Upload
jane-du-plessis
View
309
Download
0
Embed Size (px)
Citation preview
Jane du Plessis
3
Table of contents
About me 5
Time line 6
Architecture 9HRST Office building 10House Naidoo 14House Botha 20School Kiosk 22
Previous work experience 25Work experience 26Internship experience 30
4
Perspective view of House Naidoo
I am a Senior Architectural Technician that has recently immigrated to Melbourne Australia. Before immigrating I successfully ran both an Architectural Design firm as well as a Feng Shui Consultant practice. I have over 5 years of experience in the architectural profession and 3 years in Feng Shui consultancy and design.
In the 2,5 years that I ran my own architectural firm Mammoth Designs, I worked on 5 projects in three different industries. I was involved from concept design until tender documentation. I have 6 years experience in working on Revit and
used it to design and document all my projects.
As a Feng Shui Consultant I had more 38 clients, ranging from residential to office and retail. Online marketing and referrals was how I obtain most of my clients. I designed and managed my business’ website and online marketing campaigns using Wix, Google add words and Google analytics. During this time
I also published 2 Feng Shui articles and had an active newsletter.
I am fascinated by the built environment and how it transforms and interacts with peoples lives. From the large scale of urban design to the intimate influence of Feng Shui. I firmly believe that sustainable architecture and elegant design can improve the quality of peoples lives. Timeless design is about creating
spaces that are elegant and harmonious.
About me
6
Studies Work
Design Revit Senior Architectural Technician
Whilst studying at Stellenbosch University I discovered my passion for architecture and interior design. I decided to follow my dream and
study design.
I had the wonderful opportunity to work for various architectural firms in Cape Town. I worked on various projects, in different industries. I performed equally well as part of a team or
working independently.
I have a high level of Revit experience and have been using the program to model and document
projects for over 6 years.
Time line
7
Mammoth Designs
Client service Business administration Light Steel Construction
Tranquil Vitality
As a Feng Shui consultant I got the unique opportunity to assist people in enhancing their lives. This part of my work enhanced my understanding of clients ad improved my
communication skill dramatically.
As a business owner I had gained a more in-depth knowledge of how to perform and manage the administration component of an architectural
practice.
Two of the projects that I worked on was Light Steel Construction buildings. Before starting the projects I had little knowledge of this building method and learning this new technique was
remarkably rewarding.
After moving to Johannesburg in 2012 I started my own architectural design firm. I created a firm where sustainable design and customer services where the
corner stones of every project.
Architecture
10
Client: HR Solutions for Tomorrow
Project:Additions and alterations to the existing office building to increase
it’s overall size and improve its energy consumption.
Involvement:Concept design, feasibility analysis and tender documentation.
HRST Office building
Rendered image of front facade
11Site and Demolition plan
12Ground and First floor plans
13Elevations and Sections
14
Client: Mr. and Mrs. Naidoo
Project:A new residential building in an environmentally sustainable estate.
Involvement:Concept design, concept design approval by Home Owners Association
and tender documentation.
House Naidoo
Rendered image of front facade
15
Site plan
16Ground and First floor plans
17
HOUSE NAIDOOThis project was very unique in that the clients wanted me to design their house according to Feng Shui principles. As the head designer and Feng Shui consultant this gave me a wonderful opportunity to use all my skills to create a elegant architectural design that was also in harmony with the client’s and site’s chi.
Elevations and Perspective view
18
2
1
2
1
232221201918
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3 2 1
1474.
000
232221201918
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3 2 1
Section A
Section A
D5
D6
D10
D7
D8
D12
D30
D29
D23
D22
D24
D28
D27
D26
D21
D20
D19
D17
D3
D25
32 m²
entrance
tiles
25 m²
library
carpet
14 m²
bedroom1
laminate flooring
4 m²
bathroom
tiles
3 m²
toilet
tiles
30 m²
dinning room
tiles
10 m²
prayer room
tiles
16 m²
kitchen
tiles
19 m²
scullery
tiles
15 m²
lounge
laminate flooring
38 m²
gargae 1
paving
39 m²
garage 2
paving
12 m²
bedroom
laminate flooring
3 m²
bathroom
tiles
14 m²
living room
tiles
4 m²
change room
tiles
5 m²
utility room
tiles
4 m²
store room
paving
Section B
Section B
Section C
Section C
6 m²
hallway
tiles
36 m²
living room
tiles
2 m²
pantry
tiles
13 m²
green house
paving
40 m²
patio
tiles
D1
D4
D16
D11
D9
D15
D18
BACKYARD
1473.500
BACKYARD
1474.500
GARAGE 2
1474.650
DOMESTIC QUARTERS
1474.650
GROUND FLOOR
1474.650
GARAGE 1
1473.650
PATIO
1474.500
GREEN HOUSE
1473.650
POOL
90 3820 90 2820 90 620 200 3940 1010 90 3510 90 2910 90 3160 90
2100 200 1520 1200 90 2220 90 570 90 1240 90 920
450
460
450
360
7730 1540 510 2890 90 3600 30 2880 3340
1760 2140
890
1660
12590 90 3090 90
320
90 820 90 990 90
90 2680 90 8950 90 760 90 2310 90 2100 2010 300
500
950
2500 2220 400 2220 400 1580 40090
2860 220
90 4070 90 1830 90 4080 90
24090 6800 90 3120
90
5300
4520
90
1840
1000
160
4430
90
1290
90
1530
90
300
2510
90
3880
90
5300
90440
1380
90
1820
90
3610
90
90
3030
90
5800
90
1530
90
1600
90
2000
90
720
2070
90
1230
90
1100
200
4320
90
240
1770
90
1030
90
5800
90
5300
90550
500
1800
90
5470
90
4360
90
11960
90
14130
230
2890
90
3210
5890
1620
1600
5030
12140
Firepit walls and bottom of columns to be
cladded with sandstone.
Balustrade columns to be cladded with sandstone.
Side of wall facing entrance to be
cladded with sandstone
Waterfeature walls to be
cladded with sandstone.
1,2m high wall to be cladded
with sandstone
Wall to be cladded with
sandstone
Fence made from steel plates
fixed to a structural steel frame,
to later detail.
Fence made from steel plates fixed to a
structural steel frame, with 860mm gate, to
later detail.
Fence made from steel plates fixed to a
structural steel frame, with 860mm gate,
to later detail.
W21
W20
W19
W9
W1W2
W3
W5
W6
W4
W7
W8
W11
W10
W12
W13
D13
Fixed steel louvre infront of window to later detail.
Firepit seating to be made from wooden
plastic planks fixed to steel frame, to
later detail.
Waterfeature running down
glazed panel to be installed by
specialist.
Garden path and steps .
Laundry shoot duct to drop
through first floor slab and into
cupboard below. Design and
installed by specialist.
Ground floor fireplace as per detailed drawing.
W14
W15
W16 W17 W18
Light steel frame staircase as per eng.
specification, with laminate flooring with 23 risers
that are 175mm high and treads as indicated.
Balustrade as per AvA Designs' drawing.
Light steel frame staircase as per
eng. specification with paving as
floor covering and 2 risers at 175
high and treads 250mm wide.
Light steel frame staircase as per
eng. specification with paving as
floor covering and 2 risers at 175
high and treads 250mm wide.
2 hour firerated wall
All garage wall to have a 2 hour fire rating.
Step in ceiling height.
Duct to accommodated
plumbing pipes from above. Wall
to have a 300x 300mm access
panel at junction, access panel
to be flush with wall and painted
in same colour.
Duct to accommodated plumbing pipes
from above. Wall to have a 300x 300mm
access panel at junction, access panel to
be flush with wall and painted in same
colour.
Double wall to allow for plumbing
pipes. Exterior wall to have a
300x300mm access panel. Access
panel must be at junction, flush with
wall and painted same colour as wall.
Double wall to allow for plumbing pipes.
Exterior wall to have a 300x300mm access
panel. Access panel must be at junction,
flush with wall and painted same colour as
wall.
Double wall to allow for plumbing
pipes. Exterior wall to have a
300x300mm access panel. Access
panel must be at junction, flush with
wall and painted same colour as wall.
Cavity wall to accommodate sliding door.
Cavity wall to accommodate sliding door.
Cavity wall to accommodate sliding door.
Step in ceiling height.
D14D14
3m building line
5m building line
boundary line
boundary line
4m midblock building line
boundary line
2m building line
4m building line
boundary line
front garden
6440
main house
17630
back garden
14830
back garden
14190
domestic quaters
10610
driveway
4000
back yard
4000
domestic quaters
4270
25630
front garden
5000
ERF 878
ramp up
ramp up
Victoriafalls Avenue
swimming
pool
ramp up
BACKYARD
1473.500
BACKYARD
1474.500
PATIO
1474.500
DRIVEWAY
1473.500
Solar panels flush with roof
to be installed by specialist.
Section A
Section A
D41
D42
D32
D33
D34
D35
D36
D37
D38
D39
D40
Section B
Section B
Section C
Section C
15 m²
bedroom 3
laminate flooring
13 m²
bedroom 2
laminate flooring
5 m²
bathroom
tiles
18 m²
lounge
laminate flooring
14 m²
master bedroom
carpet
11 m²
walk in cupboard
carpet
13 m²
bathroom
tiles
15 m²
bedroom 4
laminate flooring
5 m²
bathroom
tiles
6 m²
bathroom
tiles
D31
W23
W22
W24
W31
W30
W29
W27W26 W25 W24
Steel sun shading device fixed to
wall. Steel fixture consisting of
steel plates fixed to steel frame.
Fixed steel louvre to later detail.
Fix steel louvre to later detail.
Fixed steel louvre to later detail.
Steel sun shading device fixed to
wall. Steel fixture consisting of
steel plates fixed to steel frame.
Glazed roof and structure for Green House.
Master bedroom fire place as per detailed drawing.
90 3030 90 3030 90 1300 90 4950 90 3510 90
90 1730 90 11900 90 2370 90
90 2810 90 3700 90
430
90 4020 90
430
90 4350 90
360
880
90
3380
90
880
90
3380
90
90
4430
90
860
90
1880
90
270
90
2020
90
3990
90
1220
90
4430
1030
90
2120
90
2140
90
860
200
4320
90
Cavity wall to allow for sliding door
Laundry shoot duct to drop through first floor slab
and into cupboard below. Design and installed by
specialist.
W28
Cavity to accommodate
plumbing pipes,
300x300mm access
panel on both sides.
Duct to accommodate
pipes, 300x300mm
access panel to be flush
against wall.
Duct to accommodate pipes,
300x300mm access panel to be flush
against wall.
Chimney for braai, chimney to be fire
resistant and must comply with National
building regulations.
client
project
drawing details
drawing scale sheet size
drawn date
drawing number revision
north
short filename :
notes
project number
subject to local authority approval
AREA CALCULATIONS
:TOTAL COVERAGE
:
:
:
:
:
TOTAL FLOOR AREA
NEW FIRST FLOOR
OUTBUILDINGS
NEW GROUND FLOOR
SITE AREA
erf no:
tel: fax:
Jane du Plessis
SPECIFICATIONS:
GENERAL NOTES:
This project is subject to Local Authority approval.
All works and building materials are to comply with National Building Regulations (SAB
20400) and Local Council's approval conditions as well as estate rules and
regulations.
This drawings is not to be scaled.
Figured dimensions to be used at all times and any before the works are commenced.
No work to commence without the contractor being in possession of the latest
approved plan.
All structural timber to be Grade 4 or better SA Pine.
Glazing to doors and windows in excess of 1m sq. or less than 300mm above
finished floor level to be laminated satey glazing.
FOUNDATIONS:
Foundations must be in accordance with the engineers specification.
FLOORS:
1. Ground floor
Floor finishes as specified on plan on 25mm thick screed on 100mm thick concrete
slad on 25 mircon dpm to SABS specification on 50mm blinding on 150mm consolidated
fill.
2. First floor
Floor finishes as specified on plan on 25mm screed on concrete slab on metal deck on
steel memebers as per engineer's specification. Lay 75mm Isotherm insulation to
manufacturer's spec. above ceiling in all roof spaces and fill voids snugly.
