Average Unit Price Report 1 JAN/01/02 to DEC/31/02 Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS 1 $80,280.17 $642,241.38 8.00 2 $54,255.83 $379,790.84 7.00 3 $52,733.75 $1,792,947.65 34.00 4 $22,061.24 $463,286.00 21.00 STATE $46,832.37 $3,278,265.87 70.00 105-04 RAILROAD FLAGGING LS 3 $1.00 $1.00 1.00 STATE $1.00 $1.00 1.00 109-10.01 TRAINEE HOUR 1 $0.80 $1,600.00 2000.00 2 $0.80 $2,400.00 3000.00 3 $0.80 $4,800.00 6000.00 4 $0.53 $3,200.00 6000.00 STATE $0.71 $12,000.00 17000.00 201-01 CLEARING AND GRUBBING LS 1 $82,212.54 $2,137,526.08 26.00 2 $117,392.86 $821,750.00 7.00 3 $111,815.69 $3,913,549.07 35.00 4 $21,004.52 $441,095.00 21.00 STATE $82,178.88 $7,313,920.15 89.00 201-01.02 CLEARING ACRE 3 $12,320.00 $49,280.00 4.00 STATE $12,320.00 $49,280.00 4.00 201-05.10 VEGETATION REMOVAL (TYPE 1) SITE 1 $1,475.00 $67,850.00 46.00 2 $34.30 $891.80 26.00 3 $34.22 $821.28 24.00 4 $100.00 $2,200.00 22.00 STATE $608.16 $71,763.08 118.00 201-07.01 REMOVAL AND DISPOSAL OF BRUSH & TRE LS 2 $112,867.12 $112,867.12 1.00 3 $162,000.00 $162,000.00 1.00 STATE $137,433.56 $274,867.12 2.00 201-07.03 REMOVAL AND DISPOSAL OF BRUSH & TRE ACRE 1 $2,782.97 $1,040,829.61 374.00 3 $3,200.17 $419,222.27 131.00 STATE $2,891.19 $1,460,051.88 505.00 201-07.04 REMOVAL OF ROCK - CUTS LS 3 $242,444.50 $242,444.50 1.00 STATE $242,444.50 $242,444.50 1.00 202-01 REMOVAL OF STRUCTURES AND OBSTRUCTI LS 1 $1,200.00 $1,200.00 1.00 2 $2,500.00 $7,500.00 3.00 3 $15,787.50 $126,300.00 8.00 4 $18,617.14 $130,320.00 7.00 STATE $13,964.21 $265,320.00 19.00 202-01.50 REMOVAL OF STRUCTURES AND OBSTRUCTI EACH 3 $200.00 $3,200.00 16.00 STATE $200.00 $3,200.00 16.00 202-02.01 REMOVAL OF PIPE L.F. 1 $12.63 $1,388.75 110.00 3 $15.29 $14,156.20 926.00 4 $9.06 $833.60 92.00 STATE $14.52 $16,378.55 1128.00 202-02.02 REMOVAL OF PIPE L.F. 3 $8.49 $18,940.00 2231.00 4 $3.00 $186.00 62.00 STATE $8.34 $19,126.00 2293.00 202-02.03 REMOVAL OF PIPE L.F. 3 $16.29 $1,776.00 109.00 STATE $16.29 $1,776.00 109.00

JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 1 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

105-01 CONSTRUCTION STAKES, LINES AND GRAD LS 1 $80,280.17 $642,241.38 8.00 2 $54,255.83 $379,790.84 7.00 3 $52,733.75 $1,792,947.65 34.00 4 $22,061.24 $463,286.00 21.00 STATE $46,832.37 $3,278,265.87 70.00 105-04 RAILROAD FLAGGING LS 3 $1.00 $1.00 1.00 STATE $1.00 $1.00 1.00 109-10.01 TRAINEE HOUR 1 $0.80 $1,600.00 2000.00 2 $0.80 $2,400.00 3000.00 3 $0.80 $4,800.00 6000.00 4 $0.53 $3,200.00 6000.00 STATE $0.71 $12,000.00 17000.00 201-01 CLEARING AND GRUBBING LS 1 $82,212.54 $2,137,526.08 26.00 2 $117,392.86 $821,750.00 7.00 3 $111,815.69 $3,913,549.07 35.00 4 $21,004.52 $441,095.00 21.00 STATE $82,178.88 $7,313,920.15 89.00 201-01.02 CLEARING ACRE 3 $12,320.00 $49,280.00 4.00 STATE $12,320.00 $49,280.00 4.00 201-05.10 VEGETATION REMOVAL (TYPE 1) SITE 1 $1,475.00 $67,850.00 46.00 2 $34.30 $891.80 26.00 3 $34.22 $821.28 24.00 4 $100.00 $2,200.00 22.00 STATE $608.16 $71,763.08 118.00 201-07.01 REMOVAL AND DISPOSAL OF BRUSH & TRE LS 2 $112,867.12 $112,867.12 1.00 3 $162,000.00 $162,000.00 1.00 STATE $137,433.56 $274,867.12 2.00 201-07.03 REMOVAL AND DISPOSAL OF BRUSH & TRE ACRE 1 $2,782.97 $1,040,829.61 374.00 3 $3,200.17 $419,222.27 131.00 STATE $2,891.19 $1,460,051.88 505.00 201-07.04 REMOVAL OF ROCK - CUTS LS 3 $242,444.50 $242,444.50 1.00 STATE $242,444.50 $242,444.50 1.00 202-01 REMOVAL OF STRUCTURES AND OBSTRUCTI LS 1 $1,200.00 $1,200.00 1.00 2 $2,500.00 $7,500.00 3.00 3 $15,787.50 $126,300.00 8.00 4 $18,617.14 $130,320.00 7.00 STATE $13,964.21 $265,320.00 19.00 202-01.50 REMOVAL OF STRUCTURES AND OBSTRUCTI EACH 3 $200.00 $3,200.00 16.00 STATE $200.00 $3,200.00 16.00 202-02.01 REMOVAL OF PIPE L.F. 1 $12.63 $1,388.75 110.00 3 $15.29 $14,156.20 926.00 4 $9.06 $833.60 92.00 STATE $14.52 $16,378.55 1128.00 202-02.02 REMOVAL OF PIPE L.F. 3 $8.49 $18,940.00 2231.00 4 $3.00 $186.00 62.00 STATE $8.34 $19,126.00 2293.00 202-02.03 REMOVAL OF PIPE L.F. 3 $16.29 $1,776.00 109.00 STATE $16.29 $1,776.00 109.00

Page 2: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 2 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

202-02.04 REMOVAL OF PIPE L.F. 3 $12.08 $1,981.00 164.00 STATE $12.08 $1,981.00 164.00 202-02.05 REMOVAL OF PIPE L.F. 3 $14.50 $2,697.00 186.00 STATE $14.50 $2,697.00 186.00 202-02.06 REMOVAL OF PIPE L.F. 3 $12.00 $3,120.00 260.00 STATE $12.00 $3,120.00 260.00 202-02.07 REMOVAL OF PIPE L.F. 3 $20.00 $1,400.00 70.00 STATE $20.00 $1,400.00 70.00 202-02.08 REMOVAL OF PIPE L.F. 3 $70.00 $4,340.00 62.00 STATE $70.00 $4,340.00 62.00 202-02.09 REMOVAL OF PIPE L.F. 3 $70.00 $3,360.00 48.00 STATE $70.00 $3,360.00 48.00 202-02.10 REMOVAL OF PIPE L.F. 3 $50.00 $2,700.00 54.00 STATE $50.00 $2,700.00 54.00 202-02.11 REMOVAL OF PIPE L.F. 3 $12.00 $5,544.00 462.00 STATE $12.00 $5,544.00 462.00 202-02.12 REMOVAL OF PIPE L.F. 3 $20.00 $600.00 30.00 STATE $20.00 $600.00 30.00 202-02.13 REMOVAL OF PIPE L.F. 3 $12.00 $1,800.00 150.00 STATE $12.00 $1,800.00 150.00 202-02.51 REMOVE CNC EW & PIPE FROM EX DRIVEW LS 3 $4,000.50 $8,001.00 2.00 STATE $4,000.50 $8,001.00 2.00 202-03 REMOVAL OF RIGID PVMT, SIDEWALK, ET S.Y. 1 $120.00 $4,440.00 37.00 2 $8.73 $8,758.00 1003.00 3 $1.36 $422,561.64 309586.00 4 $23.62 $141,388.00 5985.00 STATE $1.82 $577,147.64 316611.00 202-03.01 REMOVAL OF ASPHALT PAVEMENT S.Y. 1 $1.26 $512,301.22 406739.00 2 $26.09 $8,663.00 332.00 3 $0.90 $195,100.05 217471.00 4 $90.00 $3,060.00 34.00 STATE $1.15 $719,124.27 624576.00 202-03.03 REMOVAL OF ASPHALT PAVEMENT C.Y. 3 $27.50 $15,400.80 560.00 4 $18.00 $44,343.54 2463.00 STATE $19.76 $59,744.34 3023.00 202-04.01 REMOVAL OF STRUCTURES LS 1 $57,926.25 $926,820.04 16.00 2 $1,625.00 $3,250.00 2.00 3 $42,407.22 $1,441,845.50 34.00 4 $9,887.50 $79,100.00 8.00 STATE $40,850.26 $2,451,015.54 60.00 202-04.02 REMOVAL OF STRUCTURES LS 1 $17,000.00 $34,000.00 2.00 3 $26,535.04 $318,420.50 12.00 4 $29,000.00 $87,000.00 3.00 STATE $25,848.26 $439,420.50 17.00 202-04.03 REMOVAL OF STRUCTURES LS 1 $30,000.00 $30,000.00 1.00 3 $33,627.00 $168,135.00 5.00 4 $52,350.00 $104,700.00 2.00 STATE $37,854.38 $302,835.00 8.00

Page 3: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 3 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

202-04.04 REMOVAL OF STRUCTURES LS 1 $30,000.00 $30,000.00 1.00 4 $15,000.00 $15,000.00 1.00 STATE $22,500.00 $45,000.00 2.00 202-04.05 REMOVAL OF STRUCTURES LS 1 $130,000.00 $130,000.00 1.00 4 $12,000.00 $12,000.00 1.00 STATE $71,000.00 $142,000.00 2.00 202-04.06 REMOVAL OF STRUCTURES LS 1 $130,000.00 $130,000.00 1.00 STATE $130,000.00 $130,000.00 1.00 202-04.50 REMOVAL OF STRUCTURES LS 1 $6,659.86 $33,299.28 5.00 3 $3,050.00 $3,050.00 1.00 4 $6,130.00 $12,260.00 2.00 STATE $6,076.16 $48,609.28 8.00 202-04.51 REMOVAL OF STRUCTURES LS 1 $5,000.00 $5,000.00 1.00 STATE $5,000.00 $5,000.00 1.00 202-04.52 REMOVAL OF STRUCTURES LS 1 $5,000.00 $5,000.00 1.00 STATE $5,000.00 $5,000.00 1.00 202-06.01 REMOVAL OF BUILDINGS LS 1 $45,000.00 $45,000.00 1.00 2 $15,000.00 $15,000.00 1.00 3 $3,372.00 $16,860.00 5.00 4 $2,500.00 $2,500.00 1.00 STATE $9,920.00 $79,360.00 8.00 202-06.02 REMOVAL OF BUILDINGS LS 1 $16,000.00 $16,000.00 1.00 3 $4,852.50 $19,410.00 4.00 4 $2,500.00 $2,500.00 1.00 STATE $6,318.33 $37,910.00 6.00 202-06.03 REMOVAL OF BUILDINGS LS 1 $20,000.00 $20,000.00 1.00 3 $6,052.50 $24,210.00 4.00 4 $2,500.00 $2,500.00 1.00 STATE $7,785.00 $46,710.00 6.00 202-06.04 REMOVAL OF BUILDINGS LS 3 $2,550.00 $5,100.00 2.00 4 $2,500.00 $2,500.00 1.00 STATE $2,533.33 $7,600.00 3.00 202-06.05 REMOVAL OF BUILDINGS LS 3 $100.00 $100.00 1.00 4 $2,500.00 $2,500.00 1.00 STATE $1,300.00 $2,600.00 2.00 202-06.06 REMOVAL OF BUILDINGS LS 4 $2,500.00 $2,500.00 1.00 STATE $2,500.00 $2,500.00 1.00 202-06.07 REMOVAL OF BUILDINGS LS 4 $2,500.00 $2,500.00 1.00 STATE $2,500.00 $2,500.00 1.00 202-06.08 REMOVAL OF BUILDINGS LS 4 $2,500.00 $2,500.00 1.00 STATE $2,500.00 $2,500.00 1.00 202-08.10 REMOVAL OF CURB L.F. 1 $7.59 $4,950.00 652.00 2 $13.00 $4,004.00 308.00 3 $1.00 $1,527.00 1527.00 4 $8.00 $1,680.00 210.00 STATE $4.51 $12,161.00 2697.00 202-08.15 REMOVAL OF CURB AND GUTTER L.F. 1 $52.76 $1,952.12 37.00 2 $28.88 $288.80 10.00

Page 4: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 4 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $4.81 $5,933.50 1233.00 STATE $6.39 $8,174.42 1280.00 202-13 WATER WELL ABANDONMENT EACH 3 $1,000.00 $3,000.00 3.00 STATE $1,000.00 $3,000.00 3.00 203-01 ROAD & DRAINAGE EXCAVATION (UNCLIFI C.Y. 1 $2.99 $13,008,022.04 4357613.00 2 $2.35 $3,773,728.30 1603707.00 3 $2.26 $14,531,460.78 6419544.00 4 $1.45 $770,046.10 531143.00 STATE $2.48 $32,083,257.22 12912007.0 203-01.05 EXCAVATION C.Y. 4 $54.00 $6,156.00 114.00 STATE $54.00 $6,156.00 114.00 203-01.11 PRESPLITTING OF ROCK EXCAVATION S.Y. 1 $3.00 $25,236.00 8412.00 2 $7.00 $46,340.00 6620.00 3 $7.40 $149,493.74 20206.00 STATE $6.27 $221,069.74 35238.00 203-01.60 ROAD & DRAINAGE EXCAVATION C.Y. 1 $7.00 $3,724.00 532.00 STATE $7.00 $3,724.00 532.00 203-01.76 ROAD AND DRAINAGE EXCAVATION (UNCLA L.M. 2 $20,000.00 $6,000.00 0.30 STATE $20,000.00 $6,000.00 0.30 203-02 BORROW EXCAVATION (SOLID ROCK) C.Y. 3 $1.00 $6,035.00 6035.00 STATE $1.00 $6,035.00 6035.00 203-02.01 BORROW EXCAVATION (GRADED SOLID ROC TON 1 $15.02 $75,943.55 5055.00 2 $6.00 $637,560.00 106260.00 3 $4.55 $1,503,897.50 330284.00 4 $4.71 $21,060.00 4467.00 STATE $5.02 $2,238,461.05 446066.00 203-02.02 BORROW EXCAVATION (GRADED SOLID ROC C.Y. 3 $4.04 $45,332.84 11221.00 STATE $4.04 $45,332.84 11221.00 203-02.03 BORROW EXCAVATION (SOLID ROCK) TON 3 $30.00 $6,000.00 200.00 STATE $30.00 $6,000.00 200.00 203-03 BORROW EXCAVATION (UNCLASSIFIED) C.Y. 1 $3.75 $1,180,757.24 315258.00 2 $2.78 $782,108.30 281139.00 3 $4.07 $1,504,075.92 369445.00 4 $2.40 $4,091,979.85 1702288.00 STATE $2.83 $7,558,921.31 2668130.00 203-03.01 BORROW EXCAVATION (SELECT MATERIAL) C.Y. 1 $16.00 $6,384.00 399.00 STATE $16.00 $6,384.00 399.00 203-03.10 SELECT GRANULAR MATERIAL TON 4 $9.55 $12,653.75 1325.00 STATE $9.55 $12,653.75 1325.00 203-03.11 SELECT GRANULAR MATERIAL C.Y. 4 $3.00 $103,425.00 34475.00 STATE $3.00 $103,425.00 34475.00 203-04 PLACING AND SPREADING TOPSOIL C.Y. 1 $2.94 $185,601.32 63108.00 2 $1.64 $267,428.25 163341.00 3 $3.04 $207,135.92 68037.00 4 $1.53 $16,411.50 10692.00 STATE $2.22 $676,576.99 305178.00 203-04.02 STRIPPING & STOCKPILE TOPSOIL C.Y. 1 $13.12 $3,844.16 293.00 STATE $13.12 $3,844.16 293.00

Page 5: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 5 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

203-05 UNDERCUTTING C.Y. 4 $3.00 $93,150.00 31050.00 STATE $3.00 $93,150.00 31050.00 203-06 WATER M.G. 1 $0.61 $25,123.30 41416.00 2 $5.53 $18,010.00 3258.00 3 $3.12 $112,070.65 35973.00 4 $2.06 $75,655.84 36724.00 STATE $1.97 $230,859.79 117371.00 203-07 FURNISHING & SPREADING TOPSOIL C.Y. 1 $3.87 $36,591.00 9464.00 2 $15.07 $14,736.00 978.00 3 $1.88 $213,685.50 113780.00 4 $1.35 $40,038.00 29560.00 STATE $1.98 $305,050.50 153782.00 203-07.01 TOPSOIL FOR SHOULDERS C.Y. 3 $17.08 $8,200.00 480.00 STATE $17.08 $8,200.00 480.00 203-07.02 TOPSOIL C.Y. 3 $12.00 $1,920.00 160.00 STATE $12.00 $1,920.00 160.00 203-08 CHANNEL EXCAVATION (UNCLASSIFIED) C.Y. 1 $10.47 $33,860.12 3233.00 2 $5.00 $21,075.00 4215.00 3 $6.49 $70,071.00 10805.00 4 $3.21 $27,358.05 8517.00 STATE $5.69 $152,364.17 26770.00 203-10 EMBANKMENT (COMPACTED IN PLACE) C.Y. 3 $3.71 $2,386,875.75 643753.00 4 $8.40 $29,952.40 3566.00 STATE $3.73 $2,416,828.15 647319.00 203-30.01 ROADWAY APPROACHES LS 1 $3,298.28 $3,298.28 1.00 2 $23,391.58 $23,391.58 1.00 STATE $13,344.93 $26,689.86 2.00 203-50 CONSTRUCTION OF HAUL ROAD LS 1 $110,000.00 $110,000.00 1.00 4 $52,600.00 $263,000.00 5.00 STATE $62,166.67 $373,000.00 6.00 204-01 CULVERT EXCAVATION (UNCLASSIFIED) C.Y. 3 $15.00 $4,500.00 300.00 STATE $15.00 $4,500.00 300.00 204-02.01 DRY EXCAVATION (BRIDGES) C.Y. 1 $9.36 $54,986.40 5877.00 3 $8.40 $127,828.60 15217.00 4 $13.96 $131,110.00 9392.00 STATE $10.30 $313,925.00 30486.00 204-02.10 DRILLED CAISSON - EARTH L.F. 1 $18.00 $88,182.00 4899.00 3 $41.62 $306,014.00 7353.00 STATE $32.17 $394,196.00 12252.00 204-02.15 DRILLED CAISSON - EARTH L.F. 1 $220.00 $269,720.00 1226.00 3 $217.00 $1,298,716.50 5985.00 STATE $217.51 $1,568,436.50 7211.00 204-02.20 DRILLED CAISSON - ROCK L.F. 3 $370.00 $174,640.00 472.00 STATE $370.00 $174,640.00 472.00 204-03.01 WET EXCAVATION C.Y. 1 $28.23 $68,298.84 2419.00 3 $31.26 $45,040.00 1441.00 4 $11.36 $170,854.00 15046.00 STATE $15.03 $284,192.84 18906.00

Page 6: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 6 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

204-04.01 ROCK EXCAVATION (BRIDGES) C.Y. 1 $66.58 $117,971.63 1772.00 3 $42.93 $64,650.33 1506.00 STATE $55.71 $182,621.96 3278.00 204-05 ROCK DRILLING (BRIDGES) L.F. 1 $15.54 $11,652.60 750.00 3 $17.32 $18,967.08 1095.00 STATE $16.60 $30,619.68 1845.00 204-06 BEDDING MATERIAL (PIPE) CLASS A C.Y. 3 $20.00 $11,980.00 599.00 4 $15.00 $22,425.00 1495.00 STATE $16.43 $34,405.00 2094.00 204-07 BEDDING MATERIAL (PIPE) CLASS B C.Y. 1 $18.07 $205,728.44 11388.00 2 $21.49 $124,972.05 5815.00 3 $20.29 $660,898.15 32577.00 4 $16.15 $55,567.25 3441.00 STATE $19.68 $1,047,165.89 53221.00 204-08 FOUNDATION FILL MATERIAL C.Y. 1 $29.67 $15,785.00 532.00 2 $29.17 $6,243.33 214.00 3 $25.80 $35,326.00 1369.00 4 $18.08 $18,999.48 1051.00 STATE $24.12 $76,353.81 3166.00 204-08.01 BACKFILL MATERIAL (FLOWABLE FILL) C.Y. 1 $97.08 $45,821.00 472.00 3 $91.00 $28,392.94 312.00 4 $198.00 $3,762.00 19.00 STATE $97.11 $77,975.94 803.00 204-09.01 COFFERDAM LS 1 $154,000.00 $616,000.00 4.00 3 $40,000.00 $40,000.00 1.00 4 $1,360,000.00 $4,080,000.00 3.00 STATE $592,000.00 $4,736,000.00 8.00 204-09.02 COFFERDAM LS 1 $185,333.33 $556,000.00 3.00 3 $40,000.00 $40,000.00 1.00 4 $2,032,500.00 $4,065,000.00 2.00 STATE $776,833.33 $4,661,000.00 6.00 204-09.03 COFFERDAM LS 1 $342,000.00 $342,000.00 1.00 STATE $342,000.00 $342,000.00 1.00 204-10.01 FOUNDATION PREPARATION LS 1 $9,943.76 $29,831.29 3.00 3 $12,716.67 $76,300.00 6.00 4 $24,333.33 $73,000.00 3.00 STATE $14,927.61 $179,131.29 12.00 204-10.02 FOUNDATION PREPARATION LS 1 $15,750.00 $31,500.00 2.00 3 $11,050.00 $66,300.00 6.00 4 $29,000.00 $58,000.00 2.00 STATE $15,580.00 $155,800.00 10.00 204-10.03 FOUNDATION PREPARATION LS 1 $16,000.00 $16,000.00 1.00 3 $8,500.00 $25,500.00 3.00 4 $29,000.00 $58,000.00 2.00 STATE $16,583.33 $99,500.00 6.00 204-10.04 FOUNDATION PREPARATION LS 1 $16,000.00 $16,000.00 1.00 3 $5,250.00 $10,500.00 2.00 4 $29,000.00 $58,000.00 2.00

Page 7: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 7 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $16,900.00 $84,500.00 5.00 204-10.05 FOUNDATION PREPARATION LS 1 $16,000.00 $16,000.00 1.00 STATE $16,000.00 $16,000.00 1.00 204-10.06 FOUNDATION PREPARATION LS 1 $10,000.00 $10,000.00 1.00 STATE $10,000.00 $10,000.00 1.00 204-11 BRIDGE EXCAVATION (UNCLASSIFIED) C.Y. 1 $15.00 $46,695.00 3113.00 3 $8.60 $17,260.00 2008.00 STATE $12.49 $63,955.00 5121.00 204-12 CORE DRILLING (CONCRETE SEAL) L.F. 1 $55.00 $13,530.00 246.00 STATE $55.00 $13,530.00 246.00 204-14 CORE DRILLING FOR PILES(ROCK) L.F. 1 $200.00 $39,600.00 198.00 STATE $200.00 $39,600.00 198.00 204-15 CORE DRILLING FOR PILES(SOIL) L.F. 1 $15.00 $2,655.00 177.00 STATE $15.00 $2,655.00 177.00 208-01 SHOULDERS AND DITCHES L.M. 1 $399.90 $280,531.44 701.50 2 $300.00 $951.00 3.17 4 $3,592.00 $125,720.00 35.00 STATE $550.52 $407,202.44 739.67 208-01.01 DITCHES L.F. 2 $0.86 $5,675.00 6600.00 3 $3.75 $358,777.50 95674.00 4 $1.00 $6,996.00 6996.00 STATE $3.40 $371,448.50 109270.00 208-01.02 SHOULDER PREPARATION L.M. 4 $1,000.00 $10,320.00 10.32 STATE $1,000.00 $10,320.00 10.32 209-01.10 EROSION AND SILTATION CONTROL LS 3 $834.00 $2,502.00 3.00 STATE $834.00 $2,502.00 3.00 209-02.02 6" TEMPORARY SLOPE DRAIN L.F. 3 $9.00 $4,428.00 492.00 STATE $9.00 $4,428.00 492.00 209-02.03 8" TEMPORARY SLOPE DRAIN L.F. 1 $5.09 $28,663.20 5631.00 2 $7.13 $5,936.00 833.00 3 $3.00 $852.00 284.00 4 $5.25 $14,149.50 2695.00 STATE $5.25 $49,600.70 9443.00 209-02.04 10" TEMPORARY SLOPE DRAIN L.F. 2 $9.00 $720.00 80.00 STATE $9.00 $720.00 80.00 209-02.05 12" TEMPORARY SLOPE DRAIN L.F. 1 $8.00 $3,472.00 434.00 2 $10.18 $4,970.00 488.00 3 $4.78 $46,580.25 9745.00 4 $5.84 $4,115.00 705.00 STATE $5.20 $59,137.25 11372.00 209-02.06 15" TEMPORARY SLOPE DRAIN L.F. 1 $20.00 $6,020.00 301.00 2 $14.27 $13,210.00 926.00 3 $16.79 $12,242.16 729.00 STATE $16.09 $31,472.16 1956.00 209-02.07 18" TEMPORARY SLOPE DRAIN L.F. 1 $24.05 $31,380.00 1305.00 2 $17.28 $23,965.00 1387.00 3 $9.17 $1,210.00 132.00 STATE $20.03 $56,555.00 2824.00

Page 8: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 8 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

209-03 CHECK DAMS S.F. 1 $4.33 $122,465.28 28261.00 3 $0.79 $34,435.15 43596.00 4 $17.87 $98,134.00 5491.00 STATE $3.30 $255,034.43 77348.00 209-05 SEDIMENT REMOVAL C.Y. 1 $1.47 $18,648.67 12656.00 2 $3.06 $41,763.18 13645.00 3 $2.10 $52,189.28 24882.00 4 $6.69 $59,529.01 8899.00 STATE $2.86 $172,130.14 60082.00 209-06 BALED HAY OR STRAW EROSION CHECKS BALE 1 $4.30 $77,884.42 18101.00 2 $8.92 $5,636.80 632.00 3 $4.13 $240,621.95 58208.00 4 $5.21 $33,340.83 6398.00 STATE $4.29 $357,484.00 83339.00 209-08.01 TEMPORARY FILTER BARRIER L.F. 1 $0.79 $44,220.75 56037.00 2 $1.22 $6,641.30 5434.00 3 $1.56 $51,071.63 32684.00 4 $2.72 $125,626.00 46168.00 STATE $1.62 $227,559.68 140323.00 209-08.02 TEMPORARY SILT FENCE (WITH BACKING) L.F. 1 $2.49 $25,656.00 10283.00 2 $1.90 $845.50 445.00 3 $3.39 $41,436.90 12226.00 4 $2.05 $22,001.00 10710.00 STATE $2.67 $89,939.40 33664.00 209-08.03 TEMPORARY SILT FENCE (WITHOUT BACKI L.F. 1 $1.19 $184,399.12 155537.00 2 $1.33 $54,575.10 40916.00 3 $1.07 $454,378.53 426086.00 4 $2.19 $49,734.00 22716.00 STATE $1.15 $743,086.75 645255.00 209-09.01 SANDBAGS BAG 1 $10.00 $1,000.00 100.00 2 $7.07 $15,900.00 2250.00 3 $4.06 $14,122.00 3475.00 4 $6.00 $3,000.00 500.00 STATE $5.38 $34,022.00 6325.00 209-09.02 TEMP.SEDIMT FILTER BAG(14'6"X2'0"X1 BAG 1 $630.75 $12,615.05 20.00 2 $500.00 $5,500.00 11.00 3 $274.17 $3,290.00 12.00 4 $335.23 $7,375.00 22.00 STATE $442.77 $28,780.05 65.00 209-09.21 POLYACHLAMIDE GEL LOGS EACH 2 $125.00 $10,625.00 85.00 3 $100.00 $12,500.00 125.00 STATE $110.12 $23,125.00 210.00 209-09.29 GABIONS FOR SEDIMENT TRAPS(1.5'x1.5 L.F. 2 $30.00 $16,650.00 555.00 STATE $30.00 $16,650.00 555.00 209-09.31 ENHANCED FILTER FENCING L.F. 2 $10.00 $84,750.00 8475.00 3 $2.05 $57,344.00 27922.00 STATE $3.90 $142,094.00 36397.00 209-09.32 POLYMER BAFFLES(CATCHERS MITT) EACH 3 $1,250.00 $12,500.00 10.00

Page 9: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 9 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $1,250.00 $12,500.00 10.00 209-09.34 VERTIPRO OR SILT SAVER INLET PROTEC EACH 2 $500.00 $19,500.00 39.00 3 $325.00 $39,000.00 120.00 STATE $367.92 $58,500.00 159.00 209-10.01 TEMPORARY DEWATERING STRUCTURE C.Y. 2 $10.00 $21,000.00 2100.00 3 $9.98 $51,241.40 5135.00 4 $8.45 $13,425.00 1588.00 STATE $9.71 $85,666.40 8823.00 209-10.20 TEMPORARY SEDIMENT TRAP C.Y. 1 $30.00 $1,320.00 44.00 3 $21.20 $42,739.20 2016.00 STATE $21.39 $44,059.20 2060.00 209-13.01 FLOATING SILT BOOM L.F. 3 $25.00 $550.00 22.00 STATE $25.00 $550.00 22.00 209-20.03 POLYETHYLENE SHEETING (6 MIL. MINIM S.Y. 1 $3.37 $4,343.50 1290.00 2 $2.00 $560.00 280.00 3 $1.48 $4,476.00 3026.00 4 $2.66 $4,850.90 1823.00 STATE $2.22 $14,230.40 6419.00 303-01 MINERAL AGGREGATE, TY A BASE, GRADI TON 1 $9.13 $6,089,940.32 666912.00 2 $10.11 $4,297,813.10 425252.00 3 $9.35 $11,533,511.35 1233154.00 4 $11.28 $2,610,542.95 231471.00 STATE $9.59 $24,531,807.72 2556789.00 303-01.01 GRANULAR BACKFILL (ROADWAY) TON 1 $15.00 $12,000.00 800.00 3 $15.00 $111,829.00 7454.00 4 $16.00 $121,936.00 7621.00 STATE $15.48 $245,765.00 15875.00 303-01.02 GRANULAR BACKFILL (BRIDGES) TON 1 $13.99 $117,525.15 8402.00 2 $12.15 $67,786.40 5577.00 3 $9.62 $232,403.17 24151.00 4 $17.42 $73,225.75 4203.00 STATE $11.60 $490,940.47 42333.00 303-01.03 GRANULAR BACKFILL (RETAINING WALLS) TON 1 $20.00 $1,020.00 51.00 2 $40.00 $200.00 5.00 3 $17.41 $39,823.00 2287.00 4 $20.00 $440.00 22.00 STATE $17.54 $41,483.00 2365.00 303-01.09 MINERAL AGGR,TY A BS,GRADING D LIME TON 4 $19.00 $148,162.00 7798.00 STATE $19.00 $148,162.00 7798.00 303-02 MINERAL AGGR,TY B BASE, GR TON 4 $13.86 $926,154.54 66845.00 STATE $13.86 $926,154.54 66845.00 303-10.01 MINERAL AGGREGATE (SIZE 57) TON 1 $12.99 $24,962.10 1922.00 2 $20.00 $5,040.00 252.00 3 $13.38 $41,919.32 3132.00 4 $13.88 $11,898.30 857.00 STATE $13.60 $83,819.72 6163.00 303-10.02 MINERAL AGGREGATE (SIZE 2) TON 2 $13.24 $8,605.00 650.00 STATE $13.24 $8,605.00 650.00

Page 10: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 10 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

303-10.03 MINERAL AGGREGATE (SIZE 68) TON 1 $20.00 $1,280.00 64.00 2 $50.00 $200.00 4.00 STATE $21.76 $1,480.00 68.00 303-10.04 MINERAL AGGREGATE TON 2 $10.98 $189,218.34 17233.00 3 $10.30 $38,285.10 3717.00 STATE $10.86 $227,503.44 20950.00 306-04.01 PORTLAND CEMENT CONCRETE BASE (PLAI S.Y. 2 $88.00 $17,600.00 200.00 STATE $88.00 $17,600.00 200.00 307-01.01 ASP. CONC. MIX(PG64-22) (BPMB-HM) G TON 1 $21.01 $1,211,854.35 57678.00 2 $23.44 $1,211,887.77 51712.00 3 $30.41 $1,867,570.99 61422.00 4 $41.30 $1,667,752.06 40386.00 STATE $28.22 $5,959,065.17 211198.00 307-01.02 ASPHALT CEM. (PG64-22)(BPMB-HM) GR. TON 1 $180.00 $19,260.00 107.00 2 $181.63 $208,330.00 1147.00 3 $100.70 $82,175.00 816.00 STATE $149.64 $309,765.00 2070.00 307-01.03 AGGREGATE (BPMB-HM) GRADING A-S MIX TON 1 $10.86 $34,469.64 3174.00 2 $17.51 $597,096.00 34100.00 3 $13.01 $316,093.20 24294.00 STATE $15.39 $947,658.84 61568.00 307-01.04 ASPHALT CEMENT(PG64-22)(BPMB-HM)GR TON 1 $180.00 $91,080.00 506.00 STATE $180.00 $91,080.00 506.00 307-01.05 AGGREGATE (BPMB-HM) GRADING A-CRL TON 1 $16.91 $254,732.24 15064.00 STATE $16.91 $254,732.24 15064.00 307-01.06 ASPHALT CONC. MIX (PG64-22)(BPMB-HM TON 1 $150.00 $2,400.00 16.00 2 $59.13 $8,337.33 141.00 STATE $68.39 $10,737.33 157.00 307-01.07 ASPHALT CONC MIX(PG64-22)(BPMB-HM)G TON 1 $44.00 $13,068.00 297.00 2 $27.55 $2,511,735.12 91159.00 3 $23.07 $1,244,251.00 53939.00 4 $325.00 $12,350.00 38.00 STATE $26.00 $3,781,404.12 145433.00 307-01.08 ASPHALT CONC MX(PG64-22)(BPMB-HM)GR TON 1 $24.46 $3,918,879.04 160207.00 2 $24.19 $2,448,293.49 101198.00 3 $29.40 $2,852,173.40 97023.00 4 $37.21 $6,128,746.60 164717.00 STATE $29.34 $15,348,092.53 523145.00 307-01.09 ASPHALT CONC MIX (PG64-22)(BPMB-HM) TON 2 $27.14 $847,643.67 31234.00 STATE $27.14 $847,643.67 31234.00 307-01.10 ASPHALT CONC MIX(PG64-22)(BPMB-HM)G TON 1 $29.31 $1,850,771.81 63136.00 2 $28.93 $461,730.88 15959.00 3 $39.46 $631,232.84 15998.00 4 $13.33 $345,262.52 25896.00 STATE $27.18 $3,288,998.05 120989.00 307-01.11 ASPHALT CEM. (PG64-22) (BPMLC-HM) G TON 1 $204.02 $782,224.91 3834.00 2 $208.94 $32,176.12 154.00 3 $223.10 $753,422.50 3377.00

Page 11: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 11 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $200.19 $240,023.70 1199.00 STATE $211.10 $1,807,847.23 8564.00 307-01.12 AGGREGATE (BPMLC-HM) GRADING CS TON 1 $21.76 $1,306,673.21 60056.00 2 $31.05 $74,870.22 2411.00 3 $25.57 $1,325,862.73 51862.00 4 $28.21 $529,630.75 18777.00 STATE $24.32 $3,237,036.91 133106.00 307-02.01 ASPHALT CONC. MIX (PG70-22)(BPMB-HM TON 1 $27.59 $2,202,049.75 79813.00 3 $24.65 $2,852,616.72 115730.00 4 $23.87 $852,839.14 35728.00 STATE $25.54 $5,907,505.61 231271.00 307-02.02 ASPHALT CEMENT (PG70-22)(BPMB-HM) G TON 1 $293.45 $229,185.00 781.00 3 $240.42 $552,245.00 2297.00 STATE $253.88 $781,430.00 3078.00 307-02.03 AGGREGATE (BPMB-HM) GRADING A-S MIX TON 1 $14.66 $340,642.10 23234.00 3 $21.73 $1,484,778.48 68338.00 STATE $19.93 $1,825,420.58 91572.00 307-02.07 ASPHALT CONC MIX(PG70-22)(BPMB-HM)G TON 1 $36.50 $8,833.00 242.00 2 $27.29 $731,876.62 26820.00 3 $24.61 $334,075.06 13577.00 STATE $26.45 $1,074,784.68 40639.00 307-02.08 ASPHALT CONC MX(PG70-22)(BPMB-HM)GR TON 1 $31.00 $1,087,431.74 35080.00 3 $31.12 $1,995,195.92 64117.00 4 $37.35 $2,281,034.91 61065.00 STATE $33.47 $5,363,662.57 160262.00 307-03.01 ASPHALT CONC MIX (PG76-22)(BPMB-HM) TON 1 $26.25 $2,640,932.04 100624.00 3 $36.19 $45,780.68 1265.00 4 $41.65 $1,659,502.60 39844.00 STATE $30.66 $4,346,215.32 141733.00 307-03.02 PERF. GRADE ASPH. CEMENT(PG76-22)GR TON 1 $265.00 $116,600.00 440.00 3 $202.00 $2,424.00 12.00 STATE $263.33 $119,024.00 452.00 307-03.03 AGGREGATE(BPMB-HM) GRADING AS TON 1 $21.25 $277,695.00 13068.00 3 $28.00 $9,660.00 345.00 STATE $21.42 $287,355.00 13413.00 307-03.04 ASP CONC MIX (PG76-22)(BPMB-HM) CR TON 1 $256.00 $240,896.00 941.00 STATE $256.00 $240,896.00 941.00 307-03.05 AGGREGATE (BPMB-HM) GRADING A-CRL TON 1 $16.91 $473,801.29 28019.00 STATE $16.91 $473,801.29 28019.00 307-03.08 ASPHALT CONC MX(PG76-22)(BPMB-HM)GR TON 1 $27.70 $3,589,464.84 129590.00 2 $26.64 $2,331,139.20 87500.00 3 $29.45 $2,665,502.62 90518.00 4 $38.22 $3,237,812.95 84721.00 STATE $30.14 $11,823,919.61 392329.00 309-01.01 MINERAL AGGREGATE (A-CBC) TON 3 . . 13328.00 STATE . . 13328.00 309-01.02 PORTLAND CEMENT (A-CBC) TON 3 . . 514.00 STATE . . 514.00

Page 12: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 12 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

309-02 BITUMINOUS MATERIAL (A-CBC) TON 3 . . 36.00 STATE . . 36.00 312-01 MINERAL AGGREGATE (ALFSB) TON 3 . . 9615.00 STATE . . 9615.00 312-02 LIME TON 3 . . 366.00 STATE . . 366.00 312-03 FLY ASH TON 3 . . 1149.00 STATE . . 1149.00 312-04 BITUMINOUS MATERIAL (ALFSB) TON 3 . . 35.00 STATE . . 35.00 313-03 TREATED PERMEABLE BASE S.Y. 1 $4.85 $361,174.65 74469.00 3 $5.96 $2,381,887.81 399527.00 4 $8.75 $66,587.50 7610.00 STATE $5.83 $2,809,649.96 481606.00 402-01 BITUMINOUS MATERIAL FOR PRIME COAT TON 1 $161.06 $254,795.10 1582.00 2 $230.78 $136,619.17 592.00 3 $223.47 $404,705.05 1811.00 4 $186.83 $49,716.00 266.10 STATE $198.97 $845,835.32 4251.10 402-02 AGGREGATE FOR COVER MATERIAL (PC) TON 1 $12.32 $39,619.00 3215.80 2 $11.83 $18,565.00 1569.50 3 $12.90 $89,924.56 6971.00 4 $21.51 $21,877.75 1017.00 STATE $13.31 $169,986.31 12773.30 403-01 BITUMINOUS MATERIAL FOR TACK COAT ( TON 1 $204.98 $275,122.70 1342.20 2 $194.30 $172,581.34 888.20 3 $228.54 $356,255.29 1558.85 4 $190.03 $189,070.24 994.94 STATE $207.56 $993,029.57 4784.19 403-02 ASPHALT CEMENT FOR TACK COAT (TC) TON 2 $300.00 $37,200.00 124.00 3 $195.00 $780.00 4.00 4 $210.00 $420.00 2.00 STATE $295.38 $38,400.00 130.00 403-05 BIT MATERIAL(TC/FOG SEAL)(UNDILUTED TON 2 $121.05 $2,300.00 19.00 STATE $121.05 $2,300.00 19.00 404-01.01 BITUMINOUS MATERIAL (DBST) TON 3 $225.00 $16,537.50 73.50 STATE $225.00 $16,537.50 73.50 404-01.02 MINERAL AGGREGATE (DBST) TON 3 $13.00 $8,539.70 656.90 STATE $13.00 $8,539.70 656.90 405-02.05 MULTI-SEAL INTERLAYER (1/2") S.Y. 4 $3.00 $141,663.00 47221.00 STATE $3.00 $141,663.00 47221.00 407-02.12 REMOVAL & DISPOSAL EXISTING ASPHALT TON 1 $7.00 $6,685.00 955.00 STATE $7.00 $6,685.00 955.00 407-02.13 REMOVAL & DISPOSAL EXISTING ASPHALT S.Y. 3 $2.23 $6,028.50 2706.00 4 $27.97 $80,699.35 2885.00 STATE $15.51 $86,727.85 5591.00 407-20.05 SAW CUTTING ASPHALT PAVEMENT L.F. 2 $0.47 $34,696.50 74146.00 3 $1.02 $49,805.09 48966.00

Page 13: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 13 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $15.00 $13,650.00 910.00 STATE $0.79 $98,151.59 124022.00 408-10.01 ELASTOMERIC PATCH LB. 3 $2.00 $457,368.00 228684.00 STATE $2.00 $457,368.00 228684.00 409-01.01 CONTRACTOR MAINT. ASPH. PVMT. (PG64 TON 4 $31.66 $367,256.00 11600.00 STATE $31.66 $367,256.00 11600.00 409-01.02 CONTRACTOR MAINT. ASPH. PVMT. (PG64 S.Y. 1 $7.38 $505,921.14 68553.00 2 $6.00 $508,818.00 84803.00 STATE $6.62 $1,014,739.14 153356.00 409-02.01 CONTRACTOR MAINT. ASPH. PVMT. (PG70 TON 3 $44.85 $399,165.00 8900.00 4 $34.59 $485,193.93 14027.00 STATE $38.57 $884,358.93 22927.00 411-01.01 ASPHALT CEMENT (PG64-22) (ACS) GRAD TON 1 $210.93 $1,644,400.63 7796.00 2 $190.23 $1,610,272.98 8465.00 3 $201.90 $3,418,836.42 16933.00 4 $213.40 $1,415,524.30 6633.10 STATE $203.10 $8,089,034.33 39827.10 411-01.02 AGGREGATE (ACS) GRADING D TON 1 $26.02 $3,169,167.86 121784.00 2 $25.97 $3,441,610.27 132536.00 3 $27.47 $7,285,406.29 265215.00 4 $29.11 $2,956,261.13 101563.50 STATE $27.13 $16,852,445.55 621098.50 411-01.05 ASPHALT CEM (PG64-22)(ACS)GR E (ROA TON 4 $319.61 $14,702.00 46.00 STATE $319.61 $14,702.00 46.00 411-01.06 AGGREGATE (ACS) GRADING E (ROADWAY) TON 4 $68.43 $47,147.00 689.00 STATE $68.43 $47,147.00 689.00 411-01.07 ASPHALT CONC MIX(PG64-22)(ACS)GR E( TON 1 $29.06 $3,925,491.06 135093.00 2 $27.93 $1,101,033.77 39416.00 3 $29.42 $1,937,142.32 65835.00 4 $39.97 $1,410,894.89 35299.00 STATE $30.38 $8,374,562.04 275643.00 411-01.30 FIBER LB. 2 $1.60 $35,347.20 22092.00 STATE $1.60 $35,347.20 22092.00 411-02.01 ASPHALT CEMENT (PG70-22) (ACS) GRAD TON 1 $254.05 $2,455,623.54 9666.00 2 $231.20 $1,055,423.81 4565.00 3 $226.74 $2,571,456.81 11341.00 4 $290.17 $2,126,969.27 7330.00 STATE $249.51 $8,209,473.43 32902.00 411-02.02 AGGREGATE (ACS) GRADING D TON 1 $24.50 $3,710,756.55 151436.00 2 $26.29 $1,891,139.72 71941.00 3 $24.64 $4,362,623.08 177088.00 4 $28.57 $3,296,760.30 115377.00 STATE $25.71 $13,261,279.65 515842.00 411-03.01 ASPHALT CEMENT (PG76-22) (ACS) GRAD TON 1 $277.88 $1,643,949.00 5916.00 2 $246.55 $985,463.54 3997.00 3 $258.92 $1,260,417.45 4868.00 4 $310.71 $1,030,628.38 3317.00 STATE $271.88 $4,920,458.37 18098.00

Page 14: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 14 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

411-03.02 AGGREGATE (ACS) GRADING D TON 1 $22.93 $2,132,149.63 92987.00 2 $26.22 $1,642,829.56 62649.00 3 $26.38 $2,011,795.83 76254.00 4 $28.19 $1,464,029.37 51939.00 STATE $25.55 $7,250,804.39 283829.00 411-03.03 ASP CEM(PG76-22)FOR SUPERPAVE(1/2"A TON 4 $225.00 $249,975.00 1111.00 STATE $225.00 $249,975.00 1111.00 411-03.04 AGGREGATE FOR SUPERPAVE 1/2" (ACS) TON 4 $22.64 $440,352.65 19449.00 STATE $22.64 $440,352.65 19449.00 411-04 CRACK SEALANT LB. 1 $2.80 $3,500.00 1250.00 2 $0.75 $71,929.50 95906.00 4 $1.40 $27,468.00 19620.00 STATE $0.88 $102,897.50 116776.00 411-10.01 SCORING PAVEMENT L.M. 1 $465.74 $88,584.00 190.20 2 $523.07 $78,983.25 151.00 3 $616.76 $75,707.51 122.75 4 $690.71 $73,208.70 105.99 STATE $555.29 $316,483.46 569.94 414-02.02 EMULSIFIED ASPHALT SLURRY SEAL S.Y. 1 $0.83 $189,881.52 229974.00 2 $0.81 $41,199.03 50863.00 4 $0.70 $154,903.70 221291.00 STATE $0.77 $385,984.25 502128.00 414-02.04 EMULSIFIED ASPHALT FOR SEAL COAT TON 2 $614.17 $78,000.00 127.00 STATE $614.17 $78,000.00 127.00 414-03.01 EMULSIFIED ASPHALT FOR MICRO-SURFAC TON 1 $567.00 $92,421.00 163.00 2 $485.70 $377,872.00 778.00 4 $516.00 $317,340.00 615.00 STATE $506.19 $787,633.00 1556.00 414-03.02 AGGREGATE FOR MICRO SURFACING TON 1 $92.00 $125,028.00 1359.00 2 $51.00 $329,868.00 6468.00 4 $69.00 $354,108.00 5132.00 STATE $62.43 $809,004.00 12959.00 414-04.02 SCRUB SEAL ( CATIONIC) S.Y. 2 $1.16 $150,168.29 129066.00 STATE $1.16 $150,168.29 129066.00 415-01.01 COLD PLANING BITUMINOUS PAVEMENT TON 1 $4.84 $938,641.34 193995.00 2 $7.35 $1,092,418.24 148570.00 3 $8.47 $1,363,129.31 161014.00 4 $10.66 $2,338,991.34 219437.00 STATE $7.93 $5,733,180.23 723016.00 415-01.02 COLD PLANING BITUMINOUS PAVEMENT S.Y. 1 $1.22 $150,929.48 123485.00 2 $3.57 $86,578.94 24230.00 3 $2.34 $259,311.56 110690.00 4 $6.78 $209,919.88 30982.00 STATE $2.44 $706,739.86 289387.00 415-01.03 COLD PLANING BITUMINOUS PAVEMENT C.Y. 1 $52.97 $71,350.00 1347.00 2 $13.85 $13,628.40 984.00 3 $14.69 $6,772.90 461.00 STATE $32.86 $91,751.30 2792.00

Page 15: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 15 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

501-01 PORTLAND CEM CONC. PVMT(REPLACEMENT S.Y. 1 . . 18711.00 2 $80.71 $66,910.00 829.00 STATE $3.42 $66,910.00 19540.00 501-01.01 PORTLAND CEMENT CONCRETE PVMT (PLAI S.Y. 2 $290.00 $1,160.00 4.00 4 $82.50 $10,725.00 130.00 STATE $88.69 $11,885.00 134.00 501-01.02 PORTLAND CEMENT CONCRETE PVMT (PLAI S.Y. 1 $33.01 $2,445,829.80 74095.00 3 $32.94 $1,695,425.10 51471.00 4 $40.00 $281,840.00 7046.00 STATE $33.35 $4,423,094.90 132612.00 501-01.03 PORTLAND CEM CONCRETE PVMT (PLAIN) S.Y. 3 $35.55 $1,741,403.80 48988.00 STATE $35.55 $1,741,403.80 48988.00 501-01.04 PORTLAND CEM CONCRETE PVMT (PLAIN) S.Y. 3 $38.60 $190,684.00 4940.00 STATE $38.60 $190,684.00 4940.00 501-01.06 PORTLAND CEM CONCRETE PVMT (PLAIN) S.Y. 3 $31.95 $8,940,440.70 279826.00 STATE $31.95 $8,940,440.70 279826.00 501-01.10 PORTLAND CEM CNC PVMT (PL) 7" FAST S.Y. 3 . . 40107.00 STATE . . 40107.00 501-01.30 PORTLAND CEM CNC PVMT (PLAIN)ULTRAT C.Y. 1 $300.00 $404,100.00 1347.00 3 $290.00 $341,620.00 1178.00 4 $710.00 $14,200.00 20.00 STATE $298.59 $759,920.00 2545.00 501-03.01 COLORED CONCRETE SHOULDERS S.Y. 3 $42.90 $279,836.70 6523.00 STATE $42.90 $279,836.70 6523.00 501-04.01 ROLLER COMPACTED CONC PAVEMENT(DEPT C.Y. 1 $93.74 $19,685.00 210.00 3 $60.00 $24,000.00 400.00 STATE $71.61 $43,685.00 610.00 502-03.01 CEMENT GROUTING C.F. 2 $5.56 $8,434.52 1517.00 3 $20.69 $3,849.00 186.00 STATE $7.21 $12,283.52 1703.00 502-03.10 FULL DEPTH P.C.C. PAVEMENT REPAIR S.Y. 1 $33.76 $493,420.00 14614.00 STATE $33.76 $493,420.00 14614.00 502-03.11 FULL & PARTIAL DEPTH PCC PAVEMENT R C.Y. 3 $90.00 $54,000.00 600.00 STATE $90.00 $54,000.00 600.00 502-04.01 SAWING CONCRETE PAVEMENT (FULL DEPT L.F. 1 $0.89 $28,715.20 32391.00 2 $6.89 $7,688.00 1116.00 3 $2.16 $70,209.32 32561.00 STATE $1.61 $106,612.52 66068.00 502-04.02 LOAD TRANSFER DOWELS EACH 1 $3.18 $16,754.20 5273.00 2 $7.54 $3,348.00 444.00 3 $5.35 $3,745.00 700.00 STATE $3.72 $23,847.20 6417.00 502-04.03 TRANSVERSE TIE-BARS EACH 1 $4.23 $7,606.00 1798.00 2 $7.13 $3,036.00 426.00 3 $5.35 $17,013.00 3180.00 STATE $5.12 $27,655.00 5404.00 502-07 SPALL REPAIR S.Y. 2 $325.00 $21,775.00 67.00 STATE $325.00 $21,775.00 67.00

Page 16: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 16 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

502-08.01 RESEALING JOINTS (HOT POURED ELASTI L.F. 1 $0.64 $376,541.10 590766.00 2 $1.64 $42,420.00 25920.00 STATE $0.68 $418,961.10 616686.00 502-08.02 RESEALING JOINTS (SILICONE SEALANT) L.F. 1 $0.76 $374,133.36 494034.00 2 $1.05 $144,942.00 138040.00 3 $3.03 $1,515.00 500.00 STATE $0.82 $520,590.36 632574.00 502-08.03 SEALING SHOULDER JOINTS L.F. 2 $1.00 $16,052.00 16052.00 STATE $1.00 $16,052.00 16052.00 502-08.04 SEALING RANDOM CRCK (HOT POURED ELA L.F. 3 $12.00 $1,260.00 105.00 STATE $12.00 $1,260.00 105.00 502-08.07 SEALING RANDOM CRACKS (SILICONE SEA L.F. 1 $1.29 $22,000.00 17000.00 2 $2.32 $13,689.00 5889.00 STATE $1.56 $35,689.00 22889.00 502-08.23 CLEANING AND RESEALING JOINTS AND C L.F. 2 $2.00 $7,330.00 3665.00 STATE $2.00 $7,330.00 3665.00 503-01 GRINDING CONCRETE PAVEMENT S.Y. 1 $1.54 $925,085.70 600428.00 2 $1.99 $201,397.42 101033.00 STATE $1.61 $1,126,483.12 701461.00 503-60 RETROFIT DOWEL BAR EACH 1 . . 1200.00 2 $75.00 $12,600.00 168.00 STATE $9.21 $12,600.00 1368.00 504-01 CRACKING & SEATING CONCRETE PAVEMEN S.Y. 1 $0.25 $41,878.25 167513.00 STATE $0.25 $41,878.25 167513.00 602-03 STEEL STRUCTURES LS 1 $3,550,000.00 $3,550,000.00 1.00 3 $145,000.00 $145,000.00 1.00 STATE $1,847,500.00 $3,695,000.00 2.00 602-04.01 STL STRUCTURES LS 1 $797,500.00 $1,595,000.00 2.00 3 $621,400.00 $3,107,000.00 5.00 4 $775,000.00 $775,000.00 1.00 STATE $684,625.00 $5,477,000.00 8.00 602-04.02 STL STRUCTURES LS 1 $730,000.00 $730,000.00 1.00 3 $355,000.00 $1,065,000.00 3.00 4 $1,225,000.00 $1,225,000.00 1.00 STATE $604,000.00 $3,020,000.00 5.00 602-04.03 STL STRUCTURES LS 1 $260,000.00 $260,000.00 1.00 3 $735,000.00 $735,000.00 1.00 4 $1,325,000.00 $1,325,000.00 1.00 STATE $773,333.33 $2,320,000.00 3.00 602-04.04 STL STRUCTURES LS 1 $345,000.00 $345,000.00 1.00 STATE $345,000.00 $345,000.00 1.00 602-04.05 STL STRUCTURES LS 1 $245,000.00 $245,000.00 1.00 STATE $245,000.00 $245,000.00 1.00 602-04.06 STL STRUCTURES LS 1 $1,250,000.00 $1,250,000.00 1.00 STATE $1,250,000.00 $1,250,000.00 1.00 602-04.07 STL STRUCTURES LS 1 $395,000.00 $395,000.00 1.00 STATE $395,000.00 $395,000.00 1.00 602-08.01 JACKING STRUCTURES LS 4 $87,400.00 $87,400.00 1.00

Page 17: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 17 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $87,400.00 $87,400.00 1.00 602-10.01 STRUCTURAL STEEL REPAIRS LS 1 $14,500.00 $14,500.00 1.00 4 $5,100.00 $5,100.00 1.00 STATE $9,800.00 $19,600.00 2.00 602-10.05 BRACING REPAIRS LS 3 $5,892.93 $82,501.00 14.00 STATE $5,892.93 $82,501.00 14.00 602-10.09 STEEL HANDRAIL REPAIRS L.F. 1 $154.50 $16,686.00 108.00 STATE $154.50 $16,686.00 108.00 602-10.10 ANCHOR BOLTS EACH 1 $789.00 $98,625.00 125.00 2 $710.00 $56,090.00 79.00 3 $700.00 $92,400.00 132.00 4 $925.00 $37,000.00 40.00 STATE $755.63 $284,115.00 376.00 602-10.12 BEARING DEVICE (REPAIR) LS 3 $5,850.67 $17,552.00 3.00 STATE $5,850.67 $17,552.00 3.00 602-10.19 JACKING STEEL SPANS LS 1 $14,750.00 $29,500.00 2.00 STATE $14,750.00 $29,500.00 2.00 602-10.20 BOLTS EACH 4 $15.00 $3,015.00 201.00 STATE $15.00 $3,015.00 201.00 602-10.21 BOLTS LS 2 $2,500.00 $2,500.00 1.00 STATE $2,500.00 $2,500.00 1.00 602-10.22 STRUCTURAL STEEL WELD REPAIR EACH 1 $1,287.50 $5,150.00 4.00 3 $300.00 $14,400.00 48.00 STATE $375.96 $19,550.00 52.00 602-10.32 STRUCTURAL STEEL (REPAIRS) LB. 1 $87.55 $127,297.70 1454.00 3 $23.64 $236,019.25 9982.00 4 $5.75 $7,181.75 1249.00 STATE $29.21 $370,498.70 12685.00 602-10.33 STRUCTURAL STEEL TEST FOR CRACKS LS 3 $26,000.00 $52,000.00 2.00 STATE $26,000.00 $52,000.00 2.00 602-10.34 MISCELLANEOUS STRUCTURAL STEEL REPA LB. 3 $43.76 $13,565.60 310.00 STATE $43.76 $13,565.60 310.00 602-10.40 BRIDGE RAIL METAL POST REPAIR EACH 3 $53.75 $752.50 14.00 STATE $53.75 $752.50 14.00 602-10.50 STRUCTURAL STEEL REPAIR EACH 1 $1,914.50 $107,212.00 56.00 2 $4,000.00 $624,000.00 156.00 4 $511.31 $171,800.00 336.00 STATE $1,647.83 $903,012.00 548.00 602-10.60 BEARING DEVICE EACH 1 $1,304.17 $15,650.00 12.00 3 $575.00 $4,600.00 8.00 4 $625.20 $213,820.00 342.00 STATE $646.60 $234,070.00 362.00 603-02.01 REPNTG EX STEEL STRUCTURES LS 1 $382,042.50 $3,056,340.00 8.00 3 $33,900.00 $67,800.00 2.00 4 $4,830.00 $4,830.00 1.00 STATE $284,451.82 $3,128,970.00 11.00 603-02.02 REPNTG EX STEEL STRUCTURES LS 3 $20,000.00 $20,000.00 1.00 4 $24,570.00 $24,570.00 1.00

Page 18: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 18 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $22,285.00 $44,570.00 2.00 603-02.20 SPOT PAINTING EXISTING STEEL STRUCT S.F. 4 $4.00 $2,200.00 550.00 STATE $4.00 $2,200.00 550.00 603-05.20 CTMT & DISPOSAL WASTE LS 1 $189,495.00 $1,515,960.00 8.00 3 $35,950.00 $71,900.00 2.00 STATE $158,786.00 $1,587,860.00 10.00 603-05.21 CTMT & DISPOSAL WASTE LS 3 $2,500.00 $2,500.00 1.00 STATE $2,500.00 $2,500.00 1.00 604-01.01 CLASS A CONCRETE (ROADWAY) C.Y. 1 $300.88 $229,270.00 762.00 2 $301.42 $158,850.00 527.00 3 $260.81 $373,997.00 1434.00 4 $211.01 $652,660.00 3093.00 STATE $243.26 $1,414,777.00 5816.00 604-01.02 STEEL BAR REINFORCEMENT (ROADWAY) LB. 1 $0.45 $55,238.20 123509.00 2 $0.44 $35,425.28 80512.00 3 $0.47 $128,290.42 271990.00 4 $0.46 $188,070.24 407424.00 STATE $0.46 $407,024.14 883435.00 604-01.04 1-1/2" STEEL PIPE HANDRAIL L.F. 1 $60.00 $35,160.00 586.00 4 $81.25 $14,300.00 176.00 STATE $64.91 $49,460.00 762.00 604-01.08 CLASS A CONCRETE (FOUNDATION LEVELI C.Y. 3 $105.00 $4,830.00 46.00 STATE $105.00 $4,830.00 46.00 604-02.01 CLASS A CONCRETE (BOX BRIDGES) C.Y. 1 $283.30 $435,711.05 1538.00 2 $263.19 $430,050.00 1634.00 3 $229.21 $1,115,109.00 4865.00 4 $221.07 $425,789.64 1926.00 STATE $241.56 $2,406,659.69 9963.00 604-02.02 STEEL BAR REINFORCEMENT (BOX BRIDGE LB. 1 $0.41 $140,386.72 340575.00 2 $0.52 $158,277.04 305926.00 3 $0.42 $344,906.43 822606.00 4 $0.45 $148,505.28 332959.00 STATE $0.44 $792,075.47 1802066.00 604-02.03 EPOXY COATED REINFORCING STEEL LB. 1 $0.49 $1,529,004.75 3140900.00 3 $0.52 $1,875,271.84 3627399.00 4 $0.57 $1,699,563.82 2970543.00 STATE $0.52 $5,103,840.41 9738842.00 604-03.01 CLASS A CONCRETE (BRIDGES) C.Y. 1 $306.72 $3,586,426.06 11693.00 3 $242.24 $4,480,981.82 18498.00 4 $318.63 $5,933,134.00 18621.00 STATE $286.83 $14,000,541.88 48812.00 604-03.02 STEEL BAR REINFORCEMENT (BRIDGES) LB. 1 $0.42 $870,682.87 2077384.00 3 $0.41 $1,029,599.42 2525722.00 4 $0.58 $1,385,837.06 2382060.00 STATE $0.47 $3,286,119.35 6985166.00 604-03.04 PAVEMENT @ BRIDGE ENDS S.Y. 1 $126.45 $772,995.00 6113.00 2 $150.00 $55,500.00 370.00 3 $139.17 $1,576,552.88 11328.00

Page 19: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 19 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $142.69 $743,962.00 5214.00 STATE $136.76 $3,149,009.88 23025.00 604-03.07 CLASS A CONCRETE C.Y. 4 $963.64 $10,600.00 11.00 STATE $963.64 $10,600.00 11.00 604-03.09 CLASS D CONCRETE (BRIDGE DECK) C.Y. 1 $303.91 $3,316,589.00 10913.00 2 $369.81 $302,504.58 818.00 3 $313.87 $4,572,844.10 14569.00 4 $338.41 $3,408,169.00 10071.00 STATE $318.94 $11,600,106.68 36371.00 604-03.25 CLASS S CONCRETE (FOUNDATION SEAL) C.Y. 1 $200.00 $429,600.00 2148.00 3 $169.00 $31,772.00 188.00 4 $80.79 $806,640.00 9984.00 STATE $102.92 $1,268,012.00 12320.00 604-03.35 CLASS L CONCRETE C.Y. 1 $399.00 $187,131.00 469.00 3 $400.00 $333,200.00 833.00 STATE $399.64 $520,331.00 1302.00 604-03.60 BR JOINT SEISMIC MOD EACH 4 $613.41 $786,390.00 1282.00 STATE $613.41 $786,390.00 1282.00 604-04.01 APPLIED TEXTURE FINISH (NEW STRUCTU S.Y. 1 $4.29 $301,958.56 70436.00 2 $4.33 $10,069.50 2328.00 3 $4.20 $465,988.59 110955.00 4 $6.45 $238,710.05 37036.00 STATE $4.61 $1,016,726.70 220755.00 604-04.02 APPLIED TEXTURE FINISH (EX STRUCTUR S.Y. 1 $5.11 $129,658.20 25391.00 3 $4.92 $443,040.67 90051.00 4 $5.17 $209,352.75 40528.00 STATE $5.01 $782,051.62 155970.00 604-04.03 BRIDGE END DRAINS(2'X8') EACH 3 $2,607.43 $33,896.60 13.00 STATE $2,607.43 $33,896.60 13.00 604-04.04 BRIDGE END DRAINS(4'X8') EACH 1 $6,000.00 $12,000.00 2.00 3 $3,650.00 $14,600.00 4.00 STATE $4,433.33 $26,600.00 6.00 604-04.10 GRAFFETTI PROTECTION SYSTEM S.Y. 1 $4.00 $71,324.00 17831.00 3 $2.42 $72,532.24 29972.00 STATE $3.01 $143,856.24 47803.00 604-04.62 CLN & TEXTURE FINISH CONCRETE MEDIA L.F. 1 . . 1270.00 STATE . . 1270.00 604-05.31 BRIDGE DECK GROOVING (MECHANICAL) S.Y. 1 $1.53 $73,359.91 47806.00 2 $1.56 $17,505.48 11226.00 3 $1.56 $137,348.30 87868.00 4 $2.67 $155,808.00 58318.00 STATE $1.87 $384,021.69 205218.00 604-07.01 RETAINING WALL S.F. 1 $48.00 $589,584.00 12283.00 3 $41.67 $2,787,228.60 66894.00 4 $33.00 $265,089.00 8033.00 STATE $41.76 $3,641,901.60 87210.00 604-07.02 RETAINING WALL S.F. 1 $50.00 $766,200.00 15324.00 3 $35.56 $1,504,757.67 42320.00

Page 20: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 20 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $33.00 $98,703.00 2991.00 STATE $39.08 $2,369,660.67 60635.00 604-07.03 RETAINING WALL S.F. 1 $37.00 $182,151.00 4923.00 3 $36.91 $850,949.70 23053.00 4 $38.00 $77,254.00 2033.00 STATE $37.00 $1,110,354.70 30009.00 604-07.04 RETAINING WALL S.F. 1 $49.00 $1,159,438.00 23662.00 3 $36.15 $275,264.00 7615.00 4 $35.00 $178,360.00 5096.00 STATE $44.35 $1,613,062.00 36373.00 604-07.05 RETAINING WALL S.F. 1 $43.50 $493,159.50 11337.00 3 $43.75 $1,003,522.00 22940.00 4 $36.00 $204,660.00 5685.00 STATE $42.57 $1,701,341.50 39962.00 604-07.06 RETAINING WALL S.F. 1 $47.00 $288,298.00 6134.00 3 $37.68 $916,016.00 24311.00 4 $70.00 $6,720.00 96.00 STATE $39.65 $1,211,034.00 30541.00 604-07.07 RETAINING WALL S.F. 1 $37.00 $344,951.00 9323.00 3 $33.20 $922,270.00 27780.00 STATE $34.15 $1,267,221.00 37103.00 604-07.08 RETAINING WALL S.F. 1 $30.00 $285,390.00 9513.00 3 $31.65 $324,656.00 10258.00 STATE $30.86 $610,046.00 19771.00 604-07.09 RETAINING WALL S.F. 1 $32.00 $55,072.00 1721.00 3 $32.88 $72,996.00 2220.00 STATE $32.50 $128,068.00 3941.00 604-07.10 RETAINING WALL S.F. 1 $28.00 $66,108.00 2361.00 3 $28.96 $353,828.00 12217.00 STATE $28.81 $419,936.00 14578.00 604-07.11 RETAINING WALL S.F. 1 $54.00 $680,508.00 12602.00 3 $31.00 $796,886.00 25706.00 STATE $38.57 $1,477,394.00 38308.00 604-07.12 RETAINING WALL S.F. 1 $42.00 $546,084.00 13002.00 3 $32.00 $1,288,384.00 40262.00 STATE $34.44 $1,834,468.00 53264.00 604-07.13 RETAINING WALL S.F. 1 $42.00 $121,590.00 2895.00 3 $33.00 $623,700.00 18900.00 STATE $34.20 $745,290.00 21795.00 604-07.14 RETAINING WALL S.F. 1 $38.00 $481,954.00 12683.00 3 $30.00 $1,353,870.00 45129.00 STATE $31.76 $1,835,824.00 57812.00 604-07.15 RETAINING WALL S.F. 1 $41.00 $457,806.00 11166.00 3 $32.00 $464,864.00 14527.00 STATE $35.91 $922,670.00 25693.00 604-07.16 RETAINING WALL S.F. 1 $38.50 $702,509.50 18247.00 3 $33.00 $850,542.00 25774.00 STATE $35.28 $1,553,051.50 44021.00

Page 21: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 21 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

604-07.17 RETAINING WALL S.F. 1 $46.00 $603,980.00 13130.00 3 $30.00 $63,180.00 2106.00 STATE $43.79 $667,160.00 15236.00 604-07.18 RETAINING WALL S.F. 1 $30.00 $41,310.00 1377.00 3 $31.00 $70,928.00 2288.00 STATE $30.62 $112,238.00 3665.00 604-07.19 RETAINING WALL S.F. 3 $33.00 $262,911.00 7967.00 STATE $33.00 $262,911.00 7967.00 604-07.28 RETAINING WALL EXCAVATION C.Y. 4 $7.00 $1,470.00 210.00 STATE $7.00 $1,470.00 210.00 604-07.30 RETAINING WALL L.F. 4 $155.00 $10,850.00 70.00 STATE $155.00 $10,850.00 70.00 604-09.10 CLASS A CONCRETE C.Y. 3 $360.00 $3,240.00 9.00 STATE $360.00 $3,240.00 9.00 604-10.01 CONCRETE REPAIRS LS 1 $2,100.00 $2,100.00 1.00 STATE $2,100.00 $2,100.00 1.00 604-10.02 CONCRETE REPAIRS C.Y. 1 $1,920.00 $19,200.00 10.00 2 $650.00 $9,750.00 15.00 3 $598.55 $31,124.50 52.00 4 $1,042.71 $134,510.00 129.00 STATE $944.58 $194,584.50 206.00 604-10.05 CONCRETE S.F. 1 $74.04 $269,000.00 3633.00 3 $66.96 $81,687.30 1220.00 4 $74.09 $46,160.00 623.00 STATE $72.47 $396,847.30 5476.00 604-10.06 CONCRETE HANDRAIL REPAIR L.F. 4 $105.00 $1,575.00 15.00 STATE $105.00 $1,575.00 15.00 604-10.07 CONCRETE REMOVAL LS 4 $50,000.00 $100,000.00 2.00 STATE $50,000.00 $100,000.00 2.00 604-10.09 CONCRETE C.Y. 2 $466.00 $209,700.00 450.00 3 $1,015.00 $27,405.00 27.00 4 $452.45 $548,816.00 1213.00 STATE $465.04 $785,921.00 1690.00 604-10.12 CONCRETE SLAB REPAIRS C.Y. 1 $625.00 $63,750.00 102.00 4 $650.00 $65,000.00 100.00 STATE $637.38 $128,750.00 202.00 604-10.13 CONCRETE SLAB REMOVAL LS 2 $98,702.83 $197,405.65 2.00 4 $35,539.55 $390,935.00 11.00 STATE $45,256.97 $588,340.65 13.00 604-10.14 REMOVE EXISTING WEARING SURFACE LS 1 $7,350.00 $44,100.00 6.00 2 $11,311.62 $22,623.23 2.00 3 $8,715.67 $130,735.00 15.00 4 $10,522.00 $157,830.00 15.00 STATE $9,349.69 $355,288.23 38.00 604-10.16 EXPANSION JOINT REPAIRS LS 1 $40,000.00 $40,000.00 1.00 3 $3,000.00 $3,000.00 1.00 STATE $21,500.00 $43,000.00 2.00 604-10.17 NON-PENETRATING CONCRETE SEAL S.Y. 1 $18.33 $37,503.00 2046.00

Page 22: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 22 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

3 $16.79 $15,147.00 902.00 4 $9.01 $9,875.00 1096.00 STATE $15.46 $62,525.00 4044.00 604-10.18 REINFORCING STEEL (REPAIRS) LB. 1 $0.64 $93,175.11 146562.00 2 $0.66 $313,613.75 472785.00 3 $0.62 $453,517.67 726026.00 4 $0.66 $238,659.72 361433.00 STATE $0.64 $1,098,966.25 1706806.00 604-10.20 HYDRODEMOLITION S.Y. 1 $25.97 $270,321.00 10408.00 3 $30.62 $1,072,334.25 35015.00 4 $28.39 $443,837.80 15632.00 STATE $29.26 $1,786,493.05 61055.00 604-10.22 CONCRETE PARAPET REPAIR L.F. 4 $100.00 $57,000.00 570.00 STATE $100.00 $57,000.00 570.00 604-10.24 JACKING CONCRETE SPANS LS 3 $172,282.54 $172,282.54 1.00 4 $93,666.67 $281,000.00 3.00 STATE $113,320.64 $453,282.54 4.00 604-10.26 BRACING EACH 1 $8,200.00 $8,200.00 1.00 4 $1,667.39 $76,700.00 46.00 STATE $1,806.38 $84,900.00 47.00 604-10.30 BRIDGE DECK REPAIRS (FULL DEPTH OF S.Y. 1 $180.38 $121,575.00 674.00 3 $158.25 $153,183.90 968.00 4 $126.45 $21,750.00 172.00 STATE $163.46 $296,508.90 1814.00 604-10.32 EXPANSION JOINT REPAIRS (TYPE A) L.F. 1 $234.68 $251,580.00 1072.00 3 $380.00 $117,040.00 308.00 4 $280.00 $10,080.00 36.00 STATE $267.44 $378,700.00 1416.00 604-10.33 EXPANSION JOINT REPAIRS (TYPE B) L.F. 4 $330.00 $35,640.00 108.00 STATE $330.00 $35,640.00 108.00 604-10.40 EXPANSION JOINT REPAIRS (TYPE D) L.F. 1 $419.00 $29,749.00 71.00 4 $225.00 $24,750.00 110.00 STATE $301.10 $54,499.00 181.00 604-10.41 EXPANSION JOINT REPAIRS (TYPE E) L.F. 3 $305.00 $181,170.00 594.00 STATE $305.00 $181,170.00 594.00 604-10.42 CONCRETE REPAIRS C.F. 1 $193.53 $18,772.00 97.00 3 $88.70 $119,562.36 1348.00 4 $47.90 $487,128.00 10170.00 STATE $53.85 $625,462.36 11615.00 604-10.43 PENETRATING WATER REPELLENT CNC SEA S.Y. 1 $19.64 $43,790.00 2230.00 4 $17.49 $20,570.00 1176.00 STATE $18.90 $64,360.00 3406.00 604-10.44 EXPANSION JOINT REPAIRS L.F. 1 $85.65 $179,528.00 2096.00 2 $74.63 $13,284.14 178.00 3 $87.35 $143,523.00 1643.00 4 $102.12 $339,667.00 3326.00 STATE $93.33 $676,002.14 7243.00 604-10.45 EXPANSION JOINT REPAIRS (TYPE F) L.F. 1 $355.00 $37,630.00 106.00

Page 23: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 23 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $292.36 $41,515.00 142.00 STATE $319.13 $79,145.00 248.00 604-10.50 BRIDGE DECK REPAIRS (PARTIAL DEPTH S.Y. 1 $81.15 $322,555.00 3975.00 2 $175.00 $17,500.00 100.00 3 $74.87 $220,505.00 2945.00 4 $98.56 $91,565.00 929.00 STATE $82.04 $652,125.00 7949.00 604-10.51 SCARIFYING S.Y. 1 $6.30 $6,081.50 965.00 3 $12.09 $26,781.20 2216.00 4 $6.90 $39,984.00 5797.00 STATE $8.11 $72,846.70 8978.00 604-10.53 CONCRETE REPAIRS S.Y. 1 $470.00 $46,060.00 98.00 STATE $470.00 $46,060.00 98.00 604-10.54 CONCRETE REPAIRS S.F. 1 $79.82 $151,497.00 1898.00 2 $100.00 $2,000.00 20.00 3 $53.46 $92,643.62 1733.00 4 $62.27 $226,484.00 3637.00 STATE $64.85 $472,624.62 7288.00 604-10.55 CONCRETE (FOUNDATION REPAIRS) C.Y. 3 $730.00 $20,440.00 28.00 STATE $730.00 $20,440.00 28.00 604-10.58 EPOXY INJECTION (INJECTION) GAL. 1 $38.04 $1,712.00 45.00 2 $65.00 $715.00 11.00 STATE $43.34 $2,427.00 56.00 604-10.60 EXPANSION JOINT REPAIRS (MODULAR TY L.F. 4 $1,028.00 $52,428.00 51.00 STATE $1,028.00 $52,428.00 51.00 604-10.62 EPOXY INJCTN REPAIR (CMPLT AND IN P L.F. 1 $34.74 $85,212.90 2453.00 2 $62.07 $7,200.00 116.00 3 $54.67 $11,480.00 210.00 4 $34.97 $49,235.00 1408.00 STATE $36.57 $153,127.90 4187.00 604-10.63 CONCRETE REPAIRS (CRACKS) L.F. 1 $50.00 $1,150.00 23.00 STATE $50.00 $1,150.00 23.00 604-10.69 PRESTRESSING STRAND SPLICE EACH 3 $640.21 $5,761.86 9.00 STATE $640.21 $5,761.86 9.00 604-10.70 EXPANSION JOINT REPAIRS L.F. 4 $100.00 $66,800.00 668.00 STATE $100.00 $66,800.00 668.00 604-10.80 BRIDGE REPAIRS LS 1 $8,240.00 $16,480.00 2.00 STATE $8,240.00 $16,480.00 2.00 604-10.81 CONCRETE REPAIRS EACH 3 $890.00 $28,480.00 32.00 STATE $890.00 $28,480.00 32.00 604-10.84 FULL DEPTH REPAIR S.Y. 4 $180.00 $3,600.00 20.00 STATE $180.00 $3,600.00 20.00 604-10.85 CLASS "D" CONCRETE (OVERLAY) C.Y. 4 $440.78 $175,870.00 399.00 STATE $440.78 $175,870.00 399.00 604-10.86 CLASS "D" CONCRETE (REPAIR) C.Y. 4 $300.00 $600.00 2.00 STATE $300.00 $600.00 2.00 604-10.90 MISCELLANEOUS BRIDGE ITEMS LS 1 $3,737.00 $14,948.00 4.00 4 $2,000.00 $4,000.00 2.00

Page 24: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 24 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $3,158.00 $18,948.00 6.00 604-11.01 EXPANSION DEVICE L.F. 1 $650.00 $32,500.00 50.00 3 $374.69 $47,960.00 128.00 4 $210.00 $6,930.00 33.00 STATE $414.17 $87,390.00 211.00 604-11.02 EXPANSION DEVICE L.F. 1 $650.00 $32,500.00 50.00 3 $225.00 $8,100.00 36.00 STATE $472.09 $40,600.00 86.00 604-15.01 PORTLAND CEMENT GROUT C.Y. 3 $100.00 $2,000.00 20.00 4 $176.43 $11,115.00 63.00 STATE $158.01 $13,115.00 83.00 604-36 SCARIFYING S.Y. 4 $2.00 $1,330.00 665.00 STATE $2.00 $1,330.00 665.00 604-36.20 BRIDGE DECK REMOVAL S.Y. 1 $30.00 $123,150.00 4105.00 STATE $30.00 $123,150.00 4105.00 604-40.01 BEAM END REPAIR EACH 4 $850.00 $15,300.00 18.00 STATE $850.00 $15,300.00 18.00 605-04 WATERPROOFING CNSTR JOINTS (R/R STR S.Y. 3 $470.00 $47,470.00 101.00 STATE $470.00 $47,470.00 101.00 606-02.01 TEST PILES (STEEL PILES, 10 INCH) L.F. 4 $42.78 $16,900.00 395.00 STATE $42.78 $16,900.00 395.00 606-02.02 LOADING TEST (STEEL PILES, 10 INCH) EACH 4 $3,750.00 $7,500.00 2.00 STATE $3,750.00 $7,500.00 2.00 606-02.03 STEEL PILES (10 INCH) L.F. 1 $17.98 $561,034.40 31210.00 3 $16.19 $711,436.65 43955.00 4 $17.17 $67,030.00 3905.00 STATE $16.94 $1,339,501.05 79070.00 606-02.06 PILE TIPS (STEEL PILES, 10 INCH) EACH 1 $59.79 $53,210.24 890.00 3 $72.85 $82,682.00 1135.00 STATE $67.11 $135,892.24 2025.00 606-03.03 STEEL PILES (12 INCH) L.F. 1 $25.00 $25,825.00 1033.00 3 $22.32 $78,971.00 3538.00 STATE $22.93 $104,796.00 4571.00 606-03.06 PILE TIPS (STEEL PILES, 12 INCH) EACH 1 $85.00 $2,380.00 28.00 3 $73.05 $4,164.00 57.00 STATE $76.99 $6,544.00 85.00 606-04.03 STEEL PILES (14 INCH) L.F. 3 $30.00 $18,000.00 600.00 STATE $30.00 $18,000.00 600.00 606-04.06 PILE TIPS (STEEL PILES, 14 INCH) EACH 3 $100.00 $1,800.00 18.00 STATE $100.00 $1,800.00 18.00 606-09.01 TEST PILES (PRECAST CONCRETE, SIZE L.F. 3 $30.00 $3,600.00 120.00 4 $60.97 $198,165.00 3250.00 STATE $59.87 $201,765.00 3370.00 606-09.02 LOADING TEST (PRECAST CONCRETE, SIZ EACH 3 $7,000.00 $7,000.00 1.00 4 $4,000.00 $68,000.00 17.00 STATE $4,166.67 $75,000.00 18.00 606-09.03 PRECAST CONCRETE PILES (SIZE 1) L.F. 3 $24.00 $39,840.00 1660.00 4 $22.70 $806,035.00 35505.00

Page 25: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 25 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $22.76 $845,875.00 37165.00 606-10.01 TEST PILES (PRECAST CONCRETE, SIZE L.F. 4 $35.16 $64,700.00 1840.00 STATE $35.16 $64,700.00 1840.00 606-10.02 LOADING TEST (PRECAST CONCRETE, SIZ EACH 4 $4,000.00 $4,000.00 1.00 STATE $4,000.00 $4,000.00 1.00 606-10.03 PRECAST CONCRETE PILES (SIZE 2) L.F. 4 $30.28 $308,280.00 10180.00 STATE $30.28 $308,280.00 10180.00 606-12.01 PILE ANCHORAGE SYSTEM (SEISMIC) EACH 4 $96.69 $141,064.00 1459.00 STATE $96.69 $141,064.00 1459.00 606-15.01 TEST PILES (PRECAST CONCRETE) 18" S L.F. 4 $40.00 $14,000.00 350.00 STATE $40.00 $14,000.00 350.00 606-15.02 LOADING TEST (PRECAST CNC) 18"SQUAR EACH 4 $4,250.00 $8,500.00 2.00 STATE $4,250.00 $8,500.00 2.00 606-15.03 18" PRESTRESSED CONCRETE PILES L.F. 4 $31.92 $39,900.00 1250.00 STATE $31.92 $39,900.00 1250.00 606-19.01 TEST PILES (STEEL PIPE PILES, 16-IN L.F. 4 $53.38 $21,350.00 400.00 STATE $53.38 $21,350.00 400.00 606-19.02 LOADING TEST (STEEL PIPE PILES, 16- EACH 4 $2,750.00 $11,000.00 4.00 STATE $2,750.00 $11,000.00 4.00 606-19.03 STEEL PIPE PILES (16-INCH) L.F. 4 $35.33 $89,730.00 2540.00 STATE $35.33 $89,730.00 2540.00 606-20.01 TEST PILES (STEEL PIPE PILES, 18-IN L.F. 4 $50.00 $7,000.00 140.00 STATE $50.00 $7,000.00 140.00 606-20.02 LOADING TEST (STEEL PIPE PILES, 18- EACH 4 $4,500.00 $4,500.00 1.00 STATE $4,500.00 $4,500.00 1.00 606-20.03 STEEL PIPE PILES (18-INCH) L.F. 4 $35.00 $42,000.00 1200.00 STATE $35.00 $42,000.00 1200.00 607-02.02 15" CONCRETE PIPE CULVERT(CLASS III L.F. 3 $22.45 $5,768.60 257.00 4 $42.17 $8,392.00 199.00 STATE $31.05 $14,160.60 456.00 607-03.02 18" CONCRETE PIPE CULVERT (CLASS II L.F. 1 $34.83 $797,260.20 22887.00 2 $27.81 $185,636.04 6675.00 3 $29.43 $1,767,175.94 60040.00 4 $23.58 $232,902.71 9879.00 STATE $29.99 $2,982,974.89 99481.00 607-03.03 18" CONCRETE PIPE CULVERT (CLASS IV L.F. 1 $29.15 $14,837.35 509.00 STATE $29.15 $14,837.35 509.00 607-03.04 18" CONCRETE PIPE CULVERT (CLASS V) L.F. 1 $50.00 $7,500.00 150.00 3 $31.33 $14,002.50 447.00 STATE $36.02 $21,502.50 597.00 607-03.30 18" PIPE CULVERT L.F. 4 $23.00 $368.00 16.00 STATE $23.00 $368.00 16.00 607-05.02 24" CONCRETE PIPE CULVERT (CLASS II L.F. 1 $43.52 $200,736.35 4612.00 2 $31.93 $362,029.99 11339.00 3 $31.65 $601,816.88 19012.00 4 $32.59 $55,209.25 1694.00 STATE $33.28 $1,219,792.47 36657.00 607-05.03 24" CONCRETE PIPE CULVERT (CLASS IV L.F. 3 $27.00 $21,006.00 778.00

Page 26: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 26 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $27.00 $21,006.00 778.00 607-05.04 24" CONCRETE PIPE CULVERT (CLASS V) L.F. 3 $33.50 $24,689.50 737.00 STATE $33.50 $24,689.50 737.00 607-05.30 24" PIPE CULVERT L.F. 3 $37.50 $3,225.00 86.00 STATE $37.50 $3,225.00 86.00 607-06.02 30" CONCRETE PIPE CULVERT (CLASS II L.F. 1 $60.83 $147,079.50 2418.00 2 $46.00 $35,557.93 773.00 3 $48.67 $470,507.92 9668.00 4 $44.82 $39,890.00 890.00 STATE $50.41 $693,035.35 13749.00 607-06.03 30" CONCRETE PIPE CULVERT (CLASS IV L.F. 1 $69.58 $59,977.96 862.00 3 $39.50 $14,457.00 366.00 STATE $60.61 $74,434.96 1228.00 607-06.04 30" CONCRETE PIPE CULVERT (CLASS V) L.F. 3 $49.00 $64,337.00 1313.00 STATE $49.00 $64,337.00 1313.00 607-06.07 36" PIPE CULVERT (JACKED-IN-PLACE) L.F. 4 $550.00 $38,500.00 70.00 STATE $550.00 $38,500.00 70.00 607-06.30 30" PIPE CULVERT L.F. 1 $50.00 $2,500.00 50.00 3 $51.70 $3,515.60 68.00 STATE $50.98 $6,015.60 118.00 607-07.02 36" CONCRETE PIPE CULVERT (CLASS II L.F. 1 $67.09 $188,867.38 2815.00 2 $59.19 $90,502.17 1529.00 3 $63.64 $460,783.76 7240.00 4 $70.00 $1,120.00 16.00 STATE $63.90 $741,273.31 11600.00 607-07.03 36" CONCRETE PIPE CULVERT (CLASS IV L.F. 1 $104.43 $249,065.55 2385.00 2 $70.00 $11,550.00 165.00 3 $55.77 $57,666.00 1034.00 STATE $88.81 $318,281.55 3584.00 607-07.04 36" CONCRETE PIPE CULVERT (CLASS V) L.F. 3 $62.00 $90,210.00 1455.00 STATE $62.00 $90,210.00 1455.00 607-07.05 36"CNC PIPE CULV(CL IV)JACKED-IN-PL L.F. 2 $1,000.00 $65,000.00 65.00 STATE $1,000.00 $65,000.00 65.00 607-07.30 36" PIPE CULVERT L.F. 3 $45.00 $2,160.00 48.00 STATE $45.00 $2,160.00 48.00 607-08.02 42" CONCRETE PIPE CULVERT (CLASS II L.F. 1 $92.30 $180,912.00 1960.00 2 $73.15 $16,897.08 231.00 3 $110.74 $611,161.90 5519.00 4 $77.39 $7,120.00 92.00 STATE $104.60 $816,090.98 7802.00 607-08.03 42" CONCRETE PIPE CULVERT (CLASS IV L.F. 3 $71.00 $8,094.00 114.00 STATE $71.00 $8,094.00 114.00 607-08.04 42" CONCRETE PIPE CULVERT (CLASS V) L.F. 3 $79.00 $29,546.00 374.00 STATE $79.00 $29,546.00 374.00 607-08.05 42"CNC PIPE CULV (CL IV)JACKED-IN-P L.F. 3 $1,035.00 $401,580.00 388.00 STATE $1,035.00 $401,580.00 388.00 607-09.02 48" CONCRETE PIPE CULVERT (CLASS II L.F. 1 $113.27 $124,148.40 1096.00 2 $89.75 $17,141.53 191.00

Page 27: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 27 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

3 $83.77 $39,538.28 472.00 4 $78.00 $109,278.00 1401.00 STATE $91.81 $290,106.21 3160.00 607-09.03 48" CONCRETE PIPE CULVERT (CLASS IV L.F. 1 $175.00 $54,250.00 310.00 3 $86.00 $81,012.00 942.00 4 $100.00 $32,800.00 328.00 STATE $106.37 $168,062.00 1580.00 607-09.04 48" CONCRETE PIPE CULVERT (CLASS V) L.F. 3 $99.72 $78,877.00 791.00 STATE $99.72 $78,877.00 791.00 607-10.02 54" CONCRETE PIPE CULVERT (CLASS II L.F. 1 $125.00 $63,250.00 506.00 2 $111.86 $34,006.28 304.00 3 $90.90 $9,726.30 107.00 STATE $116.67 $106,982.58 917.00 607-11.03 60" CONCRETE PIPE CULVERT (CLASS II L.F. 2 $130.07 $13,787.42 106.00 3 $136.70 $63,016.80 461.00 STATE $135.46 $76,804.22 567.00 607-11.04 60" CONCRETE PIPE CULVERT (CLASS IV L.F. 4 $145.00 $40,745.00 281.00 STATE $145.00 $40,745.00 281.00 607-11.05 60" CONCRETE PIPE CULVERT (CLASS V) L.F. 3 $160.00 $100,800.00 630.00 STATE $160.00 $100,800.00 630.00 607-12.03 66" CONCRETE PIPE CULVERT (CLASS II L.F. 2 $159.61 $25,058.77 157.00 3 $160.00 $34,560.00 216.00 STATE $159.84 $59,618.77 373.00 607-12.05 66" CONCRETE PIPE CULVERT (CLASS V) L.F. 3 $221.72 $231,914.00 1046.00 STATE $221.72 $231,914.00 1046.00 607-13.03 72" CONCRETE PIPE CULVERT (CLASS II L.F. 1 $320.00 $34,880.00 109.00 2 $183.35 $29,702.70 162.00 STATE $238.31 $64,582.70 271.00 607-16.01 23"X 14"HORIZONTAL OVAL CNC PIPE CU L.F. 1 $57.84 $19,375.00 335.00 2 $40.00 $4,200.00 105.00 3 $28.73 $29,223.00 1017.00 STATE $36.24 $52,798.00 1457.00 607-16.02 30"X 19"HORIZONTAL OVAL CNC PIPE CU L.F. 1 $60.00 $2,280.00 38.00 2 $49.00 $25,382.00 518.00 3 $41.62 $11,070.00 266.00 STATE $47.12 $38,732.00 822.00 607-16.04 38"X 24"HORIZONTAL OVAL CNC PIPE CU L.F. 3 $46.00 $7,176.00 156.00 STATE $46.00 $7,176.00 156.00 607-16.06 45"X 29"HORIZONTAL OVAL CNC PIPE CU L.F. 1 $110.00 $22,220.00 202.00 3 $60.98 $46,588.00 764.00 STATE $71.23 $68,808.00 966.00 607-20.01 18" CROSSDRN P CLV(COLLECTORS&LOC R L.F. 1 $29.04 $3,194.50 110.00 STATE $29.04 $3,194.50 110.00 607-22.01 18" LGTDL MED DRN(GRASS-DEPRESSED M L.F. 2 $25.00 $45,025.00 1801.00 STATE $25.00 $45,025.00 1801.00 607-37.01 15" CORRUGATED METAL PIPE CULVERT L.F. 1 $65.70 $657.00 10.00 3 $20.20 $202.00 10.00 4 $21.00 $1,470.00 70.00

Page 28: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 28 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $25.88 $2,329.00 90.00 607-37.02 18" CORRUGATED METAL PIPE CULVERT L.F. 2 $28.18 $12,792.00 454.00 3 $23.44 $14,300.00 610.00 4 $18.37 $7,346.00 400.00 STATE $23.52 $34,438.00 1464.00 607-37.03 24" CORRUGATED METAL PIPE CULVERT L.F. 1 $115.50 $924.00 8.00 2 $22.48 $2,698.00 120.00 3 $30.89 $13,375.00 433.00 4 $28.00 $2,240.00 80.00 STATE $30.01 $19,237.00 641.00 607-37.04 30" CORRUGATED METAL PIPE CULVERT L.F. 3 $24.00 $5,592.00 233.00 4 $35.00 $3,500.00 100.00 STATE $27.30 $9,092.00 333.00 607-37.05 36" CORRUGATED METAL PIPE CULVERT L.F. 2 $58.00 $5,800.00 100.00 3 $750.00 $4,500.00 6.00 STATE $97.17 $10,300.00 106.00 607-37.06 42" CORRUGATED METAL PIPE CULVERT L.F. 2 $60.00 $1,500.00 25.00 3 $48.48 $3,636.00 75.00 STATE $51.36 $5,136.00 100.00 607-37.07 48" CORRUGATED METAL PIPE CULVERT L.F. 1 $223.00 $2,676.00 12.00 3 $52.52 $1,260.48 24.00 STATE $109.35 $3,936.48 36.00 607-37.08 54" CORRUGATED METAL PIPE CULVERT L.F. 2 $95.00 $6,840.00 72.00 3 $67.42 $18,742.00 278.00 STATE $73.09 $25,582.00 350.00 607-37.09 60" CORRUGATED METAL PIPE CULVERT L.F. 3 $115.00 $5,750.00 50.00 STATE $115.00 $5,750.00 50.00 607-38.03 24"CORR. METAL PIPE CULVERT (PRECOA L.F. 3 $65.00 $3,900.00 60.00 STATE $65.00 $3,900.00 60.00 607-39.02 18" PIPE CULVERT (SIDE DRAIN) L.F. 1 $19.41 $17,508.70 902.00 2 $22.50 $16,715.60 743.00 3 $19.85 $116,347.80 5860.00 4 $23.46 $104,502.28 4455.00 STATE $21.33 $255,074.38 11960.00 607-39.03 24" PIPE CULVERT (SIDE DRAIN) L.F. 1 $25.67 $3,440.00 134.00 2 $24.29 $2,720.00 112.00 3 $25.46 $25,531.50 1003.00 4 $20.03 $4,608.00 230.00 STATE $24.54 $36,299.50 1479.00 607-39.04 30" PIPE CULVERT (SIDE DRAIN) L.F. 1 $26.00 $7,124.00 274.00 3 $24.35 $5,211.50 214.00 4 $32.27 $968.10 30.00 STATE $25.68 $13,303.60 518.00 607-39.05 36" PIPE CULVERT (SIDE DRAIN) L.F. 2 $30.00 $3,360.00 112.00 STATE $30.00 $3,360.00 112.00 607-39.06 42" PIPE CULVERT (SIDE DRAIN) L.F. 3 $39.41 $8,276.00 210.00 STATE $39.41 $8,276.00 210.00 607-40.02 CORR MTL P ARCH (SIZE EQUIV. 18"ROU L.F. 3 $20.00 $1,240.00 62.00

Page 29: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 29 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $20.00 $1,240.00 62.00 607-41.03 18" SLOPE DRAIN PIPE L.F. 1 $35.00 $6,615.00 189.00 STATE $35.00 $6,615.00 189.00 607-45 12" SLOTTED DRAIN PIPE L.F. 1 $40.00 $1,200.00 30.00 3 $103.00 $3,090.00 30.00 STATE $71.50 $4,290.00 60.00 607-45.01 15" SLOTTED DRAIN PIPE L.F. 4 $66.00 $19,800.00 300.00 STATE $66.00 $19,800.00 300.00 607-45.02 18" SLOTTED DRAIN PIPE L.F. 3 $112.00 $19,264.00 172.00 STATE $112.00 $19,264.00 172.00 607-45.10 LINE DRAIN L.F. 3 $90.90 $17,725.50 195.00 STATE $90.90 $17,725.50 195.00 607-50.03 PRECAST CONCRETE BOX CULVERT (12' X L.F. 3 $950.00 $37,050.00 39.00 STATE $950.00 $37,050.00 39.00 607-50.04 PRECAST CONCRETE BOX CULVERT (10' X L.F. 2 $573.30 $79,115.40 138.00 STATE $573.30 $79,115.40 138.00 607-50.07 PRECAST CONCRETE BOX CULVERT (12' X L.F. 3 $1,075.00 $45,150.00 42.00 STATE $1,075.00 $45,150.00 42.00 607-50.09 PRECAST CONCRETE BOX CULVERT (6' X L.F. 3 $550.00 $36,850.00 67.00 STATE $550.00 $36,850.00 67.00 607-50.60 THREE SIDED PRECAST CULV - BBL L.F. 4 . . 38.00 STATE . . 38.00 607-51.03 30" SIDE TAPERED INLET EACH 1 $500.00 $500.00 1.00 STATE $500.00 $500.00 1.00 607-51.07 54" SIDE TAPERED INLET EACH 1 $1,000.00 $1,000.00 1.00 STATE $1,000.00 $1,000.00 1.00 607-51.75 45"x29" HOP SIDE TAPERED INLET EACH 1 $1,000.00 $2,000.00 2.00 STATE $1,000.00 $2,000.00 2.00 607-57.01 REINFORCED CONCRETE PIPE ARCH (22"X L.F. 4 $48.00 $2,400.00 50.00 STATE $48.00 $2,400.00 50.00 607-57.02 REINFORCED CONCRETE PIPE ARCH (29"X L.F. 4 $34.00 $7,922.00 233.00 STATE $34.00 $7,922.00 233.00 607-57.03 REINFORCED CONCRETE PIPE ARCH (36"X L.F. 4 $61.00 $4,575.00 75.00 STATE $61.00 $4,575.00 75.00 607-57.04 REINFORCED CONCRETE PIPE ARCH (44"X L.F. 4 $73.00 $65,992.00 904.00 STATE $73.00 $65,992.00 904.00 607-60.01 ENCASEMENT PIPE L.F. 3 $15.00 $5,760.00 384.00 STATE $15.00 $5,760.00 384.00 607-60.13 30" STEEL PIPE CULVERT (JACK-IN-PLA L.F. 3 $405.00 $61,560.00 152.00 STATE $405.00 $61,560.00 152.00 607-60.15 48" STEEL PIPE CULVERT (JACK-IN-PLA L.F. 3 $525.00 $90,300.00 172.00 STATE $525.00 $90,300.00 172.00 607-65.20 SITE PREPARATION EACH 1 $283.33 $17,000.00 60.00 STATE $283.33 $17,000.00 60.00 607-65.61 10"MINIMUM ID PIPE TO SLIP LINE 12" L.F. 1 $18.50 $2,960.00 160.00 STATE $18.50 $2,960.00 160.00 607-65.62 12"MINIMUM ID PIPE TO SLIP LINE 15" L.F. 1 $21.50 $57,034.25 2653.00 STATE $21.50 $57,034.25 2653.00

Page 30: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 30 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

607-65.63 15"MINIMUM ID PIPE TO SLIP LINE 18" L.F. 1 $28.86 $116,930.50 4052.00 STATE $28.86 $116,930.50 4052.00 607-65.64 18"MINIMUM ID PIPE TO SLIP LINE 24" L.F. 1 $34.57 $102,157.50 2955.00 STATE $34.57 $102,157.50 2955.00 607-65.65 24"MINIMUM ID PIPE TO SLIP LINE 30" L.F. 1 $42.82 $63,547.50 1484.00 STATE $42.82 $63,547.50 1484.00 607-65.66 30"MINIMUM ID PIPE TO SLIP LINE 36" L.F. 1 $68.96 $70,060.00 1016.00 STATE $68.96 $70,060.00 1016.00 607-65.67 33"MINIMUM ID PIPE TO SLIP LINE 42" L.F. 1 $73.90 $26,975.00 365.00 3 $70.70 $18,735.50 265.00 STATE $72.56 $45,710.50 630.00 607-65.68 36"MINIMUM ID PIPE TO SLIP LINE 48" L.F. 1 $91.49 $16,925.00 185.00 3 $80.80 $22,139.20 274.00 STATE $85.11 $39,064.20 459.00 607-65.69 42"MINIMUM ID PIPE TO SLIP LINE 54" L.F. 1 $135.00 $27,540.00 204.00 3 $111.10 $26,664.00 240.00 STATE $122.08 $54,204.00 444.00 607-65.70 48"MINIMUM ID PIPE TO SLIP LINE 60" L.F. 1 $130.00 $5,200.00 40.00 STATE $130.00 $5,200.00 40.00 607-65.71 60"MINIMUM ID PIPE TO SLIP LINE 72" L.F. 1 $290.00 $36,250.00 125.00 STATE $290.00 $36,250.00 125.00 607-65.76 42"MINIMUM ID PIPE TO SLIP LINE 60" L.F. 1 $192.00 $5,760.00 30.00 STATE $192.00 $5,760.00 30.00 610-07.03 18" PIPE DRAIN (BRIDGE DRAIN) L.F. 1 $28.25 $19,490.00 690.00 3 $20.95 $24,594.50 1174.00 4 $27.81 $18,215.00 655.00 STATE $24.73 $62,299.50 2519.00 610-10.35 MODIFY BRIDGE DECK DRAIN SYSTEM LS 1 $10,000.00 $10,000.00 1.00 STATE $10,000.00 $10,000.00 1.00 610-10.45 DECK DRAINS EACH 3 $1,500.00 $12,000.00 8.00 STATE $1,500.00 $12,000.00 8.00 610-11.03 PLASTIC PIPE DRAINS (8") L.F. 3 $11.00 $88.00 8.00 STATE $11.00 $88.00 8.00 610-11.06 PLASTIC PIPE DRAINS (15") L.F. 3 $27.00 $3,186.00 118.00 STATE $27.00 $3,186.00 118.00 611-01.01 MANHOLES, 0' - 4' DEPTH EACH 1 $2,068.00 $4,136.00 2.00 3 $2,170.00 $6,510.00 3.00 STATE $2,129.20 $10,646.00 5.00 611-01.02 MANHOLES ,> 4' - 8' DEPTH EACH 1 $3,300.00 $29,700.00 9.00 2 $2,000.00 $2,000.00 1.00 3 $2,580.12 $59,342.70 23.00 4 $3,880.00 $19,400.00 5.00 STATE $2,906.39 $110,442.70 38.00 611-01.03 MANHOLES, > 8' - 12' DEPTH EACH 1 $4,000.00 $28,000.00 7.00 3 $2,585.00 $5,170.00 2.00 4 $3,933.33 $11,800.00 3.00 STATE $3,747.50 $44,970.00 12.00 611-01.04 MANHOLES, > 12' - 16' DEPTH EACH 3 $4,778.00 $23,890.00 5.00

Page 31: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 31 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $4,778.00 $23,890.00 5.00 611-01.05 MANHOLES, > 16' - 20' DEPTH EACH 1 $5,200.00 $10,400.00 2.00 2 $4,350.00 $4,350.00 1.00 STATE $4,916.67 $14,750.00 3.00 611-01.07 MANHOLES, > 24' - 28' DEPTH EACH 1 $9,500.00 $9,500.00 1.00 STATE $9,500.00 $9,500.00 1.00 611-01.20 ADJUSTMENT OF EXISTING MANHOLE EACH 2 $285.00 $3,420.00 12.00 4 $533.33 $1,600.00 3.00 STATE $334.67 $5,020.00 15.00 611-01.21 REWORK MANHOLE EACH 1 $1,000.00 $1,000.00 1.00 2 $510.00 $1,020.00 2.00 STATE $673.33 $2,020.00 3.00 611-01.22 CAPPING EXISTING MANHOLE EACH 2 $300.00 $600.00 2.00 STATE $300.00 $600.00 2.00 611-02.01 SPRING DRAIN BOX, TYPE 1 EACH 1 $1,375.00 $5,500.00 4.00 3 $1,038.75 $4,155.00 4.00 STATE $1,206.88 $9,655.00 8.00 611-02.10 JUNCTION BOX, TYPE 1 EACH 1 $1,500.00 $21,000.00 14.00 2 $1,282.50 $2,565.00 2.00 3 $1,550.00 $7,750.00 5.00 4 $2,800.00 $2,800.00 1.00 STATE $1,550.68 $34,115.00 22.00 611-02.11 JUNCTION BOX, TYPE 2 EACH 1 $1,687.00 $8,435.00 5.00 2 $1,662.50 $6,650.00 4.00 3 $1,711.25 $13,690.00 8.00 STATE $1,692.65 $28,775.00 17.00 611-02.12 JUNCTION BOX, TYPE 3 EACH 1 $2,340.00 $11,700.00 5.00 2 $2,025.00 $10,125.00 5.00 3 $1,817.00 $9,085.00 5.00 4 $2,800.00 $2,800.00 1.00 STATE $2,106.88 $33,710.00 16.00 611-02.13 JUNCTION BOX, TYPE 4 EACH 1 $5,600.00 $5,600.00 1.00 2 $3,000.00 $3,000.00 1.00 3 $2,647.97 $7,943.90 3.00 STATE $3,308.78 $16,543.90 5.00 611-02.14 JUNCTION BOX, TYPE 5 EACH 1 $4,000.00 $4,000.00 1.00 2 $10,326.00 $10,326.00 1.00 STATE $7,163.00 $14,326.00 2.00 611-05.01 TRENCH DRAINS L.F. 3 $200.00 $16,000.00 80.00 STATE $200.00 $16,000.00 80.00 611-07.01 CLASS A CONCRETE (PIPE ENDWALLS) C.Y. 1 $468.91 $166,930.20 356.00 2 $496.00 $385,885.00 778.00 3 $426.78 $505,729.00 1185.00 4 $616.56 $84,160.00 136.50 STATE $465.37 $1,142,704.20 2455.50 611-07.02 STEEL BAR REINFORCEMENT (PIPE ENDWA LB. 1 $0.95 $16,245.56 17143.00 2 $0.62 $32,406.25 52100.00 3 $0.81 $58,477.40 72151.00

Page 32: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 32 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $1.26 $15,499.00 12337.00 STATE $0.80 $122,628.21 153731.00 611-07.03 STRUCTURAL STEEL (PIPE ENDWALLS) LB. 1 $1.91 $9,277.44 4865.00 2 $2.24 $97,926.80 43690.00 3 $2.41 $37,031.65 15395.00 4 $3.06 $14,964.40 4886.00 STATE $2.31 $159,200.29 68836.00 611-07.11 CLEAN DRAIN(WITH GRATE) EACH 1 $59.81 $95,462.50 1596.00 2 $59.70 $12,537.00 210.00 3 $48.75 $118,218.75 2425.00 4 $51.77 $134,698.00 2602.00 STATE $52.82 $360,916.25 6833.00 611-07.12 CLEAN DRAIN(WALL DRAIN) EACH 1 $40.22 $10,297.50 256.00 3 $29.00 $26,303.00 907.00 4 $30.08 $15,130.00 503.00 STATE $31.05 $51,730.50 1666.00 611-07.13 PIPE CLEANING (<18 DIA.) L.F. 1 $2.87 $6,027.15 2101.00 2 $4.00 $12,000.00 3000.00 3 $3.75 $5,992.50 1598.00 4 $2.52 $2,671.00 1062.00 STATE $3.44 $26,690.65 7761.00 611-07.14 PIPE CLEANING (>OR=18? DIA.) L.F. 1 $1.69 $11,824.25 6989.00 2 $5.00 $1,250.00 250.00 3 $4.25 $33,583.50 7902.00 4 $2.69 $12,417.50 4617.00 STATE $2.99 $59,075.25 19758.00 611-09.01 ADJUSTMENT OF EXISTING CATCHBASIN EACH 1 $313.22 $18,480.00 59.00 2 $150.00 $1,500.00 10.00 3 $1,005.00 $10,050.00 10.00 4 $445.83 $5,350.00 12.00 STATE $388.79 $35,380.00 91.00 611-09.02 REWORK CATCHBASIN EACH 1 $675.00 $2,700.00 4.00 3 $963.20 $4,816.00 5.00 4 $1,225.00 $9,800.00 8.00 STATE $1,018.59 $17,316.00 17.00 611-09.03 CAPPING EXISTING CATCHBASIN EACH 1 $443.75 $3,550.00 8.00 2 $305.00 $1,220.00 4.00 3 $696.65 $18,113.00 26.00 4 $500.00 $2,000.00 4.00 STATE $592.45 $24,883.00 42.00 611-09.50 CATCH BASINS, EACH 1 $10,000.00 $20,000.00 2.00 3 $6,150.00 $49,200.00 8.00 STATE $6,920.00 $69,200.00 10.00 611-09.51 CATCH BASINS, EACH 1 $2,000.00 $2,000.00 1.00 3 $7,200.00 $28,800.00 4.00 STATE $6,160.00 $30,800.00 5.00 611-10.01 CATCH BASINS, TYPE 10, 0' - 4' DEPT EACH 3 $1,280.00 $1,280.00 1.00 4 $1,350.00 $1,350.00 1.00

Page 33: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 33 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $1,315.00 $2,630.00 2.00 611-10.02 CATCH BASINS, TYPE 10, > 4' - 8' DE EACH 3 $1,360.00 $8,160.00 6.00 4 $2,700.00 $2,700.00 1.00 STATE $1,551.43 $10,860.00 7.00 611-12.01 CATCH BASINS, TYPE 12, 0' - 4' DEPT EACH 1 $1,661.96 $38,225.00 23.00 3 $1,241.25 $24,825.00 20.00 4 $1,801.33 $27,020.00 15.00 STATE $1,552.93 $90,070.00 58.00 611-12.02 CATCH BASINS, TYPE 12, > 4' - 8' DE EACH 1 $1,786.36 $328,690.00 184.00 2 $1,725.00 $31,050.00 18.00 3 $1,495.26 $373,815.00 250.00 4 $1,879.55 $82,700.00 44.00 STATE $1,645.68 $816,255.00 496.00 611-12.03 CATCH BASINS, TYPE 12, > 8' - 12' D EACH 1 $3,330.77 $43,300.00 13.00 3 $2,434.35 $55,990.00 23.00 4 $3,250.00 $3,250.00 1.00 STATE $2,771.35 $102,540.00 37.00 611-12.04 CATCH BASINS, TYPE 12, > 12' - 16' EACH 1 $4,600.00 $13,800.00 3.00 3 $3,055.71 $21,390.00 7.00 STATE $3,519.00 $35,190.00 10.00 611-12.05 CATCH BASINS, TYPE 12, > 16' - 20' EACH 1 $3,000.00 $3,000.00 1.00 STATE $3,000.00 $3,000.00 1.00 611-13.02 CATCH BASINS, TYPE 13, > 4' - 8' DE EACH 1 $2,740.00 $5,480.00 2.00 STATE $2,740.00 $5,480.00 2.00 611-13.03 CATCH BASINS, TYPE 13, > 8' - 12' D EACH 3 $2,495.00 $4,990.00 2.00 STATE $2,495.00 $4,990.00 2.00 611-14.02 CATCH BASINS, TYPE 14, > 4' - 8' DE EACH 1 $3,400.00 $6,800.00 2.00 3 $2,683.43 $93,920.00 35.00 4 $2,800.00 $2,800.00 1.00 STATE $2,724.21 $103,520.00 38.00 611-14.04 CATCH BASINS, TYPE 14, > 12' - 16' EACH 3 $8,150.00 $8,150.00 1.00 STATE $8,150.00 $8,150.00 1.00 611-16.01 CATCH BASINS, TYPE 16, 0' - 4' DEPT EACH 3 $2,300.00 $2,300.00 1.00 STATE $2,300.00 $2,300.00 1.00 611-16.02 CATCH BASINS, TYPE 16, > 4' - 8' DE EACH 3 $2,403.00 $24,030.00 10.00 4 $3,500.00 $7,000.00 2.00 STATE $2,585.83 $31,030.00 12.00 611-16.03 CATCH BASINS, TYPE 16, > 8' - 12' D EACH 3 $3,000.00 $3,000.00 1.00 STATE $3,000.00 $3,000.00 1.00 611-17.02 CATCH BASINS, TYPE 17, > 4' - 8' DE EACH 3 $4,566.67 $13,700.00 3.00 4 $4,300.00 $4,300.00 1.00 STATE $4,500.00 $18,000.00 4.00 611-17.03 CATCH BASINS, TYPE 17, > 8' - 12' D EACH 3 $8,800.00 $8,800.00 1.00 STATE $8,800.00 $8,800.00 1.00 611-25.01 CATCH BASINS, TYPE 25, 0' - 4' DEPT EACH 2 $1,575.00 $1,575.00 1.00 3 $1,480.00 $2,960.00 2.00 STATE $1,511.67 $4,535.00 3.00 611-25.02 CATCH BASINS, TYPE 25, > 4' - 8' DE EACH 1 $2,244.00 $8,976.00 4.00

Page 34: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 34 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $2,100.00 $4,200.00 2.00 STATE $2,196.00 $13,176.00 6.00 611-26.01 CATCH BASINS, TYPE 26, 0' - 4' DEPT EACH 1 $2,500.00 $5,000.00 2.00 STATE $2,500.00 $5,000.00 2.00 611-26.02 CATCH BASINS, TYPE 26, > 4' - 8' DE EACH 2 $2,225.00 $2,225.00 1.00 STATE $2,225.00 $2,225.00 1.00 611-31.02 CATCH BASINS, TYPE 31, > 4' - 8' DE EACH 3 $3,652.00 $127,820.00 35.00 STATE $3,652.00 $127,820.00 35.00 611-31.03 CATCH BASINS, TYPE 31, > 8' - 12' D EACH 1 $5,000.00 $5,000.00 1.00 3 $4,730.00 $9,460.00 2.00 STATE $4,820.00 $14,460.00 3.00 611-31.04 CATCH BASINS, TYPE 31, > 12' - 16' EACH 3 $4,395.00 $4,395.00 1.00 STATE $4,395.00 $4,395.00 1.00 611-38.01 CATCH BASINS, TYPE 38, 0' - 4' DEPT EACH 1 $1,313.68 $24,960.00 19.00 2 $1,250.00 $41,250.00 33.00 3 $1,111.47 $56,684.95 51.00 4 $1,300.00 $9,100.00 7.00 STATE $1,199.95 $131,994.95 110.00 611-38.02 CATCH BASINS, TYPE 38, > 4' - 8' DE EACH 1 $1,669.09 $18,360.00 11.00 2 $1,764.71 $30,000.00 17.00 3 $1,556.67 $32,690.00 21.00 4 $1,881.82 $20,700.00 11.00 STATE $1,695.83 $101,750.00 60.00 611-38.03 CATCH BASINS, TYPE 38, > 8' - 12' D EACH 1 $2,383.33 $7,150.00 3.00 2 $2,550.00 $17,850.00 7.00 3 $2,047.50 $4,095.00 2.00 STATE $2,424.58 $29,095.00 12.00 611-38.04 CATCH BASINS, TYPE 38, > 12' - 16' EACH 1 $3,200.00 $3,200.00 1.00 2 $3,400.00 $20,400.00 6.00 3 $2,398.33 $7,195.00 3.00 STATE $3,079.50 $30,795.00 10.00 611-38.06 CATCH BASINS, TYPE 38, > 20' - 24' EACH 1 $5,400.00 $5,400.00 1.00 3 $2,000.00 $4,000.00 2.00 STATE $3,133.33 $9,400.00 3.00 611-39.01 CATCH BASINS, TYPE 39, 0' - 4' DEPT EACH 2 $1,747.00 $33,193.00 19.00 3 $1,505.56 $27,100.00 18.00 4 $2,600.00 $23,400.00 9.00 STATE $1,819.41 $83,693.00 46.00 611-39.02 CATCH BASINS, TYPE 39, > 4' - 8' DE EACH 1 $2,218.75 $8,875.00 4.00 2 $3,000.00 $18,000.00 6.00 3 $2,103.30 $48,375.80 23.00 4 $2,800.00 $11,200.00 4.00 STATE $2,336.51 $86,450.80 37.00 611-39.03 CATCH BASINS, TYPE 39, > 8' - 12' D EACH 2 $2,785.00 $5,570.00 2.00 3 $2,200.00 $2,200.00 1.00 4 $3,900.00 $3,900.00 1.00 STATE $2,917.50 $11,670.00 4.00 611-39.04 CATCH BASINS, TYPE 39, > 12' - 16' EACH 1 $8,500.00 $8,500.00 1.00

Page 35: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 35 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $8,500.00 $8,500.00 1.00 611-40.02 CATCH BASINS, TYPE 40, > 4' - 8' DE EACH 1 $3,075.00 $3,075.00 1.00 3 $3,200.00 $6,400.00 2.00 STATE $3,158.33 $9,475.00 3.00 611-41.01 CATCH BASINS, TYPE 41, 0' - 4' DEPT EACH 1 $1,533.33 $9,200.00 6.00 2 $2,000.00 $2,000.00 1.00 3 $1,250.00 $7,500.00 6.00 STATE $1,438.46 $18,700.00 13.00 611-41.02 CATCH BASINS, TYPE 41, > 4' - 8' DE EACH 1 $2,004.17 $24,050.00 12.00 3 $1,874.14 $86,210.55 46.00 STATE $1,901.04 $110,260.55 58.00 611-41.03 CATCH BASINS, TYPE 41, > 8' - 12' D EACH 1 $3,000.00 $6,000.00 2.00 3 $2,602.59 $20,820.70 8.00 STATE $2,682.07 $26,820.70 10.00 611-41.04 CATCH BASINS, TYPE 41, > 12' - 16' EACH 1 $3,500.00 $10,500.00 3.00 3 $3,413.98 $6,827.95 2.00 STATE $3,465.59 $17,327.95 5.00 611-41.05 CATCH BASINS, TYPE 41, > 16' - 20' EACH 1 $4,000.00 $4,000.00 1.00 3 $7,900.00 $7,900.00 1.00 STATE $5,950.00 $11,900.00 2.00 611-41.06 CATCH BASINS, TYPE 41, > 20' - 24' EACH 3 $9,550.00 $9,550.00 1.00 STATE $9,550.00 $9,550.00 1.00 611-42.01 CATCH BASINS, TYPE 42, 0' - 4' DEPT EACH 1 $1,559.78 $35,875.00 23.00 2 $1,600.33 $12,802.60 8.00 3 $1,165.48 $36,130.00 31.00 4 $1,316.67 $15,800.00 12.00 STATE $1,359.56 $100,607.60 74.00 611-42.02 CATCH BASINS, TYPE 42, > 4' - 8' DE EACH 1 $2,409.33 $14,456.00 6.00 2 $2,350.00 $2,350.00 1.00 3 $1,972.13 $45,358.90 23.00 4 $2,150.00 $12,900.00 6.00 STATE $2,085.14 $75,064.90 36.00 611-42.03 CATCH BASINS, TYPE 42, > 8' - 12' D EACH 1 $2,200.00 $4,400.00 2.00 2 $2,895.00 $2,895.00 1.00 3 $2,900.00 $8,700.00 3.00 STATE $2,665.83 $15,995.00 6.00 611-42.05 CATCH BASINS, TYPE 42, > 16' - 20' EACH 3 $3,310.00 $6,620.00 2.00 STATE $3,310.00 $6,620.00 2.00 611-42.06 CATCH BASINS, TYPE 42, > 20' - 24' EACH 1 $4,000.00 $4,000.00 1.00 STATE $4,000.00 $4,000.00 1.00 611-43.01 CATCH BASINS, TYPE 43, 0' - 4' DEPT EACH 4 $3,928.00 $3,928.00 1.00 STATE $3,928.00 $3,928.00 1.00 611-43.02 CATCH BASINS, TYPE 43, > 4' - 8' DE EACH 1 $3,700.00 $7,400.00 2.00 2 $4,300.00 $4,300.00 1.00 3 $2,490.00 $9,960.00 4.00 STATE $3,094.29 $21,660.00 7.00 611-44.02 CATCH BASINS, TYPE 44, > 4' - 8' DE EACH 3 $4,943.95 $4,943.95 1.00 STATE $4,943.95 $4,943.95 1.00

Page 36: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 36 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

611-45.02 CATCH BASINS, TYPE 45, > 4' - 8' DE EACH 3 $2,988.77 $32,876.50 11.00 STATE $2,988.77 $32,876.50 11.00 611-45.04 CATCH BASINS, TYPE 45, > 12' - 16' EACH 3 $3,187.25 $6,374.50 2.00 STATE $3,187.25 $6,374.50 2.00 611-46.02 CATCH BASINS, TYPE 46, > 4' - 8' DE EACH 3 $9,265.00 $27,795.00 3.00 STATE $9,265.00 $27,795.00 3.00 611-51.02 CATCH BASINS, TYPE 51, > 4' - 8' DE EACH 1 $2,600.00 $26,000.00 10.00 3 $2,482.36 $215,965.00 87.00 4 $2,300.00 $2,300.00 1.00 STATE $2,492.50 $244,265.00 98.00 611-51.03 CATCH BASINS, TYPE 51, > 8' - 12' D EACH 3 $3,097.50 $6,195.00 2.00 STATE $3,097.50 $6,195.00 2.00 611-51.04 CATCH BASINS, TYPE 51, > 12' - 16' EACH 1 $4,000.00 $4,000.00 1.00 3 $3,836.67 $11,510.00 3.00 STATE $3,877.50 $15,510.00 4.00 611-51.05 CATCH BASINS, TYPE 51, > 16' - 20' EACH 1 $5,500.00 $11,000.00 2.00 3 $4,800.00 $4,800.00 1.00 STATE $5,266.67 $15,800.00 3.00 611-51.06 CATCH BASINS, TYPE 51, > 20' - 24' EACH 3 $6,000.00 $6,000.00 1.00 STATE $6,000.00 $6,000.00 1.00 615-01.01 PRESTRESSED CONCRETE I-BEAM (TYPE I L.F. 3 $60.04 $144,699.95 2410.00 STATE $60.04 $144,699.95 2410.00 615-01.02 PRESTRESSED CONCRETE I-BEAM (TYPE I L.F. 3 $65.50 $113,839.00 1738.00 4 $55.51 $454,832.00 8193.00 STATE $57.26 $568,671.00 9931.00 615-01.03 PRESTRESSED CONCRETE I-BEAM (TYPE I L.F. 1 $87.61 $367,191.27 4191.00 3 $97.67 $262,240.00 2685.00 4 $65.51 $204,140.00 3116.00 STATE $83.42 $833,571.27 9992.00 615-01.04 PRESTRESSED CONCRETE I-BEAM (TYPE I L.F. 3 $80.00 $273,600.00 3420.00 4 $75.00 $197,100.00 2628.00 STATE $77.83 $470,700.00 6048.00 615-01.10 PRESTR CONC BULB TEE BEAM (6"WEB)(B L.F. 4 $80.00 $207,360.00 2592.00 STATE $80.00 $207,360.00 2592.00 615-01.11 PRESTR CONC BULB TEE BEAM (6"WEB)(B L.F. 3 $114.60 $1,037,963.00 9057.00 4 $85.00 $206,465.00 2429.00 STATE $108.34 $1,244,428.00 11486.00 615-01.12 PRESTR CONC BULB TEE BEAM (6"WEB)(B L.F. 1 $116.06 $812,785.00 7003.00 3 $138.42 $994,000.00 7181.00 STATE $127.38 $1,806,785.00 14184.00 615-02.02 PRESTRESSED CONCRETE BOX BEAM (17"X L.F. 3 $98.67 $56,046.00 568.00 4 $122.76 $114,293.00 931.00 STATE $113.64 $170,339.00 1499.00 615-02.03 PRESTRESSED CONCRETE BOX BEAM (21"X L.F. 3 $116.96 $76,843.25 657.00 4 $125.11 $40,660.00 325.00 STATE $119.66 $117,503.25 982.00 615-02.04 PRESTRESSED CONCRETE BOX BEAM (27"X L.F. 3 $163.00 $28,362.00 174.00 4 $125.00 $56,500.00 452.00

Page 37: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 37 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $135.56 $84,862.00 626.00 615-02.05 PRESTRESSED CONCRETE BOX BEAM (33"X L.F. 3 $150.00 $260,400.00 1736.00 STATE $150.00 $260,400.00 1736.00 615-02.06 PRESTRESSED CONCRETE BOX BEAM (42"X L.F. 4 $130.00 $128,310.00 987.00 STATE $130.00 $128,310.00 987.00 615-02.18 PRESTRESSED CONCRETE BOX BEAM (36"X L.F. 4 $100.00 $410,900.00 4109.00 STATE $100.00 $410,900.00 4109.00 615-02.19 PRESTRESSED CONCRETE BOX BEAM (24"X L.F. 1 $115.00 $237,245.00 2063.00 3 $113.64 $232,398.75 2045.00 4 $128.41 $187,729.82 1462.00 STATE $118.02 $657,373.57 5570.00 615-02.22 PRESTRESSED CONCRETE BOX BEAM (18"X L.F. 3 $92.00 $33,856.00 368.00 STATE $92.00 $33,856.00 368.00 615-02.43 PRESTRESSED CONCRETE BOX BEAM (15"X L.F. 3 $88.23 $201,787.00 2287.00 STATE $88.23 $201,787.00 2287.00 615-02.52 PRESTRESSED CONCRETE BOX BEAM L.F. 1 $107.00 $70,941.00 663.00 4 $100.00 $13,400.00 134.00 STATE $105.82 $84,341.00 797.00 615-02.75 PRESTRESSED CNC BM L.F. 3 $130.00 $960,310.00 7387.00 STATE $130.00 $960,310.00 7387.00 615-05.01 POST-TENSIONING LS 4 $25,000.00 $25,000.00 1.00 STATE $25,000.00 $25,000.00 1.00 615-05.02 POST-TENSIONING LS 4 $25,000.00 $25,000.00 1.00 STATE $25,000.00 $25,000.00 1.00 615-05.03 POST-TENSIONING LS 4 $25,000.00 $25,000.00 1.00 STATE $25,000.00 $25,000.00 1.00 617-01 BRIDGE DECK SEALANT S.Y. 1 $5.06 $372,820.62 73664.00 2 $6.75 $7,249.50 1074.00 3 $5.58 $49,346.50 8837.00 4 $6.94 $31,255.00 4505.00 STATE $5.23 $460,671.62 88080.00 617-02 BRIDGE DECK CRACK SEALING L.F. 1 $1.51 $17,564.02 11609.00 2 $1.20 $1,216.80 1014.00 3 $2.07 $52,836.89 25576.00 4 $2.13 $20,368.40 9585.00 STATE $1.93 $91,986.11 47784.00 617-05 SEALANT GAL. 1 $87.68 $11,924.50 136.00 2 $87.35 $1,222.90 14.00 3 $67.01 $25,597.50 382.00 4 $66.34 $7,696.00 116.00 STATE $71.67 $46,440.90 648.00 619-01 BRIDGE DECK OVERLAY (PMC) S.Y. 1 $33.91 $352,945.00 10408.00 3 $38.55 $1,338,361.95 34714.00 4 $40.27 $576,691.00 14320.00 STATE $38.15 $2,267,997.95 59442.00 619-04 BRIDGE DECK SEALANT (PMC)EXISTING B S.Y. 1 $1.14 $26,429.00 23239.00 STATE $1.14 $26,429.00 23239.00 620-03 CONCRETE PARAPET L.F. 1 $45.00 $43,875.00 975.00

Page 38: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 38 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

2 $49.41 $51,287.58 1038.00 3 $42.59 $110,979.00 2606.00 4 $67.58 $186,668.00 2762.00 STATE $53.22 $392,809.58 7381.00 620-03.10 CONCRETE PARAPET L.F. 1 $37.20 $666,354.30 17911.00 2 $66.00 $56,430.00 855.00 3 $36.21 $1,299,304.00 35880.00 4 $36.14 $552,058.00 15275.00 STATE $36.82 $2,574,146.30 69921.00 620-03.11 CONCRETE PARAPET L.F. 3 $45.19 $74,600.70 1651.00 STATE $45.19 $74,600.70 1651.00 620-05 CONCRETE PARAPET WITH STRUCTURAL TU L.F. 1 $92.22 $303,970.00 3296.00 3 $78.95 $145,576.00 1844.00 4 $80.00 $93,040.00 1163.00 STATE $86.08 $542,586.00 6303.00 620-06 CONCRETE RAILING L.F. 1 $49.63 $26,902.03 542.00 3 $55.00 $33,935.00 617.00 4 $62.47 $109,449.50 1752.00 STATE $58.50 $170,286.53 2911.00 620-08 CONCRETE PARAPET WITH STRUCTURAL TU L.F. 3 $72.00 $41,472.00 576.00 STATE $72.00 $41,472.00 576.00 620-09 REMOVAL & REPLACEMENT EXISTING BR R L.F. 1 $230.00 $12,650.00 55.00 4 $150.00 $3,000.00 20.00 STATE $208.67 $15,650.00 75.00 620-10.01 CONCRETE PARAPET (BRDGRL REPLACEMEN L.F. 1 $74.00 $14,800.00 200.00 3 $99.77 $88,595.31 888.00 4 $76.80 $334,377.00 4354.00 STATE $80.44 $437,772.31 5442.00 620-15 HANDRAIL ASSEMBLY L.F. 3 $60.00 $177,600.00 2960.00 STATE $60.00 $177,600.00 2960.00 621-01.01 TEMPORARY STRUCTURE LS 1 $20,150.00 $60,450.00 3.00 3 $100,500.00 $201,000.00 2.00 STATE $52,290.00 $261,450.00 5.00 621-01.02 TEMPORARY STRUCTURE LS 1 $25,000.00 $25,000.00 1.00 STATE $25,000.00 $25,000.00 1.00 621-01.03 TEMPORARY STRUCTURE LS 1 $25,000.00 $25,000.00 1.00 STATE $25,000.00 $25,000.00 1.00 621-03.02 18" TEMPORARY DRAINAGE PIPE L.F. 1 $21.71 $1,845.00 85.00 2 $38.92 $23,352.00 600.00 3 $18.99 $16,068.00 846.00 STATE $26.95 $41,265.00 1531.00 621-03.03 24" TEMPORARY DRAINAGE PIPE L.F. 2 $18.86 $565.80 30.00 STATE $18.86 $565.80 30.00 621-03.04 30" TEMPORARY DRAINAGE PIPE L.F. 4 $26.00 $4,186.00 161.00 STATE $26.00 $4,186.00 161.00 621-03.05 36" TEMPORARY DRAINAGE PIPE L.F. 2 $30.06 $24,981.29 831.00 STATE $30.06 $24,981.29 831.00 621-03.06 42" TEMPORARY DRAINAGE PIPE L.F. 2 $37.35 $3,622.95 97.00

Page 39: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 3 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $37.35 $3,622.95 97.00 621-03.07 48" TEMPORARY DRAINAGE PIPE L.F. 2 $42.43 $1,824.49 43.00 STATE $42.43 $1,824.49 43.00 621-03.10 66" TEMPORARY DRAINAGE PIPE L.F. 2 $72.11 $12,979.80 180.00 STATE $72.11 $12,979.80 180.00 680-01.01 SALT BINS (40' x 60'-8") EACH 2 $60,352.00 $60,352.00 1.00 4 $51,550.00 $51,550.00 1.00 STATE $55,951.00 $111,902.00 2.00 680-01.04 SALT BINS (100' x 100') EACH 2 $175,000.00 $175,000.00 1.00 STATE $175,000.00 $175,000.00 1.00 701-01.01 CONCRETE SIDEWALK (4 ") S.F. 1 $2.48 $227,060.53 91433.00 2 $3.42 $48,846.60 14275.00 3 $2.06 $464,050.10 224847.00 4 $3.05 $211,338.40 69188.00 STATE $2.38 $951,295.63 399743.00 701-01.02 CONCRETE SIDEWALK (6 ") S.F. 1 $5.89 $2,650.50 450.00 2 $4.20 $840.00 200.00 3 $6.60 $16,387.80 2483.00 STATE $6.34 $19,878.30 3133.00 701-01.03 CONCRETE SIDEWALK - 4 " S.F. 3 $5.90 $4,401.40 746.00 STATE $5.90 $4,401.40 746.00 701-02 CONCRETE DRIVEWAY S.F. 1 $3.46 $32,512.50 9408.00 2 $3.35 $3,132.25 935.00 3 $3.36 $105,405.40 31364.00 4 $4.46 $28,824.00 6464.00 STATE $3.53 $169,874.15 48171.00 701-02.01 CONCRETE HANDICAP RAMP (RETROFIT) S.F. 1 $25.44 $17,857.20 702.00 2 $14.25 $5,131.20 360.00 3 $3.44 $3,717.50 1080.00 4 $35.52 $34,273.00 965.00 STATE $19.63 $60,978.90 3107.00 701-02.02 CONCRETE DRIVEWAY (8") S.F. 3 $3.75 $27,506.25 7335.00 4 $4.00 $3,268.00 817.00 STATE $3.78 $30,774.25 8152.00 701-03 CONCRETE MEDIAN PAVEMENT C.Y. 1 $206.67 $76,263.00 369.00 2 $751.00 $3,755.00 5.00 3 $218.26 $100,834.40 462.00 4 $284.75 $33,600.00 118.00 STATE $224.79 $214,452.40 954.00 702-01 CONCRETE CURB C.Y. 1 $188.69 $183,220.00 971.00 2 $250.84 $16,053.84 64.00 3 $211.03 $204,702.50 970.00 4 $384.31 $38,815.00 101.00 STATE $210.25 $442,791.34 2106.00 702-01.01 EXTRUDED MOUNTABLE CURB L.F. 3 $4.04 $10,784.76 2668.00 STATE $4.04 $10,784.76 2668.00 702-01.02 CONCRETE CURB L.F. 1 $10.00 $5,700.00 570.00

9

2 $21.11 $9,077.60 430.00

Page 40: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 40 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

3 $25.00 $1,500.00 60.00 STATE $15.36 $16,277.60 1060.00 702-02 CONCRETE GUTTER C.Y. 3 $200.00 $2,000.00 10.00 STATE $200.00 $2,000.00 10.00 702-03 CONCRETE COMBINED CURB & GUTTER C.Y. 1 $157.12 $415,588.00 2645.00 2 $289.83 $57,965.00 200.00 3 $146.44 $683,569.50 4668.00 4 $202.87 $233,904.00 1153.00 STATE $160.52 $1,391,026.50 8666.00 703-01 CEMENT CONCRETE DITCH PAVING C.Y. 1 $218.64 $445,376.00 2037.00 2 $255.05 $4,335.85 17.00 3 $209.41 $402,069.30 1920.00 4 $255.16 $62,005.00 243.00 STATE $216.69 $913,786.15 4217.00 703-02 CEM CONCRETE DITCH PAVING (REINFORC C.Y. 3 $810.00 $810.00 1.00 STATE $810.00 $810.00 1.00 705-01.01 GUARDRAIL AT BRIDGE ENDS L.F. 1 $28.98 $111,297.04 3841.00 2 $26.84 $15,380.00 573.00 3 $30.20 $195,281.27 6466.00 4 $31.73 $147,542.09 4650.00 STATE $30.23 $469,500.40 15530.00 705-01.02 GUARDRAIL AT BRIDGE PIERS L.F. 1 $35.00 $875.00 25.00 2 $29.22 $2,922.00 100.00 3 $18.00 $900.00 50.00 4 $32.18 $1,609.00 50.00 STATE $28.03 $6,306.00 225.00 705-01.04 METAL BEAM GUARD FENCE L.F. 1 $26.00 $14,818.34 570.00 2 $24.27 $1,213.50 50.00 3 $19.72 $12,011.25 609.00 4 $23.17 $6,373.00 275.00 STATE $22.88 $34,416.09 1504.00 705-02.01 SINGLE GUARDRAIL, WITH RUB-RAIL (TY L.F. 1 $14.16 $25,523.00 1803.00 2 $13.93 $3,482.50 250.00 3 $10.00 $500.00 50.00 4 $12.87 $3,861.00 300.00 STATE $13.89 $33,366.50 2403.00 705-02.02 SINGLE GUARDRAIL (TYPE 2) L.F. 1 $8.88 $2,604,881.08 293476.00 2 $11.19 $1,081,997.01 96715.00 3 $10.81 $1,370,953.50 126834.00 4 $11.08 $541,989.70 48900.50 STATE $9.89 $5,599,821.29 565925.50 705-02.03 SINGLE GUARDRAIL (TYPE 2) LONG POST L.F. 1 $12.45 $137,372.00 11031.00 2 $10.31 $111,490.75 10809.00 3 $9.98 $33,920.00 3400.00 4 $10.89 $2,178.00 200.00 STATE $11.20 $284,960.75 25440.00 705-02.04 SINGLE GDRL,RUB-RAIL (TYPE 2) LONG L.F. 3 $33.00 $3,300.00 100.00 STATE $33.00 $3,300.00 100.00

Page 41: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 41 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

705-03.01 MEDIAN DV GUARDRAIL,WITH RUB-RAIL ( L.F. 1 $15.00 $375.00 25.00 2 $17.98 $1,798.00 100.00 3 $11.00 $550.00 50.00 4 $12.87 $1,930.50 150.00 STATE $14.32 $4,653.50 325.00 705-03.02 MEDIAN DIVIDER GUARDRAIL (TYPE 2) L.F. 1 $15.00 $375.00 25.00 2 $14.38 $1,438.00 100.00 3 $10.00 $500.00 50.00 4 $11.88 $3,564.00 300.00 STATE $12.37 $5,877.00 475.00 705-03.03 MEDIAN DV GUARDRAIL (TY 2) (27"MT H L.F. 1 $14.36 $150,032.90 10451.00 2 $14.38 $1,438.00 100.00 3 $12.62 $4,669.10 370.00 4 $15.96 $3,991.00 250.00 STATE $14.33 $160,131.00 11171.00 705-03.04 MEDIAN DIVIDER GUARDRAIL AT CONC. B L.F. 1 $40.00 $1,080.00 27.00 2 $47.92 $2,396.00 50.00 3 $20.00 $500.00 25.00 4 $52.77 $2,638.50 50.00 STATE $43.52 $6,614.50 152.00 705-04.02 GUARDRAIL TERMINAL (TYPE 12) EACH 1 $440.00 $34,320.00 78.00 2 $364.52 $9,842.00 27.00 3 $300.48 $6,310.00 21.00 4 $222.75 $2,227.50 10.00 STATE $387.50 $52,699.50 136.00 705-04.03 GUARDRAIL TERMINAL (TYPE 13) EACH 1 $336.23 $58,840.00 175.00 2 $320.02 $13,761.00 43.00 3 $305.66 $24,147.00 79.00 4 $324.42 $8,435.00 26.00 STATE $325.64 $105,183.00 323.00 705-04.04 GUARDRAIL TERMINAL (TYPE 21) EACH 1 $1,266.81 $83,609.75 66.00 2 $1,463.33 $4,390.00 3.00 3 $1,634.78 $138,956.47 85.00 4 $1,429.56 $35,739.00 25.00 STATE $1,467.57 $262,695.22 179.00 705-04.05 GUARDRAIL TERMINAL (TYPE-IN-LINE) EACH 1 $320.79 $29,191.60 91.00 2 $315.48 $11,672.70 37.00 3 $266.47 $20,784.95 78.00 4 $308.55 $11,416.50 37.00 STATE $300.68 $73,065.75 243.00 705-04.06 MEDIAN DV GUARDRAIL TERMINAL (BKWY EACH 1 $3,000.00 $78,000.00 26.00 4 $1,150.00 $4,600.00 4.00 STATE $2,753.33 $82,600.00 30.00 705-04.07 TAN ENERGY ABSG TERM (NCHRP 350,TL3 EACH 1 $1,658.70 $1,414,873.50 853.00 2 $1,672.42 $791,056.00 473.00 3 $1,972.18 $1,108,365.38 562.00 4 $1,702.38 $936,309.00 550.00 STATE $1,743.48 $4,250,603.88 2438.00

Page 42: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 42 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

705-04.08 FLARED ENERGY ABSG TRM(NCHRP 350,TL EACH 1 $1,800.00 $540,000.00 300.00 2 $269.70 $26,970.00 100.00 3 $1,000.00 $180,000.00 180.00 4 $247.50 $32,175.00 130.00 STATE $1,097.39 $779,145.00 710.00 705-04.25 GUARDRAIL & BARRIER DELINEATOR EACH 4 $7.25 $290.00 40.00 STATE $7.25 $290.00 40.00 705-04.29 C-A-T CRASH CUSHION ATTENUATING TER EACH 1 $4,000.00 $16,000.00 4.00 2 $4,495.00 $17,980.00 4.00 3 $3,500.00 $35,000.00 10.00 4 $3,762.00 $22,572.00 6.00 STATE $3,814.67 $91,552.00 24.00 705-07.02 CONC BARRIER CRASH CUSHION(NCHRP350 EACH 1 $12,000.00 $24,000.00 2.00 STATE $12,000.00 $24,000.00 2.00 705-07.11 TRUCK MOUNTED ENERGY ATTENUATOR EACH 3 $7,750.00 $15,500.00 2.00 STATE $7,750.00 $15,500.00 2.00 705-07.90 REDIRECTIVE CRASH CUSHION (REACT 35 EACH 1 $5,333.33 $16,000.00 3.00 3 $9,164.00 $45,820.00 5.00 STATE $7,727.50 $61,820.00 8.00 705-07.91 RDCTV CRSH CUSHION(REACT 350)(6 B.R EACH 4 $31,960.00 $31,960.00 1.00 STATE $31,960.00 $31,960.00 1.00 705-08.62 GUARDRAIL ENGY ABSG TERMINAL (PORTA EACH 2 $1,501.56 $3,003.12 2.00 4 $5,042.86 $70,600.00 14.00 STATE $4,600.20 $73,603.12 16.00 705-08.65 IMPACT ATTENUATOR (PORTABLE) EACH 1 $4,192.95 $184,490.00 44.00 2 $7,846.48 $102,004.25 13.00 3 $6,601.72 $673,375.00 102.00 4 $4,568.27 $342,620.00 75.00 STATE $5,566.19 $1,302,489.25 234.00 705-08.66 RIP PLATE REPAIR KIT, STAGE 1 EACH 1 $100.00 $100.00 1.00 2 $116.62 $116.62 1.00 3 $860.70 $860.70 1.00 4 $400.00 $400.00 1.00 STATE $369.33 $1,477.32 4.00 705-08.67 RIP PLATE REPAIR KIT, STAGE 2 EACH 1 $300.00 $300.00 1.00 2 $349.87 $349.87 1.00 3 $1,721.41 $1,721.41 1.00 4 $900.00 $900.00 1.00 STATE $817.82 $3,271.28 4.00 705-08.68 RIP PLATE REPAIR KIT, STAGE 3 EACH 1 $890.00 $890.00 1.00 2 $1,668.28 $1,668.28 1.00 3 $1,123.97 $1,123.97 1.00 4 $1,636.00 $1,636.00 1.00 STATE $1,329.56 $5,318.25 4.00 705-08.69 PLASTIC NOSE PIECE/REFLECTOR EACH 1 $145.00 $145.00 1.00 2 $233.25 $233.25 1.00 3 $713.21 $713.21 1.00 4 $262.00 $262.00 1.00

Page 43: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 43 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $338.37 $1,353.46 4.00 705-08.70 IMPACT ATTENUATOR (QUADGUARD) EACH 1 . . 2.00 3 $11,211.00 $56,055.00 5.00 4 $21,365.00 $21,365.00 1.00 STATE $9,677.50 $77,420.00 8.00 705-08.72 IMPACT ATTENUATOR (TRACC) EACH 1 $11,726.67 $35,180.00 3.00 2 $14,000.00 $14,000.00 1.00 3 $6,310.41 $37,862.45 6.00 4 $14,575.00 $14,575.00 1.00 STATE $9,237.95 $101,617.45 11.00 705-08.73 REPOSITIONING VEHICULAR IMP ATTN (T EACH 1 $475.00 $475.00 1.00 2 $1,083.12 $1,083.12 1.00 3 $618.55 $618.55 1.00 4 $5,000.00 $5,000.00 1.00 STATE $1,794.17 $7,176.67 4.00 705-08.74 BASE ASSEMBLY - 9' EACH 1 $125.00 $125.00 1.00 2 $77.24 $77.24 1.00 3 $49.87 $49.87 1.00 4 $1,000.00 $1,000.00 1.00 STATE $313.03 $1,252.11 4.00 705-08.76 BEAM GUIDE - 20' EACH 1 $70.00 $70.00 1.00 2 $43.25 $43.25 1.00 3 $49.87 $49.87 1.00 4 $560.00 $560.00 1.00 STATE $180.78 $723.12 4.00 705-08.77 END SHOE (LEFT OR RIGHT) EACH 1 $25.00 $25.00 1.00 2 $15.45 $15.45 1.00 3 $12.47 $12.47 1.00 4 $220.00 $220.00 1.00 STATE $68.23 $272.92 4.00 705-08.78 SLED EACH 1 $1,520.00 $1,520.00 1.00 2 $1,482.91 $1,482.91 1.00 3 $994.81 $994.81 1.00 4 $2,800.00 $2,800.00 1.00 STATE $1,699.43 $6,797.72 4.00 705-08.79 CUTTER EACH 1 $285.00 $285.00 1.00 2 $339.83 $339.83 1.00 3 $99.73 $99.73 1.00 4 $534.00 $534.00 1.00 STATE $314.64 $1,258.56 4.00 705-08.80 SIDE PANEL - 35" EACH 1 $115.00 $115.00 1.00 2 $123.58 $123.58 1.00 3 $4.99 $4.99 1.00 4 $210.00 $210.00 1.00 STATE $113.39 $453.57 4.00 705-08.81 SIDE PANEL - 62" EACH 1 $165.00 $165.00 1.00 2 $185.36 $185.36 1.00 3 $4.99 $4.99 1.00

Page 44: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 44 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $300.00 $300.00 1.00 STATE $163.84 $655.35 4.00 705-08.82 FRAME EACH 1 $215.00 $215.00 1.00 2 $216.26 $216.26 1.00 3 $49.87 $49.87 1.00 4 $400.00 $400.00 1.00 STATE $220.28 $881.13 4.00 705-08.83 BACK-UP FRAME EACH 1 $50.00 $50.00 1.00 2 $30.89 $30.89 1.00 3 $54.85 $54.85 1.00 4 $400.00 $400.00 1.00 STATE $133.94 $535.74 4.00 705-08.84 SLOT PLATE EACH 1 $2.00 $2.00 1.00 2 $1.24 $1.24 1.00 3 $0.50 $0.50 1.00 4 $16.00 $16.00 1.00 STATE $4.94 $19.74 4.00 705-08.85 CROSSTIE EACH 1 $10.00 $10.00 1.00 2 $6.18 $6.18 1.00 3 $4.99 $4.99 1.00 4 $86.00 $86.00 1.00 STATE $26.79 $107.17 4.00 705-08.86 FORM CHANNEL - 3 X 2 EACH 1 $35.00 $35.00 1.00 2 $21.63 $21.63 1.00 3 $9.98 $9.98 1.00 4 $160.00 $160.00 1.00 STATE $56.65 $226.61 4.00 705-08.87 ASSEMBLED BASE UNIT EACH 1 $825.00 $825.00 1.00 2 $509.75 $509.75 1.00 3 $1,121.96 $1,121.96 1.00 4 $6,650.00 $6,650.00 1.00 STATE $2,276.68 $9,106.71 4.00 705-08.88 SLED/CUTTER ASSEMBLY EACH 1 $400.00 $400.00 1.00 2 $247.15 $247.15 1.00 3 $623.31 $623.31 1.00 4 $3,200.00 $3,200.00 1.00 STATE $1,117.62 $4,470.46 4.00 705-09.08 GLARE FOIL EACH 1 $5.00 $25.00 5.00 2 $9.44 $1,180.00 125.00 3 $2.50 $12.50 5.00 4 $4.95 $24.75 5.00 STATE $8.87 $1,242.25 140.00 705-10.07 CONTINUOUS GUARDRAIL (TY 1) TO TOP L.F. 1 $30.00 $1,500.00 50.00 STATE $30.00 $1,500.00 50.00 705-10.30 GUARDRAIL ATT TO SLOPE FACE ENDPOST L.F. 1 $52.89 $200,735.80 3795.00 2 $44.95 $3,371.25 75.00 3 $46.06 $28,324.10 615.00 4 $49.18 $35,017.40 712.00

