0.67) 0.31 J 1.2 1.51 3.4 HR6-LB-330 10/14/10 ND(0.30) 0.20 J 0.88 1.08 2.0 HR6-LB-331 10/14/10 ND(0.53) 0.31 J 1.3 1.61 2.9

    Page 1 of 2

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 15-3 2/9/2011

  • TABLE 15-3 PCB AND % LIPIDS DATA

    2010 HOUSATONIC RIVER YOY SAMPLING

    HOUSATONIC RIVER - REST OF RIVER GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS

    (Results are presented in parts per million, ppm)

    Sample ID Date

    Collected: Aroclor-1016, -1221, -1232, -1242,-1248 Aroclor-1254 Aroclor-1260 Total PCBs

    Percent Lipids (%)

    HR6-LB-332 10/14/10 ND(0.60) 0.36 J 1.6 1.96 2.9 HR6-LB-333 10/14/10 ND(0.28) 0.16 J 0.79 0.95 2.3 HR6-LB-334 10/14/10 ND(0.23) 0.16 J 0.65 0.81 2.1 HR6-LB-335 10/14/10 ND(0.56) 0.36 J 1.5 1.86 3.0 HR6-LB-336 10/14/10 ND(0.50) 0.26 J 1.1 1.36 2.8 HR6-YP-337 10/14/10 ND(1.0) 0.45 J 2.1 2.55 2.3 HR6-YP-338 10/14/10 ND(1.0) 0.47 J 2.0 2.47 2.2 HR6-YP-339 10/14/10 ND(1.0) 0.44 J 2.0 2.44 3.0 HR6-YP-340 10/14/10 ND(1.0) ND(1.0) 2.0 2.0 2.4 HR6-YP-341 10/14/10 ND(1.0) 0.44 J 1.9 2.34 2.6 HR6-YP-342 10/14/10 ND(0.50) 0.44 J 1.8 2.24 2.6 HR6-YP-343 10/14/10 ND(0.50) 0.50 2.1 2.6 2.4 WP-BG-288 10/12/10 ND(5.1) 3.7 J 11 14.7 3.5 WP-BG-289 10/12/10 ND(5.5) 3.7 J 10 13.7 3.1 WP-BG-290 10/12/10 ND(5.0) 3.4 J 9.9 13.3 3.3 WP-BG-291 10/12/10 ND(5.3) 3.5 J 10 13.5 3.3 WP-BG-292 10/12/10 ND(3.3) 3.3 J 9.3 12.6 3.3 WP-BG-293 10/12/10 ND(3.0) 3.2 8.8 12 2.8 WP-BG-294 10/12/10 ND(3.3) 2.4 J 6.8 9.2 3.1 WP-LB-295 10/12/10 ND(5.0) 3.4 J 10 13.4 2.9 WP-LB-296 10/12/10 ND(5.0) 4.0 J 12 16 2.8 WP-LB-297 10/12/10 ND(5.0) 4.4 J 13 17.4 2.6 WP-LB-298 10/12/10 ND(5.0) 3.5 J 11 14.5 2.7 WP LB 299 WP-LB-299 10/12/10 10/12/10 ND(5 0) ND(5.0) 3 3 J3.3 J 1111 14 3 14.3 2 42.4 WP-LB-300 10/13/10 ND(5.0) 5.0 15 20 2.8 WP-LB-301 10/13/10 ND(5.0) 5.6 17 22.6 3.0 WP-YP-302 10/12/10 ND(5.0) 4.2 J 13 17.2 2.5 WP-YP-303 10/12/10 ND(5.0) 10 16 26 3.0 WP-YP-304 10/12/10 ND(5.0) 3.9 J 14 17.9 2.5 WP-YP-305 10/13/10 ND(2.5) 5.2 15 20.2 3.6 WP-YP-306 10/13/10 ND(2.5) 5.9 17 22.9 2.9 WP-YP-307 10/13/10 ND(2.5) 4.4 13 17.4 2.7 WP-YP-308 10/13/10 ND(2.5) 4.7 14 18.7 3.0

    Notes: 1. Samples were collected by ARCADIS and submitted to Pace Analytical Services, Inc. for analysis

    of PCBs and % Lipids. 2. ND - Analyte was not detected. The number in parentheses is the associated detection limit.

    Data Qualifiers:

    J - Indicates an estimated value less than the practical quantitation limit (PQL).

    Page 2 of 2

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx - 15-3 2/9/2011

  • ITEM 20

    OTHER AREAS

    SILVER LAKE AREA

    (GECD600)

    JANUARY 2011

    a. Activities Undertaken/Completed

    GE continued efforts to obtain access permission for performance of forthcoming remediation activities.*

    b. Sampling/Test Results Received

    See attached tables.

    c. Work Plans/Reports/Documents Submitted

    None

    d. Upcoming Scheduled and Anticipated Activities (next six weeks)

    - Continue efforts to obtain access permission for performance of forthcoming remediation activities.*

    - Continue survey work for ERE for the GE-owned bank property on the western and a portion of the northern side of the Lake.*

    - PEDA to request concurrence by the Pittsfield Conservation Commission on PEDA’s allocation of certain flood storage compensation to GE for use in GE’s remediation/restoration activities at this RAA.*

    e. General Progress/Unresolved Issues/Potential Schedule Impacts

    - Certain issues relating to GE’s Revised Final RD/RA Work Plan (submitted in November 2010) and the performance of remediation/restoration activities at this RAA are under discussion with EPA.*

    - PEDA is continuing discussions with WMECo regarding the transfer to PEDA of the WMECoowned bank property on the northern side of the Lake.