WALLS:
Expansions joints are to be allowed for to accommodate movement of the building due
to shallow groundwater found on site.
1. Exterior walls
External walls to be made from made from fibre cement board (sheet of minimum 9mm
thickness), with a vapor permeable membrane, sheet insulation, light steel frame
comprising of studs and tracks with all necessary bracing to be designed by
structural engineer, with bulk insulation in between studs with Gypsum board
(minimum of 15mm). Walls to be plastered and painted externally and internally as per
client’s specification.
2. Interior walls
Interior walls to be made from Gypsum board (minimum of 15mm) with light steel frame
comprising of studs and tracks with all necessary bracing to be designed by
structural engineer, with bulk insulation in between studs with Gypsum board
(minimum of 15mm). Walls to be plastered and painted as per client’s specification.
3. Stone cladding
Walls to be cladded with Stone Library’s Savannah Buildingstone product name: Light
Mix. Cladding to be applied as per manufacture’s recommendation.
WINDOWS
Windows as per Wispeco catalogue
Light area miminum 10% of floor area od space served.
Opeing section minimum 5% floor area space served.
ROOF
The roof shall be constructed with Chromodeck roof sheeting, with flashing and
counter flashing installed as per manufacture’s recommendation. The sheeting will be
fixed to purlins which will be fixed to a light steel truss system as specified by
engineer.
The flat roofs will be constructed of fibre cement board fixed to purlins which is fixed
to a light steel truss system. Roof will have minimum of 50mm pebbles on top with no
silver waterproofing visible.
The roof shall have both sheet and bulk insulation and must deem to satisfy the
regulations in SANS 517:2009 as well as SANS:204 in this regard
CEILINGS
Flush plastered ceilings to all roofs both in the interior and exterior. (Although AvA
Design’s drawings only shows the internal ceilings, all exterior roofs will have
ceilings). For interior ceiling use 6.4mm Gypsum plastered ceiling and for exterior use
Exterior gypsum soffit board. Ceiling to consist of SABS approved steel branders
fixed at 400mm centres in one direction onto which ceiling board is fixed at right
angles to the branders with printed side up using 25mm streaker screws. All joints to
be covered with fibatape (double over butt joints) and ceiling then plastered with a 3-
6mm coat of rhinolite or cretestone plaster applied as per manufactures instructions.
Bulkhead as per drawings.
Cornice is The Moulding Shop: C01
Openings for trap doors in ceiling shall be 650 x 650mm.
RAINWATER GOODS
Watertite Guttering domestic Ogee profile aluminum H3003h 14 seamless gutter,
overall size 125 x 85 x 0,6mm thick coated internally and externally with ColourTech
G4 in color Charcoal with matching splashplate including cut and mitred angles
covered with a mitre strip externally, stop ends crimped and all sealed on the inside
with Dow Corning 813 silicone sealer, secured to fibre cement fascia with 20 x 2,5mm
internal hanger brackets at 600mm centers using aluminum peeled rivets, including
expanded aluminum mesh leaf guard set over gutter with 100 x 75 x 0,6mm thick
aluminum down-pipe in color Charcoal fixed to wall with straps at 1500mm centers
using nail plugs, with downpipes riveted and silicone sealed to gutter outlets, including
all necessary bends, elbows, shoes etc. Downpipes to extend until 150mm below
natural ground level.
At 150mm below natural ground level the downpipes will be connected to the
rainwater harvesting sealed pipe system. The rainwater harvesting system and
sealed pipes must be installed by specialist
STAIRCASE
Minimum tread length 280mm.
Maximum riser height 180mm.
Staircase minimum 900mm width.
Staircase to be constructued to detail specification.
HANDRAILS
All habdrails to comply with National Building Regulations.
Minimum height of handrail to be 1m above UFFL.
A1As indicated
F:\Waterfall 878\Revit model\5 October 2014.rvt
06/10/2014 13:37:11
Mr. & Mrs. Naidoo
House Naidoo N 001
34 Victoriafalls Avenue
Waterfall Country Estate
Plans
09/25/14
A001
878
1123 m²
238 m²
122 m²
174 m²
538 m²
466 m²
1 : 100
Ground floor plan
1 : 250
Site
1 : 100
First floor plan
N
N
N
N
Site and Floor plans
19
2
1
2
1
1475.
000
1475.500
232221201918
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3 2 1
GARAGE 2
1474.650
GREEN HOUSE
1473.650
POOL
890
1660
bedroom 3 bedroom 2
bathroom
lounge
master bedroom
walk in cupboard
bathroom
bedroom 4
bathroom
bathroom
3120 3120 1390 5040 3590
LIGHTING LEGEND:
Down lighters
Cat 6 Network Cable to be conducted to every light switch box
and distribution board.
Pendant A
Exterior wall light A
Wall light A
Pendant B
Feature pendant
Exterior wall light B
Strip lighting
Floor light
Underwater light in waterfeature
Distribution board
KB05 Light fitting
Track lighting
Pendant C
Pendant D
Pendant C
Exterior wall light C
Exterior wall light D
Exterior wall light E
Single light switch, VETI- VL111C1V
Double light switch, VETI - VL111C2H
Triple light switch, VETI - VL111C2V
Wall light B
Wall light C
client
project
drawing details
drawing scale sheet size
drawn date
drawing number revision
north
short filename :
notes
project number
subject to local authority approval
AREA CALCULATIONS
:TOTAL COVERAGE
:
:
:
:
:
TOTAL FLOOR AREA
NEW FIRST FLOOR
OUTBUILDINGS
NEW GROUND FLOOR
SITE AREA
erf no:
tel: fax:
Jane du Plessis
SPECIFICATIONS:
GENERAL NOTES:
This project is subject to Local Authority approval.
All works and building materials are to comply with National Building Regulations (SAB
20400) and Local Council's approval conditions as well as estate rules and
regulations.
This drawings is not to be scaled.
Figured dimensions to be used at all times and any before the works are commenced.
No work to commence without the contractor being in possession of the latest
approved plan.