Page 45: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 45 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $51.46 $267,448.55 5197.00 705-10.31 GUARDRAIL ATT TO VERTICAL FACE ENDP L.F. 1 $62.91 $57,252.00 910.00 2 $26.97 $1,348.50 50.00 3 $76.05 $123,348.30 1622.00 4 $49.50 $3,712.50 75.00 STATE $69.88 $185,661.30 2657.00 705-10.32 GUARDRAIL ATT TO EX BR PIER PROTECT EACH 1 $1,442.86 $10,100.00 7.00 2 $854.05 $1,708.10 2.00 3 $778.33 $11,675.00 15.00 4 $1,188.00 $2,376.00 2.00 STATE $994.58 $25,859.10 26.00 705-10.33 GUARDRAIL ATT TO CONCRETE BRIDGERAI L.F. 1 $8.00 $1,072.00 134.00 2 $18.25 $8,504.50 466.00 STATE $15.96 $9,576.50 600.00 705-10.35 ATT GUARDRAIL TO CONCRETE BOX BRIDG L.F. 3 $2.00 $160.00 80.00 STATE $2.00 $160.00 80.00 705-11.01 GUARDRAIL AT BRIDGE ENDS (POWDER CO L.F. 3 $38.00 $4,104.00 108.00 STATE $38.00 $4,104.00 108.00 705-11.03 SINGLE GUARDRAIL (TY 2) (POWDER COA L.F. 3 $27.41 $222,018.00 8100.00 STATE $27.41 $222,018.00 8100.00 705-11.08 GDRL TERMINAL (TYPE 13) POWDER COAT EACH 3 $811.20 $20,280.00 25.00 STATE $811.20 $20,280.00 25.00 705-11.11 TAN ENERGY ABS TRM(NCHRP350,TL3)PWD EACH 3 $2,323.96 $190,565.00 82.00 STATE $2,323.96 $190,565.00 82.00 705-11.14 SINGLE GUARDRAIL (TYPE 2 RAIL)(PWDR L.F. 3 $14.79 $57,681.00 3900.00 STATE $14.79 $57,681.00 3900.00 705-14.20 RELOCATE AND REWORK ATTENUATOR EACH 3 $2,149.28 $42,985.60 20.00 STATE $2,149.28 $42,985.60 20.00 705-14.30 REPOSITIONING IMPACT ATTN(REACT 350 EACH 1 $475.00 $475.00 1.00 2 $1,083.12 $1,083.12 1.00 3 $1,039.50 $1,039.50 1.00 4 $1,600.00 $1,600.00 1.00 STATE $1,049.41 $4,197.62 4.00 705-14.31 CYLINDER 0.8" CYLINDERS 1 & 2 EACH 1 $2,440.00 $2,440.00 1.00 2 $1,668.28 $1,668.28 1.00 3 $177.31 $177.31 1.00 4 $2,400.00 $2,400.00 1.00 STATE $1,671.40 $6,685.59 4.00 705-14.32 CYLINDER 0.9" CYLINDERS 3 & 4 EACH 1 $30.00 $30.00 1.00 2 $18.54 $18.54 1.00 3 $177.31 $177.31 1.00 4 $2,400.00 $2,400.00 1.00 STATE $656.46 $2,625.85 4.00 705-14.33 CYLINDER 1.0" CYLINDERS 5 & 6 EACH 1 $30.00 $30.00 1.00 2 $18.54 $18.54 1.00 3 $177.31 $177.31 1.00 4 $2,400.00 $2,400.00 1.00 STATE $656.46 $2,625.85 4.00

Page 46: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 46 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

705-14.34 CYLINDER 1.108" CYLINDER 7 EACH 1 $30.00 $30.00 1.00 2 $18.54 $18.54 1.00 3 $177.31 $177.31 1.00 4 $2,400.00 $2,400.00 1.00 STATE $656.46 $2,625.85 4.00 705-14.35 CYLINDER 1.385" CYLINDERS 8 & 9 EACH 1 $30.00 $30.00 1.00 2 $18.54 $18.54 1.00 3 $177.31 $177.31 1.00 4 $2,400.00 $2,400.00 1.00 STATE $656.46 $2,625.85 4.00 705-14.36 U-BOLTS (1/2" X 3") EACH 1 $15.00 $15.00 1.00 2 $15.45 $15.45 1.00 3 $1.26 $1.26 1.00 4 $15.00 $15.00 1.00 STATE $11.68 $46.71 4.00 705-14.37 U-BOLTS (3/8" X 3") EACH 1 $15.00 $15.00 1.00 2 $15.45 $15.45 1.00 3 $1.89 $1.89 1.00 4 $15.00 $15.00 1.00 STATE $11.84 $47.34 4.00 705-14.38 BOX BEAM (8" X 6" X 3/16") EACH 1 $110.00 $110.00 1.00 2 $77.24 $77.24 1.00 3 $10.67 $10.67 1.00 4 $110.00 $110.00 1.00 STATE $76.98 $307.91 4.00 705-14.39 FRSECTION ANGLE BS PLT(3"X3"X 3/8") EACH 1 $1,820.00 $1,820.00 1.00 2 $1,235.76 $1,235.76 1.00 3 $160.53 $160.53 1.00 4 $1,800.00 $1,800.00 1.00 STATE $1,254.07 $5,016.29 4.00 705-14.40 FR SECTION ANGLE BS PLT(3"X 3"X 1/4 EACH 1 $30.00 $30.00 1.00 2 $18.54 $18.54 1.00 3 $153.78 $153.78 1.00 4 $1,800.00 $1,800.00 1.00 STATE $500.58 $2,002.32 4.00 705-14.41 FRONT SECTION END STRIP(2" X 1/2") EACH 1 $3.00 $3.00 1.00 2 $1.85 $1.85 1.00 3 $9.41 $9.41 1.00 4 $110.00 $110.00 1.00 STATE $31.07 $124.26 4.00 705-14.42 BK SECTN ANGLE BS PLT(3"X 3"X 3/8") EACH 1 $30.00 $30.00 1.00 2 $18.54 $18.54 1.00 3 $121.61 $121.61 1.00 4 $1,350.00 $1,350.00 1.00 STATE $380.04 $1,520.15 4.00 705-14.43 BK SCTN ANGL BS PLT(3"X 3"X 1/4")7' EACH 1 $20.00 $20.00 1.00 2 $12.36 $12.36 1.00 3 $77.83 $77.83 1.00

Page 47: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 4 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $900.00 $900.00 1.00 STATE $252.55 $1,010.19 4.00 705-14.44 BACK-UP ASSEMBLY BASE PLATE EACH 1 $8.00 $8.00 1.00 2 $4.94 $4.94 1.00 3 $28.24 $28.24 1.00 4 $450.00 $450.00 1.00 STATE $122.80 $491.18 4.00 705-14.45 BACK-UP ASSEMBLY TOP PLATE EACH 1 $8.00 $8.00 1.00 2 $4.94 $4.94 1.00 3 $28.24 $28.24 1.00 4 $450.00 $450.00 1.00 STATE $122.80 $491.18 4.00 705-14.46 6" BACK-UP PIPE W/HARDWARE EACH 1 $1,205.00 $1,205.00 1.00 2 $865.03 $865.03 1.00 3 $109.84 $109.84 1.00 4 $1,200.00 $1,200.00 1.00 STATE $844.97 $3,379.87 4.00 705-14.47 8" BACK-UP PIPE W/HARDWARE EACH 1 $365.00 $365.00 1.00 2 $247.15 $247.15 1.00 3 $125.53 $125.53 1.00 4 $350.00 $350.00 1.00 STATE $271.92 $1,087.68 4.00 705-14.48 10" BACK-UP PIPE W/HARDWARE EACH 1 $1,405.00 $1,405.00 1.00 2 $988.61 $988.61 1.00 3 $131.81 $131.81 1.00 4 $1,400.00 $1,400.00 1.00 STATE $981.36 $3,925.42 4.00 705-14.49 1" CABLE GUIDE TOP/BOTTOM W/FITTING EACH 1 $1,165.00 $1,165.00 1.00 2 $803.24 $803.24 1.00 3 $90.39 $90.39 1.00 4 $1,200.00 $1,200.00 1.00 STATE $814.66 $3,258.63 4.00 705-14.50 CYLINDER RETAINER (1' 3" X 5") EACH 1 $110.00 $110.00 1.00 2 $77.24 $77.24 1.00 3 $10.67 $10.67 1.00 4 $115.00 $115.00 1.00 STATE $78.23 $312.91 4.00 705-14.51 FRONT ANCHOR PIN (1/4" X 1 1/2" X 3 EACH 1 $1.00 $1.00 1.00 2 $0.62 $0.62 1.00 3 $3.29 $3.29 1.00 4 $40.00 $40.00 1.00 STATE $11.23 $44.91 4.00 705-14.52 SKID ROLL TUBE (2" X 10' 6") EACH 1 $8.00 $8.00 1.00 2 $4.94 $4.94 1.00 3 $27.61 $27.61 1.00 4 $300.00 $300.00 1.00 STATE $85.14 $340.55 4.00 705-14.53 1/2" GALVANIZED CHAIN W/HARDWARE EACH 1 $2.00 $2.00 1.00

7

Page 48: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 48 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

2 $1.24 $1.24 1.00 3 $8.01 $8.01 1.00 4 $100.00 $100.00 1.00 STATE $27.81 $111.25 4.00 705-14.54 POLYVINYL COVER EACH 1 $960.00 $960.00 1.00 2 $12.36 $12.36 1.00 3 $76.42 $76.42 1.00 4 $950.00 $950.00 1.00 STATE $499.70 $1,998.78 4.00 705-14.55 ANCHOR BOLT SET (CONCRETE/ASPHALT) EACH 1 $20.00 $20.00 1.00 2 $12.36 $12.36 1.00 3 $88.66 $88.66 1.00 4 $1,200.00 $1,200.00 1.00 STATE $330.26 $1,321.02 4.00 705-14.56 REFLECTIVE NOSE LEFT/RIGHT EACH 1 $765.00 $765.00 1.00 2 $991.31 $991.31 1.00 3 $1,231.07 $1,231.07 1.00 4 $900.00 $900.00 1.00 STATE $971.85 $3,887.38 4.00 705-15.70 REPOSTIONING IMPACT ATTN(QUAD GUARD EACH 1 $475.00 $475.00 1.00 3 $1,915.77 $1,915.77 1.00 4 $1,600.00 $1,600.00 1.00 STATE $1,330.26 $3,990.77 3.00 705-15.71 HEX FOAM CARTRIDGE, TYPE I EACH 1 $780.00 $780.00 1.00 3 $1,231.07 $1,231.07 1.00 4 $850.00 $850.00 1.00 STATE $953.69 $2,861.07 3.00 705-15.72 HEX FOAM CARTRIDGE, TYPE II EACH 1 $830.00 $830.00 1.00 3 $1,384.95 $1,384.95 1.00 4 $880.00 $880.00 1.00 STATE $1,031.65 $3,094.95 3.00 705-15.73 NOSE ASSEMBLY, QC EACH 1 $760.00 $760.00 1.00 3 $1,231.07 $1,231.07 1.00 4 $840.00 $840.00 1.00 STATE $943.69 $2,831.07 3.00 705-15.74 DIAPHRAGM ASSEMBLY, QC EACH 1 $1,010.00 $1,010.00 1.00 3 $106.23 $106.23 1.00 4 $1,000.00 $1,000.00 1.00 STATE $705.41 $2,116.23 3.00 705-15.75 FENDER PANEL ASSEMBLY EACH 1 $650.00 $650.00 1.00 3 $76.74 $76.74 1.00 4 $660.00 $660.00 1.00 STATE $462.25 $1,386.74 3.00 705-15.76 SIDE PANEL ASSEMBLY EACH 1 $1,010.00 $1,010.00 1.00 3 $9.41 $9.41 1.00 4 $1,000.00 $1,000.00 1.00 STATE $673.14 $2,019.41 3.00 705-15.77 BACKUP ASSEMBLY, TENSION STRUT EACH 1 $2,440.00 $2,440.00 1.00

Page 49: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 49 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

3 $227.55 $227.55 1.00 4 $1,000.00 $1,000.00 1.00 STATE $1,222.52 $3,667.55 3.00 705-15.79 MONORAIL ASSEMBLY, 4-6 BAY EACH 1 $3,365.00 $3,365.00 1.00 3 $270.01 $270.01 1.00 4 $1,000.00 $1,000.00 1.00 STATE $1,545.00 $4,635.01 3.00 705-15.80 MONORAIL ASSEMBLY, 7-9 BAY EACH 1 $5,035.00 $5,035.00 1.00 3 $270.22 $270.22 1.00 4 $1,000.00 $1,000.00 1.00 STATE $2,101.74 $6,305.22 3.00 705-15.82 TRANSITION PANEL, NEW JERSEY BARRIE EACH 1 $745.00 $745.00 1.00 3 $82.70 $82.70 1.00 4 $500.00 $500.00 1.00 STATE $442.57 $1,327.70 3.00 705-15.83 TRANSITION PANEL, QUAD TO W EACH 1 $1,010.00 $1,010.00 1.00 3 $113.94 $113.94 1.00 4 $500.00 $500.00 1.00 STATE $541.31 $1,623.94 3.00 705-15.84 DIAPHRAGM ASSEMBLY, WIDE EACH 1 $1,605.00 $1,605.00 1.00 3 $213.35 $213.35 1.00 4 $1,000.00 $1,000.00 1.00 STATE $939.45 $2,818.35 3.00 705-15.85 BACKUP ASSEMBLY, TENSION STRUT, WID EACH 1 $3,025.00 $3,025.00 1.00 3 $291.60 $291.60 1.00 4 $1,500.00 $1,500.00 1.00 STATE $1,605.53 $4,816.60 3.00 705-15.87 BACKUP ASSEMBLY, CONCRETE C.Y. 1 $1,430.00 $1,430.00 1.00 3 $751.50 $751.50 1.00 4 $1,095.00 $1,095.00 1.00 STATE $1,092.17 $3,276.50 3.00 705-15.88 END SHOE, CONCRETE C.Y. 1 $390.00 $390.00 1.00 3 $751.50 $751.50 1.00 4 $360.00 $360.00 1.00 STATE $500.50 $1,501.50 3.00 705-15.89 BACKUP ASSEMBLY, CONCRETE, WIDE C.Y. 1 $2,015.00 $2,015.00 1.00 3 $987.34 $987.34 1.00 4 $1,200.00 $1,200.00 1.00 STATE $1,400.78 $4,202.34 3.00 705-15.90 EXTENSION PANEL EACH 1 $815.00 $815.00 1.00 3 $444.78 $444.78 1.00 STATE $629.89 $1,259.78 2.00 705-15.91 PIVOT SUPPORT BRACKET EACH 1 $110.00 $110.00 1.00 3 $47.66 $47.66 1.00 STATE $78.83 $157.66 2.00 705-16.50 RPOS VEHICULAR ATTN(HI-DRO CELL CLU EACH 1 $475.00 $475.00 1.00 2 $1,083.12 $1,083.12 1.00 3 $1,802.83 $1,802.83 1.00

Page 50: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 50 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $1,120.32 $3,360.95 3.00 705-16.51 VINYL CELLS EACH 1 $195.00 $195.00 1.00 2 $139.02 $139.02 1.00 STATE $167.01 $334.02 2.00 705-16.53 SUPPORT LEG EACH 1 $60.00 $60.00 1.00 2 $75.81 $75.81 1.00 3 $57.66 $57.66 1.00 STATE $64.49 $193.47 3.00 705-16.54 REPLACEMENT CAP EACH 1 $60.00 $60.00 1.00 2 $37.07 $37.07 1.00 3 $11.24 $11.24 1.00 STATE $36.10 $108.31 3.00 705-16.58 119 VINYL CELL CLUSTER ASSEMBLY EACH 3 $12,802.21 $12,802.21 1.00 STATE $12,802.21 $12,802.21 1.00 705-16.59 125 VINYL CELL CLUSTER ASSEMBLY EACH 3 $12,822.82 $12,822.82 1.00 STATE $12,822.82 $12,822.82 1.00 705-16.60 139 VINYL CELL CLUSTER ASSEMBLY EACH 3 $13,293.62 $13,293.62 1.00 STATE $13,293.62 $13,293.62 1.00 705-16.61 146 VINYL CELL CLUSTER ASSEMBLY EACH 3 $13,716.96 $13,716.96 1.00 STATE $13,716.96 $13,716.96 1.00 705-16.62 SAFETY FLEX BELT L.F. 1 $260.00 $260.00 1.00 2 $583.12 $583.12 1.00 3 $798.47 $798.47 1.00 STATE $547.20 $1,641.59 3.00 705-16.75 HAZARD REFLECTORS EACH 1 $75.00 $750.00 10.00 2 $116.62 $583.10 5.00 3 $286.90 $5,738.00 20.00 4 $100.00 $1,500.00 15.00 STATE $171.42 $8,571.10 50.00 705-16.76 GENERAL CLEANUP EACH 1 $350.00 $25,200.00 72.00 2 $849.87 $26,345.97 31.00 3 $1,077.18 $75,402.60 70.00 4 $600.00 $43,200.00 72.00 STATE $694.48 $170,148.57 245.00 705-16.77 REPAIR OF CONCRETE BACKUP WALL S.F. 1 $25.00 $25.00 1.00 2 $15.45 $15.45 1.00 3 $16.58 $16.58 1.00 4 $200.00 $200.00 1.00 STATE $64.26 $257.03 4.00 705-17.01 REPOSITION VEHICULAR ATTN(HEX-FM SN EACH 1 $475.00 $950.00 2.00 2 $1,083.12 $1,083.12 1.00 3 $2,308.25 $9,233.00 4.00 4 $1,600.00 $3,200.00 2.00 STATE $1,607.35 $14,466.12 9.00 705-17.02 FENDER PANEL EACH 1 $1,080.00 $1,080.00 1.00 2 $1,282.87 $1,282.87 1.00 3 $627.23 $2,508.92 4.00 4 $1,055.00 $10,550.00 10.00

Page 51: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 51 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $963.86 $15,421.79 16.00 705-17.03 HEX FOAM CARTRIDGE, TYPE 80 EACH 1 $685.00 $1,370.00 2.00 2 $816.37 $816.37 1.00 3 $1,461.89 $29,237.80 20.00 4 $780.00 $4,680.00 6.00 STATE $1,244.97 $36,104.17 29.00 705-17.04 HEX FOAM CARTRIDGE, TYPE 81 EACH 1 $685.00 $1,370.00 2.00 2 $816.37 $816.37 1.00 3 $1,015.63 $8,125.04 8.00 4 $780.00 $2,340.00 3.00 STATE $903.67 $12,651.41 14.00 705-17.05 HEX FOAM CARTRIDGE, TYPE 82 EACH 1 $995.00 $995.00 1.00 2 $1,137.09 $1,137.09 1.00 3 $1,692.72 $22,005.36 13.00 4 $1,015.00 $4,060.00 4.00 STATE $1,484.08 $28,197.45 19.00 705-17.06 SAFETY FLEX BELT EACH 1 $1,480.00 $1,480.00 1.00 2 $1,749.37 $1,749.37 1.00 3 $1,043.02 $2,086.04 2.00 4 $1,500.00 $1,500.00 1.00 STATE $1,363.08 $6,815.41 5.00 705-17.07 SUPPORT LEGS EACH 1 $50.00 $50.00 1.00 2 $58.31 $58.31 1.00 3 $307.77 $615.54 2.00 4 $50.00 $50.00 1.00 STATE $154.77 $773.85 5.00 705-17.08 CARTRIDGE SUPPORT BRACKETS EACH 1 $180.00 $180.00 1.00 2 $174.94 $174.94 1.00 3 $1,328.29 $2,656.58 2.00 4 $195.00 $195.00 1.00 STATE $641.30 $3,206.52 5.00 705-17.09 FRONT CABLE ANCHOR EACH 1 $5.00 $5.00 1.00 2 $3.09 $3.09 1.00 3 $54.03 $54.03 1.00 4 $725.00 $725.00 1.00 STATE $196.78 $787.12 4.00 705-17.10 GRIPPER PLATES EACH 1 $1.00 $1.00 1.00 2 $0.62 $0.62 1.00 3 $6.96 $6.96 1.00 4 $75.00 $75.00 1.00 STATE $20.90 $83.58 4.00 705-17.11 FRONT ANCHOR PINS EACH 1 $1.00 $1.00 1.00 2 $0.62 $0.62 1.00 3 $4.42 $4.42 1.00 4 $65.00 $65.00 1.00 STATE $17.76 $71.04 4.00 705-17.12 FENDER PANEL HINGE LEAF EACH 1 $50.00 $50.00 1.00 2 $33.98 $33.98 1.00

Page 52: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 52 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

3 $9.09 $18.18 2.00 4 $65.00 $65.00 1.00 STATE $33.43 $167.16 5.00 705-17.13 FENDER PANEL STABILIZER EACH 1 $195.00 $195.00 1.00 2 $123.58 $123.58 1.00 3 $38.81 $77.62 2.00 4 $200.00 $1,000.00 5.00 STATE $155.13 $1,396.20 9.00 705-17.14 DIAPHRAGM (1 THRU 2 BAY) EACH 1 $975.00 $975.00 1.00 2 $697.67 $697.67 1.00 3 $186.03 $372.06 2.00 4 $990.00 $990.00 1.00 STATE $606.95 $3,034.73 5.00 705-17.15 DIAPHRAGM (3 THRU 5 BAY) EACH 1 $1,415.00 $1,415.00 1.00 2 $679.67 $679.67 1.00 3 $165.64 $165.64 1.00 4 $1,400.00 $1,400.00 1.00 STATE $915.08 $3,660.31 4.00 705-17.16 DIAPHRAGM (6 THRU 8 BAY) EACH 1 $1,530.00 $1,530.00 1.00 2 $803.24 $803.24 1.00 3 $207.29 $207.29 1.00 4 $1,510.00 $1,510.00 1.00 STATE $1,012.63 $4,050.53 4.00 705-17.17 DIAPHRAGM (9 THRU 10 BAY) EACH 4 $1,700.00 $1,700.00 1.00 STATE $1,700.00 $1,700.00 1.00 705-17.50 RPOS VEHICULAR IMP ATTN (G.R.E.A.T. EACH 1 $475.00 $2,375.00 5.00 2 $1,083.12 $2,166.24 2.00 3 $2,308.25 $23,082.50 10.00 4 $1,600.00 $16,000.00 10.00 STATE $1,615.69 $43,623.74 27.00 705-17.51 HEX FOAM CARTRIDGE, TYPE 50 EACH 1 $875.00 $21,875.00 25.00 2 $1,049.62 $2,099.24 2.00 3 $1,923.54 $115,412.40 60.00 4 $905.00 $45,250.00 50.00 STATE $1,347.71 $184,636.64 137.00 705-17.52 HEX FOAM BRACKET FOR DIAPHRAGM EACH 1 $150.00 $150.00 1.00 2 $92.68 $92.68 1.00 3 $12.77 $25.54 2.00 4 $150.00 $150.00 1.00 STATE $83.64 $418.22 5.00 705-17.53 ANCHOR CHAIN RAIL ASSEMBLY EACH 1 $10.00 $10.00 1.00 2 $6.18 $6.18 1.00 3 $240.50 $240.50 1.00 4 $2,200.00 $2,200.00 1.00 STATE $614.17 $2,456.68 4.00 705-17.54 UNIVERSAL NOSE CONE EACH 1 $755.00 $3,775.00 5.00 2 $933.00 $933.00 1.00 3 $1,308.01 $13,080.10 10.00

Page 53: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 53 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $795.00 $7,950.00 10.00 STATE $989.93 $25,738.10 26.00 705-17.55 SUPPORT LEG EACH 1 $50.00 $250.00 5.00 2 $64.14 $64.14 1.00 3 $109.86 $2,197.20 20.00 4 $55.00 $550.00 10.00 STATE $85.04 $3,061.34 36.00 705-17.56 DIAPHRAGM EACH 1 $1,255.00 $1,255.00 1.00 2 $1,399.50 $1,399.50 1.00 3 $685.17 $1,370.34 2.00 4 $1,285.00 $3,855.00 3.00 STATE $1,125.69 $7,879.84 7.00 705-17.57 FENDER PANELS EACH 1 $715.00 $715.00 1.00 2 $845.53 $845.53 1.00 3 $390.32 $1,951.60 5.00 4 $720.00 $3,600.00 5.00 STATE $592.68 $7,112.13 12.00 705-17.59 FENDER PANEL REAR DEFLECTOR EACH 1 $5.00 $5.00 1.00 2 $3.09 $3.09 1.00 3 $65.80 $131.60 2.00 4 $425.00 $850.00 2.00 STATE $164.95 $989.69 6.00 705-17.60 SIDE PANEL CONCRETE CONNECTOR EACH 1 $1.00 $1.00 1.00 2 $0.62 $0.62 1.00 3 $14.50 $29.00 2.00 4 $125.00 $125.00 1.00 STATE $31.12 $155.62 5.00 705-17.61 MUSHROOM BOLT ASSEMBLY W/DEFLECTOR EACH 1 $65.00 $65.00 1.00 2 $33.98 $33.98 1.00 3 $19.91 $39.82 2.00 4 $70.00 $140.00 2.00 STATE $46.47 $278.80 6.00 705-17.62 ANCHOR CHAIN - 9 LINK EACH 1 $1.00 $1.00 1.00 2 $0.62 $0.62 1.00 3 $19.91 $39.82 2.00 4 $30.00 $30.00 1.00 STATE $14.29 $71.44 5.00 705-17.63 TIE DOWN STRAPS EACH 1 $10.00 $200.00 20.00 2 $11.66 $58.30 5.00 3 $38.47 $1,923.50 50.00 4 $27.00 $405.00 15.00 STATE $28.74 $2,586.80 90.00 705-17.64 RESTRAINING CABLE EACH 1 $10.00 $10.00 1.00 2 $6.18 $6.18 1.00 3 $144.97 $144.97 1.00 4 $900.00 $900.00 1.00 STATE $265.29 $1,061.15 4.00 705-17.65 RESTRAINING CABLE GUIDE EACH 1 $10.00 $10.00 1.00

Page 54: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

2 $6.18 $6.18 1.00 3 $113.01 $113.01 1.00 4 $230.00 $230.00 1.00 STATE $89.80 $359.19 4.00 705-17.66 ANCHOR CABLE FRONT EACH 1 $5.00 $5.00 1.00 2 $3.09 $3.09 1.00 3 $54.03 $54.03 1.00 4 $390.00 $390.00 1.00 STATE $113.03 $452.12 4.00 705-17.67 ANCHOR CABLE REAR EACH 1 $5.00 $5.00 1.00 2 $3.09 $3.09 1.00 3 $54.03 $54.03 1.00 4 $390.00 $390.00 1.00 STATE $113.03 $452.12 4.00 706-01 GUARDRAIL REMOVED L.F. 1 $0.64 $104,579.55 162742.00 2 $1.19 $25,974.75 21771.00 3 $1.21 $93,391.72 77127.00 4 $1.34 $34,984.80 26144.50 STATE $0.90 $258,930.82 287784.50 706-02.01 GUARDRAIL REMOVED AND RESET L.F. 3 $8.50 $11,985.00 1410.00 4 $7.80 $1,248.00 160.00 STATE $8.43 $13,233.00 1570.00 706-02.21 RESET SINGLE GUARDRAIL (TYPE 2) L.F. 1 $6.00 $1,200.00 200.00 2 $6.29 $6,290.00 1000.00 3 $1.00 $200.00 200.00 4 $5.94 $1,188.00 200.00 STATE $5.55 $8,878.00 1600.00 706-03.01 POSTS FURNISHED EACH 2 $80.00 $2,000.00 25.00 STATE $80.00 $2,000.00 25.00 706-05 GUARDRAIL ADJUSTMENT L.F. 1 $2.40 $969.60 404.00 2 $1.60 $1,873.00 1170.00 3 $1.75 $42,238.05 24144.00 4 $5.78 $1,161.78 201.00 STATE $1.78 $46,242.43 25919.00 706-06.01 SINGLE THRIE RAIL (TYPE 2) L.F. 2 $15.01 $750.50 50.00 3 $9.00 $450.00 50.00 4 $16.53 $826.50 50.00 STATE $13.51 $2,027.00 150.00 706-06.02 MEDIAN DIVIDER THRIE RAIL (TYPE 2) L.F. 2 $25.31 $1,265.50 50.00 3 $9.00 $450.00 50.00 4 $27.87 $1,393.50 50.00 STATE $20.73 $3,109.00 150.00 706-06.03 RADIUS RAIL L.F. 1 $17.95 $51,150.00 2850.00 2 $12.42 $9,737.00 784.00 3 $14.00 $44,800.00 3200.00 4 $13.07 $13,070.00 1000.00 STATE $15.16 $118,757.00 7834.00 706-06.04 MEDIAN DIVIDER GUARDRAIL(BOX BEAM B L.F. 2 $38.21 $38,210.00 1000.00

Average Unit Price Report 54

Page 55: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 55 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $38.21 $38,210.00 1000.00 706-10.24 FLARED END ELEMENT EACH 1 $15.00 $225.00 15.00 2 $17.98 $449.50 25.00 3 $15.00 $1,275.00 85.00 4 $19.80 $495.00 25.00 STATE $16.30 $2,444.50 150.00 706-10.26 ROUNDED END ELEMENT EACH 1 $15.00 $675.00 45.00 2 $29.08 $668.84 23.00 3 $20.00 $300.00 15.00 4 $19.80 $198.00 10.00 STATE $19.80 $1,841.84 93.00 706-10.53 LANE CLOSURE EACH 1 $332.15 $210,250.00 633.00 2 $439.13 $221,322.50 504.00 3 $297.45 $139,205.00 468.00 4 $335.98 $137,416.00 409.00 STATE $351.64 $708,193.50 2014.00 706-10.54 RE-ALIGN GUARDRAIL L.F. 1 $0.50 $20,000.00 40000.00 2 $2.70 $26,325.00 9750.00 3 $0.75 $56,250.00 75000.00 4 $1.00 $11,200.00 11200.00 STATE $0.84 $113,775.00 135950.00 706-10.56 BUFFER ENDS 88" EACH 1 $30.00 $150.00 5.00 2 $26.97 $674.25 25.00 3 $18.00 $1,350.00 75.00 4 $49.50 $4,950.00 100.00 STATE $34.75 $7,124.25 205.00 706-10.71 HAZARD MARKERS EACH 1 $15.00 $150.00 10.00 2 $13.49 $134.90 10.00 3 $22.00 $5,500.00 250.00 4 $19.80 $1,980.00 100.00 STATE $20.99 $7,764.90 370.00 706-10.73 REMOVAL OF GUARDRAIL & POST FOR REU L.F. 1 $1.00 $115,000.00 115000.00 2 $2.70 $151,200.00 56000.00 3 $0.75 $62,400.00 83200.00 4 $1.98 $55,440.00 28000.00 STATE $1.36 $384,040.00 282200.00 706-10.74 CONCRETE BARRIER WALL REPAIR C.Y. 1 $1,500.00 $1,500.00 1.00 2 $2,247.50 $8,990.00 4.00 3 $2,400.00 $24,000.00 10.00 4 $1,881.00 $18,810.00 10.00 STATE $2,132.00 $53,300.00 25.00 706-10.80 MICHIGAN AND MODIFIED MICHIGAN END EACH 1 $15.00 $150.00 10.00 2 $13.49 $148.39 11.00 3 $18.00 $540.00 30.00 4 $24.75 $4,950.00 200.00 STATE $23.06 $5,788.39 251.00 706-10.81 GUARDRAIL REFLECTORS EACH 2 $11.24 $22.48 2.00 3 $4.50 $36.00 8.00

Page 56: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 56 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $14.85 $1,188.00 80.00 STATE $13.85 $1,246.48 90.00 706-10.82 CONC BR END OR PIER PROTECTION REPA C.Y. 1 $1,500.00 $1,500.00 1.00 2 $2,247.50 $4,495.00 2.00 3 $1,000.00 $2,000.00 2.00 4 $1,782.00 $3,564.00 2.00 STATE $1,651.29 $11,559.00 7.00 706-10.83 DRILL BR. PAR. WALL, MICHIGAN END S EACH 1 $250.00 $2,500.00 10.00 2 $224.75 $4,495.00 20.00 3 $25.00 $750.00 30.00 4 $198.00 $3,960.00 20.00 STATE $146.31 $11,705.00 80.00 707-01.01 CHAIN-LINK FENCE (4-FOOT) L.F. 1 $1.00 $100.00 100.00 4 $1.00 $200.00 200.00 STATE $1.00 $300.00 300.00 707-01.02 END & CORNER POST ASSEMBLY(CL FENCE EACH 1 $3.00 $15.00 5.00 4 $5.00 $25.00 5.00 STATE $4.00 $40.00 10.00 707-01.11 CHAIN LINK FENCE (6 FOOT) L.F. 1 $5.43 $232,785.00 42900.00 2 $6.10 $20,477.70 3357.00 3 $5.66 $426,857.18 75480.00 4 $4.48 $179,934.64 40148.00 STATE $5.31 $860,054.52 161885.00 707-01.12 END & CORNER POST ASM(CL FENCE 6') EACH 1 $79.04 $18,180.00 230.00 2 $110.00 $880.00 8.00 3 $102.86 $41,350.87 402.00 4 $119.70 $27,650.00 231.00 STATE $101.10 $88,060.87 871.00 707-01.50 CHAIN-LINK FENCE L.F. 4 $45.00 $1,800.00 40.00 STATE $45.00 $1,800.00 40.00 707-03.01 STOCK FENCE L.F. 1 $3.04 $69,446.75 22811.00 2 $2.32 $501,391.15 215897.00 3 $1.96 $155,032.70 79101.00 4 $2.71 $54,200.00 20000.00 STATE $2.31 $780,070.60 337809.00 707-03.02 END,BRACED LINE,CORNER POST ASM (S. EACH 1 $40.00 $1,400.00 35.00 2 $91.60 $82,351.04 899.00 3 $65.12 $33,340.00 512.00 4 $5.00 $400.00 80.00 STATE $76.99 $117,491.04 1526.00 707-03.03 STOCK FENCE GATE EACH 3 $300.00 $300.00 1.00 STATE $300.00 $300.00 1.00 707-04 WATER CROSSING L.F. 3 $3.00 $2,520.00 840.00 4 $55.00 $7,700.00 140.00 STATE $10.43 $10,220.00 980.00 707-05 WATER GATE S.F. 3 $10.10 $161.60 16.00 STATE $10.10 $161.60 16.00 707-06.01 REMOVAL OF FENCE L.F. 1 $2.25 $82,575.00 36700.00

Page 57: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 57 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

2 $1.70 $351,875.00 207368.00 3 $2.32 $172,131.58 74222.00 STATE $1.91 $606,581.58 318290.00 707-06.02 REMOVAL OF GATE EACH 3 $300.00 $600.00 2.00 STATE $300.00 $600.00 2.00 707-06.03 REMOVAL AND RESET FENCE L.F. 3 $7.45 $5,513.00 740.00 4 $18.50 $740.00 40.00 STATE $8.02 $6,253.00 780.00 707-06.04 REMOVAL AND RESET GATE EACH 3 $1,575.60 $1,575.60 1.00 STATE $1,575.60 $1,575.60 1.00 707-07.01 CHAIN-LINK FENCE (BRIDGES) S.F. 1 $12.50 $21,325.00 1706.00 STATE $12.50 $21,325.00 1706.00 707-08.01 FENCE L.F. 2 $15.00 $5,400.00 360.00 STATE $15.00 $5,400.00 360.00 707-15.51 MOBILIZATION EACH 1 $1.00 $10.00 10.00 4 $950.00 $9,500.00 10.00 STATE $475.50 $9,510.00 20.00 707-15.55 REMOVAL & SITE PREPARATION (STOCK F L.F. 1 $1.00 $24,000.00 24000.00 4 $1.56 $31,200.00 20000.00 STATE $1.25 $55,200.00 44000.00 707-15.56 REMOVAL & SITE PREP, (CHAIN LINK FE L.F. 1 $0.50 $1,250.00 2500.00 4 $1.84 $7,360.00 4000.00 STATE $1.32 $8,610.00 6500.00 708-01.01 MONUMENTS EACH 3 $60.00 $20,340.00 339.00 STATE $60.00 $20,340.00 339.00 708-02.01 MARKERS (CONCRETE R.O.W. POSTS) EACH 1 $70.77 $26,679.93 377.00 2 $104.88 $5,558.52 53.00 3 $80.43 $22,439.20 279.00 4 $73.92 $9,240.00 125.00 STATE $76.64 $63,917.65 834.00 709-01.01 RUBBLE STONE RIP-RAP C.Y. 1 $250.00 $1,500.00 6.00 3 $9.93 $7,864.00 792.00 4 $40.00 $1,360.00 34.00 STATE $12.89 $10,724.00 832.00 709-04 REINFORCED CONCRETE SLOPE PAVEMENT C.Y. 1 $251.30 $186,713.00 743.00 3 $269.38 $219,273.10 814.00 4 $211.92 $112,740.00 532.00 STATE $248.31 $518,726.10 2089.00 709-05.02 MACHINED RIP-RAP (RUBBLE STONE) C.Y. 4 $28.00 $364.00 13.00 STATE $28.00 $364.00 13.00 709-05.05 MACHINED RIP-RAP (CLASS A-3) TON 1 $17.40 $73,623.50 4231.00 3 $29.55 $20,506.00 694.00 4 $24.00 $148,200.00 6175.00 STATE $21.83 $242,329.50 11100.00 709-05.06 MACHINED RIP-RAP (CLASS A-1) TON 1 $15.33 $199,577.80 13023.00 2 $14.43 $364,854.00 25293.00 3 $17.16 $364,383.20 21240.50 4 $21.06 $424,761.75 20170.00

Page 58: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 58 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $16.98 $1,353,576.75 79726.50 709-05.07 MACHINED RIP-RAP (CLASS A-2) TON 1 $50.00 $600.00 12.00 2 $35.00 $420.00 12.00 3 $21.60 $254,090.24 11763.00 4 $24.96 $68,860.00 2759.00 STATE $22.27 $323,970.24 14546.00 709-05.08 MACHINED RIP-RAP (CLASS B) TON 1 $11.72 $118,954.92 10149.00 2 $16.55 $29,883.84 1806.00 3 $16.46 $93,052.75 5654.00 4 $23.79 $44,965.00 1890.00 STATE $14.71 $286,856.51 19499.00 709-05.09 MACHINED RIP-RAP (CLASS C) TON 1 $10.15 $47,329.45 4663.00 3 $5.05 $221,740.20 43879.00 4 $19.64 $81,714.50 4161.00 STATE $6.66 $350,784.15 52703.00 709-05.12 MACHINED RIP-RAP TON 1 $60.00 $18,300.00 305.00 STATE $60.00 $18,300.00 305.00 709-05.20 DUMPED RIP-RAP C.Y. 3 $7.00 $5,320.00 760.00 STATE $7.00 $5,320.00 760.00 709-05.21 DUMPED RIP-RAP TON 3 $22.00 $2,200.00 100.00 4 $8.68 $13,950.00 1608.00 STATE $9.46 $16,150.00 1708.00 709-10.01 GABIONS C.Y. 3 $227.73 $30,060.00 132.00 STATE $227.73 $30,060.00 132.00 710-02 AGGREGATE UNDERDRAINS (WITH PIPE) L.F. 1 $2.15 $317,786.25 147468.00 2 $1.81 $135,554.70 74798.00 3 $1.83 $331,075.13 181307.00 4 $13.50 $26,932.50 1995.00 STATE $2.00 $811,348.58 405568.00 710-04 FILTER CLOTH UNDERDRAIN (WITH PIPE) L.F. 1 $3.73 $147,821.40 39669.00 3 $2.70 $34,262.84 12692.00 4 $5.50 $2,200.00 400.00 STATE $3.49 $184,284.24 52761.00 710-05 LATERAL UNDERDRAIN L.F. 1 $2.56 $46,794.88 18286.00 2 $1.60 $16,312.30 10186.00 3 $1.78 $22,429.12 12585.00 STATE $2.08 $85,536.30 41057.00 710-06.11 LATERAL UNDERDRAIN ENDWALL (2:1) EACH 1 $152.88 $11,160.00 73.00 2 $165.00 $1,320.00 8.00 3 $162.14 $14,593.00 90.00 STATE $158.32 $27,073.00 171.00 710-06.12 LATERAL UNDERDRAIN ENDWALL (3:1) EACH 1 $169.00 $5,070.00 30.00 2 $170.00 $4,590.00 27.00 3 $170.16 $1,701.60 10.00 STATE $169.58 $11,361.60 67.00 710-06.13 LATERAL UNDERDRAIN ENDWALL (4:1) EACH 1 $174.77 $7,690.00 44.00 2 $180.00 $4,500.00 25.00 3 $176.01 $13,377.00 76.00

Page 59: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 59 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $176.32 $25,567.00 145.00 710-06.15 LATERAL UNDERDRAIN ENDWALL (6:1) EACH 1 $178.51 $128,525.00 720.00 2 $197.38 $69,280.00 351.00 3 $193.11 $35,339.70 183.00 STATE $185.92 $233,144.70 1254.00 710-09.01 6"PERFORATED PIPE WITH VERTIC DRN S L.F. 1 $20.71 $82,636.79 3990.00 3 $18.01 $131,567.50 7304.00 4 $31.25 $117,126.00 3748.00 STATE $22.03 $331,330.29 15042.00 710-09.02 6" PIPE UNDERDRAIN L.F. 1 $9.75 $6,349.11 651.00 3 $10.15 $17,094.80 1684.00 4 $14.46 $15,646.00 1082.00 STATE $11.44 $39,089.91 3417.00 710-10.08 18" PERFORATED PLASTIC PIPE L.F. 3 $21.00 $6,300.00 300.00 STATE $21.00 $6,300.00 300.00 710-13.03 FILTER CLOTH S.Y. 2 $1.00 $1,261.00 1261.00 4 $3.27 $784.80 240.00 STATE $1.36 $2,045.80 1501.00 711-01 CONCRETE MEDIAN BARRIER L.F. 1 $30.87 $117,382.00 3802.00 3 $27.78 $34,813.55 1253.00 STATE $30.11 $152,195.55 5055.00 711-01.02 CONCRETE HALF MEDIAN BARRIER L.F. 3 $37.08 $125,174.00 3376.00 STATE $37.08 $125,174.00 3376.00 711-01.04 CONCRETE BARRIER WALL L.F. 3 $110.00 $2,750.00 25.00 STATE $110.00 $2,750.00 25.00 711-01.05 CONCRETE BARRIER WALL (MODIFIED) L.F. 3 $28.40 $273,861.20 9643.00 STATE $28.40 $273,861.20 9643.00 711-01.06 CONCRETE MEDIAN B.R (TYING TO GUARD L.F. 1 $100.00 $2,200.00 22.00 3 $150.00 $3,300.00 22.00 STATE $125.00 $5,500.00 44.00 711-02 CONCRETE MEDIAN B.R (BR PIER PROTEC L.F. 3 $28.28 $296,374.40 10480.00 STATE $28.28 $296,374.40 10480.00 711-02.04 REINFORCED CNC MEDIAN B.R L.F. 1 $53.00 $47,912.00 904.00 3 $60.43 $62,785.00 1039.00 STATE $56.97 $110,697.00 1943.00 711-02.05 REINFORCED CNC MEDIAN B.R L.F. 3 $75.75 $23,785.50 314.00 STATE $75.75 $23,785.50 314.00 711-04 CONCRETE GLARE SCREEN MEDIAN BARR W L.F. 1 $34.32 $687,582.00 20032.00 3 $39.36 $816,590.90 20749.00 STATE $36.88 $1,504,172.90 40781.00 711-04.01 CNC GLARE SCREEN MEDIAN B.R @ BR PI L.F. 1 $115.00 $19,665.00 171.00 3 $154.24 $82,210.00 533.00 STATE $144.71 $101,875.00 704.00 711-04.05 CONCRETE GLARE SCREEN (MEDIAN BARR L.F. 1 . . 790.00 STATE . . 790.00 711-05.01 RMVL & DISPOSAL CONCRETE MEDIAN BAR L.F. 1 $3.37 $64,134.50 19028.00 3 $121.20 $24,482.40 202.00 STATE $4.61 $88,616.90 19230.00

Page 60: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 60 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

711-05.02 EXPANSION JOINT FOR CONCRETE MEDIAN EACH 1 . . 3.00 STATE . . 3.00 711-05.70 SINGLE SLOPE MEDIAN BARRIER WALL L.F. 1 $35.00 $299,810.00 8566.00 STATE $35.00 $299,810.00 8566.00 711-05.71 SINGLE SLOPE CONCRETE BARRIER WALL L.F. 1 $100.00 $100.00 1.00 STATE $100.00 $100.00 1.00 712-01 TRAFFIC CONTROL LS 1 $13,106.05 $1,480,983.47 113.00 2 $10,682.61 $843,926.53 79.00 3 $16,699.49 $2,254,431.81 135.00 4 $10,016.22 $871,411.50 87.00 STATE $13,166.07 $5,450,753.31 414.00 712-01.02 LANE CLOSURE EACH 1 $215.41 $31,450.00 146.00 2 $721.24 $54,814.20 76.00 3 $544.21 $51,155.60 94.00 4 $448.78 $36,800.00 82.00 STATE $437.74 $174,219.80 398.00 712-01.50 MAINTENANCE OF TRAFFIC EACH 1 $350.00 $14,000.00 40.00 2 $643.17 $9,647.55 15.00 3 $947.13 $37,885.20 40.00 4 $585.51 $46,255.00 79.00 STATE $619.47 $107,787.75 174.00 712-02.02 INTERCONNECTED PORTABLE BARRIER RAI L.F. 1 $14.19 $912,486.00 64321.00 2 $18.55 $176,617.60 9519.00 3 $23.19 $3,394,817.86 146367.00 4 $14.96 $570,535.50 38140.00 STATE $19.56 $5,054,456.96 258347.00 712-04.01 FLEXIBLE DRUMS (CHANNELIZING) EACH 1 $37.87 $366,639.13 9682.00 2 $35.80 $183,558.08 5127.00 3 $32.26 $384,166.43 11910.00 4 $27.15 $139,781.98 5148.00 STATE $33.71 $1,074,145.62 31867.00 712-04.10 TEMPORARY FLEXIBLE TUBULAR DELINEAT EACH 4 $33.97 $985.00 29.00 STATE $33.97 $985.00 29.00 712-05.01 WARNING LIGHTS (TYPE A) EACH 1 $44.34 $21,415.48 483.00 2 $31.17 $14,774.37 474.00 3 $43.85 $31,004.20 707.00 4 $33.79 $13,212.44 391.00 STATE $39.13 $80,406.49 2055.00 712-05.02 WARNING LIGHTS(TYPE B) EACH 3 $353.50 $1,414.00 4.00 STATE $353.50 $1,414.00 4.00 712-05.03 WARNING LIGHTS (TYPE C) EACH 1 $39.60 $47,793.87 1207.00 2 $42.89 $21,657.99 505.00 3 $50.36 $118,996.10 2363.00 4 $31.58 $60,088.90 1903.00 STATE $41.58 $248,536.86 5978.00 712-06 SIGNS (CONSTRUCTION) S.F. 1 $9.66 $463,390.11 47993.00 2 $8.02 $313,957.64 39151.00 3 $8.71 $620,656.46 71270.00

Page 61: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 61 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $8.15 $375,499.24 46089.50 STATE $8.67 $1,773,503.45 204503.50 712-06.01 VERTICAL PANELS S.F. 1 $13.09 $60,812.80 4646.00 2 $16.02 $9,660.58 603.00 3 $16.99 $126,748.00 7458.00 4 $8.95 $13,591.20 1518.00 STATE $14.82 $210,812.58 14225.00 712-06.10 NEW SIGNS (CONSTRUCTION) S.F. 1 $10.50 $231,118.60 22017.00 2 $9.33 $61,447.24 6587.00 3 $10.70 $193,254.73 18066.00 4 $8.33 $186,425.03 22384.00 STATE $9.74 $672,245.60 69054.00 712-06.16 SIGNS (CNSTR)(REDUCED SPEED WARNING EACH 1 $343.57 $28,860.00 84.00 2 $621.13 $12,422.60 20.00 3 $587.57 $16,452.04 28.00 4 $382.50 $6,120.00 16.00 STATE $431.45 $63,854.64 148.00 712-07.02 TEMPORARY BARRICADES (TYPE II) L.F. 4 $6.00 $72.00 12.00 STATE $6.00 $72.00 12.00 712-07.03 TEMPORARY BARRICADES (TYPE III) L.F. 1 $20.09 $33,415.28 1663.00 2 $12.46 $17,984.60 1443.00 3 $14.23 $48,654.92 3420.00 4 $11.00 $16,195.56 1472.00 STATE $14.53 $116,250.36 7998.00 712-08.03 ARROW BOARD (TYPE C) EACH 1 $1,892.56 $215,752.00 114.00 2 $1,294.72 $95,809.58 74.00 3 $1,848.98 $325,419.98 176.00 4 $1,434.03 $219,407.00 153.00 STATE $1,656.46 $856,388.56 517.00 712-08.06 UNIFORMED POLICE OFFICER HOUR 1 $23.86 $210,000.00 8800.00 STATE $23.86 $210,000.00 8800.00 712-08.07 PORTABLE SPEED MONITOR UNIT EACH 1 $10,000.00 $40,000.00 4.00 STATE $10,000.00 $40,000.00 4.00 712-09.01 REMOVABLE PAVEMENT MARKING LINE L.F. 1 $1.44 $82,738.10 57451.00 2 $1.39 $6,108.00 4400.00 3 $1.34 $249,714.50 186016.00 4 $1.50 $209,478.90 139550.00 STATE $1.41 $548,039.50 387417.00 712-09.02 REMOVABLE PAVEMENT MKG (8" BARRIER L.F. 1 $2.48 $95,728.25 38614.00 2 $2.13 $62,310.00 29300.00 3 $2.91 $562,651.94 193059.00 4 $2.83 $45,611.50 16120.00 STATE $2.77 $766,301.69 277093.00 712-09.03 REMOVABLE PVMT MKG(CHNZIZING STRIPI S.Y. 3 $29.29 $25,599.46 874.00 STATE $29.29 $25,599.46 874.00 712-09.04 REMOVABLE PAVEMENT MARKING (STOP LI L.F. 1 $11.53 $2,766.84 240.00 3 $15.59 $18,181.80 1166.00 4 $8.66 $3,626.70 419.00