    f. Proposed/Approved Work Plan Modifications

    None

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • TABLE 20-1 DATA RECEIVED AND/OR SAMPLES COLLECTED DURING JANUARY 2011

    SILVER LAKE AREA GENERAL ELECTRIC COMPANY - PITTSFIELD MASSACHUSETTS

    Project Name Monthly Water Column

    Sampling

    Field Sample ID

    Location-4A

    Sample Date

    12/16/10

    Matrix

    Water

    Laboratory

    NEA

    Analyses

    PCB, TSS

    Date Received by GE or ARCADIS

    1/5/11

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Tracking Logs\ Tracking.xlsm - TABLE 20-1 1 of 1 2/9/2011

  • Sample was collected by ARCADIS, and submitted to Northeast Analytical, Inc. for analysis of unfiltered PCBs and total suspended solids (TSS).Sampling methods involved the collection of single grab 50 percent of the total river width, and 50 percent of the total river depth.ND Analyte was not detected. The number in parenthesis is the associated detection limit.

    Data Qualifiers:

    PB - Aroclor 1221 is being used to report an altered PCB pattern exhibited by the sample. Actual Aroclor 1221is not present in the sample, but is reported to more accurately quantify PCBs present in a sample that has undergone environmental alteration. PD Aroclor 1242 is being used to report an altered PCB pattern exhibited by the sample. Actual Aroclor 1242 is not present in the sample, but is reported to

    more accurately quantify PCBs present in a sample that has undergone environmental alteration.

    TABLE 20-2 SAMPLE DATA RECEIVED DURING JANUARY 2011

    MONTHLY WATER COLUMN SAMPLING SILVER LAKE AREA

    GENERAL ELECTRIC COMPANY -P ITTSFIELD, MASSACHUSETTS (Results are presented in parts per million, ppm)

    Sample ID Location Date

    Collected Aroclor-1016,

    -1232, -1248, -1254 Aroclor 1221 Aroclor 1242 Aroclor 1260 Total PCBs TSS LOCATION-4A Silver Lake Outlet 12/16/2010 ND(0.0000220) 0.0000490 PB 0.0000220 PD ND(0.0000220) 0.0000710 2.67

    Notes: 1. Sample was collected by ARCADIS, and submitted to Northeast Analytical, Inc. for analysis of unfiltered PCBs and total suspended solids (TSS). 2. Sampling methods involved the collection of single grab 50 percent of the total river width, and 50 percent of the total river depth. 3. ND -- Analyte was not detected. The number in parenthesis is the associated detection limit.

    Data Qualifiers:

    PB - Aroclor 1221 is being used to report an altered PCB pattern exhibited by the sample. Actual Aroclor 1221is not present in the sample, but is reported to more accurately quantify PCBs present in a sample that has undergone environmental alteration. PD -- Aroclor 1242 is being used to report an altered PCB pattern exhibited by the sample. Actual Aroclor 1242 is not present in the sample, but is reported to

    more accurately quantify PCBs present in a sample that has undergone environmental alteration.

    Page 1 of 1

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\Analytical Data Tables\ Tables.xlsx -2 0-2 2/9/2011

  • ITEM 21

    GROUNDWATER MANAGEMENT AREAS

    PLANT SITE 1 (GMA 1)

    (GECD310)

    JANUARY 2011

    * All activities described below for this item were conducted pursuant to the Consent Decree.

    a. Activities Undertaken/Completed

    General:

    - Conducted routine groundwater elevation and NAPL monitoring/recovery activities, including quarterly monitoring round.

    - Conducted survey and maintenance activities at selected monitoring wells.

    - Conducted waste characterization analyses on soil cuttings, development water, and debris from well maintenance activities, as indicated in Table 21-1.

    East Street Area 1-North and South:

    - Continued automated groundwater and NAPL pumping at North Side and South Side Caissons. No LNAPL was removed from the North Side Caisson in January. No LNAPL was removed from the South Side Caisson in January.

    - Continued routine well monitoring and manual NAPL removal activities. Approximately 0.678 liter (0.179 gallon) of LNAPL was removed from this area during January.

    East Street Area 2-South:

    - Continued automated groundwater and LNAPL removal activities. A total of approximately 3,907,863 gallons of groundwater was recovered from pumping systems 64R, 64S, 64V, 64X, RW-1(S), RW-1(X), and RW-2(X). In addition, approximately 538 gallons of LNAPL were removed from pumping systems 64R, 64V, GMA1-17W, RW-1(S), RW-2(X), RW-4, 64X, and 64S Caisson.

    - Continued automated DNAPL removal activities. Approximately 30 gallons of DNAPL were removed from pumping system RW-3(X) during January.

    - Continued routine well monitoring and manual NAPL removal activities. Approximately 27.122 liters (7.156 gallons) of LNAPL were removed from wells in this area during January. Approximately 4.133 liters (1.091 gallons) of DNAPL were removed from wells in this area during January.

    G:\GE\GE_Pittsfield_General\Reports and Presentations\Monthly Reports\2011\01-11\01-11 CD Monthly Text Final.doc

  • ITEM 21

    (cont’d)

    GROUNDWATER MANAGEMENT AREAS

    PLANT SITE 1 (GMA 1)

    (GECD310)

    JANUARY 2011

    a. Activities Undertaken/Completed (cont’d)

    East Street Area 2-South (cont’d):

    - Treated/discharged approximately 4,049,711 gallons of water through Building 64G Groundwater Treatment Facility.

    East Street Area 2-North:

    - Continued well monitoring and NAPL removal activities. No LNAPL was removed from wells in this area in January.

    20s, 30s, and 40s Complexes:

    - Continued well monitoring and NAPL removal activities. No LNAPL was recovered from this area during January.

    Lyman Street Area: