45
GreenBIM in Design & Preconstruction James Anwyl WSP, Leeds 03.12.14

James anwyl shareable pdf version 2014 cibse greenbim

Embed Size (px)

DESCRIPTION

GreenBIM in Design and Preconstruction

Citation preview

Page 1: James anwyl shareable pdf version 2014 cibse greenbim

     

GreenBIM in Design & Preconstruction James Anwyl WSP, Leeds 03.12.14

Page 2: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

1.  Hadlow College – new build

2.  Large Residential (Grade II Listed)

3.  Small Residential (Point Cloud)

4.  Small Residential (Victorian Terrace)

5.  BIM Intelligent Objects

GreenBIM: Summary

Page 3: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

BIM: Hadlow College

Page 4: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Project Overview Name: Hadlow College RRC

Type: Teaching facility/ Visitor Centre

Build type: Timber frame, GSHP, MVHR

Location: Tonbridge, Kent

Occupied: Since 03/2010

Client: Hadlow College

Architect: Eurobuild

Contractor: Eurobuild

Page 5: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Day 1!!

Day 2!!

Day 3!!

Prefabrication

Page 6: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Value & Aftercare

Page 7: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

BIM Cost Benefits

* Based on data from a survey of 834 schools built in the last 10 years

Page 8: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

EnerPHit Refurbishment

Existing Proposed

Page 9: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Existing Proposed

EnerPHit Refurbishment

50% space

increase

Page 10: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

EnerPHit Refurbishment

50% space

increase

Page 11: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

EnerPHit Refurbishment

50% space

increase

Page 12: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

EnerPHit Refurbishment

80% energy

reduction

Page 13: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Proof ?

Page 14: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Renovation Filter:

Page 15: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Renovation Filter:

Page 16: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Renovation Filter:

Page 17: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

3D Thermal Zones

Page 18: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Thermal Bridges

Page 19: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Results ?

Page 20: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Results ?

Page 21: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

EnerPHit Walls

Page 22: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

EnerPHit Floors

Page 23: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

EnerPHit Thin Screed

Page 24: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Point Cloud

Page 25: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

3.05.110 Kinnear RoadLondonW12 9LE

Client

Site Address Date

27.09.13

PlanningStatusScale on A3

Drawing Title

Site Sections10 Kinnear RoadJob No.

174Project

Rev. Change

Faisal Islam & Verity EvansAll dimensions to be verified on site. Allinformation to be checked by contractor foraccuracy and fit. Do not scale drawing. Readdrawing in conjunction with all other contractdocuments. Any identified discrepanciesshould be pointed out to the design team. Atconstruction status this drawing remainsdesign intent only. Drawings are subject tostatutory approvals and site surveys.

77 South RoadHaywards HeathWest Sussex RH16 4LB

T: +44 (0)1444 451662E: [email protected]

UK Company No.: 7604448

5.80

5

8.24

5

Existing FFL +2.52

Existing FFL +5.81

Existing FFL + 2.80

Existing FFL +0.00 Existing FFL -0.75

5.80

5

2.63

Existing Ground Level -0.195

5.80

5

8.24

5

Existing FFL + 2.80

Existing FFL +0.00

2.63

Existing Ground Level -0.195

Proposed FFL +0.00

5.80

5

Proposed FFL +5.71

Proposed FFL +2.64

0 1 2 3 4

1:100

meters

Existing Site Section AA 1:100

Proposed Site Section AA 1:100

Existing rear addition to property at112 Jeddo Road

Existing rear addition to property at112 Jeddo Road

EnerPHit Victorian terrace

Page 26: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

EnerPHit terrace

Page 27: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Structure

Page 28: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Construction rehearsal

Page 29: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Ventilation

Page 30: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Phases

Existing In construction As built

Page 31: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Fabric & details

Page 32: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Clay blocks

Page 33: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Brick slips

Page 34: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Comfort Living

Page 35: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Performance

Page 36: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Performance

… in 3 months … in autumn … in a Victorian building

Page 37: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

BIM Level 3?

PassivHaus Factory, Austria

Delivered 400+ PassivHaus buildings…

Page 38: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

BIM Level 3? Engineered product…

Roof panel

.

Automatically react to structural needs

Page 39: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

BIM Level 3? Intelligent object?

Roof panel

.

Automatically react to structural needs

Page 40: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

BIM Level 3? LoD protocol support

Wall panel

Floor panel

1:50 detail 3d cut detail

Page 41: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

BIM Level 3? Component finishes

Wall panel

Floor panel

Page 42: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Carbon Footprint

Page 43: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

BIM Level 3? In Built LCA, cost, weight…

Automatic data output

Page 44: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Q. Advantages? A. Resource efficiency:

•  Minor changes: less checking; easy output

•  Major changes: quick & real (hotfix flats example)

•  Drives greater understanding of buildings

•  Less risk for same effort

•  Demonstrates good value for less effort

Page 45: James anwyl shareable pdf version 2014 cibse greenbim

GreenBIM in Design & Preconstruction

Thanks for listening…

www.eurobuilduk.com