Page 62: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 62 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $13.47 $24,575.34 1825.00 712-09.05 REMOVABLE PAVEMENT MARKING (ARROW) EACH 3 $139.97 $4,759.00 34.00 4 $220.00 $440.00 2.00 STATE $144.42 $5,199.00 36.00 712-09.21 REMOVABLE WET REFLECTIVE PVMT MARK. L.F. 3 $3.03 $337,299.60 111320.00 STATE $3.03 $337,299.60 111320.00 712-09.30 REMOVABLE BLACK-OUT TAPE (6") L.F. 1 $1.97 $34,110.00 17280.00 STATE $1.97 $34,110.00 17280.00 713-01.01 CL A CNC (FOUNDATION FOR SIGN SUPPO C.Y. 1 $320.60 $42,640.00 133.00 2 $400.00 $12,000.00 30.00 3 $369.16 $36,790.30 99.66 4 $350.00 $23,100.00 66.00 STATE $348.48 $114,530.30 328.66 713-01.02 STEEL B. REINFORCEM(F FOR SIGN SUPP LB. 1 $1.13 $20,146.00 17873.00 2 $1.05 $3,150.00 3000.00 3 $1.28 $13,472.18 10500.60 4 $1.02 $9,317.44 9148.00 STATE $1.14 $46,085.62 40521.60 713-02.04 DELINEATOR (MILE MARKER) & STEEL PO EACH 1 $103.03 $6,800.00 66.00 2 $97.37 $3,700.00 38.00 3 $107.87 $5,933.00 55.00 STATE $103.35 $16,433.00 159.00 713-02.11 REMOVAL OF EXISTING DELINEATORS EACH 1 $4.00 $400.00 100.00 STATE $4.00 $400.00 100.00 713-02.14 FLEXIBLE DELINEATOR (WHITE) EACH 1 $17.38 $27,848.80 1602.00 2 $22.14 $17,134.00 774.00 3 $22.23 $31,740.58 1428.00 STATE $20.17 $76,723.38 3804.00 713-02.15 FLEXIBLE DELINEATOR (YELLOW) EACH 1 $17.23 $9,856.10 572.00 2 $23.34 $11,528.50 494.00 3 $25.42 $6,633.96 261.00 4 $65.00 $650.00 10.00 STATE $21.44 $28,668.56 1337.00 713-04.02 STEEL I-BEAMS & W-F BEAMS-SIGN SUPP LB. 1 $2.01 $30,150.00 15000.00 2 $2.00 $5,000.00 2500.00 3 $1.83 $6,405.00 3500.00 4 $1.75 $20,975.50 11970.00 STATE $1.90 $62,530.50 32970.00 713-05 STEEL HOLLOW SQ PST (BKWY) SIGN SUP LB. 1 $3.00 $1,437.00 479.00 2 $1.82 $227.50 125.00 3 $2.47 $1,943.66 786.00 4 $1.82 $182.00 100.00 STATE $2.54 $3,790.16 1490.00 713-06 STEEL I-BMs & WF-BMs(BKWY) SIGN SUP LB. 1 $2.01 $200,425.70 99956.00 2 $1.75 $18,375.00 10500.00 3 $1.87 $69,658.06 37244.00 4 $1.68 $64,625.00 38500.00 STATE $1.90 $353,083.76 186200.00

Page 63: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 63 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

713-09.01 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $32,500.00 $32,500.00 1.00 2 $25,000.00 $100,000.00 4.00 3 $31,639.17 $189,835.00 6.00 STATE $29,303.18 $322,335.00 11.00 713-09.02 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $50,000.00 $50,000.00 1.00 3 $42,625.00 $85,250.00 2.00 STATE $45,083.33 $135,250.00 3.00 713-09.03 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $30,500.00 $30,500.00 1.00 3 $31,125.00 $62,250.00 2.00 STATE $30,916.67 $92,750.00 3.00 713-09.04 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $32,500.00 $32,500.00 1.00 3 $48,000.00 $48,000.00 1.00 STATE $40,250.00 $80,500.00 2.00 713-09.05 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $33,000.00 $33,000.00 1.00 STATE $33,000.00 $33,000.00 1.00 713-09.06 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $36,500.00 $36,500.00 1.00 STATE $36,500.00 $36,500.00 1.00 713-09.07 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $32,300.00 $32,300.00 1.00 STATE $32,300.00 $32,300.00 1.00 713-09.08 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $61,500.00 $61,500.00 1.00 STATE $61,500.00 $61,500.00 1.00 713-09.09 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $30,500.00 $30,500.00 1.00 STATE $30,500.00 $30,500.00 1.00 713-09.10 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $32,000.00 $32,000.00 1.00 3 $28,000.00 $28,000.00 1.00 STATE $30,000.00 $60,000.00 2.00 713-09.11 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $36,500.00 $36,500.00 1.00 STATE $36,500.00 $36,500.00 1.00 713-09.12 STEEL OVERHEAD SIGN STRUCTURE EACH 1 $32,500.00 $32,500.00 1.00 STATE $32,500.00 $32,500.00 1.00 713-10.01 STEEL CNTLV SIGN STRUCTURE EACH 3 $20,548.75 $82,195.00 4.00 4 $21,393.00 $21,393.00 1.00 STATE $20,717.60 $103,588.00 5.00 713-10.02 STEEL CNTLV SIGN STRUCTURE EACH 3 $17,890.00 $53,670.00 3.00 STATE $17,890.00 $53,670.00 3.00 713-10.03 STEEL CNTLV SIGN STRUCTURE EACH 3 $18,395.00 $55,185.00 3.00 STATE $18,395.00 $55,185.00 3.00 713-10.04 STEEL CNTLV SIGN STRUCTURE EACH 3 $18,250.00 $36,500.00 2.00 STATE $18,250.00 $36,500.00 2.00 713-10.05 STEEL CNTLV SIGN STRUCTURE EACH 3 $19,000.00 $19,000.00 1.00 STATE $19,000.00 $19,000.00 1.00 713-11.01 "U" SECTION STEEL POSTS LB. 1 $1.52 $33,870.60 22241.00 2 $1.73 $12,046.10 6962.00 3 $1.83 $29,342.00 16055.00 4 $2.02 $8,541.95 4221.00 STATE $1.69 $83,800.65 49479.00 713-11.02 PERFORATED/KNOCKOUT SQUARE TUBE POS LB. 1 $3.21 $23,188.05 7218.00 2 $3.75 $5,906.78 1577.00

Page 64: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 64 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

3 $2.98 $12,387.81 4157.00 4 $3.91 $4,101.85 1048.00 STATE $3.26 $45,584.49 14000.00 713-13.02 FLAT SHEET ALUMINUM SIGNS (0.080" T S.F. 1 $9.37 $73,601.75 7859.00 2 $14.07 $15,495.93 1101.00 3 $9.77 $49,136.53 5030.00 4 $11.52 $7,856.00 682.00 STATE $9.96 $146,090.21 14672.00 713-13.03 FLAT SHEET ALUMINUM SIGNS (0.100" T S.F. 1 $12.69 $44,181.95 3483.00 2 $13.67 $7,447.43 545.00 3 $10.03 $35,030.75 3494.00 4 $12.51 $2,877.00 230.00 STATE $11.55 $89,537.13 7752.00 713-13.04 FLAT SHEET ALUMINUM SIGNS (0.125" T S.F. 3 $12.12 $5,090.40 420.00 STATE $12.12 $5,090.40 420.00 713-13.12 FLAT SHEET ALUM SIGNS OVLY (0.080"T S.F. 1 $10.00 $5,000.00 500.00 2 $7.53 $3,200.25 425.00 3 $11.75 $8,225.00 700.00 4 $7.53 $3,388.50 450.00 STATE $9.55 $19,813.75 2075.00 713-13.13 FLAT SHT ALM SGN OVRLY(0.080"TH)DRC S.F. 4 $7.53 $1,506.00 200.00 STATE $7.53 $1,506.00 200.00 713-14 EXTRUDED ALUMINUM PANEL SIGNS S.F. 1 $14.01 $535,438.30 38223.00 2 $14.80 $138,589.40 9362.00 3 $14.96 $397,634.98 26580.00 4 $13.35 $232,031.62 17382.00 STATE $14.24 $1,303,694.30 91547.00 713-15 REMOVAL OF SIGNS, POSTS AND FOOTING LS 1 $406.43 $2,845.00 7.00 2 $289.23 $3,760.00 13.00 3 $2,558.32 $28,141.50 11.00 4 $1,008.33 $12,100.00 12.00 STATE $1,089.45 $46,846.50 43.00 713-15.01 REMOVAL OF EXISTING SIGN POST EACH 1 $21.10 $11,687.00 554.00 2 $36.54 $4,055.92 111.00 3 $27.20 $3,753.72 138.00 4 $94.17 $9,040.00 96.00 STATE $31.74 $28,536.64 899.00 713-15.02 REMOVAL & RELOCATION OF SIGN & SUPP EACH 1 $17.05 $2,301.50 135.00 2 $55.52 $222.08 4.00 3 $33.21 $4,948.78 149.00 4 $478.57 $3,350.00 7.00 STATE $36.69 $10,822.36 295.00 713-15.05 INSTN FLAT SHEET SIGN ON EX SUPPORT EACH 1 $35.00 $280.00 8.00 2 $25.69 $102.76 4.00 3 $25.62 $102.48 4.00 4 $100.00 $400.00 4.00 STATE $44.26 $885.24 20.00 713-15.07 SUSPENDED FLAT SHT ALM SGN (0.080"T EACH 1 $238.33 $1,430.00 6.00

Page 65: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 65 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

2 $202.56 $3,646.00 18.00 3 $175.25 $1,402.00 8.00 4 $158.46 $3,644.50 23.00 STATE $184.05 $10,122.50 55.00 713-15.11 SIGN SUPPORT ASM ON BRIDGES LS 1 $2,000.00 $2,000.00 1.00 3 $8,106.67 $24,320.00 3.00 STATE $6,580.00 $26,320.00 4.00 713-15.12 SIGN SUPPORT ASM ON BRIDGES LS 1 $2,500.00 $2,500.00 1.00 3 $8,106.67 $24,320.00 3.00 STATE $6,705.00 $26,820.00 4.00 713-15.13 SIGN SUPPORT ASM ON BRIDGES LS 3 $6,645.00 $13,290.00 2.00 STATE $6,645.00 $13,290.00 2.00 713-15.35 METAL BARRICADE (TYPE III) EACH 3 $675.00 $5,400.00 8.00 4 $400.00 $6,000.00 15.00 STATE $495.65 $11,400.00 23.00 713-15.36 REMOVE SIGN, SUPPORT & FOOTING EACH 1 $94.29 $3,960.00 42.00 2 $100.00 $3,400.00 34.00 3 $92.95 $2,788.50 30.00 4 $98.75 $3,160.00 32.00 STATE $96.44 $13,308.50 138.00 713-15.37 INSTALLATION OF SIGN MESSAGE(LETTER S.F. 1 $5.00 $250.00 50.00 2 $9.50 $712.50 75.00 3 $16.45 $822.50 50.00 4 $9.50 $475.00 50.00 STATE $10.04 $2,260.00 225.00 713-15.38 EXTRD ALM PANELS FOR OVERLAYING BKG S.F. 1 $1.00 $100.00 100.00 2 $1.00 $100.00 100.00 3 $4.98 $647.40 130.00 4 $1.00 $450.00 450.00 STATE $1.66 $1,297.40 780.00 713-15.50 REMOVE AND REPLACE SIGN EACH 1 $10.00 $200.00 20.00 4 $10.00 $320.00 32.00 STATE $10.00 $520.00 52.00 713-16.01 CHANGEABLE MESSAGE SIGN UNIT EACH 1 $9,692.31 $126,000.00 13.00 2 $7,551.50 $30,206.00 4.00 3 $9,441.62 $349,340.00 37.00 4 $7,048.39 $218,500.00 31.00 STATE $8,518.19 $724,046.00 85.00 713-16.03 CHANGEABLE MESSAGE SIGN EACH 1 $20,666.67 $124,000.00 6.00 2 $8,250.00 $41,250.00 5.00 3 $6,100.00 $12,200.00 2.00 4 $13,400.00 $120,600.00 9.00 STATE $13,547.73 $298,050.00 22.00 713-16.05 RAILROAD CROSS-BUCK SIGN & SUPPORT EACH 1 $415.00 $38,180.00 92.00 2 $350.21 $18,210.92 52.00 3 $348.28 $17,065.88 49.00 4 $275.00 $12,100.00 44.00 STATE $361.00 $85,556.80 237.00

Page 66: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 66 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

713-16.06 DEAD END SIGN AND SUPPORT EACH 1 $160.00 $160.00 1.00 3 $132.00 $792.00 6.00 4 $160.00 $640.00 4.00 STATE $144.73 $1,592.00 11.00 713-16.07 END OF ROADWAY SIGN AND SUPPORT EACH 1 $122.50 $980.00 8.00 3 $136.50 $1,092.00 8.00 4 $137.00 $1,918.00 14.00 STATE $133.00 $3,990.00 30.00 713-16.09 RAILROAD ADVANCE WARNING SIGN AND S EACH 1 $294.62 $27,400.00 93.00 2 $184.95 $9,617.40 52.00 3 $184.55 $8,858.40 48.00 4 $204.00 $9,180.00 45.00 STATE $231.33 $55,055.80 238.00 713-16.20 SIGNS EACH 1 $160.85 $16,246.08 101.00 2 $304.82 $5,182.00 17.00 3 $319.06 $22,334.24 70.00 4 $792.48 $32,491.50 41.00 STATE $332.99 $76,253.82 229.00 713-16.21 SIGNS EACH 1 $226.43 $1,585.00 7.00 2 $231.43 $1,620.00 7.00 3 $262.00 $11,266.00 43.00 4 $611.23 $9,168.50 15.00 STATE $328.33 $23,639.50 72.00 713-16.22 SIGNS EACH 1 $137.50 $2,200.00 16.00 2 $305.00 $305.00 1.00 3 $242.50 $2,425.00 10.00 4 $171.50 $2,058.00 12.00 STATE $179.18 $6,988.00 39.00 713-16.23 SIGNS EACH 1 $90.00 $720.00 8.00 2 $155.00 $310.00 2.00 3 $312.50 $1,250.00 4.00 4 $166.00 $498.00 3.00 STATE $163.41 $2,778.00 17.00 713-16.24 SIGNS EACH 1 $55.00 $165.00 3.00 2 $190.00 $190.00 1.00 3 $315.00 $315.00 1.00 4 $162.00 $972.00 6.00 STATE $149.27 $1,642.00 11.00 713-16.25 SIGNS EACH 1 $10.00 $100.00 10.00 2 $160.00 $160.00 1.00 4 $98.00 $392.00 4.00 STATE $43.47 $652.00 15.00 713-16.26 SIGNS EACH 1 $90.00 $90.00 1.00 4 $212.00 $424.00 2.00 STATE $171.33 $514.00 3.00 713-16.27 SIGNS EACH 4 $212.00 $424.00 2.00 STATE $212.00 $424.00 2.00 713-16.28 SIGNS EACH 4 $333.00 $666.00 2.00

Page 67: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 67 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $333.00 $666.00 2.00 713-16.29 SIGNS EACH 4 $166.00 $332.00 2.00 STATE $166.00 $332.00 2.00 713-16.41 RELOCATE SIGN LS 1 $80.00 $80.00 1.00 3 $234.00 $234.00 1.00 STATE $157.00 $314.00 2.00 713-16.50 REMOVE AND REPLACE SIGN EACH 1 $65.00 $3,640.00 56.00 2 $5.00 $100.00 20.00 3 $39.46 $907.54 23.00 4 $13.27 $345.00 26.00 STATE $39.94 $4,992.54 125.00 713-16.51 REMOVE AND REPLACE SIGN EACH 4 $220.00 $220.00 1.00 STATE $220.00 $220.00 1.00 713-17.02 INST AUX SUPPORT FOR EXIT NUMBER PA EACH 1 $210.00 $840.00 4.00 3 $105.00 $105.00 1.00 STATE $189.00 $945.00 5.00 713-17.03 INSTALL AUX SUPPORT ON EXISTING SIG EACH 1 $23.81 $5,000.00 210.00 2 $25.00 $1,250.00 50.00 3 $43.93 $2,196.50 50.00 4 $25.00 $2,250.00 90.00 STATE $26.74 $10,696.50 400.00 713-17.20 OVERHEAD SIGN SUPP. FOOTING LS 3 $4,040.00 $4,040.00 1.00 STATE $4,040.00 $4,040.00 1.00 713-17.30 MOD EXISTING OVERHEAD SIGN STRUCTUR LS 2 $2,200.00 $2,200.00 1.00 3 $2,000.00 $2,000.00 1.00 4 $2,500.00 $2,500.00 1.00 STATE $2,233.33 $6,700.00 3.00 713-17.31 MOD EXISTING OVERHEAD SIGN STRUCTUR LS 2 $2,200.00 $2,200.00 1.00 STATE $2,200.00 $2,200.00 1.00 713-17.32 MOD EXISTING OVERHEAD SIGN STRUCTUR LS 2 $2,200.00 $2,200.00 1.00 STATE $2,200.00 $2,200.00 1.00 713-17.33 MOD EXISTING OVERHEAD SIGN STRUCTUR LS 2 $2,200.00 $2,200.00 1.00 STATE $2,200.00 $2,200.00 1.00 713-17.34 MOD EXISTING OVERHEAD SIGN STRUCTUR LS 2 $2,200.00 $2,200.00 1.00 STATE $2,200.00 $2,200.00 1.00 713-17.35 MOD EXISTING OVERHEAD SIGN STRUCTUR LS 2 $2,200.00 $2,200.00 1.00 STATE $2,200.00 $2,200.00 1.00 713-17.36 MOD EXISTING OVERHEAD SIGN STRUCTUR LS 2 $2,200.00 $2,200.00 1.00 STATE $2,200.00 $2,200.00 1.00 713-17.60 SIGN MOUNTED ON CONC MEDIAN B.R EACH 1 $160.00 $480.00 3.00 3 $480.00 $480.00 1.00 STATE $240.00 $960.00 4.00 713-17.61 SIGN MOUNTED ON CONC MEDIAN B.R EACH 3 $480.00 $480.00 1.00 STATE $480.00 $480.00 1.00 713-20.30 SIGN ADJUSTMENTS EACH 1 $65.00 $13,000.00 200.00 2 $80.00 $8,000.00 100.00 3 $111.96 $11,196.00 100.00 4 $80.00 $9,600.00 120.00

Page 68: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 68 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $80.38 $41,796.00 520.00 713-30.01 ERECT OVERHEAD SIGN TRUSS EACH 1 $100.00 $100.00 1.00 2 $500.00 $500.00 1.00 3 $215.60 $215.60 1.00 4 $500.00 $500.00 1.00 STATE $328.90 $1,315.60 4.00 713-30.02 BRIDGE MOUNTED SIGN SUPPORT LB. 1 $2.00 $2,000.00 1000.00 2 $1.85 $1,850.00 1000.00 3 $2.98 $2,980.00 1000.00 4 $1.85 $1,850.00 1000.00 STATE $2.17 $8,680.00 4000.00 713-30.03 OVERHEAD SIGN SUPPORT FOOTING C.Y. 1 $300.00 $3,000.00 10.00 2 $200.00 $1,200.00 6.00 3 $238.14 $1,428.84 6.00 4 $200.00 $1,600.00 8.00 STATE $240.96 $7,228.84 30.00 713-30.04 VERTICAL OVERHEAD SIGN SUPPORT L.F. 1 $100.00 $3,000.00 30.00 2 $20.00 $600.00 30.00 3 $72.93 $2,187.90 30.00 4 $20.00 $600.00 30.00 STATE $53.23 $6,387.90 120.00 713-30.05 BARRIER MOUNTED SQUARE TUBE SIGN SU LB. 1 $3.00 $450.00 150.00 2 $2.00 $300.00 150.00 3 $1.84 $276.00 150.00 4 $2.00 $300.00 150.00 STATE $2.21 $1,326.00 600.00 713-30.07 BRIDGE MOUNT FOR FLAT SHEET SIGN EACH 1 $15.00 $630.00 42.00 3 $59.10 $5,673.60 96.00 STATE $45.68 $6,303.60 138.00 714-01 STRUCTURAL LIGHTING LS 1 $12,500.00 $12,500.00 1.00 3 $6,500.00 $6,500.00 1.00 STATE $9,500.00 $19,000.00 2.00 714-01.01 STRUCTURAL LIGHTING LS 1 $2,300.00 $4,600.00 2.00 3 $4,063.92 $20,319.59 5.00 4 $13,200.00 $13,200.00 1.00 STATE $4,764.95 $38,119.59 8.00 714-01.02 STRUCTURAL LIGHTING LS 1 $5,050.00 $10,100.00 2.00 3 $2,167.62 $4,335.24 2.00 STATE $3,608.81 $14,435.24 4.00 714-01.03 STRUCTURAL LIGHTING LS 1 $4,400.00 $4,400.00 1.00 3 $2,300.00 $2,300.00 1.00 STATE $3,350.00 $6,700.00 2.00 714-01.04 STRUCTURAL LIGHTING LS 1 $3,600.00 $3,600.00 1.00 STATE $3,600.00 $3,600.00 1.00 714-01.05 STRUCTURAL LIGHTING LS 1 $3,700.00 $3,700.00 1.00 STATE $3,700.00 $3,700.00 1.00 714-01.06 STRUCTURAL LIGHTING LS 1 $2,600.00 $2,600.00 1.00 STATE $2,600.00 $2,600.00 1.00

Page 69: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 69 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

714-01.07 STRUCTURAL LIGHTING LS 1 $3,600.00 $3,600.00 1.00 STATE $3,600.00 $3,600.00 1.00 714-01.08 STRUCTURAL LIGHTING LS 1 $3,600.00 $3,600.00 1.00 STATE $3,600.00 $3,600.00 1.00 714-02.03 ENCASED CONDUIT (3" PVC, SCHEDULE 4 L.F. 3 $7.50 $127.50 17.00 STATE $7.50 $127.50 17.00 714-03 JACKED OR BORED CONDUIT L.F. 1 $22.90 $48,406.00 2114.00 2 $26.42 $24,917.00 943.00 3 $26.82 $113,387.60 4228.00 4 $20.00 $8,000.00 400.00 STATE $25.34 $194,710.60 7685.00 714-03.01 DIRECT BRL CONDUIT (2"PVC, SCHEDULE L.F. 1 $3.51 $136,262.50 38838.00 2 $2.49 $29,403.70 11828.00 3 $4.80 $439,789.68 91711.00 4 $3.00 $10,800.00 3600.00 STATE $4.22 $616,255.88 145977.00 714-03.02 DIRECT BRL CONDUIT (3"PVC, SCHEDULE L.F. 3 $6.30 $8,287.05 1315.00 4 $3.50 $945.00 270.00 STATE $5.82 $9,232.05 1585.00 714-03.03 DIRECT BURIAL CONDUIT L.F. 3 $6.12 $69,768.00 11400.00 STATE $6.12 $69,768.00 11400.00 714-03.04 DIRECT BURIAL CONDUIT L.F. 3 $6.71 $20,002.51 2981.00 STATE $6.71 $20,002.51 2981.00 714-03.05 DIRECT BURIAL CONDUIT L.F. 3 $3.47 $93,690.00 27000.00 STATE $3.47 $93,690.00 27000.00 714-04.02 CONDUIT (STRUCTURES - 2" RGS) L.F. 3 $7.23 $10,256.62 1419.00 STATE $7.23 $10,256.62 1419.00 714-04.03 CONDUIT L.F. 3 $7.67 $14,418.64 1880.00 STATE $7.67 $14,418.64 1880.00 714-04.04 CONDUIT L.F. 3 $3.57 $35,289.30 9888.00 STATE $3.57 $35,289.30 9888.00 714-04.05 CONDUIT L.F. 3 $3.93 $67,291.20 17132.00 STATE $3.93 $67,291.20 17132.00 714-04.06 CONDUIT L.F. 3 $4.61 $1,653.80 359.00 STATE $4.61 $1,653.80 359.00 714-05.01 PULL BOXES (TYPE A, B, OR C) EACH 2 $175.00 $2,100.00 12.00 3 $323.00 $9,044.00 28.00 4 $317.50 $635.00 2.00 STATE $280.45 $11,779.00 42.00 714-05.04 PULL BOXES (TYPE C) EACH 1 $253.40 $12,670.00 50.00 2 $260.00 $3,120.00 12.00 3 $362.85 $61,322.00 169.00 4 $300.00 $6,900.00 23.00 STATE $330.76 $84,012.00 254.00 714-05.05 PULL BOXES EACH 1 $250.00 $20,500.00 82.00 3 $632.72 $117,052.80 185.00 STATE $515.18 $137,552.80 267.00 714-06.04 CABLE (1/C # 8 AWG) L.F. 3 $0.36 $14,629.60 40376.00

Page 70: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 70 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $0.36 $14,629.60 40376.00 714-06.05 CABLE (1/C # 6 AWG) L.F. 1 $0.54 $97,427.10 179616.00 2 $0.50 $7,354.00 14708.00 3 $0.47 $64,655.65 136949.00 4 $0.40 $1,680.00 4200.00 STATE $0.51 $171,116.75 335473.00 714-06.06 CABLE (1/C # 4 AWG) L.F. 1 $0.70 $4,977.00 7110.00 2 $0.50 $6,127.00 12254.00 3 $0.73 $57,108.28 78142.00 STATE $0.70 $68,212.28 97506.00 714-06.07 CABLE (1/C # 2 AWG) L.F. 1 $0.75 $10,649.25 14199.00 2 $0.65 $5,054.40 7776.00 3 $0.84 $13,004.88 15482.00 STATE $0.77 $28,708.53 37457.00 714-06.08 CABLE L.F. 2 $0.80 $7,464.80 9331.00 3 $0.50 $43,542.80 87055.00 4 $1.10 $220.00 200.00 STATE $0.53 $51,227.60 96586.00 714-06.09 CABLE L.F. 3 $0.34 $299.20 880.00 4 $1.80 $1,620.00 900.00 STATE $1.08 $1,919.20 1780.00 714-06.10 CABLE L.F. 1 $0.55 $21,344.95 38809.00 4 $2.00 $8,400.00 4200.00 STATE $0.69 $29,744.95 43009.00 714-06.11 CABLE L.F. 1 $0.70 $1,386.00 1980.00 4 $2.80 $5,880.00 2100.00 STATE $1.78 $7,266.00 4080.00 714-06.12 CABLE L.F. 1 $0.75 $5,534.25 7379.00 STATE $0.75 $5,534.25 7379.00 714-07.01 PREASSEMBLED CABLE IN DUCT (2"2/C#6 L.F. 3 $3.50 $6,300.00 1800.00 STATE $3.50 $6,300.00 1800.00 714-08.01 LIGHT STANDARDS (45' M.H., 15' ARM) EACH 2 $3,038.00 $3,038.00 1.00 STATE $3,038.00 $3,038.00 1.00 714-08.03 LIGHT STANDARDS (35' M.H., 6' ARM) EACH 1 $1,353.85 $17,600.00 13.00 STATE $1,353.85 $17,600.00 13.00 714-08.06 LIGHT STANDARDS (STEEL) EACH 3 $4,080.00 $69,360.00 17.00 STATE $4,080.00 $69,360.00 17.00 714-08.08 LIGHT STANDARDS (NEW MED BARR MOUNT EACH 3 $3,062.35 $156,180.00 51.00 STATE $3,062.35 $156,180.00 51.00 714-08.09 LIGHT STANDARDS EACH 1 $2,040.19 $218,300.00 107.00 2 $2,095.34 $117,339.00 56.00 3 $1,438.56 $172,627.00 120.00 4 $9,900.00 $59,400.00 6.00 STATE $1,964.24 $567,666.00 289.00 714-08.10 LIGHT STANDARDS EACH 1 $10,686.00 $85,488.00 8.00 3 $5,110.43 $316,846.77 62.00 STATE $5,747.64 $402,334.77 70.00 714-08.11 LIGHT STANDARDS EACH 1 $14,500.00 $29,000.00 2.00

Page 71: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 71 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

3 $9,163.61 $82,472.46 9.00 STATE $10,133.86 $111,472.46 11.00 714-08.12 LIGHT STANDARDS EACH 1 $14,600.00 $131,400.00 9.00 3 $1,450.67 $129,109.44 89.00 STATE $2,658.26 $260,509.44 98.00 714-08.13 LIGHT STANDARDS EACH 1 $1,500.00 $12,000.00 8.00 3 $1,498.84 $32,974.48 22.00 STATE $1,499.15 $44,974.48 30.00 714-08.14 LIGHT STANDARDS EACH 1 $18,600.00 $130,200.00 7.00 3 $2,495.71 $2,495.71 1.00 STATE $16,586.96 $132,695.71 8.00 714-08.15 LIGHT STANDARDS EACH 3 $1,236.24 $1,236.24 1.00 STATE $1,236.24 $1,236.24 1.00 714-08.20 FOUNDATION (ONLY) FOR LIGHT STANDAR EACH 3 $920.81 $21,178.74 23.00 STATE $920.81 $21,178.74 23.00 714-08.23 FOUNDATION (ONLY) FOR LIGHT STANDAR EACH 3 $837.73 $141,576.62 169.00 STATE $837.73 $141,576.62 169.00 714-08.24 FOUNDATION (ONLY) FOR LIGHT STANDAR EACH 3 $1,150.00 $55,200.00 48.00 STATE $1,150.00 $55,200.00 48.00 714-08.30 REMOVE & RELOCATE LIGHT STANDARD EACH 3 $201.00 $402.00 2.00 STATE $201.00 $402.00 2.00 714-08.32 REMOVAL OF LIGHT STANDARD & FOUNDAT EACH 1 $369.32 $21,790.00 59.00 3 $348.21 $13,232.00 38.00 STATE $361.05 $35,022.00 97.00 714-08.33 REMOVAL OF EXISTING COBRA HEAD LUMI EACH 1 $130.00 $1,170.00 9.00 STATE $130.00 $1,170.00 9.00 714-08.50 REMOVE WOOD POLE & ROADWAY LUMINARE EACH 1 $280.00 $4,200.00 15.00 STATE $280.00 $4,200.00 15.00 714-09.01 LUMINAIRES (150 WATT) EACH 3 $561.00 $14,586.00 26.00 STATE $561.00 $14,586.00 26.00 714-09.02 LUMINAIRES (200 WATT) EACH 1 $300.00 $3,900.00 13.00 STATE $300.00 $3,900.00 13.00 714-09.03 LUMINAIRES (250 WATT) EACH 2 $419.94 $7,139.00 17.00 3 $642.83 $59,140.00 92.00 STATE $608.06 $66,279.00 109.00 714-09.04 LUMINAIRES (400 WATT) EACH 2 $435.00 $15,225.00 35.00 3 $537.86 $175,342.32 326.00 STATE $527.89 $190,567.32 361.00 714-09.05 LUMINAIRES (400 WATT - HIGH MAST) EACH 1 $610.00 $117,120.00 192.00 3 $524.19 $6,290.28 12.00 STATE $604.95 $123,410.28 204.00 714-09.06 LUMINAIRES (1000 WATT - HIGH MAST) EACH 1 $587.45 $51,696.00 88.00 2 $600.00 $24,000.00 40.00 3 $575.89 $37,432.84 65.00 4 $550.00 $15,400.00 28.00 STATE $581.58 $128,528.84 221.00 714-09.07 LUMINAIRES (150 WATT - UNDERPASS) EACH 1 $488.00 $4,880.00 10.00 3 $522.00 $2,088.00 4.00

Page 72: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 72 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $497.71 $6,968.00 14.00 714-09.09 LUMINAIRES EACH 1 $370.00 $14,800.00 40.00 3 $360.53 $5,408.00 15.00 STATE $367.42 $20,208.00 55.00 714-09.10 LUMINAIRES EACH 1 $600.00 $4,800.00 8.00 3 $341.61 $1,708.04 5.00 STATE $500.62 $6,508.04 13.00 714-09.11 LUMINAIRES EACH 1 $580.00 $51,040.00 88.00 3 $290.00 $290.00 1.00 STATE $576.74 $51,330.00 89.00 714-09.12 LUMINAIRES EACH 1 $625.00 $10,000.00 16.00 STATE $625.00 $10,000.00 16.00 714-09.13 LUMINAIRES EACH 1 $585.00 $14,040.00 24.00 STATE $585.00 $14,040.00 24.00 714-10.01 OVERHEAD CONDUCTORS L.F. 1 $3.00 $9,126.00 3042.00 STATE $3.00 $9,126.00 3042.00 714-12.01 CONTROL CENTER (NO. 1) LS 1 $6,766.67 $20,300.00 3.00 2 $5,400.00 $10,800.00 2.00 3 $6,470.07 $25,880.28 4.00 4 $14,500.00 $14,500.00 1.00 STATE $7,148.03 $71,480.28 10.00 714-12.02 CONTROL CENTER (NO. 2) LS 1 $4,650.00 $9,300.00 2.00 2 $5,400.00 $10,800.00 2.00 3 $6,680.68 $26,722.72 4.00 STATE $5,852.84 $46,822.72 8.00 714-12.03 CONTROL CENTER (NO. 3) LS 1 $4,650.00 $9,300.00 2.00 3 $6,637.06 $13,274.11 2.00 STATE $5,643.53 $22,574.11 4.00 714-12.04 CONTROL CENTER (NO. 4) LS 1 $9,300.00 $9,300.00 1.00 3 $7,000.00 $7,000.00 1.00 STATE $8,150.00 $16,300.00 2.00 714-12.11 MODIFY EXIST CONTROL CENTER EACH 1 $2,000.00 $2,000.00 1.00 STATE $2,000.00 $2,000.00 1.00 714-12.12 MODIFY EXIST CONTROL CENTER EACH 1 $2,000.00 $2,000.00 1.00 STATE $2,000.00 $2,000.00 1.00 714-13 CL A CNC(ROADWAY & STRUCTURE LIGHTI C.Y. 1 $488.43 $130,900.00 268.00 2 $455.46 $15,258.00 33.50 3 $500.00 $250.00 0.50 4 $560.00 $22,400.00 40.00 STATE $493.59 $168,808.00 342.00 714-14.01 MASTARM - 15' EACH 2 $444.00 $1,776.00 4.00 STATE $444.00 $1,776.00 4.00 714-16.01 NAVIGATIONAL LIGHTING LS 1 $34,000.00 $34,000.00 1.00 2 $31,263.00 $31,263.00 1.00 STATE $32,631.50 $65,263.00 2.00 714-25 ELECTRICAL CONNECTION EACH 1 $730.00 $7,300.00 10.00 2 $451.00 $1,353.00 3.00 3 $226.99 $2,496.88 11.00

Page 73: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 73 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $3,300.00 $3,300.00 1.00 STATE $578.00 $14,449.88 25.00 714-26.05 TEMPORARY ROADWAY LIGHTING LS 3 $19,000.00 $19,000.00 1.00 STATE $19,000.00 $19,000.00 1.00 714-40 LOCATING UTILITIES LS 3 $950.00 $950.00 1.00 STATE $950.00 $950.00 1.00 715-01 ASPHALTIC CONCRETE CURB (4 INCHES) L.F. 1 $1.00 $500.00 500.00 STATE $1.00 $500.00 500.00 715-01.01 ASPHALTIC CONCRETE CURB L.F. 4 $11.15 $22,047.50 1978.00 STATE $11.15 $22,047.50 1978.00 716-01.05 TEMPORARY RAISED PAVEMENT MARKER EACH 3 $11.30 $34,436.61 3048.00 STATE $11.30 $34,436.61 3048.00 716-01.06 TEMPORARY RAISED PAVEMENT MARKER,WH EACH 2 $10.25 $317.75 31.00 STATE $10.25 $317.75 31.00 716-01.07 TEMPORARY RAISED PAVEMENT MARKER,YE EACH 2 $10.25 $317.75 31.00 STATE $10.25 $317.75 31.00 716-01.10 SNOWPLOWABLE REFLECTIVE MARKER EACH 1 $22.78 $451,298.82 19808.00 2 $27.02 $328,520.50 12160.00 3 $30.05 $461,139.00 15346.00 4 $38.19 $503,437.80 13184.00 STATE $28.83 $1,744,396.12 60498.00 716-01.30 RMVL OF SNOWPLOWABLE REFLECTIVE MAR EACH 1 $7.07 $75,316.80 10651.00 2 $8.70 $55,680.20 6402.00 3 $12.11 $37,819.75 3123.00 4 $12.68 $47,420.00 3741.00 STATE $9.04 $216,236.75 23917.00 716-02.01 PLASTIC PAVEMENT MARKING (4" LINE) L.M. 1 $1,542.41 $1,022,991.00 663.24 2 $1,567.02 $546,562.46 348.79 3 $2,528.71 $1,730,091.11 684.18 4 $2,297.60 $1,013,344.41 441.04 STATE $2,018.01 $4,312,988.98 2137.25 716-02.02 PLASTIC PAVEMENT MKG (8" BARRIER LI L.F. 1 $0.92 $4,481.00 4892.00 2 $0.91 $29,115.71 31965.00 3 $2.30 $54,041.00 23509.00 4 $2.11 $56,704.65 26818.00 STATE $1.66 $144,342.36 87184.00 716-02.03 PLASTIC PAVEMENT MARKING (CROSS-WAL L.F. 1 $7.08 $21,845.14 3087.00 2 $3.77 $124,241.55 32948.00 3 $7.29 $56,855.60 7804.00 4 $8.95 $180,729.75 20204.00 STATE $5.99 $383,672.04 64043.00 716-02.04 PLASTIC PAVEMENT MARKING (CHNZ STRI S.Y. 1 $15.18 $128,969.17 8494.00 2 $10.25 $74,053.80 7225.00 3 $20.27 $282,889.08 13954.00 4 $22.41 $121,656.20 5429.00 STATE $17.31 $607,568.25 35102.00 716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE L.F. 1 $7.03 $155,124.16 22079.00 2 $7.06 $164,298.08 23276.00

Page 74: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 74 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

3 $14.10 $250,475.52 17765.00 4 $11.56 $183,937.10 15912.00 STATE $9.54 $753,834.86 79032.00 716-02.06 PLASTIC PAVEMENT MKG (TURN LANE ARR EACH 1 $69.22 $66,241.90 957.00 2 $77.33 $42,530.46 550.00 3 $192.02 $164,372.00 856.00 4 $151.36 $128,805.00 851.00 STATE $125.06 $401,949.36 3214.00 716-02.07 PLASTIC PAVEMENT MKG (24" BARRIER L L.F. 1 $5.16 $5,835.00 1130.00 2 $5.20 $2,885.00 555.00 3 $12.50 $12,500.00 1000.00 4 $7.39 $8,020.00 1085.00 STATE $7.76 $29,240.00 3770.00 716-02.08 PLASTIC PAVEMENT MKG (8" DOTTED LIN L.F. 1 $2.73 $5,787.12 2117.00 2 $2.17 $2,148.00 990.00 3 $3.21 $7,402.25 2307.00 4 $1.64 $2,050.00 1250.00 STATE $2.61 $17,387.37 6664.00 716-02.09 PLASTIC PVMT MKG (LONGITUDINAL X-WA L.F. 1 $9.05 $37,910.40 4188.00 2 $14.97 $17,473.00 1167.00 3 $21.34 $60,400.00 2830.00 4 $27.37 $16,260.00 594.00 STATE $15.04 $132,043.40 8779.00 716-02.10 PLASTIC PAVEMENT MARKING (6" LINE) L.M. 1 $2,188.25 $371,784.50 169.90 2 $1,954.63 $498,040.06 254.80 3 $2,879.76 $413,822.00 143.70 4 $3,068.96 $480,288.78 156.50 STATE $2,433.35 $1,763,935.34 724.90 716-02.11 PLASTIC PAVEMENT MKG (6" DOTTED LIN L.F. 1 $1.87 $21,098.00 11253.00 2 $1.51 $10,855.25 7205.00 3 $2.18 $10,798.00 4960.00 4 $1.36 $5,906.00 4328.00 STATE $1.75 $48,657.25 27746.00 716-02.30 RETRACING PVMT MKG-PLASTIC (4" LINE L.M. 2 $980.00 $54,007.80 55.11 3 $11,000.00 $880.00 0.08 STATE $994.52 $54,887.80 55.19 716-02.31 RETRACING PVMT MKG-PLASTIC(8" BAR. L.F. 2 $0.50 $2,000.00 4000.00 STATE $0.50 $2,000.00 4000.00 716-02.32 RETRACING PVMT MKG-PLASTIC (6" LINE L.M. 2 $1,560.00 $45,318.00 29.05 STATE $1,560.00 $45,318.00 29.05 716-02.33 RETRACING PVMT MKG-PLASTIC (DOTTED L.F. 2 $0.50 $400.00 800.00 STATE $0.50 $400.00 800.00 716-03.01 PLASTIC WORD PVMT MARKING (ONLY) EACH 1 $131.39 $16,686.00 127.00 2 $105.37 $3,582.50 34.00 3 $210.61 $13,900.00 66.00 4 $177.58 $19,356.00 109.00 STATE $159.30 $53,524.50 336.00 716-03.02 PLASTIC WORD PVMT MARKING (RXR) EACH 1 $413.13 $40,900.00 99.00

Page 75: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 75 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

2 $373.67 $30,267.48 81.00 3 $566.04 $37,358.46 66.00 4 $542.77 $45,050.00 83.00 STATE $466.80 $153,575.94 329.00 716-03.03 PLASTIC WORD PVMT MARKING (STOP AHE EACH 1 $243.00 $2,430.00 10.00 2 $215.55 $8,622.10 40.00 3 $573.37 $6,307.10 11.00 4 $481.12 $12,028.00 25.00 STATE $341.71 $29,387.20 86.00 716-03.04 PLASTIC WORD PVMT MARKING (SCHOOL) EACH 1 $183.00 $1,830.00 10.00 2 $250.00 $500.00 2.00 3 $550.00 $1,100.00 2.00 4 $200.00 $400.00 2.00 STATE $239.38 $3,830.00 16.00 716-03.05 PLASTIC WORD PVMT MARKING (BIKE LAN EACH 1 $182.50 $730.00 4.00 2 $200.00 $400.00 2.00 3 $500.00 $1,000.00 2.00 4 $150.00 $300.00 2.00 STATE $243.00 $2,430.00 10.00 716-03.06 PLASTIC WORD PVMT MARKING (SIGNAL A EACH 1 $250.00 $1,500.00 6.00 2 $250.00 $500.00 2.00 3 $700.00 $3,500.00 5.00 4 $517.64 $36,235.00 70.00 STATE $502.83 $41,735.00 83.00 716-03.07 PLASTIC WORD PVMT MARKING (STOP) EACH 1 $194.50 $1,556.00 8.00 2 $181.12 $724.48 4.00 3 $432.99 $1,731.96 4.00 4 $150.00 $600.00 4.00 STATE $230.62 $4,612.44 20.00 716-03.08 PLASTIC WORD PVMT MARKING (PED-XING EACH 1 $232.50 $930.00 4.00 2 $200.00 $400.00 2.00 3 $500.00 $1,000.00 2.00 4 $240.00 $480.00 2.00 STATE $281.00 $2,810.00 10.00 716-03.09 PLASTIC WORD PVMT MARKING EACH 1 $95.00 $570.00 6.00 2 $400.00 $400.00 1.00 3 $525.00 $525.00 1.00 STATE $186.88 $1,495.00 8.00 716-04.01 PLASTIC PVMT MKG (STRAIGHT-TURN ARR EACH 1 $103.85 $4,050.00 39.00 2 $105.78 $2,856.00 27.00 3 $225.79 $8,580.00 38.00 4 $164.66 $7,245.00 44.00 STATE $153.59 $22,731.00 148.00 716-04.02 PLASTIC PVMT MKG(DOUBLE TURNING ARR EACH 1 $125.00 $3,625.00 29.00 2 $104.60 $3,347.25 32.00 3 $175.00 $4,375.00 25.00 4 $173.72 $6,775.00 39.00 STATE $144.98 $18,122.25 125.00

Page 76: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 76 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

716-04.03 PLASTIC PAVEMENT MARKING(4" DOTTED L.F. 1 $1.29 $7,007.00 5411.00 2 $2.00 $338.00 169.00 3 $1.22 $2,228.90 1824.00 4 $2.25 $315.00 140.00 STATE $1.31 $9,888.90 7544.00 716-04.04 PLASTIC PVMT MKG (TRANSVERSE SHOULD L.F. 1 $3.60 $9,293.50 2585.00 2 $3.50 $1,750.00 500.00 3 $7.25 $7,250.00 1000.00 4 $4.00 $4,000.00 1000.00 STATE $4.38 $22,293.50 5085.00 716-04.05 PLASTIC PAVEMENT MKG (STRAIGHT ARRO EACH 1 $72.59 $4,573.00 63.00 2 $69.68 $1,533.00 22.00 3 $178.53 $13,390.00 75.00 4 $106.33 $3,190.00 30.00 STATE $119.40 $22,686.00 190.00 716-04.06 PLASTIC PAVEMENT MKG (WRONG WAY ARR EACH 1 $151.36 $3,330.00 22.00 2 $95.71 $1,340.00 14.00 3 $125.00 $3,125.00 25.00 4 $123.46 $3,210.00 26.00 STATE $126.49 $11,005.00 87.00 716-04.07 PLASTIC PAVEMENT MKG (EXIT ONLY ARR EACH 1 $110.48 $6,297.50 57.00 2 $100.00 $300.00 3.00 3 $279.79 $5,316.00 19.00 4 $200.00 $1,200.00 6.00 STATE $154.28 $13,113.50 85.00 716-04.08 PLASTIC PAVEMENT MKG (OPTION LANE A EACH 1 $159.17 $2,865.00 18.00 2 $150.00 $450.00 3.00 3 $322.84 $6,134.00 19.00 4 $250.00 $1,500.00 6.00 STATE $238.02 $10,949.00 46.00 716-04.09 PLASTIC PAVEMENT MKG (H.O.V. DIAMON EACH 1 $225.00 $450.00 2.00 2 $100.00 $100.00 1.00 3 $215.14 $9,681.25 45.00 4 $150.00 $3,000.00 20.00 STATE $194.58 $13,231.25 68.00 716-04.10 PLASTIC PAVEMENT MKG (HANDICAP SYMB EACH 1 $156.00 $4,680.00 30.00 2 $100.00 $1,500.00 15.00 3 $225.00 $5,625.00 25.00 4 $175.00 $5,250.00 30.00 STATE $170.55 $17,055.00 100.00 716-04.11 PLAS PVMNT MKG(BICYCLE SYMBOL W/RID EACH 3 $350.00 $6,300.00 18.00 STATE $350.00 $6,300.00 18.00 716-05.01 PAINTED PAVEMENT MARKING (4" LINE) L.M. 1 $341.65 $706,948.97 2069.21 2 $324.34 $317,386.29 978.55 3 $675.27 $1,215,444.20 1799.94 4 $757.53 $758,183.02 1000.87 STATE $512.60 $2,997,962.47 5848.57 716-05.02 PAINTED PAVEMENT MKG (8" BARRIER LI L.F. 1 $0.12 $101,972.10 855620.00

Page 77: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 77 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

2 $0.44 $2,380.32 5472.00 3 $1.30 $169,736.00 130877.00 4 $0.65 $12,885.00 19940.00 STATE $0.28 $286,973.42 1011909.00 716-05.03 PAINTED PAVEMENT MARKING (CROSS-WAL L.F. 1 $5.50 $2,200.00 400.00 2 $3.50 $700.00 200.00 3 $2.50 $2,250.00 900.00 4 $4.86 $6,124.00 1260.00 STATE $4.08 $11,274.00 2760.00 716-05.04 PAINTED PVMT MKG (CHNZ STRIPING) S.Y. 1 $15.89 $7,562.00 476.00 2 $19.93 $3,986.00 200.00 3 $15.20 $24,840.56 1634.00 4 $11.89 $7,014.00 590.00 STATE $14.97 $43,402.56 2900.00 716-05.05 PAINTED PAVEMENT MARKING (STOP LINE L.F. 1 $3.31 $13,468.00 4068.00 2 $6.26 $1,666.36 266.00 3 $9.43 $15,346.00 1627.00 4 $7.24 $5,392.60 745.00 STATE $5.35 $35,872.96 6706.00 716-05.06 PAINTED PAVEMENT MKG (TURN LANE ARR EACH 1 $45.10 $10,779.00 239.00 2 $60.00 $900.00 15.00 3 $88.07 $4,667.67 53.00 4 $67.16 $2,485.00 37.00 STATE $54.74 $18,831.67 344.00 716-05.07 PAINTED PAVEMENT MKG (24" BARRIER L L.F. 1 $4.00 $800.00 200.00 2 $3.18 $4,075.40 1280.00 3 $3.00 $600.00 200.00 4 $4.00 $800.00 200.00 STATE $3.34 $6,275.40 1880.00 716-05.08 PAINTED PAVEMENT MARKING (PARKING L L.F. 1 $3.13 $312.50 100.00 2 $1.00 $50.00 50.00 3 $1.00 $50.00 50.00 4 $3.21 $758.00 236.00 STATE $2.68 $1,170.50 436.00 716-05.09 PAINTED PAVEM'T MARK'G(STR'T-TURN A EACH 3 $250.00 $500.00 2.00 STATE $250.00 $500.00 2.00 716-05.10 PAINTED PAVEMENT MARKING (RXR) EACH 1 $415.00 $4,980.00 12.00 2 $421.52 $2,529.12 6.00 3 $320.26 $1,921.56 6.00 4 $500.00 $3,000.00 6.00 STATE $414.36 $12,430.68 30.00 716-05.20 PAINTED PAVEMENT MARKING (6" LINE) L.M. 1 $468.90 $113,942.00 243.00 2 $504.80 $54,972.50 108.90 3 $607.18 $84,215.40 138.70 4 $500.00 $15,000.00 30.00 STATE $515.04 $268,129.90 520.60 716-05.60 RETRACING PVMT MKGS-PAINTED(4" LINE L.M. 1 $105.74 $708,988.60 6704.88 2 $104.45 $674,244.57 6455.27