All structural timber to be Grade 4 or better SA Pine.
Glazing to doors and windows in excess of 1m sq. or less than 300mm above
finished floor level to be laminated satey glazing.
FOUNDATIONS:
Foundations must be in accordance with the engineers specification.
FLOORS:
1. Ground floor
Floor finishes as specified on plan on 25mm thick screed on 100mm thick concrete
slad on 25 mircon dpm to SABS specification on 50mm blinding on 150mm consolidated
fill.
2. First floor
Floor finishes as specified on plan on 25mm screed on concrete slab on metal deck on
steel memebers as per engineer's specification. Lay 75mm Isotherm insulation to
manufacturer's spec. above ceiling in all roof spaces and fill voids snugly.
WALLS:
Expansions joints are to be allowed for to accommodate movement of the building due
to shallow groundwater found on site.
1. Exterior walls
External walls to be made from made from fibre cement board (sheet of minimum 9mm
thickness), with a vapor permeable membrane, sheet insulation, light steel frame
comprising of studs and tracks with all necessary bracing to be designed by
structural engineer, with bulk insulation in between studs with Gypsum board
(minimum of 15mm). Walls to be plastered and painted externally and internally as per
client’s specification.
2. Interior walls
Interior walls to be made from Gypsum board (minimum of 15mm) with light steel frame
comprising of studs and tracks with all necessary bracing to be designed by
structural engineer, with bulk insulation in between studs with Gypsum board
(minimum of 15mm). Walls to be plastered and painted as per client’s specification.
3. Stone cladding
Walls to be cladded with Stone Library’s Savannah Buildingstone product name: Light
Mix. Cladding to be applied as per manufacture’s recommendation.
WINDOWS
Windows as per Wispeco catalogue
Light area miminum 10% of floor area od space served.
Opeing section minimum 5% floor area space served.
ROOF
The roof shall be constructed with Chromodeck roof sheeting, with flashing and
counter flashing installed as per manufacture’s recommendation. The sheeting will be
fixed to purlins which will be fixed to a light steel truss system as specified by
engineer.
The flat roofs will be constructed of fibre cement board fixed to purlins which is fixed
to a light steel truss system. Roof will have minimum of 50mm pebbles on top with no
silver waterproofing visible.
The roof shall have both sheet and bulk insulation and must deem to satisfy the
regulations in SANS 517:2009 as well as SANS:204 in this regard
CEILINGS
Flush plastered ceilings to all roofs both in the interior and exterior. (Although AvA
Design’s drawings only shows the internal ceilings, all exterior roofs will have
ceilings). For interior ceiling use 6.4mm Gypsum plastered ceiling and for exterior use
Exterior gypsum soffit board. Ceiling to consist of SABS approved steel branders
fixed at 400mm centres in one direction onto which ceiling board is fixed at right
angles to the branders with printed side up using 25mm streaker screws. All joints to
be covered with fibatape (double over butt joints) and ceiling then plastered with a 3-
6mm coat of rhinolite or cretestone plaster applied as per manufactures instructions.
Bulkhead as per drawings.
Cornice is The Moulding Shop: C01
Openings for trap doors in ceiling shall be 650 x 650mm.
RAINWATER GOODS
Watertite Guttering domestic Ogee profile aluminum H3003h 14 seamless gutter,
overall size 125 x 85 x 0,6mm thick coated internally and externally with ColourTech
G4 in color Charcoal with matching splashplate including cut and mitred angles
covered with a mitre strip externally, stop ends crimped and all sealed on the inside
with Dow Corning 813 silicone sealer, secured to fibre cement fascia with 20 x 2,5mm
internal hanger brackets at 600mm centers using aluminum peeled rivets, including
expanded aluminum mesh leaf guard set over gutter with 100 x 75 x 0,6mm thick
aluminum down-pipe in color Charcoal fixed to wall with straps at 1500mm centers
using nail plugs, with downpipes riveted and silicone sealed to gutter outlets, including
all necessary bends, elbows, shoes etc. Downpipes to extend until 150mm below
natural ground level.
At 150mm below natural ground level the downpipes will be connected to the
rainwater harvesting sealed pipe system. The rainwater harvesting system and
sealed pipes must be installed by specialist
STAIRCASE
Minimum tread length 280mm.
Maximum riser height 180mm.
Staircase minimum 900mm width.
Staircase to be constructued to detail specification.
HANDRAILS
All habdrails to comply with National Building Regulations.
Minimum height of handrail to be 1m above UFFL.
A1 1 : 100
F:\Waterfall 878\Revit model\5 October 2014.rvt
06/10/2014 13:37:20
Mr. & Mrs. Naidoo
House Naidoo N 001
34 Victoriafalls Avenue
Waterfall Country Estate
Lighting layouts
09/26/14
A005
1 : 100
Ground floor lighitng layout
1 : 100
First floor lighting layout
1 : 100
Lighting legend
Lighting layout
20
Client: Mr. and Mrs. Botha
Project:Additions and alterations to their existing home to include more
accommodation and a small private office for Mrs. Botha.
Involvement:Concept design
House Botha
Front facade
21
HOUSE BOTHAThe clients wanted to extend their existing house to include extra accommodation as well as a small office for a medical practice. The challenged with this project was to extend the house in such a way that they can still occupy it while the extension was being built.
Trying to make a clear distinction between the medical practice and the home was a interesting programmatic and visual problem for the front facade of the house.
Concept diagram and plan
22
Client: HTS John Voster High School.
Project:New Kiosk building at HTS John Voster High School.
Involvement:Concept design and council submission
School Kiosk
Perspective view of front facade
23
UFL Datum level 1160
Concrete slab as per engineer's specifications, if slab
thickness is to increase floor to ceiling height must be retained.
Covered with dpm as per manufactures recommendations on
top of a min. 25mm screed laid to a fall of not less than 1:50.
Waterproofing on top of parapet wall on top of screed
falling inwards with flashing and counter flashing. All
waterproofing to be according to manufactures
specifications. Parapet wall to be min of 340mm (4 brick
courses) above roof slab.
Brick on edge lintol with 10mm diameter reinforced
bars.
