jacky ray barganier architect, inc. P.O. Box 1734 Orange Beach, Alabama 36561 251.980.1034 ADDENDUM ONE November 6, 2015 A New Art Gallery and Children’s Art Studio for the COASTAL ARTS CENTER OF ORANGE BEACH A1.1 GENERAL A. The following changes and/or substitutions to the plans and specifications are hereby made a part of same and are incorporated in full force as part of the contract. B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. C. See the attached Sign In Sheet of the attendees tat attended the mandatory pre-bid meeting will be held on Wednesday, October 28, 2015. D. Clarification: City will repave Nancy Lane after completion of project. E. Clarification: City will designate parking on city property within walking distance to site. F. Clarification: City will provide temporary water and power at site. G. Clarification: Contractor to return lay down yard to its prior state. H. Clarification: All building permits will be required – Fees to be waived. I. Clarification: City of Orange Beach Business License will be required for contractor and all subs. A1.2 SPECIFICATIONS A. Refer to Section 12500, Window Treatment, Clarification: Window blinds shall be installed on types “A” and “C” windows only B. Refer to Section 7410, Preformed Metal Roofing, Clarification:

jacky ray barganier architect, inc. - Green-SimmonsNov 06, 2015  · jacky ray barganier architect, inc. P.O. Box 1734 Orange Beach, Alabama 36561 251.980.1034 ADDENDUM ONE November

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

jacky ray barganier architect, inc.

P.O. Box 1734 Orange Beach, Alabama 36561 251.980.1034

ADDENDUM ONE November 6, 2015

A New Art Gallery and Children’s Art Studio

for the COASTAL ARTS CENTER

OF ORANGE BEACH A1.1 GENERAL

A. The following changes and/or substitutions to the plans and

specifications are hereby made a part of same and are incorporated in full force as part of the contract.

B. Bidders shall acknowledge receipt of this Addendum in writing on his

Proposal Form.

C. See the attached Sign In Sheet of the attendees tat attended the mandatory pre-bid meeting will be held on Wednesday, October 28, 2015.

D. Clarification: City will repave Nancy Lane after completion of project. E. Clarification: City will designate parking on city property within walking

distance to site. F. Clarification: City will provide temporary water and power at site. G. Clarification: Contractor to return lay down yard to its prior state. H. Clarification: All building permits will be required – Fees to be waived. I. Clarification: City of Orange Beach Business License will be required for

contractor and all subs. A1.2 SPECIFICATIONS

A. Refer to Section 12500, Window Treatment, Clarification:

Window blinds shall be installed on types “A” and “C” windows only

B. Refer to Section 7410, Preformed Metal Roofing, Clarification:

P.O. Box 1734 Orange Beach, Alabama 36561 251.980.1034

Roof panels are to match those on existing adjacent buildings. No weather tightness warranty will be required. No third party inspection required.

C. The following manufacturers are hereby approved subject to the plans and specifications:

Section 07216, Spray In Place Semi Rigid Foam Insulation: Johns Manville Corband Open-Cell Appendix X SPF Section 12500, Window Treatment: SWF contract – Graber Lake Forest 2” Faux Wood Horiz. Blinds

A1.3 DRAWINGS

A. Refer to Structural Drawings for thickness of all exterior sheathing.

B. Refer to Sheet S3.0 and section EE/A4.4: engineered trusses at vaulted space of kids’ studio: Trusses are to be parallel chord to achieve vaulted ceiling as shown – add heel at bearing as required.

C. Refer to Elevator Shaft: shaft is to be constructed of 2x6 wood studs as

shown on plans. Contractor to install any additional steel support as required per elevator manufacturer.

D. Clarification: Contractor shall provide water and sewer 5’ outside of

building – City to connect from there. E. Clarification: Contractor to connect electrical to the transformer. F. Clarification: Contractor to provide all labor and material for the new

storm drain around building and all downspout boots and tie-ins. END OF ADDENDUM ONE