Page 78: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 78 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

3 $132.33 $1,410,167.75 10656.10 4 $98.33 $545,642.20 5548.99 STATE $113.71 $3,339,043.13 29365.24 716-05.61 RETRACING PVMT MKGS-PAINTED(8" BAR. L.F. 1 $0.06 $17,811.70 322874.00 2 $0.05 $5,210.90 108442.00 3 $0.04 $2,538.30 60000.00 STATE $0.05 $25,560.90 491316.00 716-05.62 RETRACING PVMT MKGS-PAINTED(6" LINE L.M. 1 $137.97 $163,194.03 1182.83 2 $159.96 $55,691.10 348.16 3 $188.51 $207,619.79 1101.40 STATE $162.02 $426,504.91 2632.39 716-05.63 RETRACING PVMT MKGS-PAINTED(DOTTED L.F. 2 $0.05 $1,130.00 25000.00 STATE $0.05 $1,130.00 25000.00 716-08.01 REMOVAL OF PAVEMENT MARKING (LINE) L.F. 1 $0.49 $72,131.20 148120.00 2 $1.42 $5,161.60 3639.00 3 $0.70 $39,169.25 56101.00 4 $0.52 $18,783.40 35874.00 STATE $0.55 $135,245.45 243734.00 716-08.02 REMOVAL OF PVMT MKG (8" BARRIER LIN L.F. 1 $1.18 $1,175.00 1000.00 2 $1.00 $500.00 500.00 3 $1.00 $1,000.00 1000.00 4 $0.60 $600.00 1000.00 STATE $0.94 $3,275.00 3500.00 716-08.03 REMOVAL OF PAVEMENT MARKING (CROSS- L.F. 1 $2.36 $944.00 400.00 2 $2.50 $500.00 200.00 3 $1.00 $500.00 500.00 4 $5.92 $6,024.25 1018.00 STATE $3.76 $7,968.25 2118.00 716-08.04 REMOVAL PAVEMENT MKG (CHNZ STRIPING S.Y. 1 $9.19 $3,494.00 380.00 2 $22.80 $4,719.80 207.00 3 $18.68 $10,311.70 552.00 4 $15.22 $5,326.00 350.00 STATE $16.02 $23,851.50 1489.00 716-08.05 REMOVAL OF PAVEMENT MARKING (STOP L L.F. 1 $7.22 $1,791.00 248.00 2 $6.54 $2,177.57 333.00 3 $5.51 $2,280.78 414.00 4 $6.40 $2,516.25 393.00 STATE $6.32 $8,765.60 1388.00 716-08.06 REMOVAL OF PVMT MKG (TURN LANE ARRO EACH 1 $93.00 $1,860.00 20.00 2 $98.30 $1,966.00 20.00 3 $24.38 $707.00 29.00 4 $45.19 $1,220.00 27.00 STATE $59.93 $5,753.00 96.00 716-08.07 REMOVAL PVMT MKG (STRAIGHT-TURN ARR EACH 1 $105.50 $2,110.00 20.00 2 $87.73 $965.00 11.00 3 $24.29 $510.00 21.00 4 $50.00 $1,000.00 20.00 STATE $63.68 $4,585.00 72.00

Page 79: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 79 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

716-08.08 REMOVAL PVMT MKG (DOUBLE TURNING AR EACH 1 $166.00 $3,320.00 20.00 2 $80.00 $800.00 10.00 3 $20.00 $400.00 20.00 4 $60.45 $1,330.00 22.00 STATE $81.25 $5,850.00 72.00 716-08.09 REMOVAL OF PAVEMENT MKG (DOTTED LIN L.F. 1 $0.93 $185.00 200.00 2 $2.00 $200.00 100.00 3 $0.50 $162.50 325.00 4 $0.60 $195.00 325.00 STATE $0.78 $742.50 950.00 716-08.10 REMOVAL PVMT MKG (TRANSVERSE SHOULD L.F. 1 $1.43 $285.00 200.00 2 $3.50 $350.00 100.00 3 $5.28 $4,225.00 800.00 4 $2.00 $600.00 300.00 STATE $3.90 $5,460.00 1400.00 716-08.11 REMOVAL OF WORD PVMT MKG EACH 1 $211.64 $5,926.00 28.00 2 $155.84 $2,181.78 14.00 3 $49.89 $1,496.78 30.00 4 $66.67 $1,800.00 27.00 STATE $115.20 $11,404.56 99.00 716-08.12 REMOVAL OF WORD PVMT MKG EACH 1 $206.79 $2,895.00 14.00 2 $197.45 $1,382.16 7.00 3 $137.81 $964.68 7.00 4 $85.71 $600.00 7.00 STATE $166.91 $5,841.84 35.00 716-08.13 REMOVAL OF WORD PVMT MKG EACH 1 $210.25 $1,682.00 8.00 2 $180.45 $721.78 4.00 3 $144.20 $576.78 4.00 4 $36.00 $144.00 4.00 STATE $156.23 $3,124.56 20.00 716-08.20 REMOVAL OF PAVEMENT MARKING (LINE) L.M. 1 $2,240.24 $91,850.00 41.00 2 $3,552.40 $32,540.00 9.16 STATE $2,479.86 $124,390.00 50.16 716-10.01 PREFORMED PLASTIC PAVEMENT MKG (4" L.M. 1 $11,107.49 $474,512.00 42.72 2 $12,595.19 $253,163.33 20.10 3 $11,203.62 $250,288.83 22.34 4 $10,372.56 $217,160.00 20.94 STATE $11,264.55 $1,195,124.16 106.10 716-10.02 PREFORMED PLASTIC PVMT MKG (8"BARR L.F. 1 $4.60 $36,921.40 8018.00 2 $6.69 $46,102.20 6895.00 3 $11.42 $110,352.45 9660.00 4 $4.00 $400.00 100.00 STATE $7.85 $193,776.05 24673.00 716-10.03 PREFORMED PLASTIC PAVEMENT MKG (X-W L.F. 1 $15.85 $3,170.00 200.00 2 $15.00 $1,500.00 100.00 3 $7.00 $700.00 100.00 4 $11.00 $1,100.00 100.00 STATE $12.94 $6,470.00 500.00

Page 80: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 80 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

716-10.04 PRFMD PLS PVMT MKG (CHNLZTN STRIPIN S.Y. 1 $47.68 $152,142.50 3191.00 2 $72.63 $24,330.00 335.00 3 $66.89 $360,649.50 5392.00 4 $52.73 $5,800.00 110.00 STATE $60.14 $542,922.00 9028.00 716-10.05 PREFORMED PLS PVMT MKG (TURN LANE A EACH 1 $330.74 $14,222.00 43.00 2 $300.00 $3,000.00 10.00 3 $325.38 $4,230.00 13.00 4 $180.00 $1,800.00 10.00 STATE $305.95 $23,252.00 76.00 716-10.06 PREFORMED PLASTIC PVMT MKG (8"DOTTE L.F. 1 $5.48 $1,095.00 200.00 2 $9.00 $900.00 100.00 3 $11.25 $36,950.75 3285.00 4 $4.00 $400.00 100.00 STATE $10.68 $39,345.75 3685.00 716-10.07 PREFORMED PLASTIC PVMT MKG (STOP LI L.F. 1 $20.99 $24,708.40 1177.00 2 $21.67 $2,210.24 102.00 3 $25.97 $4,934.36 190.00 4 $15.39 $1,570.00 102.00 STATE $21.27 $33,423.00 1571.00 716-10.08 PREFORMED PLASTIC PVMT MKG(4" DOTTE L.F. 1 $5.00 $1,000.00 200.00 2 $5.00 $500.00 100.00 3 $1.80 $180.00 100.00 4 $2.50 $250.00 100.00 STATE $3.86 $1,930.00 500.00 716-10.09 PRFMD PLS PVMT MKG (TRANSVERSE SHOU L.F. 1 $9.83 $1,965.00 200.00 2 $5.00 $500.00 100.00 3 $10.00 $1,000.00 100.00 4 $6.00 $600.00 100.00 STATE $8.13 $4,065.00 500.00 716-10.10 PREFORMED PLS PVMT MKG (EXIT ONLY A EACH 1 $398.55 $15,942.00 40.00 2 $200.00 $1,000.00 5.00 3 $275.00 $1,375.00 5.00 4 $200.00 $1,000.00 5.00 STATE $351.22 $19,317.00 55.00 716-10.11 PRFMD PLS PVMT MKG (OPTION LANE ARR EACH 1 $321.00 $3,210.00 10.00 2 $300.00 $1,500.00 5.00 3 $400.00 $2,000.00 5.00 4 $300.00 $1,500.00 5.00 STATE $328.40 $8,210.00 25.00 716-10.12 PREFORMED PLS PVMT MKG (WRONG WAY A EACH 1 $369.00 $3,690.00 10.00 2 $266.67 $2,400.00 9.00 3 $225.00 $1,125.00 5.00 4 $200.00 $1,000.00 5.00 STATE $283.28 $8,215.00 29.00 716-10.13 PREFORMED PLS PVMT MKG (H.O.V. DIAM EACH 1 $102.50 $205.00 2.00 2 $150.00 $150.00 1.00 3 $150.00 $3,000.00 20.00

Page 81: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 81 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $200.00 $4,000.00 20.00 STATE $171.05 $7,355.00 43.00 716-10.14 PREFORMED PLASTIC PVMT MKG (BIKE LA EACH 1 $439.50 $879.00 2.00 2 $300.00 $300.00 1.00 3 $500.00 $500.00 1.00 4 $200.00 $200.00 1.00 STATE $375.80 $1,879.00 5.00 716-10.15 PREFORMED PLASTIC PAVEMENT MKG (6" L.M. 1 $15,492.35 $3,352,545.00 216.40 2 $18,000.27 $656,290.00 36.46 3 $19,603.36 $1,620,217.70 82.65 4 $14,468.25 $289,365.00 20.00 STATE $16,647.68 $5,918,417.70 355.51 716-10.16 PREFORMED PLASTIC PVMT MKG (6"DOTTE L.F. 1 $5.08 $66,173.30 13038.00 2 $7.00 $700.00 100.00 3 $8.36 $28,187.31 3371.00 4 $3.50 $350.00 100.00 STATE $5.74 $95,410.61 16609.00 716-10.17 PREFORMED PLS PVMT MKG (LGTDL CROSS L.F. 1 $33.65 $6,730.00 200.00 2 $50.00 $5,000.00 100.00 3 $20.00 $2,000.00 100.00 4 $36.00 $3,600.00 100.00 STATE $34.66 $17,330.00 500.00 716-10.18 PREFORMED PLS PVMT MKG (STRAIGHT AR EACH 1 $156.77 $4,076.00 26.00 2 $250.00 $2,500.00 10.00 3 $245.00 $2,450.00 10.00 4 $150.00 $1,500.00 10.00 STATE $187.96 $10,526.00 56.00 716-10.19 PRFMD PLS PVMT MKG (STRAIGHT TURN A EACH 1 $351.25 $4,215.00 12.00 2 $350.00 $1,750.00 5.00 3 $295.00 $1,475.00 5.00 4 $250.00 $1,250.00 5.00 STATE $321.85 $8,690.00 27.00 716-10.20 PREFORM PLASTIC PVM'T MARK. (RXR) EACH 1 $750.00 $3,000.00 4.00 2 $950.19 $1,900.38 2.00 3 $1,098.94 $2,197.88 2.00 4 $1,200.00 $2,400.00 2.00 STATE $949.83 $9,498.26 10.00 716-10.21 PREFORM PLASTIC PVM'T MARK (STOP AH EACH 1 $387.50 $1,550.00 4.00 2 $2,105.92 $4,211.84 2.00 3 $1,255.92 $2,511.84 2.00 4 $350.00 $700.00 2.00 STATE $897.37 $8,973.68 10.00 716-50.01 ROADWAY CLEANING FOR PAVEMENT MARKI L.M. 1 $63.93 $2,685.00 42.00 2 $62.88 $1,760.75 28.00 3 $44.26 $1,947.32 44.00 4 $42.39 $1,059.84 25.00 STATE $53.62 $7,452.91 139.00 717-01 MOBILIZATION LS 1 $32,110.40 $4,334,903.40 135.00

Page 82: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 82 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

2 $14,234.00 $1,423,399.55 100.00 3 $31,790.11 $5,181,787.63 163.00 4 $21,700.45 $2,473,851.30 114.00 STATE $26,199.11 $13,413,941.88 512.00 717-01.03 MOBILIZATION (PER CALL-OUT) EACH 1 $1,350.00 $27,000.00 20.00 2 $1,000.00 $10,000.00 10.00 3 $1,300.00 $13,000.00 10.00 4 $800.00 $8,000.00 10.00 STATE $1,160.00 $58,000.00 50.00 717-01.04 MOBILIZATION EACH 1 $200.00 $3,400.00 17.00 2 $520.80 $26,561.00 51.00 3 $175.00 $8,750.00 50.00 4 $429.78 $3,868.00 9.00 STATE $335.27 $42,579.00 127.00 717-01.05 MOBILIZATION EACH 1 $150.00 $2,400.00 16.00 2 $359.60 $13,664.80 38.00 3 $400.00 $24,000.00 60.00 4 $396.00 $3,168.00 8.00 STATE $354.37 $43,232.80 122.00 717-01.06 MOBILIZATION EACH 4 $198.00 $1,584.00 8.00 STATE $198.00 $1,584.00 8.00 717-01.50 MOBILIZATION (IMPACT) EACH 1 $350.00 $5,250.00 15.00 2 $549.87 $1,649.61 3.00 3 $1,839.40 $55,182.00 30.00 4 $750.00 $11,250.00 15.00 STATE $1,163.99 $73,331.61 63.00 717-01.51 MOBILIZATION (REGION WIDE CLEANUP) EACH 1 $25,200.00 $25,200.00 1.00 2 $15,846.00 $15,846.00 1.00 3 $47,237.73 $47,237.73 1.00 4 $32,400.00 $32,400.00 1.00 STATE $30,170.93 $120,683.73 4.00 718-01.01 NOISE BARRIER S.F. 1 $17.85 $1,659,657.30 92978.00 3 $13.99 $4,555,118.51 325623.00 STATE $14.85 $6,214,775.81 418601.00 718-01.02 NOISE BARRIER S.F. 1 $17.85 $699,077.40 39164.00 3 $15.31 $2,472,437.13 161539.00 STATE $15.80 $3,171,514.53 200703.00 718-01.03 NOISE BARRIER S.F. 1 $17.85 $303,325.05 16993.00 3 $12.92 $431,828.80 33430.00 STATE $14.58 $735,153.85 50423.00 718-01.04 NOISE BARRIER S.F. 1 $17.85 $78,718.50 4410.00 3 $25.25 $81,002.00 3208.00 STATE $20.97 $159,720.50 7618.00 719-01 SWEEPING L.M. 1 $31.34 $470,144.75 15002.00 2 $44.50 $259,657.50 5835.00 3 $28.50 $349,752.00 12272.00 4 $41.01 $359,116.50 8756.00 STATE $34.36 $1,438,670.75 41865.00

Page 83: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 83 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

719-02 REMOVAL AND DISPOSAL OF LITTER L.M. 1 $115.27 $469,624.92 4074.00 2 $187.05 $921,053.00 4924.00 3 $144.69 $761,367.00 5262.00 4 $88.16 $1,464,906.52 16616.00 STATE $117.14 $3,616,951.44 30876.00 719-03 CEMENT BAG 1 $10.00 $3,000.00 300.00 STATE $10.00 $3,000.00 300.00 719-03.01 SNOW AND ICE REMOVAL(OPERATOR) HOUR 1 $85.00 $479,230.00 5638.00 STATE $85.00 $479,230.00 5638.00 719-03.02 SNOW AND ICE REMOVAL(SUPERVISOR) HOUR 1 $57.50 $77,970.00 1356.00 STATE $57.50 $77,970.00 1356.00 719-03.03 SNOW AND ICE REMOVAL(LOADER) HOUR 1 $76.00 $67,944.00 894.00 STATE $76.00 $67,944.00 894.00 719-03.06 SNOW & ICE REMOVAL (MOTOR PATROL) HOUR 1 $76.00 $9,500.00 125.00 STATE $76.00 $9,500.00 125.00 719-03.07 SNOW & ICE REMOVAL (ANTI-ICING) HOUR 1 $85.00 $25,500.00 300.00 STATE $85.00 $25,500.00 300.00 719-03.14 SNOW & ICE REMOVAL(PARTIAL MOBILIZA EACH 1 . . 33.00 STATE . . 33.00 719-03.15 SNOW & ICE REMOVAL(SPECIAL MOBILIZA EACH 1 $2,500.00 $82,500.00 33.00 STATE $2,500.00 $82,500.00 33.00 719-50.01 RWIS INSTALLATION (SITE NO. 1) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.02 RWIS INSTALLATION (SITE NO. 2) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.03 RWIS INSTALLATION (SITE NO. 3) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.04 RWIS INSTALLATION (SITE NO. 4) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.05 RWIS INSTALLATION (SITE NO. 5) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.06 RWIS INSTALLATION (SITE NO. 6) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.07 RWIS INSTALLATION (SITE NO. 7) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.08 RWIS INSTALLATION (SITE NO. 8) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.09 RWIS INSTALLATION (SITE NO. 9) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.10 RWIS INSTALLATION (SITE NO. 10) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.11 RWIS INSTALLATION (SITE NO. 11) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.12 RWIS INSTALLATION (SITE NO. 12) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.13 RWIS INSTALLATION (SITE NO. 13) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.14 RWIS INSTALLATION (SITE NO. 14) LS 4 $36,504.00 $73,008.00 2.00

Page 84: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 84 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $36,504.00 $73,008.00 2.00 719-50.15 RWIS INSTALLATION (SITE NO. 15) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.16 RWIS INSTALLATION (SITE NO. 16) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.17 RWIS INSTALLATION (SITE NO. 17) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.18 RWIS INSTALLATION (SITE NO. 18) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.19 RWIS INSTALLATION (SITE NO. 19) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.20 RWIS INSTALLATION (SITE NO. 20) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.21 RWIS INSTALLATION (SITE NO. 21) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.22 RWIS INSTALLATION (SITE NO. 22) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.23 RWIS INSTALLATION (SITE NO. 23) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.24 RWIS INSTALLATION (SITE NO. 24) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.25 RWIS INSTALLATION (SITE NO. 25) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.26 RWIS INSTALLATION (SITE NO. 26) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.27 RWIS INSTALLATION (SITE NO. 27) LS 4 $36,504.00 $73,008.00 2.00 STATE $36,504.00 $73,008.00 2.00 719-50.28 RWIS SOFTWARE CONFIGURATION LS 4 $9,625.00 $19,250.00 2.00 STATE $9,625.00 $19,250.00 2.00 719-50.29 RWIS COMMISSIONING LS 4 $1,320.00 $2,640.00 2.00 STATE $1,320.00 $2,640.00 2.00 719-50.30 TRAFFIC SENSOR INSTALLATION EACH 4 $1,490.00 $333,760.00 224.00 STATE $1,490.00 $333,760.00 224.00 719-50.31 TRAFFIC DATA PROCESSOR EACH 4 $1,365.00 $73,710.00 54.00 STATE $1,365.00 $73,710.00 54.00 719-50.32 TIS COMMISSIONING LS 4 $11,110.00 $22,220.00 2.00 STATE $11,110.00 $22,220.00 2.00 719-50.33 WARRANTY YEAR MAINTENANCE(RWIS) LS 4 $2,145.00 $4,290.00 2.00 STATE $2,145.00 $4,290.00 2.00 719-50.34 WARRANTY YEAR MAINTENANCE(TIS) LS 4 $2,460.00 $4,920.00 2.00 STATE $2,460.00 $4,920.00 2.00 719-50.35 EXTENDED MAINTENANCE (YEAR 1) LS 4 $7,975.00 $15,950.00 2.00 STATE $7,975.00 $15,950.00 2.00 719-50.36 EXTENDED MAINTENANCE (YEAR 2) LS 4 $8,270.00 $16,540.00 2.00 STATE $8,270.00 $16,540.00 2.00 719-50.37 EXTENDED MAINTENANCE (YEAR 3) LS 4 $8,340.00 $16,680.00 2.00 STATE $8,340.00 $16,680.00 2.00 719-50.38 EXTENDED MAINTENANCE (YEAR 4) LS 4 $8,455.00 $16,910.00 2.00

Page 85: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 85 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $8,455.00 $16,910.00 2.00 719-50.39 UNSCHEDULED MAINTENANCE HOUR 4 $85.00 $68,000.00 800.00 STATE $85.00 $68,000.00 800.00 719-50.40 SPARE PART (RPU) EACH 4 $5,625.00 $11,250.00 2.00 STATE $5,625.00 $11,250.00 2.00 719-50.41 SPARE PART (RPU MODEM) EACH 4 $1,760.00 $21,120.00 12.00 STATE $1,760.00 $21,120.00 12.00 719-50.42 SPARE PART (WIND SPEED/DIRECTION) EACH 4 $810.00 $1,620.00 2.00 STATE $810.00 $1,620.00 2.00 719-50.43 SPARE PART (AIR TEMP/RELATIVE HUMID EACH 4 $557.00 $1,114.00 2.00 STATE $557.00 $1,114.00 2.00 719-50.44 SPARE PART (SUBSURFACE TEMP) EACH 4 $286.00 $572.00 2.00 STATE $286.00 $572.00 2.00 719-50.45 SPARE PART (PRECIP SENSOR) EACH 4 $4,820.00 $9,640.00 2.00 STATE $4,820.00 $9,640.00 2.00 719-50.46 SPARE PART (PAVEMENT SENSOR) EACH 4 $2,315.00 $37,040.00 16.00 STATE $2,315.00 $37,040.00 16.00 719-50.47 SPARE PART (RWIS TOWER) EACH 4 $2,110.00 $4,220.00 2.00 STATE $2,110.00 $4,220.00 2.00 719-50.48 TRAINING (RWIS) LS 4 $3,297.50 $6,595.00 2.00 STATE $3,297.50 $6,595.00 2.00 719-50.49 TRAINING (TIS) LS 4 $1,970.00 $3,940.00 2.00 STATE $1,970.00 $3,940.00 2.00 719-50.50 TRAFFIC SENSOR EACH 4 $340.00 $8,160.00 24.00 STATE $340.00 $8,160.00 24.00 720-07 SUBBALLAST TON 3 $14.50 $165,952.50 11445.00 STATE $14.50 $165,952.50 11445.00 730-01.01 REMOVE & RELOCATE EX TRAFFIC SIGNAL EACH 2 $100.00 $200.00 2.00 STATE $100.00 $200.00 2.00 730-01.02 REMOVAL OF SIGNAL EQUIPMENT EACH 1 $1,514.92 $4,544.75 3.00 2 $379.13 $8,720.00 23.00 3 $722.91 $15,904.00 22.00 4 $842.71 $10,112.50 12.00 STATE $654.69 $39,281.25 60.00 730-01.03 MODIFICATION EXISTING TRAFFIC SIGNA EACH 3 $255.00 $510.00 2.00 4 $3,750.00 $30,000.00 8.00 STATE $3,051.00 $30,510.00 10.00 730-01.08 SCHOOL SPEED LIMIT FLASHG SIGNAL IN EACH 1 $9,000.00 $18,000.00 2.00 3 $5,200.00 $5,200.00 1.00 STATE $7,733.33 $23,200.00 3.00 730-02.01 SIGNAL HEAD ASSEMBLY (110) EACH 2 $220.00 $880.00 4.00 STATE $220.00 $880.00 4.00 730-02.08 SIGNAL HEAD ASSEMBLY (130 POLE MOUN EACH 3 $799.00 $799.00 1.00 4 $2,497.69 $19,981.50 8.00 STATE $2,308.94 $20,780.50 9.00 730-02.09 SIGNAL HEAD ASSEMBLY(130 WITH BACKP EACH 1 $615.25 $66,446.48 108.00 2 $574.35 $65,476.00 114.00 3 $669.93 $87,760.80 131.00

Page 86: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 86 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $545.30 $59,983.00 110.00 STATE $604.03 $279,666.28 463.00 730-02.10 SIGNAL HEAD ASSEMBLY (130 A2) EACH 3 $863.60 $11,226.78 13.00 STATE $863.60 $11,226.78 13.00 730-02.13 SIGNAL HEAD ASSEMBLY (140 A1) EACH 3 $964.86 $6,754.00 7.00 4 $797.50 $1,595.00 2.00 STATE $927.67 $8,349.00 9.00 730-02.17 SIGNAL HEAD ASM (150 A2H WITH BACKP EACH 1 $896.12 $32,260.19 36.00 2 $1,052.25 $53,665.00 51.00 3 $1,073.37 $42,934.92 40.00 4 $911.85 $23,708.00 26.00 STATE $997.18 $152,568.11 153.00 730-02.18 SIGNAL HEAD ASSEMBLY (150 A2V) EACH 3 $1,211.00 $2,422.00 2.00 4 $825.00 $1,650.00 2.00 STATE $1,018.00 $4,072.00 4.00 730-02.21 SIGNAL HEAD ASSEMBLY (220) EACH 2 $370.00 $740.00 2.00 4 $375.00 $750.00 2.00 STATE $372.50 $1,490.00 4.00 730-02.27 SIGNAL HEAD ASSEMBLY (440) EACH 4 $600.00 $600.00 1.00 STATE $600.00 $600.00 1.00 730-02.30 SIGNAL HEAD ASSEMBLY EACH 1 $653.42 $32,671.00 50.00 2 $606.50 $3,639.00 6.00 3 $659.72 $16,493.00 25.00 4 $753.75 $9,045.00 12.00 STATE $665.03 $61,848.00 93.00 730-02.31 SIGNAL HEAD ASSEMBLY EACH 2 $123.40 $9,255.00 75.00 3 $1,566.00 $9,396.00 6.00 4 $2,391.25 $9,565.00 4.00 STATE $331.95 $28,216.00 85.00 730-02.32 SIGNAL HEAD ASSEMBLY EACH 2 $158.51 $38,360.00 242.00 3 $1,270.17 $7,621.00 6.00 4 $1,603.33 $9,620.00 6.00 STATE $218.90 $55,601.00 254.00 730-02.33 SIGNAL HEAD ASSEMBLY EACH 3 $695.00 $1,390.00 2.00 4 $5,830.00 $5,830.00 1.00 STATE $2,406.67 $7,220.00 3.00 730-02.34 SIGNAL HEAD ASSEMBLY EACH 4 $4,730.00 $4,730.00 1.00 STATE $4,730.00 $4,730.00 1.00 730-03.12 AERIAL SPLICE ENCLOSURE EACH 3 $714.71 $2,144.13 3.00 STATE $714.71 $2,144.13 3.00 730-03.20 INSTALL PULL BOX (TYPE A) EACH 1 $307.58 $307.58 1.00 3 $300.00 $1,800.00 6.00 4 $313.29 $16,291.00 52.00 STATE $311.84 $18,398.58 59.00 730-03.21 INSTALL PULL BOX (TYPE B) EACH 3 $300.00 $1,200.00 4.00 STATE $300.00 $1,200.00 4.00 730-03.22 INSTALL PULL BOX (TYPE C) EACH 3 $387.50 $10,850.00 28.00 STATE $387.50 $10,850.00 28.00

Page 87: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 87 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

730-03.23 INSTALL PULL BOX (FIBER OPTIC-TYPE EACH 4 $605.00 $69,575.00 115.00 STATE $605.00 $69,575.00 115.00 730-03.24 INSTALL PULL BOX (FIBER OPTIC-TYPE EACH 4 $1,000.00 $20,000.00 20.00 STATE $1,000.00 $20,000.00 20.00 730-03.25 INSTALL PULL BOX EACH 1 $280.95 $26,689.86 95.00 2 $255.41 $18,134.00 71.00 3 $328.35 $46,296.65 141.00 4 $266.99 $34,708.39 130.00 STATE $287.94 $125,828.90 437.00 730-03.26 INSTALL PULL BOX EACH 1 $690.64 $7,597.00 11.00 STATE $690.64 $7,597.00 11.00 730-03.27 INSTALL PULL BOX EACH 1 $1,850.00 $42,550.00 23.00 STATE $1,850.00 $42,550.00 23.00 730-05.01 ELECTRICAL SERVICE CONNECTION EACH 1 $668.57 $12,702.74 19.00 2 $582.77 $15,152.00 26.00 3 $568.71 $16,492.61 29.00 4 $413.49 $7,856.35 19.00 STATE $561.33 $52,203.70 93.00 730-05.02 SERVICE CABLE (2 CONDUCTOR, # 8 AWG L.F. 3 $2.00 $1,200.00 600.00 STATE $2.00 $1,200.00 600.00 730-08.01 SIGNAL CABLE - 3 CONDUCTOR L.F. 1 $1.73 $6,277.45 3620.00 2 $0.75 $144.00 192.00 3 $0.73 $1,217.90 1665.00 4 $0.99 $7,567.80 7620.00 STATE $1.16 $15,207.15 13097.00 730-08.02 SIGNAL CABLE - 5 CONDUCTOR L.F. 1 $2.03 $15,021.20 7404.00 2 $1.38 $5,251.70 3810.00 3 $0.80 $15,837.24 19776.00 4 $1.13 $31,741.91 28126.00 STATE $1.15 $67,852.05 59116.00 730-08.03 SIGNAL CABLE - 7 CONDUCTOR L.F. 1 $2.15 $6,347.20 2956.00 2 $1.52 $1,327.90 872.00 3 $0.90 $4,637.66 5139.00 4 $1.39 $7,857.35 5639.00 STATE $1.38 $20,170.11 14606.00 730-08.04 SIGNAL CABLE - 9 CONDUCTOR L.F. 1 $2.51 $4,840.10 1926.00 2 $1.50 $19,589.14 13029.00 3 $1.02 $7,137.81 7032.00 4 $1.60 $8,836.59 5535.00 STATE $1.47 $40,403.64 27522.00 730-08.05 SIGNAL CABLE - 12 CONDUCTOR L.F. 1 $2.10 $19,431.35 9245.00 STATE $2.10 $19,431.35 9245.00 730-08.10 SIGNAL CABLE - L.F. 2 $2.54 $828.04 326.00 3 $0.94 $404.20 430.00 4 $1.80 $3,960.00 2200.00 STATE $1.76 $5,192.24 2956.00 730-08.11 SIGNAL CABLE - L.F. 4 $1.50 $1,500.00 1000.00 STATE $1.50 $1,500.00 1000.00

Page 88: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 88 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

730-08.30 INTERCONNECT CABLE(COPPER-TWISTED P L.F. 1 $4.00 $3,000.00 750.00 3 $1.16 $2,586.80 2230.00 4 $1.40 $1,820.00 1300.00 STATE $1.73 $7,406.80 4280.00 730-08.31 INTERCONNECT CABLE (12 FIBER MULTI- L.F. 1 $3.50 $70,122.50 20035.00 3 $4.85 $11,155.00 2300.00 STATE $3.64 $81,277.50 22335.00 730-08.32 INTERCONNECT CABLE L.F. 1 $2.50 $895.00 358.00 3 $1.91 $10,172.92 5326.00 STATE $1.95 $11,067.92 5684.00 730-08.40 INTRCNNCT CABLE-FIBER OPTIC L.F. 3 $2.10 $33,180.00 15800.00 4 $1.89 $65,772.00 34800.00 STATE $1.96 $98,952.00 50600.00 730-08.41 INTRCNNCT CABLE-FIBER OPTIC L.F. 3 $1.85 $2,035.00 1100.00 4 $2.35 $5,170.00 2200.00 STATE $2.18 $7,205.00 3300.00 730-09.01 SPAN WIRE ASSEMBLY L.F. 1 $3.04 $20,744.75 6823.00 2 $1.74 $9,669.03 5555.00 3 $2.67 $6,513.71 2441.00 4 $3.92 $23,743.60 6064.00 STATE $2.91 $60,671.09 20883.00 730-09.02 SPAN WIRE ASSEMBLY L.F. 3 $3.44 $1,437.92 418.00 4 $3.29 $2,577.25 784.00 STATE $3.34 $4,015.17 1202.00 730-09.03 SPAN WIRE ASSEMBLY L.F. 3 $3.44 $491.92 143.00 STATE $3.44 $491.92 143.00 730-10.01 TETHER WIRE ASSEMBLY - 1/4" DIAMETE L.F. 1 $2.49 $3,007.75 1210.00 2 $1.79 $17,065.09 9512.00 3 $2.42 $4,222.40 1748.00 4 $1.73 $8,822.65 5087.00 STATE $1.89 $33,117.89 17557.00 730-10.02 MESSENGER CABLE - 1/4" DIAMETER L.F. 2 $2.25 $256.50 114.00 3 $2.11 $28,787.00 13615.00 4 $2.30 $15,875.58 6900.00 STATE $2.18 $44,919.08 20629.00 730-11.01 STEEL CONDUIT RISER ASSEMBLY EACH 1 $150.33 $751.66 5.00 2 $182.73 $2,010.00 11.00 3 $188.03 $752.10 4.00 4 $231.55 $17,134.50 74.00 STATE $219.66 $20,648.26 94.00 730-11.10 RISER ASSEMBLY EACH 1 $306.88 $2,148.14 7.00 2 $55.05 $2,312.00 42.00 4 $251.74 $2,265.65 9.00 STATE $115.96 $6,725.79 58.00 730-12.01 CONDUIT 1" DIAMETER (PVC) L.F. 1 $7.25 $13,902.86 1918.00 2 $3.95 $7,614.40 1928.00 3 $4.96 $11,144.68 2246.00 4 $3.85 $25,560.70 6644.00

Page 89: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 89 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $4.57 $58,222.64 12736.00 730-12.02 CONDUIT 2" DIAMETER (PVC) L.F. 1 $3.81 $79,235.05 20809.00 2 $7.46 $16,235.70 2175.00 3 $4.68 $50,049.65 10695.00 4 $6.10 $17,456.31 2860.00 STATE $4.46 $162,976.71 36539.00 730-12.03 CONDUIT 3" DIAMETER (PVC) L.F. 1 $8.42 $3,182.80 378.00 2 $9.30 $660.00 71.00 3 $5.74 $746.70 130.00 4 $5.06 $50,344.90 9950.00 STATE $5.22 $54,934.40 10529.00 730-12.04 CONDUIT 4" DIAMETER (PVC) L.F. 1 $8.10 $148,845.60 18376.00 4 $9.84 $1,427.20 145.00 STATE $8.11 $150,272.80 18521.00 730-12.07 CONDUIT 1" DIAMETER (RGS) L.F. 1 $9.40 $526.40 56.00 3 $4.33 $5,522.75 1275.00 4 $6.04 $3,754.70 622.00 STATE $5.02 $9,803.85 1953.00 730-12.08 CONDUIT 2" DIAMETER (RGS) L.F. 1 $13.21 $25,299.25 1915.00 2 $18.57 $2,859.15 154.00 3 $6.03 $5,455.22 904.00 4 $7.13 $34,990.00 4910.00 STATE $8.70 $68,603.62 7883.00 730-12.09 CONDUIT 3" DIAMETER (RGS) L.F. 2 $18.00 $2,880.00 160.00 3 $9.70 $194.00 20.00 STATE $17.08 $3,074.00 180.00 730-12.10 CONDUIT 4" DIAMETER (RGS) L.F. 1 $30.00 $34,740.00 1158.00 2 $12.00 $180.00 15.00 STATE $29.77 $34,920.00 1173.00 730-12.13 CONDUIT 2" DIAMETER (JACK AND BORE) L.F. 1 $16.44 $4,767.60 290.00 2 $19.52 $6,714.00 344.00 3 $24.42 $124,716.90 5107.00 4 $21.27 $17,440.00 820.00 STATE $23.42 $153,638.50 6561.00 730-12.14 CONDUIT 3" DIAMETER (JACK AND BORE) L.F. 1 $45.74 $7,958.76 174.00 2 $7.00 $406.00 58.00 3 $22.00 $2,200.00 100.00 4 $16.15 $34,080.00 2110.00 STATE $18.28 $44,644.76 2442.00 730-12.15 CONDUIT 4" DIAMETER (JACK AND BORE) L.F. 4 $22.00 $990.00 45.00 STATE $22.00 $990.00 45.00 730-12.16 CONDUIT L.F. 2 $8.81 $11,668.00 1325.00 3 $5.23 $13,492.50 2578.00 4 $6.24 $10,752.25 1723.00 STATE $6.38 $35,912.75 5626.00 730-12.17 CONDUIT L.F. 2 $8.35 $2,312.95 277.00 STATE $8.35 $2,312.95 277.00 730-12.40 ENCASED CONDUIT L.F. 4 $14.30 $1,716.00 120.00

Page 90: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 90 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $14.30 $1,716.00 120.00 730-12.41 ENCASED CONDUIT L.F. 4 $15.40 $2,464.00 160.00 STATE $15.40 $2,464.00 160.00 730-13.01 VEHICLE LOOP DETECTOR (SHELF MOUNT) EACH 1 $216.40 $61,890.75 286.00 2 $138.24 $9,124.00 66.00 3 $216.78 $34,251.57 158.00 4 $187.44 $19,681.14 105.00 STATE $203.17 $124,947.46 615.00 730-13.02 VEHICLE DETECTOR (VIDEO) EACH 2 $7,500.00 $52,500.00 7.00 3 $6,916.67 $41,500.00 6.00 STATE $7,230.77 $94,000.00 13.00 730-13.03 VEHICLE DETECTOR (4-CHANNEL, RACK M EACH 2 $400.79 $13,627.00 34.00 3 $297.33 $3,568.00 12.00 4 $333.53 $29,684.00 89.00 STATE $347.25 $46,879.00 135.00 730-13.05 VEHICLE DETECTOR (EXT. CALL-DELAY C EACH 1 $160.00 $960.00 6.00 4 $268.40 $5,904.89 22.00 STATE $245.17 $6,864.89 28.00 730-13.06 VEHICLE DETECTOR(OPT. ACT. PRIOR. C EACH 2 $1,796.05 $118,539.00 66.00 3 $4,824.00 $33,768.00 7.00 4 $425.00 $2,125.00 5.00 STATE $1,979.90 $154,432.00 78.00 730-13.07 VEHICLE DETECTOR EACH 1 $3,200.00 $28,800.00 9.00 STATE $3,200.00 $28,800.00 9.00 730-13.10 VEHICLE DETECTOR EACH 2 $1,100.00 $1,100.00 1.00 STATE $1,100.00 $1,100.00 1.00 730-14.01 SHIELDED DETECTOR CABLE L.F. 1 $0.71 $38,284.86 54242.00 2 $1.10 $41,888.21 38001.00 3 $0.62 $20,123.62 32303.00 4 $1.15 $53,128.25 46128.00 STATE $0.90 $153,424.94 170674.00 730-14.02 SAW SLOT L.F. 1 $3.29 $249,718.16 75887.00 2 $2.91 $95,838.43 32958.00 3 $3.61 $541,233.35 149788.00 4 $5.29 $480,459.60 90748.00 STATE $3.91 $1,367,249.54 349381.00 730-14.03 LOOP WIRE L.F. 1 $0.42 $71,426.46 172110.00 2 $0.46 $46,533.04 101460.00 3 $0.42 $132,360.76 316394.00 4 $0.96 $198,371.87 205642.00 STATE $0.56 $448,692.13 795606.00 730-15.02 CABINET - TYPE II (POLE MOUNTED) EACH 3 $483.00 $483.00 1.00 STATE $483.00 $483.00 1.00 730-15.05 CABINET - TYPE IV EACH 3 $6,500.00 $19,500.00 3.00 STATE $6,500.00 $19,500.00 3.00 730-15.07 CABINET EACH 2 $2,950.00 $2,950.00 1.00 3 $3,952.50 $7,905.00 2.00 STATE $3,618.33 $10,855.00 3.00

Page 91: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 91 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

730-15.10 MOD. CABINET (INSTALL COORDINATION EACH 4 $1,237.43 $8,662.00 7.00 STATE $1,237.43 $8,662.00 7.00 730-15.11 MODIFY CABINET EACH 2 $2,091.67 $12,550.00 6.00 3 $336.00 $4,032.00 12.00 4 $248.80 $1,244.00 5.00 STATE $775.04 $17,826.00 23.00 730-15.13 MODIFY CABINET EACH 4 $17,000.00 $17,000.00 1.00 STATE $17,000.00 $17,000.00 1.00 730-15.20 MASTER PANEL AND RACK EACH 4 $10,500.00 $10,500.00 1.00 STATE $10,500.00 $10,500.00 1.00 730-16.01 FOUR PHASE ACTUATED CONTROLLER EACH 2 $5,289.00 $5,289.00 1.00 3 $3,251.83 $13,007.32 4.00 4 $4,900.00 $4,900.00 1.00 STATE $3,866.05 $23,196.32 6.00 730-16.02 EIGHT PHASE ACTUATED CONTROLLER EACH 1 $11,384.00 $170,760.00 15.00 2 $5,994.00 $5,994.00 1.00 3 $7,840.58 $188,173.88 24.00 4 $5,810.01 $168,490.30 29.00 STATE $7,730.70 $533,418.18 69.00 730-16.03 CONTROLLER (FLASHING BEACON) EACH 2 $750.00 $750.00 1.00 3 $130.00 $130.00 1.00 4 $2,000.00 $2,000.00 1.00 STATE $960.00 $2,880.00 3.00 730-16.10 CONTROLLER (4-PHASE W/TYPE II CABIN EACH 1 $7,277.85 $7,277.85 1.00 STATE $7,277.85 $7,277.85 1.00 730-16.11 CONTROLLER (8-PHASE W/TYPE III CABI EACH 2 $7,679.00 $15,358.00 2.00 3 $7,716.00 $7,716.00 1.00 4 $10,387.00 $51,935.00 5.00 STATE $9,376.13 $75,009.00 8.00 730-16.12 CONTROLLER (8-PHASE W/TYPE IV CABIN EACH 1 $10,427.10 $41,708.40 4.00 2 $7,391.67 $133,050.00 18.00 3 $8,284.11 $49,704.66 6.00 4 $8,380.33 $50,282.00 6.00 STATE $8,080.74 $274,745.06 34.00 730-16.14 CONTROLLER EACH 2 $8,600.00 $17,200.00 2.00 3 $3,012.00 $24,096.00 8.00 4 $8,250.00 $8,250.00 1.00 STATE $4,504.18 $49,546.00 11.00 730-17.01 INSTALL MODEM EACH 2 $189.00 $378.00 2.00 STATE $189.00 $378.00 2.00 730-18.01 MASTER CONTROLLER EACH 1 $5,500.00 $11,000.00 2.00 2 $2,820.00 $8,460.00 3.00 3 $9,617.00 $19,234.00 2.00 4 $4,150.00 $4,150.00 1.00 STATE $5,355.50 $42,844.00 8.00 730-20.02 MASTER COORDINATOR EACH 3 $2,688.16 $2,688.16 1.00 STATE $2,688.16 $2,688.16 1.00 730-21.01 WOOD POLE (SIGNAL SUPPORT) CL 3, 35 EACH 2 $820.00 $1,640.00 2.00

Page 92: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 92 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $820.00 $1,640.00 2.00 730-21.02 WOOD POLE (SIGNAL SUPPORT) CL 3, 40 EACH 3 $800.00 $3,200.00 4.00 STATE $800.00 $3,200.00 4.00 730-21.03 WOOD POLE (SIGNAL SUPPORT) CL 3, 45 EACH 1 $783.33 $9,400.00 12.00 2 $742.86 $5,200.00 7.00 STATE $768.42 $14,600.00 19.00 730-21.10 WOOD POLE EACH 2 $565.00 $1,130.00 2.00 STATE $565.00 $1,130.00 2.00 730-22.02 GUYING DEVICE (ANGLE ANCHOR) EACH 1 $236.67 $4,260.00 18.00 2 $175.71 $2,460.00 14.00 3 $195.00 $1,950.00 10.00 STATE $206.43 $8,670.00 42.00 730-22.03 GUYING DEVICE (VERTICAL ANCHOR) EACH 1 $270.00 $540.00 2.00 2 $200.00 $800.00 4.00 STATE $223.33 $1,340.00 6.00 730-23.01 STEEL STRAIN POLE (SIGNAL SUPPORT) EACH 1 $4,605.10 $221,045.00 48.00 2 $4,001.81 $108,049.00 27.00 3 $4,753.46 $57,041.48 12.00 4 $4,988.12 $169,596.00 34.00 STATE $4,592.82 $555,731.48 121.00 730-23.02 STEEL STRAIN POLE EACH 3 $4,378.61 $100,708.00 23.00 4 $5,244.39 $104,887.80 20.00 STATE $4,781.30 $205,595.80 43.00 730-23.03 STEEL STRAIN POLE EACH 3 $3,603.43 $25,224.00 7.00 STATE $3,603.43 $25,224.00 7.00 730-23.04 STEEL STRAIN POLE EACH 3 $4,300.00 $12,900.00 3.00 STATE $4,300.00 $12,900.00 3.00 730-23.30 PEDESTAL POLE EACH 1 $1,240.91 $13,650.00 11.00 3 $1,183.00 $11,830.00 10.00 4 $423.93 $11,446.00 27.00 STATE $769.29 $36,926.00 48.00 730-23.31 PEDESTAL POLE EACH 3 $1,487.50 $2,975.00 2.00 4 $825.00 $825.00 1.00 STATE $1,266.67 $3,800.00 3.00 730-23.48 CANTILEVER SIGNAL SUPPORT (1 ARM @ EACH 1 $5,373.93 $5,373.93 1.00 STATE $5,373.93 $5,373.93 1.00 730-23.56 CANTILEVER SIGNAL SUPPORT (1 ARM @ EACH 3 $3,672.00 $3,672.00 1.00 STATE $3,672.00 $3,672.00 1.00 730-23.64 CANTILEVER SIGNAL SUPPORT (1 ARM @ EACH 4 $4,290.00 $4,290.00 1.00 STATE $4,290.00 $4,290.00 1.00 730-23.68 CANTILEVER SIGNAL SUPPORT(2 @ 30' & EACH 3 $5,860.00 $5,860.00 1.00 STATE $5,860.00 $5,860.00 1.00 730-23.69 CANTILEVER SIGNAL SUPPORT(2 @ 30' & EACH 3 $5,979.30 $5,979.30 1.00 4 $6,105.00 $6,105.00 1.00 STATE $6,042.15 $12,084.30 2.00 730-23.70 CANTILEVER SIGNAL SUPPORT(2 @ 30' & EACH 3 $7,648.00 $7,648.00 1.00 STATE $7,648.00 $7,648.00 1.00 730-23.72 CANTILEVER SIGNAL SUPPORT (1 ARM @ EACH 1 $5,796.63 $5,796.63 1.00

Page 93: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 93 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

3 $3,462.36 $24,236.52 7.00 STATE $3,754.14 $30,033.15 8.00 730-23.77 CANTILEVER SIGNAL SUPPORT(2 @ 35' & EACH 3 $7,613.00 $7,613.00 1.00 STATE $7,613.00 $7,613.00 1.00 730-23.79 CANTILEVER SIGNAL SUPPORT(2 @ 35' & EACH 3 $2,800.00 $2,800.00 1.00 4 $6,200.00 $6,200.00 1.00 STATE $4,500.00 $9,000.00 2.00 730-23.80 CANTILEVER SIGNAL SUPPORT (1 ARM @ EACH 1 $3,950.00 $7,900.00 2.00 3 $5,052.80 $25,264.00 5.00 4 $4,595.00 $9,190.00 2.00 STATE $4,706.00 $42,354.00 9.00 730-23.85 CANTILEVER SIGNAL SUPPORT(2 @ 40' & EACH 3 $7,200.00 $7,200.00 1.00 STATE $7,200.00 $7,200.00 1.00 730-23.86 CANTILEVER SIGNAL SUPPORT(2 @ 40' & EACH 3 $6,760.00 $20,280.00 3.00 STATE $6,760.00 $20,280.00 3.00 730-23.88 CANTILEVER SIGNAL SUPPORT (1 ARM @ EACH 1 $4,620.00 $4,620.00 1.00 3 $3,750.99 $11,252.97 3.00 4 $5,170.00 $5,170.00 1.00 STATE $4,208.59 $21,042.97 5.00 730-23.91 CANTILEVER SIGNAL SUPPORT(2 @ 45' & EACH 1 $6,809.78 $6,809.78 1.00 STATE $6,809.78 $6,809.78 1.00 730-23.93 CANTILEVER SIGNAL SUPPORT(2 @ 45' & EACH 1 $7,477.28 $7,477.28 1.00 STATE $7,477.28 $7,477.28 1.00 730-23.96 CANTILEVER SIGNAL SUPPORT EACH 1 $6,213.40 $18,640.20 3.00 2 $5,862.50 $11,725.00 2.00 3 $6,181.73 $67,999.00 11.00 4 $5,170.00 $5,170.00 1.00 STATE $6,090.25 $103,534.20 17.00 730-23.97 CANTILEVER SIGNAL SUPPORT EACH 2 $6,808.00 $13,616.00 2.00 3 $6,378.73 $70,166.00 11.00 4 $6,930.00 $6,930.00 1.00 STATE $6,479.43 $90,712.00 14.00 730-23.98 CANTILEVER SIGNAL SUPPORT EACH 3 $5,188.00 $15,564.00 3.00 STATE $5,188.00 $15,564.00 3.00 730-23.99 CANTILEVER SIGNAL SUPPORT EACH 3 $17,017.00 $17,017.00 1.00 STATE $17,017.00 $17,017.00 1.00 730-24.01 FOUNDATION (SIGNAL SUPPORT) EACH 3 $1,325.00 $13,250.00 10.00 STATE $1,325.00 $13,250.00 10.00 730-24.08 FOUNDATION EACH 2 $825.00 $825.00 1.00 STATE $825.00 $825.00 1.00 730-26.01 PEDESTRIAN SIGNAL DISPLAY EACH 4 $688.10 $5,504.76 8.00 STATE $688.10 $5,504.76 8.00 730-26.02 PEDESTRIAN PUSHBUTTON WITH 12" SIGN EACH 2 $775.00 $3,100.00 4.00 4 $198.00 $396.00 2.00 STATE $582.67 $3,496.00 6.00 730-26.03 PED SIGNAL HD,PUSHBUTTON & 12"SIGN EACH 1 $784.30 $43,920.56 56.00 2 $705.00 $5,640.00 8.00 3 $735.76 $50,767.36 69.00