Foundation to
engineer's specification
Foundation to
engineer's specification
Underside of slab plastered and painted with 75mm
concave gypsum cornices
Ceramic tiles on top of adhesive on 25mm
screed on 150mm concrete slab on top of
250micron dpm on 50mm sand binding on 100
well compacted fill.
230mm Double brick wall with external face brick
and plastered and painted internally.
350
.2720
dpc
dpc
Brick on edge linted with 10mm
diameter reinforced bars.
20mm screed laid to fall, on
100mm concrete slab on 25
sand binding on well conpacted
earth.
Top of concrete slab 4050
Existing fence, pillars support wall and
trees must be removed and made good.
UFL Datum level1160
dpc
Foundation to
engineer's specification
Foundation to
engineer's specification
85
Concrete slab as per engineer's specifications if slab size is to
increase floor to ceiling height is to be maintained. Covered
with dpm as per manufactures recommendations on top of a
min. 25mm screed laid to a fall of not less than 1:50.
Waterproofing on top of parapet wall on top of screed
falling inwards with flashing and counter flashing. All
waterproofing to be according to manufactures
specifications. Parapet wall to be min of 340mm (4 brick
courses) above roof slab.
Brick on edge lintol with 10mm diameter
reinforced bars.
Underside of slab plastered and painted with 75mm
concave gypsum cornices
Ceramic tiles on top of adhesive on 25mm screed
on 150mm concrete slab on top of 250micron dpm
on 50mm sand binding on 100 well compacted fill.
230mm Double brick wall with external face brick
and plastered and painted internally.
Steel poles at 2400mm c/c with 110mm
steel beams above at 1200mm c/c with
steel rods in between. Installed as per
manufactures specifications
300mm Wide steel grate above
100mm deep concrete stormwater
channel.
Brick on edge lintol with 10mm diameter
reinforced bars.
Paving on top of adhesive on 25mm screed
on 100mm concrete slab on 50mm sand
binding on 100 well compacted fill.
dpcdpc
client
project
drawing details
drawing scale sheet size
drawn
date
checked by
drawing number revision
north
short filename :
project number
subject to local authority approval
SPECIFICATION
AREA CALCULATIONS
:TOTAL COVERAGE
This drawing is not to be scaled.
Figured dimensions to be used at all times.
All concrete and steel work as per engineer's specifications.
All structural timber to be grade 4 or better SA Pine.
Two air vent bricks to be provided to every room.
Glazing to doors & windows in excess of 1m SQ. or less than 300mm
above finished floor level to be laminated safety glazing.
Floor finishes as specified on plan, on 25mm thick screed on 100mm
thick concrete slab on 250micron DPM to SABS specification on
50mmBlinidng on 150mm consolidated fill.
Install prestressed lintels over all openings up to 3000mm wide with a
minimum of four courses of brickforce in brickwork over.
All foundations to be built as per engineer's specifications.
Foundationwalls: cavity walls to be filled with concrete from
foundation to dpc level. Not to project behond boundary.
Walls: 230mm double brick walls, with facebrick used extrenally
and internal walls plastered and painted. Walls to have 5 wire ties
per sqm.
Windows as per specification. Light area minimum 10% of floor area
of space served. Opening section min. 5% of floor area of space
served.
Roof is to be a concrete slab, built according to engineer's
specifications. Roof and parapet wall waterproofing to section detail
applied as per manufactures recommendations. Internal rainwater
down pipe to be securely and properly fixed to exclude all water from
entering rooms.
Ceilings to be underside of slab plastered and painted with
75mm coved gypsum cornices.
(incl. covered stoep)
:
:
:
:
TOTAL FLOOR AREA
GARAGE
FIRST FLOOR
GROUND FLOOR
THIS PROJECT IS SUBJECT TO LOCAL AUTHORITY APPROVAL
GENERAL
WALLS
FOUNDATIONS
FLOORS
OPENINGS
ROOF
WINDOWS
CEILINGS
RAINWATER GOODS
erf no:
tel: fax:
Fulbore fixed with 110mm round PVC rain water down pipe, securely
fitted and fixed within external wall, covered with internal paneling.
Water to discharge into concrete rainwater channel.
1 : 50
F:\Architecture\HTS Voster\05062013 Council submission.rvt
6/5/2013 9:34:13 AM
John Voster Technical High School
Kiosk 001
John Voster Technical High
School
Sections
J. du Plessis
04/02/13
J. Redelinghuis
A002
1 : 50
1
Section AA
1 : 50
2
Section BB
Sections
Previous work experience
Rendered image of False Bay Clinic
Part-time Senior Architectural Technician at Visser Architects May - October 2011 Cape TownI worked on various residential projects which entailed the preparing of tender drawings, council submissions and 3D modelling.
Part-time Architectural Technician at KL Architects February - April 2011 Cape TownI was appointed to oversee the last stages of additions and alterations to a house as project architect under direction from Alan Louw. I interacted with the client and assisted with selection and specification of the finishes. I handled all the administration, site meeting minutes and correspondence with contractors as well as conducting site visits, compilation and issuance of working drawings.
Senior Architectural Technician at Joshua Conrad Architects May 2009 - December 2010 Cape TownI worked independently under the guidance of the project architect on several institutional, commercial and residential projects. This included a new house in Lynedoch Eco-Village and a Substance Abuse Centre in Somerset West.
As part of a team I worked on larger scale projects such as the UWC’s new Student Village.
Work experience
Ground floor plan of False Bay Clinic | Joshua Conrad Architects
Locality Plan UWC Refurbishment | Joshua Conrad Architects
..
3750
43.330
42.830
0. 500
GRADIENT
DISTANCE
DEPTH
INVERT LEVEL
COVER LEVEL
1 : 60
GROUND LEVEL
FIRST FLOOR LEVEL
A B C D E F G
43.330
42.770
0. 560
5080
1 : 60
43.330
42.688
0. 642
43.330
42.602
0. 728
5400
1 : 60
hwb
toilettoilet
hwb hwb
bath
gulley
SS
manhole
sink
SEWAGE NOTES:
ALL SEWAGE WASTE PIPES TO BE 110MM DIA UPVC SOIL PIPE..
