PROFESSIONAL EXPERIENCE:

TURBO PROJECTS CC / METSI PROJECTS CC - 2002 – Feb 2016 - Projects Engineer /MemberResponsible for the management of all aspects of a contract as per Biwater including, financial control and reporting, evaluating and meeting of contractual requirements, design programming, liaison/communication internally and externally, checking of drawings, procurement, supervising of manufacture, QA,. expediting, supervising of installation, method statements, commissioning of plants, training, design and drawing (AutoCad). BIWATER (PTY) LTD - 1994-2002 - Contracts Engineer Responsible for the management of all aspects of a contract. KLOMAC ENGINEERING – 1993Sales, service, fabrication, installation and commissioning of industrial chlorination and chemical dosing equipment. SAMCOR (PTY) LTD 1989-1992 – Facilities & Equipment EngineerTrainee involved in the Samcor in-house trainee programme. PROJECTS:

Below are a list of significant projects that I have been the lead contracts engineer. Addendum A, images.

• Olifantspoort WTW, 2010 - High Lift Pump Station/Abstraction Works Upgrade - Contract Value R59mil

• Zeeland WTW, 2011/12 -25 - ML Day Extension to Water Treatment Works Contract Value R16,5 mil

• Sterkfontein WTW, 2011/12 -25 - ML Day New Water Treatment Works Upgrade Contract Value R25 mil

• Kamfer’s Dam, 2011/12 - New Final Effluent Pump Station Contract Value R6 mil

• Rustfontein WTW, 2012/13 - Upgrade High Lift Pump Station Contract Value R16 mil

• Inyaka WTW (Phase 3 and 4), 2012/13 - 50 Ml/Day Extension to existing plant Contract Value R43 mil

• Mearns Pump Station Upgrade, 2014/15 - Upgrade of complete pump station 3400l/s Contract Value R47 mil

• Mooi Mgeni, 2014/15 - New Pumps Station at Spring Grove Dam 4500l/s Contract Value R52 Mil

20 Bentinck Avenue, Bryanston, Gauteng

[email protected] or +27 82 804 5374

DOB – 06/08/1969 – SA & British Citizen

J A M E S H E L E

Page 3: James Hele CV 26th May 2016 (1)

ADDENDUM A

Nandoni High Lift Pump Station Mearns Pump Station

Mooi Mgeni Pump Station 50Ton Lim Silo at Inyaka

Mooi Mgeni Pump Station Mooi Mgeni Pump Station

Page 4: James Hele CV 26th May 2016 (1)

EDUCATION:

• National Diploma in Mech. Eng. - Natal Technikon, • Professional Engineering Technologist – 200870163• Member South African Institution of Mechanical Engineers - 700744

REFERENCES:

Full list of references available on request.

KEY CLIENTS:

• Department of water affairs (DWA).• Trans Calendon Transfer Scheme (TCTA)• Mooi Mgeni Water• Bloemfontein Water• EXXARO

CONSULTANTS / IMPLEMENTING AGENTS /SUBCONTRACTORS:

• Aurecon• Bigen Africa (PTY) LTD• Silulumanzi • Sol Plaatjie Municiplaity ( Kimberly)• Tumber Fourie Consulting• WBHO, and Murray Roberts

PROFFESSIONAL GOALS:

Professional contracts engineer with significant experience in the water treatment industry. My approach is to maintain a strong relationship management approach to staffing and qualitative delivery of contracts to specification timeously.