Page 94: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 94 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $675.68 $60,811.00 90.00 STATE $722.60 $161,138.92 223.00 730-30.02 COMPUTER FOR SIGNAL SYSTEM LS 2 $5,000.00 $5,000.00 1.00 4 $18,000.00 $18,000.00 1.00 STATE $11,500.00 $23,000.00 2.00 730-35.01 RF DATA SYSTEM EACH 1 $5,700.00 $5,700.00 1.00 2 $2,300.00 $2,300.00 1.00 3 $2,548.00 $45,864.00 18.00 STATE $2,693.20 $53,864.00 20.00 730-35.05 DATA SYSTEM POWER SUPPLY EACH 1 $325.00 $325.00 1.00 2 $265.00 $265.00 1.00 3 $70.00 $1,260.00 18.00 STATE $92.50 $1,850.00 20.00 730-35.10 ANTENNA (OMNI) EACH 3 $1,414.00 $1,414.00 1.00 STATE $1,414.00 $1,414.00 1.00 730-35.11 ANTENNA (YAGI) EACH 1 $2,400.00 $2,400.00 1.00 2 $800.00 $800.00 1.00 3 $667.00 $11,339.00 17.00 STATE $765.21 $14,539.00 19.00 730-35.20 RF DATA SYSTEM CABLE L.F. 1 $7.00 $224.00 32.00 3 $1.80 $5,040.00 2800.00 STATE $1.86 $5,264.00 2832.00 730-35.21 RF DATA SYSTEM CABLE L.F. 2 $3.65 $182.50 50.00 STATE $3.65 $182.50 50.00 730-40 TEMPORARY TRAFFIC SIGNAL SYSTEM EACH 1 $3,500.00 $21,000.00 6.00 3 $6,543.00 $130,860.00 20.00 4 $12,250.15 $159,252.00 13.00 STATE $7,977.23 $311,112.00 39.00 730-41.25 REWORK OF CONTROLLER EACH 4 $1,200.00 $1,200.00 1.00 STATE $1,200.00 $1,200.00 1.00 730-41.60 BRIDGE SUSPENDED SIGNALS EACH 4 $1,050.00 $8,400.00 8.00 STATE $1,050.00 $8,400.00 8.00 730-41.61 BRIDGE SUSPENDED SIGNALS EACH 4 $1,075.00 $8,600.00 8.00 STATE $1,075.00 $8,600.00 8.00 730-41.62 BRIDGE SUSPENDED SIGNALS EACH 4 $1,260.00 $7,560.00 6.00 STATE $1,260.00 $7,560.00 6.00 730-50 TEMPORARY TRAFFIC SGNL SYST (RAD CT EACH 1 $18,885.00 $283,275.00 15.00 3 $12,388.87 $185,833.00 15.00 4 $7,857.14 $55,000.00 7.00 STATE $14,165.08 $524,108.00 37.00 740-06.01 GEOMEMBRANE S.Y. 1 $5.25 $232,325.50 44257.00 STATE $5.25 $232,325.50 44257.00 740-10.03 GEOTEXTILE (TYPE III)(EROSION CONTR S.Y. 1 $1.55 $21,482.22 13902.00 2 $2.02 $21,050.00 10430.00 3 $1.62 $25,515.30 15721.00 4 $2.44 $56,969.90 23312.00 STATE $1.97 $125,017.42 63365.00 740-10.04 GEOTEXTILE (TYPE IV) (STABILIZATION S.Y. 1 $1.87 $4,395.50 2355.00

Page 95: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 95 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

2 $1.40 $55,732.60 39809.00 3 $1.56 $20,286.65 13012.00 4 $2.00 $70,527.00 35300.00 STATE $1.67 $150,941.75 90476.00 740-10.05 GEOTEXTILE - TYPE V S.Y. 3 $2.65 $3,180.00 1200.00 STATE $2.65 $3,180.00 1200.00 755-01.01 8" DIP SEWER PIPE, OUTSIDE ROADWAY L.F. 3 $56.00 $10,024.00 179.00 STATE $56.00 $10,024.00 179.00 755-01.02 8" DIP SEWER PIPE, INSIDE ROADWAY L.F. 3 $88.00 $23,584.00 268.00 STATE $88.00 $23,584.00 268.00 755-01.03 6" DIP SEWER SERVICE, INSIDE ROADWA L.F. 3 $56.00 $4,032.00 72.00 STATE $56.00 $4,032.00 72.00 755-01.04 DIP FITTINGS (8"x6" TEES) EACH 3 $150.00 $450.00 3.00 STATE $150.00 $450.00 3.00 755-01.05 MH 6 V.F. IN DEPTH W/ BASE, 48" I.D EACH 3 $1,025.00 $5,125.00 5.00 STATE $1,025.00 $5,125.00 5.00 755-01.06 ADDITIONAL MANHOLE SIDEWALL, 48" I. EACH 3 $120.00 $5,400.00 45.00 STATE $120.00 $5,400.00 45.00 755-01.07 STANDARD CAST IRON MANHOLE FRAME & EACH 3 $320.00 $1,600.00 5.00 STATE $320.00 $1,600.00 5.00 755-01.08 MANHOLE FRAME & COVER ADJUSTMENTS EACH 3 $250.00 $500.00 2.00 STATE $250.00 $500.00 2.00 755-01.09 MANHOLE SIDEWALL ADJUSTMENTS V.F. 3 $170.00 $170.00 1.00 STATE $170.00 $170.00 1.00 755-01.10 EXISTING MANHOLE ABANDONMENT EACH 3 $330.00 $1,980.00 6.00 STATE $330.00 $1,980.00 6.00 755-01.11 TOP SOILING & SEEDING L.F. 3 $3.50 $2,450.00 700.00 STATE $3.50 $2,450.00 700.00 755-01.12 PERMANENT PAVEMENT, "H" (TYPE 9) L.F. 3 $19.75 $3,653.75 185.00 STATE $19.75 $3,653.75 185.00 755-01.13 PERMANENT PAVEMENT, "A" (411-E) S.Y. 3 $6.00 $2,472.00 412.00 STATE $6.00 $2,472.00 412.00 755-01.14 SHDR SHOT & CHIPED GRAVEL 2" TO 4" L.F. 3 $8.50 $1,530.00 180.00 STATE $8.50 $1,530.00 180.00 755-01.15 4" PVC SEWER SERVICE, OUTSIDE ROADW L.F. 3 $28.00 $5,320.00 190.00 STATE $28.00 $5,320.00 190.00 755-01.16 12" DIP (CL 52) WTR MAIN INSTAL. UN L.F. 3 $264.00 $42,240.00 160.00 STATE $264.00 $42,240.00 160.00 755-01.17 12" DIP (CL 52) WATER MAIN, INSIDE L.F. 3 $81.00 $810.00 10.00 STATE $81.00 $810.00 10.00 755-01.18 8" DIP (CL 52) WATER MAIN, INSIDE R L.F. 3 $33.70 $36,665.60 1088.00 STATE $33.70 $36,665.60 1088.00 755-01.19 6" DIP (CL 52) WATER MAIN, INSIDE R L.F. 3 $33.60 $1,478.40 44.00 STATE $33.60 $1,478.40 44.00 755-01.20 3/4" COPPER WATER LINE SERVICE L.F. 3 $17.00 $3,400.00 200.00 STATE $17.00 $3,400.00 200.00 755-01.21 DIP FITTINGS LB. 3 $3.00 $12,000.00 4000.00 STATE $3.00 $12,000.00 4000.00

Page 96: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 96 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-01.22 CUT & PLUG EXISTING 8" WATER MAIN EACH 3 $280.00 $560.00 2.00 STATE $280.00 $560.00 2.00 755-01.23 8" RESILIENT SET GATE VALVE IN BOX EACH 3 $900.00 $1,800.00 2.00 STATE $900.00 $1,800.00 2.00 755-01.24 6" RESILIENT SET GATE VALVE IN BOX EACH 3 $700.00 $1,400.00 2.00 STATE $700.00 $1,400.00 2.00 755-01.25 FIRE HYDRANT ABANDONMENT EACH 3 $375.00 $1,125.00 3.00 STATE $375.00 $1,125.00 3.00 755-01.26 FIRE HYDRANT ASSEMBLY EACH 3 $1,900.00 $3,800.00 2.00 STATE $1,900.00 $3,800.00 2.00 755-01.27 NEW TAPS & CONNECTIONS EACH 3 $150.00 $1,050.00 7.00 STATE $150.00 $1,050.00 7.00 755-01.28 WATER METER RELOCATION WITH NEW BOX EACH 3 $340.00 $2,040.00 6.00 STATE $340.00 $2,040.00 6.00 755-01.29 WATER METER WITH BOX ABANDONMENT EACH 3 $125.00 $250.00 2.00 STATE $125.00 $250.00 2.00 755-01.30 1/2" COPPER WATER SERVICE LINE L.F. 3 $16.00 $6,400.00 400.00 STATE $16.00 $6,400.00 400.00 755-01.31 INSTAL. BELL SOUTH UNDERBR. CONDUIT LS 1 $42,000.00 $42,000.00 1.00 STATE $42,000.00 $42,000.00 1.00 755-01.40 8" PVC SEWER PIPE, OUTSIDE ROADWAY L.F. 3 $38.09 $78,874.50 2071.00 STATE $38.09 $78,874.50 2071.00 755-01.41 8" DIP SEWER PIPE, OUTSIDE ROADWAY L.F. 3 $68.00 $22,440.00 330.00 STATE $68.00 $22,440.00 330.00 755-01.43 10" DIP SEWER PIPE, INSIDE ROADWAY L.F. 3 $102.00 $4,080.00 40.00 STATE $102.00 $4,080.00 40.00 755-01.44 10" DIP SEWER PIPE, OUTSIDE ROADWAY L.F. 3 $87.31 $4,540.00 52.00 STATE $87.31 $4,540.00 52.00 755-01.45 54" RCP SEWER PIPE, OUTSIDE ROADWAY L.F. 3 $470.00 $265,550.00 565.00 STATE $470.00 $265,550.00 565.00 755-01.46 54" RCP SWR, INSIDE 96" TUNL W/LINE L.F. 3 $1,310.00 $648,450.00 495.00 STATE $1,310.00 $648,450.00 495.00 755-01.47 6" PVC SEWER SERVICE PIPE, OUTSIDE L.F. 3 $57.00 $2,280.00 40.00 STATE $57.00 $2,280.00 40.00 755-01.48 CAST IN PLACE MH STR AT EXIST CNCT L.F. 3 $45,000.00 $180,000.00 4.00 STATE $45,000.00 $180,000.00 4.00 755-01.50 MH 6 V.F. 72" I.D., DH FORM INVERT EACH 3 $1,900.00 $5,700.00 3.00 STATE $1,900.00 $5,700.00 3.00 755-01.51 ADDITIONAL MANHOLE SIDEWALL, 72" I. V.F. 3 $161.48 $7,105.00 44.00 STATE $161.48 $7,105.00 44.00 755-01.52 MANHOLE 6 V.F. IN DEPTH WITH BASE, EACH 3 $1,816.96 $41,790.00 23.00 STATE $1,816.96 $41,790.00 23.00 755-01.53 ADDITIONAL MANHOLE SIDEWALL, 48" I. V.F. 3 $350.00 $29,750.00 85.00 STATE $350.00 $29,750.00 85.00 755-01.54 STANDARD MANHOLE FRAME AND COVER EACH 3 $300.00 $3,000.00 10.00 STATE $300.00 $3,000.00 10.00 755-01.55 OUTSIDE DROP MANHOLE CONNECTION EACH 3 $4,600.00 $9,200.00 2.00 STATE $4,600.00 $9,200.00 2.00

Page 97: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 97 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-01.56 MODIFY EXISTING MANHOLE, ADD NEW CO EACH 3 $1,570.00 $1,570.00 1.00 STATE $1,570.00 $1,570.00 1.00 755-01.57 STANDARD SEWER SERVICE W/ C.O. AND EACH 3 $567.86 $3,975.00 7.00 STATE $567.86 $3,975.00 7.00 755-01.58 EXISTING MANHOLE REMOVAL/ABANDONMEN EACH 3 $649.00 $6,490.00 10.00 STATE $649.00 $6,490.00 10.00 755-01.59 TOP SOIL AND SEEDING L.F. 3 $5.67 $21,453.20 3781.00 STATE $5.67 $21,453.20 3781.00 755-01.60 8" DIP WATER LINE, OUTSIDE ROADWAY L.F. 3 $57.00 $19,950.00 350.00 STATE $57.00 $19,950.00 350.00 755-01.61 8" DIP WTR LN, INSIDE 14" CS PIPE, L.F. 3 $150.00 $25,500.00 170.00 STATE $150.00 $25,500.00 170.00 755-01.62 8" DIP WTR LN, IN 14" CS PIPE,JACK. L.F. 3 $350.00 $59,500.00 170.00 STATE $350.00 $59,500.00 170.00 755-01.63 8" DIP WATER LINE, INSIDE ROADWAY L.F. 3 $65.00 $4,550.00 70.00 STATE $65.00 $4,550.00 70.00 755-01.64 1/2" COPPER SERVICE LINE REPLACEMEN L.F. 3 $18.70 $3,366.00 180.00 STATE $18.70 $3,366.00 180.00 755-01.65 8" RESILIENT SEAT GATE VALVE W/ BOX EACH 3 $1,115.00 $2,230.00 2.00 STATE $1,115.00 $2,230.00 2.00 755-01.66 DIP FITTINGS LB. 3 $2.25 $2,250.00 1000.00 STATE $2.25 $2,250.00 1000.00 755-01.67 CONNECTION TO EXISTING 8" WATER LIN EACH 3 $2,700.00 $5,400.00 2.00 STATE $2,700.00 $5,400.00 2.00 755-01.68 CONNECTION TO EXISTING 6" WATER LIN EACH 3 $2,700.00 $5,400.00 2.00 STATE $2,700.00 $5,400.00 2.00 755-01.69 SERVICE CONNECTION TO EXISTING WATE EACH 3 $577.50 $1,155.00 2.00 STATE $577.50 $1,155.00 2.00 755-01.70 WATER METER RELOCATION W/ NEW BOX EACH 3 $567.50 $2,270.00 4.00 STATE $567.50 $2,270.00 4.00 755-01.72 TOPSOIL AND SEEDING L.F. 3 $6.12 $8,119.50 1326.00 STATE $6.12 $8,119.50 1326.00 755-01.73 PERMANENT PAVEMENT, "H" (TYPE 9) L.F. 3 $26.55 $7,700.00 290.00 STATE $26.55 $7,700.00 290.00 755-01.74 PERMANENT PAVEMENT, "A" (411-E) S.Y. 3 $8.43 $8,343.00 990.00 STATE $8.43 $8,343.00 990.00 755-01.76 8" DIP SWR PIPE COMP WITH 48" TUNN. L.F. 3 $990.00 $326,700.00 330.00 STATE $990.00 $326,700.00 330.00 755-01.78 ADDITIONAL MANHOLE SIDEWALL, 48" I. V.F. 3 $125.00 $10,750.00 86.00 STATE $125.00 $10,750.00 86.00 755-01.79 STANDARD MANHOLE FRAME AND COVER EACH 3 $300.00 $3,600.00 12.00 STATE $300.00 $3,600.00 12.00 755-01.80 OUTSIDE DROP MANHOLE CONNECTION EACH 3 $1,340.00 $4,020.00 3.00 STATE $1,340.00 $4,020.00 3.00 755-01.81 WATERTIGHT MANHOLE FRAME AND COVER EACH 3 $520.00 $1,040.00 2.00 STATE $520.00 $1,040.00 2.00 755-01.82 MODIFY EXISTING MANHOLE EACH 3 $610.00 $3,050.00 5.00 STATE $610.00 $3,050.00 5.00

Page 98: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 98 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-01.83 CONCRETE ENCASEMENT L.F. 3 $15.00 $3,750.00 250.00 STATE $15.00 $3,750.00 250.00 755-01.86 12"DIP (CL 52) WTR LN INSTALL UND B L.F. 3 $275.00 $121,000.00 440.00 STATE $275.00 $121,000.00 440.00 755-01.87 12" DIP (CL 52) WATER LINE, INSIDE L.F. 3 $51.00 $66,810.00 1310.00 STATE $51.00 $66,810.00 1310.00 755-01.88 DIP FITTINGS LB. 3 $3.50 $67,424.00 19264.00 STATE $3.50 $67,424.00 19264.00 755-01.89 CONNECTION TO EXISTING 8" WATER LIN EACH 3 $760.00 $3,040.00 4.00 STATE $760.00 $3,040.00 4.00 755-01.90 CONNECTION TO EXISTING 12" WATER LI EACH 3 $830.00 $1,660.00 2.00 STATE $830.00 $1,660.00 2.00 755-01.91 CUT AND CAP 12" TEMP. DURING CONST. EACH 3 $810.00 $1,620.00 2.00 STATE $810.00 $1,620.00 2.00 755-01.98 12" WM ABANDON & INSTALLATION ON BR LS 3 $98,437.00 $98,437.00 1.00 STATE $98,437.00 $98,437.00 1.00 755-01.99 CUT-IN 12" VALVE EACH 3 $1,500.00 $3,000.00 2.00 STATE $1,500.00 $3,000.00 2.00 755-02.40 8" DIP SEWER PIPE, INSIDE ROADWAY L.F. 3 $62.05 $24,075.40 388.00 STATE $62.05 $24,075.40 388.00 755-02.41 8" PVC SEWER PIPE, INSIDE ROADWAY L.F. 3 $46.50 $168,516.00 3624.00 STATE $46.50 $168,516.00 3624.00 755-02.42 6" PVC SEWER SERVICE PIPE L.F. 3 $46.48 $35,785.75 770.00 STATE $46.48 $35,785.75 770.00 755-02.43 MANHOLE 0'-6' IN DEPTH EACH 3 $1,840.00 $77,280.00 42.00 STATE $1,840.00 $77,280.00 42.00 755-02.44 STANDARD CAST IRON MANHOLE FRAME & EACH 3 $206.00 $8,652.00 42.00 STATE $206.00 $8,652.00 42.00 755-02.45 CONN. TO EX. M.H., COMPLETE EACH 3 $530.00 $1,060.00 2.00 STATE $530.00 $1,060.00 2.00 755-02.46 ADDITIONAL MH SIDEWALL, 48" DIA V.F. 3 $133.00 $10,640.00 80.00 STATE $133.00 $10,640.00 80.00 755-02.47 MANHOLE DROP ASSEMBY EACH 3 $1,060.00 $4,240.00 4.00 STATE $1,060.00 $4,240.00 4.00 755-02.48 8"x 6" PLUGGED TEE CONNECTION EACH 3 $277.50 $7,215.00 26.00 STATE $277.50 $7,215.00 26.00 755-02.49 6" D.I.P., CLASS 52 INSIDE ROADWAY L.F. 3 $60.95 $41,324.10 678.00 STATE $60.95 $41,324.10 678.00 755-02.50 6"x 6" TAPPING SLEEVE AND VALVE EACH 3 $1,900.00 $7,600.00 4.00 STATE $1,900.00 $7,600.00 4.00 755-02.51 6" VALVE WITH BOX, COMPLETE EACH 3 $800.00 $11,200.00 14.00 STATE $800.00 $11,200.00 14.00 755-02.52 DUCTILE IRON FITTINGS LB. 3 $2.10 $8,408.40 4004.00 STATE $2.10 $8,408.40 4004.00 755-02.53 NEW TAPS AND CONNECTIONS EACH 3 $265.00 $5,300.00 20.00 STATE $265.00 $5,300.00 20.00 755-02.54 3/4" COPPER WATER SERVICE LINE L.F. 3 $11.00 $1,100.00 100.00 STATE $11.00 $1,100.00 100.00

Page 99: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 99 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-02.55 1" COPPER WATER SERVICE LINE L.F. 3 $12.70 $1,270.00 100.00 STATE $12.70 $1,270.00 100.00 755-02.56 EX. WATER VALVE ADJUSTMENT EACH 3 $265.00 $12,190.00 46.00 STATE $265.00 $12,190.00 46.00 755-02.57 FIRE HYADRANT ASSEMBLY EACH 3 $1,900.00 $19,000.00 10.00 STATE $1,900.00 $19,000.00 10.00 755-02.58 EXISTING FIRE ABANDONMENT EACH 3 $530.00 $5,300.00 10.00 STATE $530.00 $5,300.00 10.00 755-02.59 6" PVC SANITARY SEWER PIPE L.F. 3 $45.00 $12,375.00 275.00 STATE $45.00 $12,375.00 275.00 755-02.67 24" DIP SEWER PIPE, IN 48" TUNNEL W L.F. 3 $1,030.00 $427,450.00 415.00 STATE $1,030.00 $427,450.00 415.00 755-02.68 24" DIP SEWER PIPE, OUTSIDE ROADWAY L.F. 3 $65.00 $48,750.00 750.00 STATE $65.00 $48,750.00 750.00 755-02.69 48" DIP SEWER PIPE, OUTSIDE ROADWAY L.F. 3 $245.00 $114,170.00 466.00 STATE $245.00 $114,170.00 466.00 755-02.70 48" DIP SEWER PIPE, INSIDE ROADWAY L.F. 3 $250.00 $49,250.00 197.00 STATE $250.00 $49,250.00 197.00 755-02.71 12" DIP WATER LINE, OUTSIDE ROADWAY L.F. 3 $35.00 $25,410.00 726.00 STATE $35.00 $25,410.00 726.00 755-02.72 12" DIP WTR LINE IN 48" DIA. TUNNEL L.F. 3 $150.00 $58,500.00 390.00 STATE $150.00 $58,500.00 390.00 755-02.73 60" DIP(CL52) WATER LINE, RST JT IN L.F. 3 $425.00 $271,575.00 639.00 STATE $425.00 $271,575.00 639.00 755-02.75 CONNECTION TO EXISTING 60" WATER LI EACH 3 $18,500.00 $37,000.00 2.00 STATE $18,500.00 $37,000.00 2.00 755-02.76 CONCRETE THRUST BLOCKING C.Y. 3 $50.00 $2,500.00 50.00 STATE $50.00 $2,500.00 50.00 755-02.77 24" DIP SEWER PIPE, INSIDE ROADWAY L.F. 3 $150.00 $28,650.00 191.00 STATE $150.00 $28,650.00 191.00 755-02.79 CUT AND CAP EXISTING WATER LINE EACH 3 $600.00 $600.00 1.00 STATE $600.00 $600.00 1.00 755-02.80 36" DIP SEWER PIPE, OUTSIDE ROADWAY L.F. 3 $200.00 $4,600.00 23.00 STATE $200.00 $4,600.00 23.00 755-03.19 MOBILIZATION LS 1 $5,000.00 $5,000.00 1.00 STATE $5,000.00 $5,000.00 1.00 755-03.20 2" DR11 HDPE OUTSIDE OF PAVEMENT L.F. 1 $10.00 $200.00 20.00 STATE $10.00 $200.00 20.00 755-03.21 6" DIP OUTSIDE OF PAVEMENT L.F. 1 $15.00 $1,500.00 100.00 STATE $15.00 $1,500.00 100.00 755-03.22 2" TIE-IN (TAPPING SLEEVE AND VALVE LS 1 $1,200.00 $1,200.00 1.00 STATE $1,200.00 $1,200.00 1.00 755-03.23 CONNECT NEW 6" TO EXISTING 6" (NO V EACH 1 $300.00 $600.00 2.00 STATE $300.00 $600.00 2.00 755-03.24 6" GATE VALVE AND BOX EACH 1 $500.00 $1,000.00 2.00 STATE $500.00 $1,000.00 2.00 755-03.25 2" GATE VALVE AND BOX EACH 1 $350.00 $350.00 1.00 STATE $350.00 $350.00 1.00

Page 100: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-03.26 6" STEEL CASING (W/ 2" CARRIER PIPE L.F. 1 $30.00 $1,650.00 55.00 STATE $30.00 $1,650.00 55.00 755-03.27 SURFACE RESTORATION, TOPSOIL, SEED( LS 1 $1,500.00 $1,500.00 1.00 STATE $1,500.00 $1,500.00 1.00 755-03.28 TRAFFIC CONTROL(WATER) LS 1 $1,500.00 $1,500.00 1.00 STATE $1,500.00 $1,500.00 1.00 755-03.29 8" CL200 C900 PVC FORCE MAIN OUT OF L.F. 1 $18.00 $16,200.00 900.00 STATE $18.00 $16,200.00 900.00 755-03.30 8" CL200 C900 PVC FORCE MAIN UNDER L.F. 1 $25.00 $625.00 25.00 STATE $25.00 $625.00 25.00 755-03.31 TIE-IN TO EXISTING 8" LS 1 $1,000.00 $1,000.00 1.00 STATE $1,000.00 $1,000.00 1.00 755-03.32 CONNECTION TO EXISTING MH LS 1 $1,000.00 $1,000.00 1.00 STATE $1,000.00 $1,000.00 1.00 755-03.33 16" STEEL CASING OUTSIDE OF PAVEMEN L.F. 1 $40.00 $1,200.00 30.00 STATE $40.00 $1,200.00 30.00 755-03.34 16" STEEL CASING UNDER PAVEMENT L.F. 1 $60.00 $3,300.00 55.00 STATE $60.00 $3,300.00 55.00 755-03.35 AIR RELEASE VALVE ASSEMBLY EACH 1 $1,500.00 $3,000.00 2.00 STATE $1,500.00 $3,000.00 2.00 755-03.36 SURFACE RESTOR. TOPSOIL, SEEDING(SS LS 1 $1,500.00 $1,500.00 1.00 STATE $1,500.00 $1,500.00 1.00 755-03.37 TRAFFIC CONTROL(SS) LS 1 $1,500.00 $1,500.00 1.00 STATE $1,500.00 $1,500.00 1.00 755-03.38 PIPELINE MARKERS (SEWER) EACH 1 $100.00 $500.00 5.00 STATE $100.00 $500.00 5.00 755-03.39 PLUG EXISTING SEWER EACH 1 $500.00 $1,000.00 2.00 STATE $500.00 $1,000.00 2.00 755-03.40 12" STL GAS MAIN (1/4" WALL THICK) L.F. 1 $36.00 $43,200.00 1200.00 STATE $36.00 $43,200.00 1200.00 755-03.41 12" STEEL GAS MAIN (1/4" WALL THICK L.F. 1 $40.00 $4,000.00 100.00 STATE $40.00 $4,000.00 100.00 755-03.42 2" STEEL GAS MAIN OUTSIDE OF PAVEME L.F. 1 $20.00 $3,000.00 150.00 STATE $20.00 $3,000.00 150.00 755-03.43 2" STEEL GAS MAIN UNDER PAVEMENT L.F. 1 $25.00 $500.00 20.00 STATE $25.00 $500.00 20.00 755-03.44 12" STEEL BALL VALVE EACH 1 $8,000.00 $32,000.00 4.00 STATE $8,000.00 $32,000.00 4.00 755-03.45 2" STEEL BALL VALVE EACH 1 $500.00 $1,000.00 2.00 STATE $500.00 $1,000.00 2.00 755-03.46 TIE-IN TO EXISTING 12" EACH 1 $1,500.00 $3,000.00 2.00 STATE $1,500.00 $3,000.00 2.00 755-03.47 20" HDPE CASING (INCL. 12" CARRIER L.F. 1 $100.00 $3,000.00 30.00 STATE $100.00 $3,000.00 30.00 755-03.48 6" HDPE CASING (INCLUDE 2" CARRIER L.F. 1 $20.00 $1,100.00 55.00 STATE $20.00 $1,100.00 55.00 755-03.49 SERVICE RECONNECTION EACH 1 $500.00 $1,000.00 2.00 STATE $500.00 $1,000.00 2.00

Average Unit Price Report 100

Page 101: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 101 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-03.50 PIPELINE MARKERS (GAS) EACH 1 $100.00 $500.00 5.00 STATE $100.00 $500.00 5.00 755-03.51 X-RAY LS 1 $5,000.00 $5,000.00 1.00 STATE $5,000.00 $5,000.00 1.00 755-03.52 SURFACE RESTOR., TOPSOIL, SEED(GAS) LS 1 $1,500.00 $1,500.00 1.00 STATE $1,500.00 $1,500.00 1.00 755-03.53 TRAFFIC CONTROL(GAS) LS 1 $1,500.00 $1,500.00 1.00 STATE $1,500.00 $1,500.00 1.00 755-03.54 SEAL EXISTING 12" TO BE ABANDONED EACH 1 $1,000.00 $2,000.00 2.00 STATE $1,000.00 $2,000.00 2.00 755-04.01 UNSUITABLE MATERIAL EXC., W/ DISPOS C.Y. 1 $6.00 $2,400.00 400.00 STATE $6.00 $2,400.00 400.00 755-04.02 CRUSHED STONE TDOT NO. 67 TON 1 $13.50 $2,700.00 200.00 STATE $13.50 $2,700.00 200.00 755-04.03 ASPHALT PAVEMENT REPAIR S.Y. 1 $30.00 $7,200.00 240.00 STATE $30.00 $7,200.00 240.00 755-04.04 CONCRETE PAVEMENT REPAIR S.Y. 1 $60.00 $1,800.00 30.00 STATE $60.00 $1,800.00 30.00 755-04.05 CONCRETE FOR UTILITIES C.Y. 1 $120.00 $2,400.00 20.00 STATE $120.00 $2,400.00 20.00 755-04.06 INSTALL 2" MDPE WITHOUT STONE BACKF L.F. 1 $5.00 $4,925.00 985.00 STATE $5.00 $4,925.00 985.00 755-04.07 INSTALL 4" MDPE WITHOUT STONE BACKF L.F. 1 $9.10 $26,936.00 2960.00 STATE $9.10 $26,936.00 2960.00 755-04.08 INSTALL 8" MDPE WITHOUT STONE BACKF L.F. 1 $15.25 $118,721.25 7785.00 STATE $15.25 $118,721.25 7785.00 755-04.09 INSTALL 12" MDPE W/O STONE BACKFILL L.F. 1 $23.00 $18,400.00 800.00 STATE $23.00 $18,400.00 800.00 755-04.10 INSTALL 2-INCH MDPE BENEATH PAVEMEN L.F. 1 $23.00 $3,565.00 155.00 STATE $23.00 $3,565.00 155.00 755-04.11 INSTALL 4-INCH MDPE BENEATH PAVEMEN L.F. 1 $50.00 $17,000.00 340.00 STATE $50.00 $17,000.00 340.00 755-04.12 INSTALL 8-INCH MDPE BENEATH PAVEMEN L.F. 1 $71.00 $7,455.00 105.00 STATE $71.00 $7,455.00 105.00 755-04.13 INSTALL 2-INCH POLYETHYLENE GAS VAL EACH 1 $60.00 $540.00 9.00 STATE $60.00 $540.00 9.00 755-04.14 INSTALL 4-INCH POLYETHYLENE GAS VAL EACH 1 $60.00 $960.00 16.00 STATE $60.00 $960.00 16.00 755-04.15 INSTALL 6-INCH POLYETHYLENE GAS VAL EACH 1 $170.00 $170.00 1.00 STATE $170.00 $170.00 1.00 755-04.16 INSTALL 8-INCH POLYETHYLENE GAS VAL EACH 1 $225.00 $5,400.00 24.00 STATE $225.00 $5,400.00 24.00 755-04.17 INSTALL 12-INCH POLYETHYLENE GAS VA EACH 1 $225.00 $225.00 1.00 STATE $225.00 $225.00 1.00 755-04.18 BORE 4-INCH MDPE L.F. 1 $23.00 $4,830.00 210.00 STATE $23.00 $4,830.00 210.00 755-04.19 BORE 8-INCH MDPE L.F. 1 $51.00 $32,385.00 635.00 STATE $51.00 $32,385.00 635.00

Page 102: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 102 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-04.20 BORE12-INCH MDPE L.F. 1 $56.00 $12,880.00 230.00 STATE $56.00 $12,880.00 230.00 755-04.21 AUGER BORE 18" STEEL CASING W/ 12" L.F. 1 $140.00 $68,600.00 490.00 STATE $140.00 $68,600.00 490.00 755-04.22 AUGER BORE 12" STEEL CASING W/ 8" M L.F. 1 $67.00 $17,085.00 255.00 STATE $67.00 $17,085.00 255.00 755-04.23 18" STEEL CASING W/ 12" MDPE (OPEN- L.F. 1 $90.00 $9,000.00 100.00 STATE $90.00 $9,000.00 100.00 755-04.24 12" STEEL CASING W/ 8" MDPE (OPEN-C L.F. 1 $67.00 $3,350.00 50.00 STATE $67.00 $3,350.00 50.00 755-04.25 8" STEEL CASING W/ 4" MDPE (OPEN-CU L.F. 1 $45.00 $1,350.00 30.00 STATE $45.00 $1,350.00 30.00 755-04.26 MDPE SERVICE LINE UP TO 1-INCH(OPEN L.F. 1 $6.70 $3,919.50 585.00 STATE $6.70 $3,919.50 585.00 755-04.27 MDPE SERVICE LINE 1 ¼" TO 2"(OPEN C L.F. 1 $6.70 $6,499.00 970.00 STATE $6.70 $6,499.00 970.00 755-04.28 MDPE SERVICE LINE UP TO 1-INCH (BOR L.F. 1 $23.00 $2,760.00 120.00 STATE $23.00 $2,760.00 120.00 755-04.29 MDPE SERVICE LINE 1 ¼" TO 2" (BORE) L.F. 1 $23.00 $5,175.00 225.00 STATE $23.00 $5,175.00 225.00 755-04.30 RECONNECT EXISTING SERVICE LINE UP EACH 1 $170.00 $5,270.00 31.00 STATE $170.00 $5,270.00 31.00 755-04.31 RE-CONNECT EXIST SERVICE LINE 1 ¼-" EACH 1 $170.00 $2,380.00 14.00 STATE $170.00 $2,380.00 14.00 755-04.32 PURGING OF EXISTING GAS FACILITIES LS 1 $1,250.00 $2,500.00 2.00 STATE $1,250.00 $2,500.00 2.00 755-04.40 INSTALL WOOD UTILITY POLE, CLASS 4, EACH 1 $600.00 $1,200.00 2.00 STATE $600.00 $1,200.00 2.00 755-04.41 INSTALL WOOD UTILITY POLE, CLASS 4, EACH 1 $700.00 $3,500.00 5.00 STATE $700.00 $3,500.00 5.00 755-04.42 CONCRETE UTILITY POLE, CLASS 2, 45' EACH 1 $2,400.00 $12,000.00 5.00 STATE $2,400.00 $12,000.00 5.00 755-04.43 CONCRETE UTILITY POLE, CLASS 2, 50' EACH 1 $2,500.00 $17,500.00 7.00 STATE $2,500.00 $17,500.00 7.00 755-04.44 CONCRETE UTILITY POLE, CLASS 2, 55' EACH 1 $2,600.00 $5,200.00 2.00 STATE $2,600.00 $5,200.00 2.00 755-04.45 CONCRETE UTILITY POLE, CLASS 2, 60' EACH 1 $2,900.00 $2,900.00 1.00 STATE $2,900.00 $2,900.00 1.00 755-04.46 STEEL UTILITY POLE, CLASS H4, 95' EACH 1 $7,000.00 $7,000.00 1.00 STATE $7,000.00 $7,000.00 1.00 755-04.47 STEEL UTILITY POLE, CLASS H6,90' W EACH 1 $8,100.00 $8,100.00 1.00 STATE $8,100.00 $8,100.00 1.00 755-04.48 STEEL UTILITY POLE, CLASS H4, 90' EACH 1 $6,200.00 $6,200.00 1.00 STATE $6,200.00 $6,200.00 1.00 755-04.49 STEEL UTILITY POLE, CLASS H2, 90' W EACH 1 $7,100.00 $7,100.00 1.00 STATE $7,100.00 $7,100.00 1.00 755-04.50 STEEL UTILITY POLE, CLASS H2, 90' EACH 1 $5,500.00 $44,000.00 8.00 STATE $5,500.00 $44,000.00 8.00

Page 103: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 103 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-04.51 STEEL UTILITY POLE, CLASS H2, 85' EACH 1 $5,200.00 $36,400.00 7.00 STATE $5,200.00 $36,400.00 7.00 755-04.52 STEEL UTILITY POLE, CLASS H1, 80' EACH 1 $4,700.00 $4,700.00 1.00 STATE $4,700.00 $4,700.00 1.00 755-04.53 STEEL UTILITY POLE, CLASS H3, 65' EACH 1 $4,100.00 $4,100.00 1.00 STATE $4,100.00 $4,100.00 1.00 755-04.54 STEEL UTILITY POLE, CLASS H4, 50' EACH 1 $3,200.00 $6,400.00 2.00 STATE $3,200.00 $6,400.00 2.00 755-04.55 STEEL UTILITY POLE,85' SELF-SUPP W/ EACH 1 $94,000.00 $94,000.00 1.00 STATE $94,000.00 $94,000.00 1.00 755-04.56 STEEL UTILITY POLE,80' SELF-SUPP W/ EACH 1 $80,000.00 $80,000.00 1.00 STATE $80,000.00 $80,000.00 1.00 755-04.57 STEEL UTILITY POLE,50' SELF-SUPP W/ EACH 1 $26,000.00 $52,000.00 2.00 STATE $26,000.00 $52,000.00 2.00 755-04.58 ELECTRIC FRAMING ASSEMBLY (TYPE A2- EACH 1 $325.00 $650.00 2.00 STATE $325.00 $650.00 2.00 755-04.59 ELECTRIC FRAMING ASSEMBLY (TYPE B1) EACH 1 $180.00 $180.00 1.00 STATE $180.00 $180.00 1.00 755-04.60 ELECTRIC FRAMING ASSEMBLY (TYPE C1 EACH 1 $900.00 $2,700.00 3.00 STATE $900.00 $2,700.00 3.00 755-04.61 ELECTRIC FRAMING ASSEMBLY (TYPE C1- EACH 1 $325.00 $1,625.00 5.00 STATE $325.00 $1,625.00 5.00 755-04.62 ELECTRIC FRAMING ASSEMBLY (TYPE C1- EACH 1 $750.00 $2,250.00 3.00 STATE $750.00 $2,250.00 3.00 755-04.63 ELECTRIC FRAMING ASSEMBLY (TYPE DE) EACH 1 $125.00 $500.00 4.00 STATE $125.00 $500.00 4.00 755-04.64 ELECTRIC FRAMING ASSEMBLY (TYPE S3B EACH 1 $900.00 $900.00 1.00 STATE $900.00 $900.00 1.00 755-04.65 ELECTRIC FRAMING ASSEMBLY (TYPE S5B EACH 1 $2,600.00 $13,000.00 5.00 STATE $2,600.00 $13,000.00 5.00 755-04.66 ELECTRIC FRAMING ASSEMBLY (TYPE S7B EACH 1 $3,600.00 $3,600.00 1.00 STATE $3,600.00 $3,600.00 1.00 755-04.67 ELECTRIC FRAMING ASSEMBLY (TYPE SV1 EACH 1 $85.00 $1,530.00 18.00 STATE $85.00 $1,530.00 18.00 755-04.68 ELECTRIC FRAMING ASSEMBLY (TYPE SV3 EACH 1 $85.00 $85.00 1.00 STATE $85.00 $85.00 1.00 755-04.69 ELECTRIC FRAMING ASSEMBLY (TYPE SV5 EACH 1 $145.00 $435.00 3.00 STATE $145.00 $435.00 3.00 755-04.70 ELECTRIC FRAMING (TYPE SWITCH 69 K EACH 1 $3,500.00 $3,500.00 1.00 STATE $3,500.00 $3,500.00 1.00 755-04.71 ELECTRIC FRAMING ASSEMBLY (TYPE T2) EACH 1 $350.00 $7,350.00 21.00 STATE $350.00 $7,350.00 21.00 755-04.72 ELECTRIC FRAMING ASSEMBLY (TYPE T2A EACH 1 $370.00 $370.00 1.00 STATE $370.00 $370.00 1.00 755-04.73 ELECTRIC FRAMING ASSEMBLY (TYPE T2D EACH 1 $1,100.00 $8,800.00 8.00 STATE $1,100.00 $8,800.00 8.00 755-04.74 ELECTRIC FRAMING ASSEMBLY (TYPE T2D EACH 1 $520.00 $5,720.00 11.00 STATE $520.00 $5,720.00 11.00

Page 104: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 104 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-04.75 ELECTRIC FRAMING ASSEMBLY (TYPE Y1B EACH 1 $750.00 $11,250.00 15.00 STATE $750.00 $11,250.00 15.00 755-04.76 ELECTRIC UTILITY ASSEMBLY (TYPE 1TR EACH 1 $650.00 $9,750.00 15.00 STATE $650.00 $9,750.00 15.00 755-04.77 ELECTRIC UTILITY ASSEMBLY (TYPE 3CO EACH 1 $700.00 $2,100.00 3.00 STATE $700.00 $2,100.00 3.00 755-04.78 ELECTRIC UTILITY ASSEMBLY (TYPE 3TR EACH 1 $1,900.00 $3,800.00 2.00 STATE $1,900.00 $3,800.00 2.00 755-04.79 ELECTRIC UTILITY ASSEMBLY (TYPE A-1 EACH 1 $125.00 $4,375.00 35.00 STATE $125.00 $4,375.00 35.00 755-04.80 ELECTRIC UTILITY ASSEMBLY (TYPE A-8 EACH 1 $125.00 $2,625.00 21.00 STATE $125.00 $2,625.00 21.00 755-04.81 ELECTRIC UTLY ASSEMBLY (TYPE CAPACI EACH 1 $1,100.00 $3,300.00 3.00 STATE $1,100.00 $3,300.00 3.00 755-04.82 ELECTRIC UTILITY ASSEMBLY (TYPE DG- EACH 1 $135.00 $12,150.00 90.00 STATE $135.00 $12,150.00 90.00 755-04.83 ELECTRIC UTLY ASSEMBLY (TYPE GUARD EACH 1 $75.00 $1,950.00 26.00 STATE $75.00 $1,950.00 26.00 755-04.84 ELECTRIC UTILITY ASSEMBLY (TYPE GUY EACH 1 $25.00 $1,375.00 55.00 STATE $25.00 $1,375.00 55.00 755-04.85 ELECTRIC UTILITY ASSEMBLY (TYPE HG- EACH 1 $135.00 $1,485.00 11.00 STATE $135.00 $1,485.00 11.00 755-04.86 ELECTRIC UTILITY ASSEMBLY (TYPE ROD EACH 1 $65.00 $1,560.00 24.00 STATE $65.00 $1,560.00 24.00 755-04.87 ELECTRIC UTLY ASSEMBLY (TYPE SERV E EACH 1 $200.00 $200.00 1.00 STATE $200.00 $200.00 1.00 755-04.88 ELECTRIC UTILITY ASSEMBLY (TYPE SW/ EACH 1 $760.00 $3,040.00 4.00 STATE $760.00 $3,040.00 4.00 755-04.89 INSTALL RISER ASSEMBLY (TYPE SECRIS EACH 1 $310.00 $1,550.00 5.00 STATE $310.00 $1,550.00 5.00 755-04.90 INSTALL RISER ASSEMBLY (TYPE TP1S) EACH 1 $570.00 $3,990.00 7.00 STATE $570.00 $3,990.00 7.00 755-04.91 INSTALL RISER ASSEMBLY (TYPE TP3D-7 EACH 1 $1,600.00 $4,800.00 3.00 STATE $1,600.00 $4,800.00 3.00 755-04.92 INSTALL RISER ASSEMBLY (TYPE TP3S-1 EACH 1 $1,000.00 $4,000.00 4.00 STATE $1,000.00 $4,000.00 4.00 755-04.93 INSTALL RISER ASSEMBLY (TYPE TP3S-3 EACH 1 $900.00 $4,500.00 5.00 STATE $900.00 $4,500.00 5.00 755-04.94 COMMUNICATION CONDUIT, 4 TYPE C L.F. 1 $18.00 $360.00 20.00 STATE $18.00 $360.00 20.00 755-04.95 COMMUNICATION DUCTLINE TAP (CDT) EACH 1 $380.00 $3,800.00 10.00 STATE $380.00 $3,800.00 10.00 755-04.96 COMMUNICATION RISER BASE (CRB) EACH 1 $350.00 $3,150.00 9.00 STATE $350.00 $3,150.00 9.00 755-04.97 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $137.00 $82,748.00 604.00 STATE $137.00 $82,748.00 604.00 755-04.98 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $169.00 $136,383.00 807.00 STATE $169.00 $136,383.00 807.00

Page 105: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 105 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-04.99 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $185.00 $156,880.00 848.00 STATE $185.00 $156,880.00 848.00 755-05.01 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $200.00 $22,800.00 114.00 STATE $200.00 $22,800.00 114.00 755-05.02 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $76.00 $11,172.00 147.00 STATE $76.00 $11,172.00 147.00 755-05.03 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $125.00 $1,875.00 15.00 STATE $125.00 $1,875.00 15.00 755-05.04 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $135.00 $37,395.00 277.00 STATE $135.00 $37,395.00 277.00 755-05.05 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $43.00 $12,771.00 297.00 STATE $43.00 $12,771.00 297.00 755-05.06 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $70.00 $18,200.00 260.00 STATE $70.00 $18,200.00 260.00 755-05.07 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $1.70 $967.30 569.00 STATE $1.70 $967.30 569.00 755-05.08 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $33.00 $43,230.00 1310.00 STATE $33.00 $43,230.00 1310.00 755-05.09 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $130.00 $5,850.00 45.00 STATE $130.00 $5,850.00 45.00 755-05.10 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $57.00 $9,120.00 160.00 STATE $57.00 $9,120.00 160.00 755-05.11 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $43.00 $6,966.00 162.00 STATE $43.00 $6,966.00 162.00 755-05.12 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $48.00 $21,504.00 448.00 STATE $48.00 $21,504.00 448.00 755-05.13 CONCRETE ENCASED CONDUIT (DUCTLINE L.F. 1 $17.00 $44,659.00 2627.00 STATE $17.00 $44,659.00 2627.00 755-05.14 ELECTRIC UTILITY RISER BASE (ERB) EACH 1 $500.00 $8,500.00 17.00 STATE $500.00 $8,500.00 17.00 755-05.15 ELECTRIC MANHOLE EACH 1 $22,000.00 $22,000.00 1.00 STATE $22,000.00 $22,000.00 1.00 755-05.16 ELECTRIC PULLBOX (3X5) EACH 1 $2,900.00 $92,800.00 32.00 STATE $2,900.00 $92,800.00 32.00 755-05.17 ELECTRIC PULLBOX (4X8) EACH 1 $4,700.00 $9,400.00 2.00 STATE $4,700.00 $9,400.00 2.00 755-05.18 INSTALL 1/0 URD PRIMARY CONDUCTOR L.F. 1 $0.80 $175.20 219.00 STATE $0.80 $175.20 219.00 755-05.19 2/0 CU URD SECONDARY TRIPLEXED COND L.F. 1 $0.80 $267.20 334.00 STATE $0.80 $267.20 334.00 755-05.20 INSTALL OVERHEAD CONDUCTOR(#1/0 TRI L.F. 1 $3.00 $414.00 138.00 STATE $3.00 $414.00 138.00 755-05.21 INSTALL OVERHEAD CONDUCTOR (#4 TRIP L.F. 1 $2.40 $1,000.80 417.00 STATE $2.40 $1,000.80 417.00 755-05.22 INSTALL OVERHEAD CONDUCTOR (#6 DUPL L.F. 1 $2.00 $910.00 455.00 STATE $2.00 $910.00 455.00 755-05.23 INSTALL OVERHEAD CONDUCTOR (1/0 ACS L.F. 1 $1.25 $8,272.50 6618.00 STATE $1.25 $8,272.50 6618.00