ALL STUB STAKS TO BE 110MM DIA WITH FULL BORE ACCESS.
ALL R.I. AND I.E. TO SABS STANDARD MAX DISTANCE
BETWEEN R.E. 25 M. DRAINS TO BE MIN 300MM BELOW GL LAID ON
STONE BASE DRAIN FALL MIN 1:60 MAX 1:5.
VP TO BE 600MM ABOVE ROOF AND/OR 2000 ABOVE WINDOW CILL
SCALE 1 : 100
FROM MANHOLE TO CONNECTTO MUNICIPAL SEWER
DRAINAGE SECTION A
Corrugated metal roof sheeting on38x152mm rafters @ 760 c/c with 38 x38mm batttens @ 450 c/c with Gypsumboard ceiling with Isotherm insulation.
Timber facia and aluminium gutterpainted as per client approved MIDASColour
22x96mm T&G boarding on 50x150mmjoist @450 c/c, on wall plate built intowall
Brick paving on 25mm screed on100mm concrete slab on 250 microndpm to SABS specification on 50mmbinding on 150mm consolidated fill.
StoreWood
BedroomPaving
NGL
Dining roomWood
2400
2400
5 °
Weephole& dpc
Weephole& dpc
Weephole& dpc
Flashing with counter flashing
2400
2800
Corrugated metal roof sheeting on38x152mm rafters @ 760 c/c with 38 x38mm batttens @ 450 c/c with Gypsumboard ceiling with Isotherm insulation.
Solar panel
22x96mm T&G boarding on 50x150mmjoist @450 c/c, on wall plate built intowall
Brick paving on 25mm screed on100mm concrete slab on 250 microndpm to SABS specification on 50mmbinding on 150mm consolidated fill.
Weephole& DCP
Weephole& DCP
Weephole& DCP
Weephole& DCP
Living roomWood
StoreWood
BedroomPaving
ToiletPaving
StorePaving
Guest toiletPaving
Living roomPaving
NGL
KitchenWood
Weephole &DPC
B E G
Plastered and painted
NGL
Road
Plastered and painted
600 x 600h
1800 x 1200h
1800 x 1200h
NGL
Plastered and painted
3000 x 2100h
3000 x 2100h
2400 x 2100h
2400 x 2100h
NGL
Plastered and painted Plastered and painted
2400 x 2100h
2400 x 2100h
2200 x 2400h
2200 x 2400h
1800 x 1200h
NGL
1800 x 2100h
StoreWood
Living roomWood
BalconyWood
A A
B
B
270
1220
80
11170
270
270
4800
270
2530
270
2870
2000
270 1720 4000 270
6260
270 1200 270
3400 80 2250 270
6260
2000
13000
2000
13000
15000
Dining roomWood Kitchen
Wood
Ducting for mechanical ventilationand tubular roof light
114x38mm Timber slats rotated 45º at250mm c/c
Ducting for mechanical ventilationand tubular roof light
SSF
G
Guest toiletPaving
ToiletPaving
BedroomPaving
Living roomPaving
StorePaving
A A
B
B
270 4510 110 1100 270
3010 3030 230
6260
230
1770
270
2690
110
2000
230
1990
110
1800
110
3430
270
6330
2000
13000
15000
2870
270
2530
270
4800
270
2000
3140
2530
5340
13000
2780
270 1200 270 2340 110 1800 270
5720
Toilet to be mechanicallyventilated
50x152mm Timber slates rotated 45º at200mm c/c
gulley
SS
new manhole
Toilet to be mechanicallyventilated
A
B
C
D
E
F
G
Solar panel
Solar ventilation vent
Solar ventilation vent
Roof light
Roof light
Ro
ad
Road
Erf 12
2000
client
project
drawing details
drawing scale sheet size
drawn date checked by
drawing number revision
north
short filename :
notes
project number
subject to local authority approval
SPECIFICATION
AREA CALCULATIONS
TOTAL COVERAGE
DETAIL X
CAVITY CASTSOLID
2/Y12� STARTERBARS
450
650
50mmCOVER
FOOTINGLINE OF WALL5
00 L
AP
750 x 750 BASE
200 M
IN
ALL HANDRAILS TO COMPLY WITH NATIONAL BUILDINGREGULATIONS. MINIMUM HEIGHT OF HANDRAIL TO BE 1mABOVE FINISHED FLOOR LEVELBALUSTRES CONSTRUCTED SO THAT NO OPENING INBALUSTRADE PERMITS THE PASSAGE OF A 125mm dia. BALLALL BALUSTRADES TO BE AT LEAST 75% VOID.BALUSTERS AND HANDRAILS TO BE ALUMINUM PAINTED ASPER CLIENT'S SPECIFICATION.
MINIMUM TREAD LENGTH 280mmMAXIMUM RISER HEIGHT 180mmSTAIRCASE MINIMUM WIDTH 900mmSTAIRCASE TO BE CONSTRUCTED TO DETAIL SPECIFICATION
THIS DRAWING IS NOT TO BE SCALED.FIGURED DIMENSIONS TO BE USED AT ALL TIMES AND ANYBEFORE THE WORKS ARE COMMENCED.NO WORK TO COMMENCE WITHOUT THE CONTRACTOR BEINGIN POSSESSION OF THE LATEST APPROVED PLANALL TIMBER MUST BE TREATED WITH BORON AND NOT CCA ORBITUMEN. ALL STRUCTURAL TIMBER TO BE GRADE 4 OR BETTERSA PINE.PIPING FOR ELECTRICAL, WATER AND SEWER TO BE HDPEPLASTIC.ALL PLUMBING FITTINGS TO BE WATER SAVING, INCLUDINGAERATOR TAPS, ON ALL BASINS, SINKS, SHOWERS AND BATHR.RECYCLED WATER SUPPLY TO BE USED FOR TOILET FLUSHINGAND IRRATION.TWO AIR VENT BRICKS TO BE PROVIDED TO EVERY ROOMGLAZING TO DOORS & WINDOWS IN EXCESS OF 1m SQ.OR LESS THAN 300mm ABOVE FINISHED FLOOR LEVELTO BE LAMINATED SAFETY GLAZING
GROUND FLOOR:BRICK PAVING ON 25mm SAND BINDING ON 100mm THICKCONCRETE SLAB ON 250micron DPM TO SABS SPECIFICATION ON50mm BINDING ON 150mm CONSOLIDATED FILLFIRST FLOOR:22 X 96mm T&G BOARDING ON 50 X 150mm JOIST @ 450mm C/CON A WALL PLATE BUILT INTO THE WALL.