Page 106: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 106 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-05.24 INSTALL OVERHEAD CONDUCTOR(3/8 HS S L.F. 1 $1.50 $634.50 423.00 STATE $1.50 $634.50 423.00 755-05.25 INSTALL OVERHEAD CONDUCTOR (4/0 AA) L.F. 1 $1.50 $8,196.00 5464.00 STATE $1.50 $8,196.00 5464.00 755-05.26 INSTALL OVERHEAD CONDUCTOR (795 AA) L.F. 1 $1.75 $73,739.75 42137.00 STATE $1.75 $73,739.75 42137.00 755-05.27 INSTALL UNDERGROUND CONDUCTOR (#8 A L.F. 1 $0.80 $1,828.00 2285.00 STATE $0.80 $1,828.00 2285.00 755-05.28 INSTALL UNDERGROUND CONDUCTOR (1/0 L.F. 1 $0.80 $112.00 140.00 STATE $0.80 $112.00 140.00 755-05.29 PADMOUNT TRANSFORMER (TYPE 75 KVA) EACH 1 $2,900.00 $17,400.00 6.00 STATE $2,900.00 $17,400.00 6.00 755-05.30 PADMOUNT TRANSFORMER (TYPE 225 KVA) EACH 1 $3,100.00 $3,100.00 1.00 STATE $3,100.00 $3,100.00 1.00 755-05.31 TRANSFORMER PROTECTIVE ENCLOSURE EACH 1 $5,200.00 $5,200.00 1.00 STATE $5,200.00 $5,200.00 1.00 755-05.32 REMOVE PUSHPOLE EACH 1 $225.00 $225.00 1.00 STATE $225.00 $225.00 1.00 755-05.33 REMOVE WOOD UTILITY POLE,CLASS 1,80 EACH 1 $475.00 $5,700.00 12.00 STATE $475.00 $5,700.00 12.00 755-05.34 REMOVE WOOD UTILITY POLE,CLASS 1,85 EACH 1 $540.00 $3,780.00 7.00 STATE $540.00 $3,780.00 7.00 755-05.35 REMOVE WOOD UTILITY POLE,CLASS 1,90 EACH 1 $560.00 $1,120.00 2.00 STATE $560.00 $1,120.00 2.00 755-05.36 REMOVE WOOD UTILITY POLE,CLASS 2,65 EACH 1 $460.00 $460.00 1.00 STATE $460.00 $460.00 1.00 755-05.37 REMOVE WOOD UTILITY POLE,CLASS 3,35 EACH 1 $245.00 $2,695.00 11.00 STATE $245.00 $2,695.00 11.00 755-05.38 REMOVE WOOD UTILITY POLE,CLASS 3,40 EACH 1 $245.00 $2,450.00 10.00 STATE $245.00 $2,450.00 10.00 755-05.39 REMOVE WOOD UTILITY POLE,CLASS 3,45 EACH 1 $295.00 $13,865.00 47.00 STATE $295.00 $13,865.00 47.00 755-05.40 REMOVE WOOD UTILITY POLE,CLASS 3,50 EACH 1 $295.00 $4,425.00 15.00 STATE $295.00 $4,425.00 15.00 755-05.41 REMOVE WOOD UTILITY POLE,CLASS 4,35 EACH 1 $245.00 $1,225.00 5.00 STATE $245.00 $1,225.00 5.00 755-05.42 REMOVE WOOD UTILITY POLE,CLASS 4,40 EACH 1 $245.00 $1,470.00 6.00 STATE $245.00 $1,470.00 6.00 755-05.43 REMOVE CONC UTLY POLE, CLASS 2, 50' EACH 1 $520.00 $520.00 1.00 STATE $520.00 $520.00 1.00 755-05.44 REMOVE ELECTRIC FRAMING (TYPE A2) EACH 1 $220.00 $220.00 1.00 STATE $220.00 $220.00 1.00 755-05.45 REMOVE ELECTRIC FRAMING (TYPE A2-79 EACH 1 $220.00 $220.00 1.00 STATE $220.00 $220.00 1.00 755-05.46 REMOVE ELECTRIC FRAMING (TYPE B1) EACH 1 $120.00 $480.00 4.00 STATE $120.00 $480.00 4.00 755-05.47 REMOVE ELECTRIC FRAMING (TYPE B2) EACH 1 $220.00 $660.00 3.00 STATE $220.00 $660.00 3.00

Page 107: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 107 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-05.48 REMOVE ELECTRIC FRAMING (TYPE C1A) EACH 1 $410.00 $2,050.00 5.00 STATE $410.00 $2,050.00 5.00 755-05.49 REMOVE ELECTRIC FRAMING (TYPE C1B) EACH 1 $400.00 $2,000.00 5.00 STATE $400.00 $2,000.00 5.00 755-05.50 REMOVE ELECTRIC FRAMING (TYPE C1-NO EACH 1 $160.00 $1,280.00 8.00 STATE $160.00 $1,280.00 8.00 755-05.51 REMOVE ELECTRIC FRAMING (TYPE DE) EACH 1 $57.00 $912.00 16.00 STATE $57.00 $912.00 16.00 755-05.52 REMOVE ELECTRIC FRAMING (TYPE LL) EACH 1 $250.00 $500.00 2.00 STATE $250.00 $500.00 2.00 755-05.53 REMOVE ELECTRIC FRAMING (TYPE P1BS) EACH 1 $640.00 $11,520.00 18.00 STATE $640.00 $11,520.00 18.00 755-05.54 REMOVE ELECTRIC FRAMING ASSEMBLY(TY EACH 1 $1,500.00 $1,500.00 1.00 STATE $1,500.00 $1,500.00 1.00 755-05.55 REMOVE ELECTRIC FRAMING (TYPE S5B) EACH 1 $1,500.00 $3,000.00 2.00 STATE $1,500.00 $3,000.00 2.00 755-05.56 REMOVE ELECTRIC FRAMING (TYPE S7B) EACH 1 $2,300.00 $2,300.00 1.00 STATE $2,300.00 $2,300.00 1.00 755-05.57 REMOVE ELECTRIC FRAMING (TYPE SV1) EACH 1 $61.00 $1,098.00 18.00 STATE $61.00 $1,098.00 18.00 755-05.58 REMOVE ELECTRIC FRAMING (TYPE SV3) EACH 1 $65.00 $65.00 1.00 STATE $65.00 $65.00 1.00 755-05.59 REMOVE ELECTRIC FRAMING (TYPE SV5) EACH 1 $110.00 $330.00 3.00 STATE $110.00 $330.00 3.00 755-05.60 REMOVE ELEC FRAMING (TYPE SWITCH 69 EACH 1 $1,800.00 $1,800.00 1.00 STATE $1,800.00 $1,800.00 1.00 755-05.61 REMOVE ELECTRIC FRAMING (TYPE T1) EACH 1 $130.00 $1,300.00 10.00 STATE $130.00 $1,300.00 10.00 755-05.62 REMOVE ELECTRIC FRAMING (TYPE T2) EACH 1 $235.00 $8,460.00 36.00 STATE $235.00 $8,460.00 36.00 755-05.63 REMOVE ELECTRIC FRAMING (TYPE T2A) EACH 1 $250.00 $1,750.00 7.00 STATE $250.00 $1,750.00 7.00 755-05.64 REMOVE ELECTRIC FRAMING (TYPE T2DDE EACH 1 $510.00 $12,240.00 24.00 STATE $510.00 $12,240.00 24.00 755-05.65 REMOVE ELECTRIC FRAMING (TYPE T2DE) EACH 1 $230.00 $6,670.00 29.00 STATE $230.00 $6,670.00 29.00 755-05.66 REMOVE ELECTRIC UTILITY (TYPE 1CO) EACH 1 $65.00 $65.00 1.00 STATE $65.00 $65.00 1.00 755-05.67 REMOVE ELECTRIC UTILITY (TYPE 3CO) EACH 1 $245.00 $1,715.00 7.00 STATE $245.00 $1,715.00 7.00 755-05.68 REMOVE ELECTRIC UTILITY (TYPE 1TR) EACH 1 $360.00 $4,320.00 12.00 STATE $360.00 $4,320.00 12.00 755-05.69 REMOVE ELECTRIC UTILITY (TYPE 3TR) EACH 1 $1,050.00 $7,350.00 7.00 STATE $1,050.00 $7,350.00 7.00 755-05.70 REMOVE ELECTRIC UTILITY (TYPE A-10D EACH 1 $60.00 $780.00 13.00 STATE $60.00 $780.00 13.00 755-05.71 REMOVE ELECTRIC UTILITY (TYPE A-8DH EACH 1 $60.00 $4,860.00 81.00 STATE $60.00 $4,860.00 81.00

Page 108: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 108 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-05.72 REMOVE ELECTRIC UTILITY (TYPE CAPAC EACH 1 $390.00 $1,170.00 3.00 STATE $390.00 $1,170.00 3.00 755-05.73 REMOVE ELECTRIC UTILITY (TYPE DG-3/ EACH 1 $50.00 $6,050.00 121.00 STATE $50.00 $6,050.00 121.00 755-05.74 REMOVE ELECTRIC UTILITY (TYPE GUYGR EACH 1 $18.00 $1,692.00 94.00 STATE $18.00 $1,692.00 94.00 755-05.75 REMOVE ELECTRIC UTILITY (TYPE HG-3/ EACH 1 $50.00 $1,850.00 37.00 STATE $50.00 $1,850.00 37.00 755-05.76 REMOVE ELECTRIC UTILITY (TYPE LT) EACH 1 $120.00 $4,920.00 41.00 STATE $120.00 $4,920.00 41.00 755-05.77 REMOVE ELECTRIC UTILITY (TYPE SW/DI EACH 1 $310.00 $2,790.00 9.00 STATE $310.00 $2,790.00 9.00 755-05.78 REMOVE RISER ASSEMBLY (TYPE SECRISE EACH 1 $110.00 $110.00 1.00 STATE $110.00 $110.00 1.00 755-05.79 REMOVE RISER ASSEMBLY (TYPE TP1S) EACH 1 $190.00 $190.00 1.00 STATE $190.00 $190.00 1.00 755-05.80 REMOVE RISER ASSEMBLY (TYPE TP3S-1/ EACH 1 $280.00 $1,400.00 5.00 STATE $280.00 $1,400.00 5.00 755-05.81 REMOVE OVERHEAD CONDUCTOR (#1/0 TRI L.F. 1 $0.90 $1,092.60 1214.00 STATE $0.90 $1,092.60 1214.00 755-05.82 REMOVE OVERHEAD CONDUCTOR (#2 TRIPL L.F. 1 $0.75 $462.75 617.00 STATE $0.75 $462.75 617.00 755-05.83 REMOVE OVERHEAD CONDUCTOR (#4 TRIPL L.F. 1 $0.75 $1,048.50 1398.00 STATE $0.75 $1,048.50 1398.00 755-05.84 REMOVE OVERHEAD CONDUCTOR (#6 DUPLE L.F. 1 $0.40 $1,966.00 4915.00 STATE $0.40 $1,966.00 4915.00 755-05.85 REMOVE OVERHEAD CONDUCTOR (#6 HDCU) L.F. 1 $0.30 $617.40 2058.00 STATE $0.30 $617.40 2058.00 755-05.86 REMOVE OVERHEAD CONDUCTOR (#8 HDCU) L.F. 1 $0.30 $456.00 1520.00 STATE $0.30 $456.00 1520.00 755-05.87 REMOVE OVERHEAD CONDUCTOR (1/0 ACSR L.F. 1 $0.50 $13,192.00 26384.00 STATE $0.50 $13,192.00 26384.00 755-05.88 REMOVE OVERHEAD CONDUCTOR(1/0 QUADR L.F. 1 $1.00 $115.00 115.00 STATE $1.00 $115.00 115.00 755-05.89 REMOVE OVERHEAD CONDUCTOR (2/0 CU) L.F. 1 $0.60 $4,267.20 7112.00 STATE $0.60 $4,267.20 7112.00 755-05.90 REMOVE OVERHEAD CONDUCTOR (3/8 HS S L.F. 1 $0.50 $2,097.00 4194.00 STATE $0.50 $2,097.00 4194.00 755-05.91 REMOVE OVERHEAD CONDUCTOR (4/0 AA) L.F. 1 $0.60 $4,232.40 7054.00 STATE $0.60 $4,232.40 7054.00 755-05.92 REMOVE OVERHEAD CONDUCTOR (795 AA) L.F. 1 $0.75 $38,230.50 50974.00 STATE $0.75 $38,230.50 50974.00 755-05.93 REMOVE UNDERGROUND CONDUCTOR(1/0 UR L.F. 1 $0.60 $103.20 172.00 STATE $0.60 $103.20 172.00 755-05.94 REMOVE PADMOUNT TRANSFORMER(TYPE 15 EACH 1 $250.00 $250.00 1.00 STATE $250.00 $250.00 1.00 755-05.95 REMOVE PADMOUNT TRANSFORMER(TYPE 22 EACH 1 $270.00 $270.00 1.00 STATE $270.00 $270.00 1.00

Page 109: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-05.96 TRANSFER ELECTRIC UTILITY (TYPE 1TR EACH 1 $725.00 $1,450.00 2.00 STATE $725.00 $1,450.00 2.00 755-05.97 TRANSFER ELECTRIC UTILITY (TYPE 3TR EACH 1 $2,500.00 $2,500.00 1.00 STATE $2,500.00 $2,500.00 1.00 755-05.98 TRANSFER ELECTRIC UTILITY (TYPE CON EACH 1 $60.00 $3,120.00 52.00 STATE $60.00 $3,120.00 52.00 755-05.99 TRANSFER ELECTRIC UTILITY (TYPE LT) EACH 1 $175.00 $875.00 5.00 STATE $175.00 $875.00 5.00 755-06.01 TRANSFER ELEC. UTLTY ASSB. (TYPE SE EACH 1 $150.00 $150.00 1.00 STATE $150.00 $150.00 1.00 755-06.02 TRANSFER ELEC. UTILITY ASSB.(TYPE T EACH 1 $1,500.00 $3,000.00 2.00 STATE $1,500.00 $3,000.00 2.00 755-06.03 TRNSFR ELEC. UTLTY ASSB(TYPE TP3S-1 EACH 1 $550.00 $1,100.00 2.00 STATE $550.00 $1,100.00 2.00 755-06.04 RELOCATE CATCHBASIN EACH 1 $6,000.00 $6,000.00 1.00 STATE $6,000.00 $6,000.00 1.00 755-06.20 MECHANICAL JOINT FITTINGS LB. 1 $3.75 $70,710.00 18856.00 STATE $3.75 $70,710.00 18856.00 755-06.21 CONNECT PROPOSED 6 WATER TO EX. 6 W EACH 1 $1,000.00 $4,000.00 4.00 STATE $1,000.00 $4,000.00 4.00 755-06.22 CONNECT PROPOSED 8 WATER TO EX. 8 W EACH 1 $1,200.00 $13,200.00 11.00 STATE $1,200.00 $13,200.00 11.00 755-06.23 CONNECT PROPOSED 12 WATER TO EX.12 EACH 1 $1,500.00 $6,000.00 4.00 STATE $1,500.00 $6,000.00 4.00 755-06.24 WET CONN: PRO. 6 D.I.P. LINE TO EX EACH 1 $2,500.00 $5,000.00 2.00 STATE $2,500.00 $5,000.00 2.00 755-06.25 WET CONN: PROP. 8 D.I.P. W. TO EX. EACH 1 $2,500.00 $5,000.00 2.00 STATE $2,500.00 $5,000.00 2.00 755-06.26 WET CONN: PROP. 8 D.I.P. W. TO EX. EACH 1 $2,500.00 $2,500.00 1.00 STATE $2,500.00 $2,500.00 1.00 755-06.27 WET CONN. PROP. 12D.I.P. WTR TO EX. EACH 1 $5,000.00 $5,000.00 1.00 STATE $5,000.00 $5,000.00 1.00 755-06.28 CONN. PROP.8 D.I.P.WTR TO EX.12X8 M EACH 1 $2,000.00 $4,000.00 2.00 STATE $2,000.00 $4,000.00 2.00 755-06.29 CONN. PROP. 12 D.I.P. WTR TO EX.12X EACH 1 $5,000.00 $5,000.00 1.00 STATE $5,000.00 $5,000.00 1.00 755-06.30 CONN PROP. 16 D.I.P. WTR TO EX. 16 EACH 1 $800.00 $800.00 1.00 STATE $800.00 $800.00 1.00 755-06.31 1 AIR REL VLVE, CMPLT INSTALL W/VLV EACH 1 $2,500.00 $17,500.00 7.00 STATE $2,500.00 $17,500.00 7.00 755-06.32 2 AIR REL VLV, COMPL INSTALL W/VLV EACH 1 $3,000.00 $3,000.00 1.00 STATE $3,000.00 $3,000.00 1.00 755-06.33 2 BLOW-OFF ASSEMBLY EACH 1 $1,000.00 $8,000.00 8.00 STATE $1,000.00 $8,000.00 8.00 755-06.34 8 GATE VALVE, COMPLETE INSTALL W/ V EACH 1 $950.00 $24,700.00 26.00 STATE $950.00 $24,700.00 26.00 755-06.35 12 BUTTERFLY VALVE EACH 1 $1,400.00 $14,000.00 10.00 STATE $1,400.00 $14,000.00 10.00

Average Unit Price Report 109

Page 110: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-06.36 FIRE HYDRANT ASSEMBLY EACH 1 $1,900.00 $22,800.00 12.00 STATE $1,900.00 $22,800.00 12.00 755-06.37 RELOCATE & RECONNECT EX. 3/4 WATER EACH 1 $300.00 $5,100.00 17.00 STATE $300.00 $5,100.00 17.00 755-06.38 RELOCATE & RECONNECT EX. 1 WATER ME EACH 1 $300.00 $3,600.00 12.00 STATE $300.00 $3,600.00 12.00 755-06.39 RELOCATE & RECONNECT EX. 1 1/2 WATE EACH 1 $300.00 $900.00 3.00 STATE $300.00 $900.00 3.00 755-06.40 RELOCATE & RECONNECT EX. 2 WATER ME EACH 1 $400.00 $3,600.00 9.00 STATE $400.00 $3,600.00 9.00 755-06.41 RELOCATE & RECONNECT EX. 3 WATER ME EACH 1 $500.00 $2,000.00 4.00 STATE $500.00 $2,000.00 4.00 755-06.42 RELOCATE & RECONNECT EX. 4 WATER ME EACH 1 $500.00 $1,000.00 2.00 STATE $500.00 $1,000.00 2.00 755-06.43 RECONN. EX. 2 SERV. LINE TO PROP. 8 L.F. 1 $25.00 $625.00 25.00 STATE $25.00 $625.00 25.00 755-06.44 RECONN EX. 3/4 MT ASSMBLY TO PRO 8D L.F. 1 $25.00 $375.00 15.00 STATE $25.00 $375.00 15.00 755-06.45 RECONN EX. 1 MTR ASSEMBLY TO PRO 8D L.F. 1 $25.00 $250.00 10.00 STATE $25.00 $250.00 10.00 755-06.46 RECONN EX. 3 MTR ASSEMBLY TO PRO 8D L.F. 1 $30.00 $600.00 20.00 STATE $30.00 $600.00 20.00 755-06.47 RECONN EX. 6 MTR ASSEMBLY TO PRO 12 L.F. 1 $35.00 $350.00 10.00 STATE $35.00 $350.00 10.00 755-06.48 RECONN EX. 4 FIRE LINE TO PROP. 8DI L.F. 1 $35.00 $700.00 20.00 STATE $35.00 $700.00 20.00 755-06.49 RECONN EX. 6 FIRE LINE TO PRO 12DIP L.F. 1 $35.00 $525.00 15.00 STATE $35.00 $525.00 15.00 755-06.50 RECONN EX. 8 FIRE LINE TO PRO 8DIP L.F. 1 $45.00 $450.00 10.00 STATE $45.00 $450.00 10.00 755-06.51 RECONN EX. 8 FIRE LINE TO PRO 12DIP L.F. 1 $45.00 $450.00 10.00 STATE $45.00 $450.00 10.00 755-06.52 RECONN EX. 10 FIRE LINE TO PRO 12DI L.F. 1 $50.00 $500.00 10.00 STATE $50.00 $500.00 10.00 755-06.53 RECONN EX. 12 FIRE LINE TO PRO 12DI L.F. 1 $50.00 $500.00 10.00 STATE $50.00 $500.00 10.00 755-06.54 REMOVE AND RESET SECTION EXIST SEC LS 1 $5,000.00 $5,000.00 1.00 STATE $5,000.00 $5,000.00 1.00 755-06.55 6 CLASS 350 D.I.P. WITH STONE BACKF L.F. 1 $23.00 $552.00 24.00 STATE $23.00 $552.00 24.00 755-06.56 8 CLASS 350 D.I.P. WITH STONE BACKF L.F. 1 $35.00 $44,590.00 1274.00 STATE $35.00 $44,590.00 1274.00 755-06.57 12 CLASS 350 D.I.P. WITH STONE BACK L.F. 1 $45.00 $11,115.00 247.00 STATE $45.00 $11,115.00 247.00 755-06.58 16 CLASS 350 D.I.P. WITH STONE BACK L.F. 1 $60.00 $3,120.00 52.00 STATE $60.00 $3,120.00 52.00 755-06.59 6 CLASS 350 D.I.P. WITHOUT STONE BA L.F. 1 $40.00 $560.00 14.00

110

STATE $40.00 $560.00 14.00

Page 111: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 111 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-06.60 8 CLASS 350 D.I.P. WITHOUT STONE BA L.F. 1 $30.00 $131,160.00 4372.00 STATE $30.00 $131,160.00 4372.00 755-06.61 12 CLASS 350 D.I.P. WITHOUT STONE B L.F. 1 $40.00 $175,360.00 4384.00 STATE $40.00 $175,360.00 4384.00 755-06.62 16 CLASS 350 D.I.P. WITHOUT STONE B L.F. 1 $55.00 $10,010.00 182.00 STATE $55.00 $10,010.00 182.00 755-06.63 16 STL CASING PIPE (OPN CUT) W/STON L.F. 1 $175.00 $52,675.00 301.00 STATE $175.00 $52,675.00 301.00 755-06.64 16 STL CAS. PIPE (OPN CUT) W/OUT ST L.F. 1 $125.00 $41,875.00 335.00 STATE $125.00 $41,875.00 335.00 755-06.65 24 STL CASING PIPE (OPN CUT) W/STON L.F. 1 $210.00 $136,290.00 649.00 STATE $210.00 $136,290.00 649.00 755-06.66 16 STL CASING PIPE(JACK & BORE OR T L.F. 1 $180.00 $52,920.00 294.00 STATE $180.00 $52,920.00 294.00 755-06.67 30 STL CASING PIPE(JACK & BORE OR T L.F. 1 $350.00 $88,200.00 252.00 STATE $350.00 $88,200.00 252.00 755-06.68 PAVEMENT REPAIR S.Y. 1 $75.00 $95,925.00 1279.00 STATE $75.00 $95,925.00 1279.00 755-06.69 CLASS A CONCRETE C.Y. 1 $200.00 $6,600.00 33.00 STATE $200.00 $6,600.00 33.00 755-06.70 RETIREMENT OF EXISTING WATER MANHOL EACH 1 $350.00 $7,350.00 21.00 STATE $350.00 $7,350.00 21.00 755-06.71 SEEDING (WITH MULCH) LS 1 $2,500.00 $5,000.00 2.00 STATE $2,500.00 $5,000.00 2.00 755-06.72 CONCRETE SIDEWALK / DRIVEWAY REPAIR S.Y. 1 $12.00 $480.00 40.00 STATE $12.00 $480.00 40.00 755-06.73 REMOVAL OF EXISTING 6 WATER LINE L.F. 1 $40.00 $400.00 10.00 STATE $40.00 $400.00 10.00 755-06.74 REMOVAL OF EXISTING 8 WATER LINE L.F. 1 $10.00 $2,500.00 250.00 STATE $10.00 $2,500.00 250.00 755-06.75 REMOVAL OF EXISTING 12 WATER LINE L.F. 1 $20.00 $200.00 10.00 STATE $20.00 $200.00 10.00 755-06.76 REMOVAL OF EXISTING 15 C.M.P. L.F. 1 $30.00 $300.00 10.00 STATE $30.00 $300.00 10.00 755-06.77 REMOVAL OF EXISTING 18 R.C.P L.F. 1 $40.00 $400.00 10.00 STATE $40.00 $400.00 10.00 755-06.78 REMOVAL OF EXISTING 24 R.C.P. L.F. 1 $50.00 $500.00 10.00 STATE $50.00 $500.00 10.00 755-06.79 UNSUITABLE MATERIAL EXC, INCL. DISP C.Y. 1 $15.00 $1,800.00 120.00 STATE $15.00 $1,800.00 120.00 755-06.80 CRUSHED STONE - TDOT NO. 67 TON 1 $20.00 $4,400.00 220.00 STATE $20.00 $4,400.00 220.00 755-06.81 CELLULAR GROUT FOR RETIRED WATER LI C.Y. 1 $150.00 $15,000.00 100.00 STATE $150.00 $15,000.00 100.00 755-07.01 8 PVC GRAVITY SEWER PIPE, W/ST -0-6 L.F. 1 $55.00 $8,030.00 146.00 STATE $55.00 $8,030.00 146.00 755-07.02 8 PVC GRAVITY SEWER PIPE, W/ST-8-10 L.F. 1 $85.00 $8,075.00 95.00 STATE $85.00 $8,075.00 95.00

Page 112: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 112 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-07.03 8 PVC GRAVITY SEWER PIPE,W/ST-10-12 L.F. 1 $100.00 $16,300.00 163.00 STATE $100.00 $16,300.00 163.00 755-07.04 8 PVC GRAVITY SEWER PIPE,W/ST-12-14 L.F. 1 $130.00 $19,240.00 148.00 STATE $130.00 $19,240.00 148.00 755-07.05 8 PVC GRAVITY SEWER PIPE,W/ST-14-16 L.F. 1 $150.00 $15,600.00 104.00 STATE $150.00 $15,600.00 104.00 755-07.06 8 PVC GRAVITY SWR PIPE, W/OUT ST-0- L.F. 1 $40.00 $12,240.00 306.00 STATE $40.00 $12,240.00 306.00 755-07.07 8 PVC GRAVITY SEWER PIPE, W/OUT ST- L.F. 1 $45.00 $18,270.00 406.00 STATE $45.00 $18,270.00 406.00 755-07.08 8 PVC GRAVITY SEWER PIPE,W/OUT ST-8 L.F. 1 $50.00 $60,300.00 1206.00 STATE $50.00 $60,300.00 1206.00 755-07.09 8 PVC GRAVITY SEWER PIPE,WOUT ST-10 L.F. 1 $60.00 $68,220.00 1137.00 STATE $60.00 $68,220.00 1137.00 755-07.10 8 PVC GRAVITY SEWER PIPE,WOUT ST-12 L.F. 1 $80.00 $3,680.00 46.00 STATE $80.00 $3,680.00 46.00 755-07.11 8 PVC GRAVITY SEWER PIPE,WOUT ST-14 L.F. 1 $135.00 $4,050.00 30.00 STATE $135.00 $4,050.00 30.00 755-07.12 8 D.I.P. GRAVITY SEWER, W/STONE - 0 L.F. 1 $60.00 $6,600.00 110.00 STATE $60.00 $6,600.00 110.00 755-07.13 8 D.I.P. GRAVITY SEWER, W/STONE - 6 L.F. 1 $75.00 $4,875.00 65.00 STATE $75.00 $4,875.00 65.00 755-07.14 8 D.I.P. GRAVITY SEWER, W/STONE 8-1 L.F. 1 $85.00 $9,860.00 116.00 STATE $85.00 $9,860.00 116.00 755-07.15 8 D.I.P. GRAVITY SEWER, W/STONE -10 L.F. 1 $110.00 $8,360.00 76.00 STATE $110.00 $8,360.00 76.00 755-07.16 8 D.I.P. GRAVITY SEWER, W/STONE -14 L.F. 1 $140.00 $9,520.00 68.00 STATE $140.00 $9,520.00 68.00 755-07.17 8 D.I.P. GRAVITY SEWER, W/STONE -16 L.F. 1 $175.00 $11,900.00 68.00 STATE $175.00 $11,900.00 68.00 755-07.18 8 D.I.P. GRAVITY SEWER, W/OUT ST -0 L.F. 1 $45.00 $52,830.00 1174.00 STATE $45.00 $52,830.00 1174.00 755-07.19 8 D.I.P. GRAVITY SEWER, W/OUT ST -6 L.F. 1 $47.00 $26,555.00 565.00 STATE $47.00 $26,555.00 565.00 755-07.20 8 D.I.P. GRAVITY SEWER, W/OUT ST -8 L.F. 1 $50.00 $34,600.00 692.00 STATE $50.00 $34,600.00 692.00 755-07.21 8 D.I.P. GRAVITY SEWER, W/OUT ST-10 L.F. 1 $60.00 $26,940.00 449.00 STATE $60.00 $26,940.00 449.00 755-07.22 8 D.I.P. GRAVITY SEWER, W/OUT ST-12 L.F. 1 $75.00 $26,250.00 350.00 STATE $75.00 $26,250.00 350.00 755-07.23 8 D.I.P. GRAVITY SEWER, W/OUT ST-14 L.F. 1 $100.00 $15,000.00 150.00 STATE $100.00 $15,000.00 150.00 755-07.24 8 D.I.P. GRAVITY SEWER, WOUT ST-16- L.F. 1 $125.00 $21,500.00 172.00 STATE $125.00 $21,500.00 172.00 755-07.25 8 D.I.P. GRAVITY SEWER, W/OUT ST-18 L.F. 1 $150.00 $16,200.00 108.00 STATE $150.00 $16,200.00 108.00 755-07.26 12 PVC GRAVITY SEWER PIPE, W/ST -6- L.F. 1 $85.00 $510.00 6.00 STATE $85.00 $510.00 6.00

Page 113: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-07.27 12 PVC GRAVITY SEWER PIPE, W/ST -8- L.F. 1 $95.00 $570.00 6.00 STATE $95.00 $570.00 6.00 755-07.28 12 PVC GRAVITY SEWER PIPE, W/ST -10 L.F. 1 $115.00 $2,875.00 25.00 STATE $115.00 $2,875.00 25.00 755-07.29 12 PVC GRAVITY SWR PIPE,W/OUT ST.6- L.F. 1 $80.00 $3,680.00 46.00 STATE $80.00 $3,680.00 46.00 755-07.30 12 PVC GRAVITY SWR PIPE,W/OUT ST.8- L.F. 1 $90.00 $1,710.00 19.00 STATE $90.00 $1,710.00 19.00 755-07.31 12 PVC GRAVITY SWR PIPE,W/OUT ST.10 L.F. 1 $110.00 $2,750.00 25.00 STATE $110.00 $2,750.00 25.00 755-07.32 12 D.I.P. GRAVITY SEWER, W/ST - 0-6 L.F. 1 $90.00 $25,110.00 279.00 STATE $90.00 $25,110.00 279.00 755-07.33 12 D.I.P. GRAVITY SEWER, W/ST - 6-8 L.F. 1 $95.00 $16,340.00 172.00 STATE $95.00 $16,340.00 172.00 755-07.34 12 D.I.P. GRAVITY SEWER, W/ST - 8-1 L.F. 1 $105.00 $27,300.00 260.00 STATE $105.00 $27,300.00 260.00 755-07.35 12 D.I.P. GRAVITY SEWER, W/ST - 10- L.F. 1 $125.00 $12,875.00 103.00 STATE $125.00 $12,875.00 103.00 755-07.36 12 D.I.P. GRAVITY SEWER, W/ST - 12- L.F. 1 $200.00 $800.00 4.00 STATE $200.00 $800.00 4.00 755-07.37 16 D.I.P. GRAVITY SEWER, W/ST - 0-6 L.F. 1 $165.00 $4,125.00 25.00 STATE $165.00 $4,125.00 25.00 755-07.38 16 D.I.P. GRAVITY SEWER, W/ST - 6-8 L.F. 1 $165.00 $990.00 6.00 STATE $165.00 $990.00 6.00 755-07.39 16 D.I.P. GRAVITY SEWER, WST - 8-10 L.F. 1 $165.00 $9,240.00 56.00 STATE $165.00 $9,240.00 56.00 755-07.40 16 D.I.P. GRAVITY SEWER, W/ST -10-1 L.F. 1 $165.00 $6,930.00 42.00 STATE $165.00 $6,930.00 42.00 755-07.41 16 D.I.P. GRAVITY SEWER, W/ST -12-1 L.F. 1 $170.00 $29,070.00 171.00 STATE $170.00 $29,070.00 171.00 755-07.42 16 D.I.P. GRAVITY SEWER, W/ST -14-1 L.F. 1 $210.00 $21,210.00 101.00 STATE $210.00 $21,210.00 101.00 755-07.43 16 D.I.P. GRAVITY SEWER, W/ST -16-1 L.F. 1 $250.00 $38,750.00 155.00 STATE $250.00 $38,750.00 155.00 755-07.44 16 D.I.P. GRAVITY SEWER,W/OUT ST.0 L.F. 1 $80.00 $23,840.00 298.00 STATE $80.00 $23,840.00 298.00 755-07.45 16 D.I.P. GRAVITY SEWER,WOUT ST-6-8 L.F. 1 $110.00 $2,530.00 23.00 STATE $110.00 $2,530.00 23.00 755-07.46 16 D.I.P. GRAVITY SEWER, W/OUT ST-8 L.F. 1 $130.00 $11,570.00 89.00 STATE $130.00 $11,570.00 89.00 755-07.47 4' DIA STANDARD CONC. MANHOLE - 0'- EACH 1 $1,800.00 $25,200.00 14.00 STATE $1,800.00 $25,200.00 14.00 755-07.48 4' DIA STANDARD CONC. MANHOLE - 6'- EACH 1 $2,000.00 $20,000.00 10.00 STATE $2,000.00 $20,000.00 10.00 755-07.49 4' DIA STANDARD CONC. MANHOLE - 8'- EACH 1 $2,000.00 $22,000.00 11.00 STATE $2,000.00 $22,000.00 11.00 755-07.50 4' DIA STANDARD CONC. MANHOLE -10'- EACH 1 $2,500.00 $20,000.00 8.00 STATE $2,500.00 $20,000.00 8.00

Average Unit Price Report 113

Page 114: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 114 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-07.51 4' DIA STANDARD CONC. MANHOLE -12'- EACH 1 $3,000.00 $9,000.00 3.00 STATE $3,000.00 $9,000.00 3.00 755-07.52 4' DIA STANDARD CONC. MANHOLE -14'- EACH 1 $3,500.00 $14,000.00 4.00 STATE $3,500.00 $14,000.00 4.00 755-07.53 4' DIA STANDARD CONC. MANHOLE -16'- EACH 1 $3,500.00 $3,500.00 1.00 STATE $3,500.00 $3,500.00 1.00 755-07.54 4' DIA STANDARD CONC. MANHOLE -18'- EACH 1 $4,000.00 $8,000.00 2.00 STATE $4,000.00 $8,000.00 2.00 755-07.55 DROP SEWER MANHOLE CONNECTIONS V.F. 1 $300.00 $900.00 3.00 STATE $300.00 $900.00 3.00 755-07.56 8 CONNECT TO EX. MANHOLE -CORED & B EACH 1 $1,000.00 $1,000.00 1.00 STATE $1,000.00 $1,000.00 1.00 755-07.57 12 CONNECT TO EX. MANHOLE-CORED & B EACH 1 $2,000.00 $6,000.00 3.00 STATE $2,000.00 $6,000.00 3.00 755-07.58 ADJUSTMENT OF EXISTING MANHOLE EACH 1 $750.00 $4,500.00 6.00 STATE $750.00 $4,500.00 6.00 755-07.59 16 STL CASING PIPE(OPEN CUT)(W/ST B L.F. 1 $150.00 $133,800.00 892.00 STATE $150.00 $133,800.00 892.00 755-07.60 16 STEEL CASING PIPE (OPEN CUT) L.F. 1 $125.00 $1,625.00 13.00 STATE $125.00 $1,625.00 13.00 755-07.61 24 STL CASING PIPE(OPEN CUT)(W/ST B L.F. 1 $300.00 $4,500.00 15.00 STATE $300.00 $4,500.00 15.00 755-07.62 24 STEEL CASING PIPE (OPEN CUT) L.F. 1 $150.00 $16,500.00 110.00 STATE $150.00 $16,500.00 110.00 755-07.63 30 STL CASING PIPE(OPEN CUT)(W/ST B L.F. 1 $300.00 $24,000.00 80.00 STATE $300.00 $24,000.00 80.00 755-07.64 30 STEEL CASING PIPE (OPEN CUT) L.F. 1 $275.00 $1,375.00 5.00 STATE $275.00 $1,375.00 5.00 755-07.65 30 STL CASING PIPE(JACK & BORE OR T L.F. 1 $375.00 $174,375.00 465.00 STATE $375.00 $174,375.00 465.00 755-07.66 6 PVC SANITARY SEWER SERVICE LATERA L.F. 1 $35.00 $21,700.00 620.00 STATE $35.00 $21,700.00 620.00 755-07.67 6 PVC CLEANOUT EACH 1 $500.00 $500.00 1.00 STATE $500.00 $500.00 1.00 755-07.68 REMOVAL OF EX. SANITARY SEWER LINES L.F. 1 $15.00 $17,775.00 1185.00 STATE $15.00 $17,775.00 1185.00 755-07.69 REMOVAL OF EX. SANITARY SEWER MANHO EACH 1 $350.00 $2,800.00 8.00 STATE $350.00 $2,800.00 8.00 755-07.70 RETIREMENT OF EXISTING SEWER MANHOL EACH 1 $100.00 $3,800.00 38.00 STATE $100.00 $3,800.00 38.00 755-07.71 RETIREMENT OF EX. 12 SANITARY SEWER L.F. 1 $10.00 $11,720.00 1172.00 STATE $10.00 $11,720.00 1172.00 755-07.72 RETIREMENT OF EX. 15 SANITARY SEWER L.F. 1 $15.00 $12,915.00 861.00 STATE $15.00 $12,915.00 861.00 755-07.73 RETIREMENT OF EX. 16 SANITARY SEWER L.F. 1 $20.00 $5,260.00 263.00 STATE $20.00 $5,260.00 263.00 755-07.74 PLUG EXISTING 8 SANITARY SEWER LINE EACH 1 $300.00 $2,100.00 7.00 STATE $300.00 $2,100.00 7.00

Page 115: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 115 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

755-07.75 PLUG EXISTING 12 SANITARY SEWER LIN EACH 1 $300.00 $300.00 1.00 STATE $300.00 $300.00 1.00 755-07.76 PLUG EXISTING 15 SANITARY SEWER LIN EACH 1 $300.00 $300.00 1.00 STATE $300.00 $300.00 1.00 801-01 SEEDING (WITH MULCH) UNIT 1 $18.02 $90,879.65 5042.70 2 $15.53 $109,433.76 7048.80 3 $15.54 $229,745.10 14788.00 4 $19.46 $232,283.25 11934.00 STATE $17.06 $662,341.76 38813.50 801-01.02 CROWN VETCH MIXTURE (WITH MULCH) UNIT 1 $25.05 $22,273.80 889.00 3 $14.72 $87,102.84 5917.00 STATE $16.07 $109,376.64 6806.00 801-01.07 TEMPORARY SEEDING (WITH MULCH) UNIT 1 $21.08 $9,149.00 434.00 2 $11.35 $51,187.25 4508.00 3 $14.78 $35,555.48 2406.00 STATE $13.05 $95,891.73 7348.00 801-02 SEEDING (WITHOUT MULCH) UNIT 1 $13.30 $38,279.04 2879.00 2 $10.64 $8,874.10 834.00 3 $12.99 $6,909.50 532.00 4 $18.27 $11,782.00 645.00 STATE $13.47 $65,844.64 4890.00 801-02.01 CROWN VETCH MIXTURE (WITHOUT MULCH) UNIT 1 $14.25 $62,276.00 4369.00 2 $13.10 $13,144.00 1003.00 3 $16.74 $24,719.89 1477.00 STATE $14.62 $100,139.89 6849.00 801-02.08 TEMPORARY SEEDING (WITHOUT MULCH) UNIT 1 $30.00 $150.00 5.00 4 $12.50 $91,375.00 7310.00 STATE $12.51 $91,525.00 7315.00 801-02.15 FERTILIZER TON 3 $107.94 $215.87 2.00 STATE $107.94 $215.87 2.00 801-02.16 FUMIGATION OF WILDFLOWER SITES ACRE 1 $2,327.82 $516,776.04 222.00 STATE $2,327.82 $516,776.04 222.00 801-03 WATER (SEEDING & SODDING) M.G. 1 $2.61 $5,603.53 2144.80 2 $2.95 $10,421.05 3534.00 3 $1.44 $5,405.90 3750.82 4 $4.62 $14,920.95 3227.35 STATE $2.87 $36,351.43 12656.97 801-07 SEED (SUPPLEMENTAL APPLICATION) LB. 1 $2.71 $1,008.00 372.00 2 $5.00 $5,166.00 1033.00 3 $4.22 $9,346.50 2213.00 4 $1.10 $2,674.10 2431.00 STATE $3.01 $18,194.60 6049.00 801-07.01 CROWN VETCH SEED (SUPPLEMENTAL APPL LB. 1 $5.30 $10.60 2.00 3 $5.00 $6,410.00 1282.00 STATE $5.00 $6,420.60 1284.00 801-08 FERTILIZER (SUPPLEMENTAL APPLICATIO TON 1 $186.88 $1,495.00 8.00 2 $293.89 $2,645.00 9.00 3 $204.19 $6,534.10 32.00

Page 116: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 116 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

4 $235.00 $4,465.00 19.00 STATE $222.63 $15,139.10 68.00 802-01.01 TREES(QUERCUS PALUSTRIS)(1.5-2"CAL. EACH 3 $75.87 $4,780.00 63.00 STATE $75.87 $4,780.00 63.00 802-01.02 TR(LIRIODENDRON TULIPI)(1.5-2"CAL. EACH 3 $75.64 $5,068.00 67.00 STATE $75.64 $5,068.00 67.00 802-01.03 TREES(CERCIS CARADERSIS)(1.5-2"CAL. EACH 1 $70.00 $1,260.00 18.00 3 $76.07 $4,564.00 60.00 STATE $74.67 $5,824.00 78.00 802-01.04 TREES (ACER RUBRUM) (1.5 - 2" CAL. EACH 1 $65.00 $1,105.00 17.00 3 $76.07 $4,564.00 60.00 STATE $73.62 $5,669.00 77.00 802-01.05 TREES (BETULA NEGRA)(1.5" - 2" CAL. EACH 3 $75.94 $4,708.00 62.00 STATE $75.94 $4,708.00 62.00 802-01.06 TREES (ACER SACCHARUM)(1.5- 2" CAL. EACH 3 $72.00 $504.00 7.00 STATE $72.00 $504.00 7.00 802-01.07 (LIQUIDAMBER STYRACIFLUA)(1.5-2"CAL EACH 1 $65.00 $1,040.00 16.00 STATE $65.00 $1,040.00 16.00 802-01.08 (PLATANUS OCCIDENTALIS) (1.5-2"CAL. EACH 1 $65.00 $1,105.00 17.00 STATE $65.00 $1,105.00 17.00 802-01.10 TREES EACH 1 $57.37 $5,565.00 97.00 2 $62.50 $1,562.50 25.00 3 $50.99 $12,899.94 253.00 4 $219.36 $7,897.00 36.00 STATE $67.94 $27,924.44 411.00 802-01.11 TREES EACH 1 $32.00 $36,000.00 1125.00 2 $62.50 $1,562.50 25.00 3 $52.24 $13,217.08 253.00 4 $309.85 $26,647.00 86.00 STATE $52.00 $77,426.58 1489.00 802-01.12 TREES EACH 1 $38.61 $43,590.00 1129.00 2 $62.50 $1,562.50 25.00 3 $50.95 $12,942.36 254.00 4 $126.54 $3,037.00 24.00 STATE $42.69 $61,131.86 1432.00 802-01.13 TREES EACH 1 $60.00 $4,680.00 78.00 2 $62.50 $1,562.50 25.00 3 $50.95 $12,942.36 254.00 4 $94.85 $1,897.00 20.00 STATE $55.92 $21,081.86 377.00 802-01.14 TREES EACH 1 $60.00 $4,620.00 77.00 2 $62.50 $1,562.50 25.00 3 $65.00 $6,240.00 96.00 4 $94.85 $1,897.00 20.00 STATE $65.69 $14,319.50 218.00 802-02.01 SEEDLINGS EACH 3 $6.00 $1,200.00 200.00 STATE $6.00 $1,200.00 200.00 802-03.01 SHRUBS EACH 2 $30.25 $3,781.25 125.00

Page 117: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 117 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

3 $19.19 $2,302.80 120.00 4 $315.00 $16,695.00 53.00 STATE $76.44 $22,779.05 298.00 802-03.02 SHRUBS EACH 2 $37.00 $4,625.00 125.00 4 $45.00 $6,750.00 150.00 STATE $41.36 $11,375.00 275.00 802-03.03 SHRUBS EACH 2 $27.50 $3,410.00 124.00 STATE $27.50 $3,410.00 124.00 802-05 WATER (PLANT ESTABLISHMENT) M.G. 4 $46.11 $415.00 9.00 STATE $46.11 $415.00 9.00 803-01 SODDING (NEW SOD) S.Y. 1 $1.71 $138,965.05 81245.00 2 $1.52 $304,045.94 199539.00 3 $1.78 $315,561.57 176967.00 4 $1.83 $353,131.05 192748.00 STATE $1.71 $1,111,703.61 650499.00 805-12.01 EROSION CONTROL BLANKET (TYPE I) S.Y. 1 $1.06 $63,823.96 60188.00 2 $0.84 $345,943.07 413201.00 3 $0.97 $3,481.30 3572.00 STATE $0.87 $413,248.33 476961.00 805-12.02 EROSION CONTROL BLANKET (TYPE II) S.Y. 1 $0.92 $487,434.38 527595.00 2 $0.86 $75,479.62 87767.00 3 $0.50 $93,775.37 188039.00 4 $1.00 $151,800.00 151200.00 STATE $0.85 $808,489.37 954601.00 805-12.03 EROSION CONTROL BLANKET (TYPE III) S.Y. 3 $1.30 $395,616.00 304320.00 4 $1.00 $42,013.00 42013.00 STATE $1.26 $437,629.00 346333.00 805-12.04 EROSION CONTROL BLANKET (TYPE IV) S.Y. 1 $8.00 $12,008.00 1501.00 2 $1.45 $125,287.25 86405.00 3 $1.00 $96,790.00 96790.00 STATE $1.27 $234,085.25 184696.00 805-13.03 FLEXIBLE CHANNEL LINER (CLASS III) S.Y. 2 $4.00 $15,420.00 3855.00 STATE $4.00 $15,420.00 3855.00 806-01 MOWING ACRE 1 $43.32 $1,676,638.48 38705.00 2 $36.13 $1,882,914.26 52118.00 3 $41.37 $2,799,661.96 67681.00 4 $20.17 $1,886,029.50 93518.00 STATE $32.72 $8,245,244.20 252022.00 806-02 SWATH MOWING L.M. 3 $45.31 $109,734.00 2422.00 4 $29.78 $143,041.00 4803.00 STATE $34.99 $252,775.00 7225.00 806-02.01 HERBICIDE APPLICATION(WOODY VEGETAT ACRE 2 $97.00 $34,823.00 359.00 STATE $97.00 $34,823.00 359.00 806-02.02 HERBICIDE APPLICATION(BARRIER WALL) L.F. 2 $0.02 $2,477.37 165158.00 STATE $0.02 $2,477.37 165158.00 806-02.05 HERBICIDE APPLICATION ACRE 3 $55.00 $10,780.00 196.00 STATE $55.00 $10,780.00 196.00 806-02.06 HERBICIDE APPLICATION ACRE 3 $34.38 $118,335.96 3442.00

Page 118: JAN/01/02 to DEC/31/02 105-01 CONSTRUCTION STAKES, LINES AND GRAD LS … · 2017. 10. 24. · 105-04 railroad flagging ls 3 $1.00 $1.00 1.00 state $1.00 $1.00 1.00 109-10.01 ... 3

Average Unit Price Report 118 JAN/01/02 to DEC/31/02

Item Unit of Average Total Total Number Description Measure Region Unit Price Cost Quantity

STATE $34.38 $118,335.96 3442.00 806-03.01 TREE CUTTING LS 2 $900.00 $900.00 1.00 STATE $900.00 $900.00 1.00 908-21.01 BEARINGS EACH 1 $4,571.43 $32,000.00 7.00 3 $365.00 $1,460.00 4.00 STATE $3,041.82 $33,460.00 11.00 908-21.02 BEARINGS EACH 1 $4,460.00 $22,300.00 5.00 3 $473.00 $1,892.00 4.00 STATE $2,688.00 $24,192.00 9.00 908-21.03 BEARINGS EACH 1 $3,860.00 $19,300.00 5.00 3 $425.00 $850.00 2.00 STATE $2,878.57 $20,150.00 7.00 908-21.04 BEARINGS EACH 1 $3,757.14 $26,300.00 7.00 3 $715.00 $5,720.00 8.00 STATE $2,134.67 $32,020.00 15.00 908-21.05 BEARINGS EACH 1 $4,571.43 $32,000.00 7.00 3 $520.00 $2,080.00 4.00 STATE $3,098.18 $34,080.00 11.00 908-21.06 BEARINGS EACH 1 $5,000.00 $10,000.00 2.00 STATE $5,000.00 $10,000.00 2.00 920-10.01 (DESCRIPTION) S.F. 4 . . 19173.00 STATE . . 19173.00 920-10.04 (DESCRIPTION) EACH 2 $1,000.00 $13,000.00 13.00 4 $163.14 $19,250.00 118.00 STATE $246.18 $32,250.00 131.00 920-11.04 (DESCRIPTION) EACH 2 $1,000.00 $3,000.00 3.00 4 $93.31 $33,500.00 359.00 STATE $100.83 $36,500.00 362.00 920-12.04 (DESCRIPTION) EACH 4 $30.76 $43,920.00 1428.00 STATE $30.76 $43,920.00 1428.00 920-13.06 (DESCRIPTION) LB. 4 $1.25 $12,970.00 10376.00 STATE $1.25 $12,970.00 10376.00 920-14 (DESCRIPTION) L.F. 4 $25.00 $4,800.00 192.00 STATE $25.00 $4,800.00 192.00 920-15 (DESCRIPTION) L.F. 4 $10.13 $330,320.00 32621.00 STATE $10.13 $330,320.00 32621.00 920-16 (DESCRIPTION) L.F. 4 $28.53 $73,200.00 2566.00 STATE $28.53 $73,200.00 2566.00 920-17 (DESCRIPTION) L.F. 4 $5.43 $24,000.00 4420.00 STATE $5.43 $24,000.00 4420.00 920-18 (DESCRIPTION) L.F. 4 . . 6900.00 STATE . . 6900.00 920-20.04 (DESCRIPTION) EACH 4 $9,714.29 $544,000.00 56.00 STATE $9,714.29 $544,000.00 56.00