INSTALL PRESTRESSED CONCRETE LINTOLS OVER ALLOPENINGS UP TO 3000mm WIDE WITH A MINIMUM OF FOURCOURSES OF BRICKFORCE IN BRICKWORK OVER
750 x 250mm 15MPa CONCRETE FOUNDATIONS TO ALL280 & 220mm WALLS650 x 250mm 10MPa CONCRETE FOUNDATIONS TO ALL110mm WALLS
AS PER SECTION DETAILSSIDE WALL FLASHING & RIDGE CAPPINGS TO BE INSTALLED ASPER MANUFACTURER'S SPECIFICATION AND RECOMMENDATIONS
CEILINGS TO BE 6mm GYPSUM BOARD SKIMMED FLUSH ANDSMOOTH WITH CRETESTONE ON 38 x 38mm BRANDERINGAT 400mm CENTRES MAXIMUM75mm COVED GYPSUM CORNICE
SQUARE ALUMINIUM GUTTERS BY WATERTITEFLOWING INTO SQUARE ALUMINIUM DOWNPIPES BY WATERTITEFIXED TO 225 x 22mm TIMBER FASCIA WITH MANUFACTURER'SSUPPLIED BRACKETS DISCHARGED INTO 150mm H.R. CONCRETERAINWATER CHANNELS
(incl. covered stoep)
TOTAL FLOOR AREA
GARAGE
FIRST FLOOR
GROUND FLOOR
SITE AREA
THIS PROJECT IS SUBJECT TO LOCAL AUTHORITY APPROVAL
HANDRAILS
GENERAL
WALLS
FOUNDATIONS
FLOORS
OPENINGS
ROOF
WINDOWS
CEILINGS
RAINWATER GOODS
STAIRCASES
erf no:
tel: fax:
A1
c
BRICKS MADE FROM CRUSHED BUILDING RUBBEL ANDCEMENT BY CAPEBRICK OR EQUALLY APPROVED TO BE USEDFOR WALL CONSTRUCTION. CAVITY TO BE FILLED WITHCONCRETE FROM FOUNDATION TO DPC LEVEL. CAVITY WALLSTO HAVE FIVE WIRE TIES per SQM AND A WEEPHOLE AT THREEBRICK CENTERS. FOUNDATIONS TO WALLS NOT TO PROJECTBEYOND BOUNDARY. WALLS TO BE PLASTERED AND PAINTEDWITH NON-TOXIC MATERIALS, BY BREATHECOAT OR EQUALLYAPPROVED.
ALL WINDOWS TO HAVE ALUMIMIUM FRAMES PAINTED WITHCLIENT APPROVED COLOUR FROM MIDAS COLOUR CHART.LIGHT AREA MINIMUM 10% OF FLOOR AREA OF SPACE SERVED.OPENING SECTION MIN. 5% OF FLOOR AREA OF SPACE SERVED.
12 Lynedoch Eco VillageStellenbosch
1 : 100
W:\Lynedock Eco Village\Revit\091130 council submission.rvt
2009/12/02 05:00:39 PM
Mr. and Mrs. Lemmetjies
New House 01
Lynedoch EcoVillage Plot 12
J. Boshoff 11/03/09 R. Conrad
1001
0820927290
12
92m²
79m²
79m³
0m²
86%
158m²
1 : 100Section AA
1 : 100Section BB
1 : 100Northeast Elevation
1 : 100Northwest Elevation
1 : 100Southeast Elevation
1 : 100Southwest Elevation
1 : 100First Floor
1 : 100Ground floor
1 : 100Site plan
Council Submission for House Lemmetjies | Joshua Conrad Architects
Internship at Raubenheimer Harvey & Associates October - December 2006 Cape TownI was involved with a new development, for Classico, in various stages of the project. I completed council submission plans for a new house in Plettenberg Bay. I worked on additions to Mr. and Mrs. Whales’ house, from drawing the “as built” plans until the final stages.
Internship at KMH Architects February - September 2006 Cape TownWorked in a team on several large scale retail projects. This included alterations and additions to the Canal Walk’s West Piazza, design of the new tourist bus stop and new parent-child ablution facilities. I was involved from the concept development through until the technical documentation.I compiled council and working drawings for several residential projects and a retail project as well as the extensions to the Village Centre in Betty’s Bay.
Internship experience
200
EXISTING SIGNAGE REMOVED
EXISTING BRICKWORK REMOVEDABOUT COLUMN COLUMN
MADE TO MATCH
EXISTING ROTATING DOORTO BE RELOCATED
NEW AUTOMATED SLIDERTO SUIT NEW OPENING - BYSPECIALIST SUB-CONTRACTOR
WATER FEATURE TOLATER DETAIL
CANVAS RETRACTABLE AWNINGSBETWEEN COLUMNS TO LATER
SPECIFICATIONS
HERRINGBONE PAVING TOLATER SPECIFICATION
250x250mm PAVINGMARGIN TO SPEC.
NEW BALUSTERSTO MATCH EXIST.
NEW TIMBER PERGOLA OVERSUPPORTED OFF CIRCULARCOLUMNS TO MATCH EXIST.
NEW SHOP FRONT TOLATER DETAIL
NEW ENTRANCE
NEW CEILING OVERTO LATER DETAIL
LINE OF EXISTINGMEZZANINE FLOOR OVER
EXISTING SHOP FRONTALTERED AND REPOSITIONED
DEMOLISH EXIST. WALL& MAKE GOOD
SEATING AREA
SEATING AREA
PROPOSED KIOSKTENANT
TO LATER DETAIL
NEW FLOOR FINISH TOMATCH EXISTING
EXISTINGSHOPFRONT
EXISTING PAVING REPLACED WITH500X500mm PAVERS WITH250X250mm SURROUND-
REFER TO FINISHES
EXISTING STAIRS
NEW FLOOR FINISH TOMATCH EXISTING
EXISTING ROOFLIGHTOVER
EXISTING PLANTERREMOVED
EXISTING DRAINAGE GARTINGPOSITION TO BE CONFIRMED
ON SITE
427RESTAURANT
324m²
429RESTAURANT
466m²
435KARMA
68m²
437NAARTJIE
103m²
439LIFE93m²
445PERFECT REFLECTIONS
140m²
407AINCREDIBLE CONNECTION
490m²
417CATTLE BARON RESTAURANT
338m²
421TAIWAN CITY RESTAURANT
292m²
423RESTAURANT
186m²
425RESTAURANT
219m²
EX. BALCONY130m²
EX. BALCONY64m²
NEW CEILINGTO DETAIL
NEW ENTRANCE
NEW CONCRETE SLABOVER EXISTING STAIR
TO ENGINEERING DETAIL
EXISTING BALUSTRADEWALL DEMOLISHED
EXISTING BALUSTRADEWALL DEMOLISHED
NEW STAIR TOMATCH EXIST.
LINE OF EXISTINGMEZZANINE OVER
DEMOLISH EXIST.FIRE-ESCAPE & MAKE
GOOD
EXIST. ROTATING DOORRELOCATED
EXISTING PLANTERREMOVED
EXISTING PLANTERREMOVED
EXISTING PLANTERREMOVED
NEW TIMBER PERGOLAOVER
SUPPORTED OFFCIRCULAR
COLUMNS TO MATCHEXIST.
NEW CONCRETE SLABOVER EXISTING STAIR
TO ENGINEERING DETAIL
NEW LOW WALL &BALUSTERS TOMATCH EXIST
NEW LOW WALL &BALUSTERS TO
MATCH EXIST
NEW STAIR TOMATCH EXIST.
NEW STAIR TOMATCH EXIST.
407MTN SCIENCECENTRE
NEW LOW WALL &BALUSTRADE TOMATCH EXIST.
EXISTING MANHOLE POSITIONALTERED - POSITION TO BE
CONFIRMED ON SITE
930
1870
1235
2355
1235
2800
4825
7625
3240 25003000
2500 324057405740
3870
2240
9020
5500
1676
0
EXISTING DRAINAGE GARTINGPOSITION TO BE CONFIRMED
ON SITE
CANVAS RETRACTABLE AWNINGSBETWEEN COLUMNS TO LATER
SPECIFICATIONS
730
EXTENT OFADDITIONAL AREA
NEW DOUBLE SWING DOOR &SHOPFRONT TO LATER DETAIL
EX. PEDESTRIANFOOT-BRIDGE
LINE OF EXIST.STRUCTURE OVER
NEW CEILING OVERTO LATER DETAIL
UP UP
VIEWING BALCONY
UP
EX. LANDING
EX. SHOPFRONT
EX. SHOPFRONTRETAINED
EX. COVEREDWALKWAY
EX. COVEREDWALKWAY
LINE OFSTRUCTURE OVER
LINE OFSTRUCTURE OVER
EX. SHOPFRONTRETAINED
EX. BRICKPAVING EDGE
EX. BRICKPAVING EDGE
EXISTING MANHOLE POSITIONALTERED - POSITION TO BE
CONFIRMED ON SITESTONE / PEBBLESURROUND
500x500mm CEMENTPAVER TO SPEC.
NEW 270mm CAVITYWALL
BOLLARD LIGHTINGTO LATER SPEC.
BOLLARD LIGHTINGTO LATER SPEC.
STONE / PEBBLESURROUND
NEW FIXEDSHOPFRONTTO LATER DETAIL
4233
RECESSED FLOORLIGHTS
EXIST. SWING DOORTO BE REMOVED
NEW BULKHEADCEILING OVER
RECESSED FLOORLIGHTS - TO LATERSPEC.
280 2020
2300
400
1360
500
2260
EXIST. SWING DOORTO BE REMOVED
4225
REVISIONS
NOTES
REVISION
PROJECT NO
SCALE
DRAWING NO
DATE
3744/02
1:100
2-01
.
CANAL WALK SHOPPING CENTRECENTURY CITY DRIVECENTURY CITY - ERF No 5958
MARCH 2006
ALTERATIONS & ADDITIONS TOTHE WEST PIAZZA PLAN
Part of the Canal Walk Shopping Centre plan | KMH Architects
NEW SHOP 6NEW SHOP 5 NEW SHOP 7
NEW SHOP 8
EXTENSIONTO SHOP 1
EX. SHOP 1
EX. SHOP 2EX. SHOP 3EX. SHOP 4
EXTENSION
ATM COURTYARDLOADING BAYSERVITUDE
ramp
ENTRANCE
EX. SHOP
51 sqm 30 sqm 30 sqm
42 sqm
37 sqm
44 sqm
42 sqm47 sqm42 sqm
12 sqm
CORA
LCI
RCLE
NewConservancyTank
BIN YARD
ENTRANCE
F
T
PORTER DRIVE
PUBLIC PHONES
EX. RESTAURANT
EX. YARD
ERF 2666
ERF 2659
0.000FFL
0.000FFL
-0.950FFL
0.000FFL
0.150FFL
0.650FFL
0.550FFL
-0.250FFL
-0.550FFL
-0.560FFL
0.150FFL
-0.560FFL
0.650FFL 0.650FFL
-0.1300GL
-0.1400GL
-0.1200GL
ERF 2660
GROUNDFLOOR & SITE PLAN
-REVISION
PROJECT NO
2-01
NTS.
3736
DRAWING NO
SCALE
SEPTEMBER '05
DATE
DESIGN DEVELOPMENT
PROPOSED EXTENSIONSTO THE VILLAGE CENTREBETTY'S BAY ERF 2667
Ground floor and Site plan for Betty’s Bay Village Centre | KMH Architects
Sections AA, BB and Drainage plan for House Kempton | KMH Architects