Client OIL AND NATURAL GAS CORPORATION LIMITED
Project ONGC Tender for B-193 WELL PLATFORM
To Mr. ZAlNLlDDlN
Submission By:
TOMERS LT&
BEHIND GOVT. POLYTE&IC, GULBAI TE- AMBAVADI, AHMEDABAD - 380 015 INDIA TELEFAX: +9179 26303078 1079 E MAIL: [email protected]
Contact details:
3) Inquiry Follow up by: Mr. Raju Bhattwarketing Manager) Email:[email protected] Contact No.:+91-9904103682
1)For TechnicaVDesign: Mr.RV.Soni Wxecutive Director) EMAIL:[email protected] Contact No.:+91-9824022529
2)For CommerciaYFinancial: Mrs.Mansi Parikh@iector) Email:[email protected] Contact No.:+91-9824654666
INDEX
[ 11.3 (1, 1 1 12.3 1 13.1 13.2 1 1 4 1 1 14.3 1 (
15.2 1 (1 (1
1 1 15.2
Particular ANNEXURE-I "HDC DIAPHRAGM CLOSURE WITH GROUT SEAL99 DRAWING glT2 MATERIAL SPECIFICATION QUALITY ASSURANCE PLAN ANNEXURE-2 "HSF SHEAR FENDER " DRAWING MAMATERIAL SPECIFICA-TION QUAI-ITY ASSLIRANCE PLAN
Page NO. 1
D 4 +=I 1
1 1 3 1 1 1 4 1 1 1 1 7 1 2 2 1 3 1 1 1 1
ANNEXURE-3 "BOAT LANDING RUBBING STRIP" DRAWING MATERIAL SPECIFICA-TION
i
QUALITY ASSURANCE PLAN ANNEXURE-4 "JACKET LEG RUB STRIP" DRAWING PERFORMANCE CLIRVE MATERIAL SPECIFICATION QUALITY ASSURANCE PLAN ANNEXURE-5 " HITECH SHOCK CELL SECTION" HSC SHOCK CELL DRAWING HSC SHOCK CELL PERFORMANCE CURVE
5.3
HSC SHOCK CELL MATERIAL SPECIFICATION QUAI-ITY ASSLIRANCE PLAN ANNEXURE-6 " ZIP OUT CLOSURE SECTION" ZIP OUT CLOSURE DRAWING MATERIAL SPECIFICATION 1 QUALITY ASSURANCE PLAN ANNEXURE -6 " PRICE BID "
ANNEXURE 1:
HDC DIAPHRAGM CLOSURE WITH GROUT SEAL
11.1 11.2 1
DRAWING I MATERIAL SPECIFICATION
1.3 QUALITY ASSURANCE PLAN 1
I I
1 . I . I HDC DIAPHRAGM CLOSURE WITH GROUT SEAL ASSEMBLY
DRAWING:
(FOR PLATFORM NO. : B179A (4 Nos.) , B23A (4 Nos.) & B28A (4 Nos.))
01600 JACKET LEG ID
01524 PILE OD
--+-+--+-
GROUT SEAL ASSEMBLY.
GROUT SEAL CAN
02035 Diaphragm Ring OD
GUSSET PLATE
.4 Jacket Leg ID
01676.4 Pile OD
GROUT SEAL PRESSURE RING BOLTED/WELDED WITH CAN I
GROUT SEAL ASSEMBLY. DIAPHRAGM CLOSURE
GROUT SEAL CAN
01752 Diaphragm Ring ID
0191 7 Grout Seal Can ID
01987 Grout Seal Can OD
1 . l . Z HDC DIAPHRAGM CLOSURE DRAWING:
-
DIAPGRAGM CLOSURE ASSEMBLY TESTING PROCEDURE
!ESSURE WITH
GAUGE
RUBBER DIAPHRAGM
: INJUCTER
WATER' I
DIRECTION
TESTING
FLANGE
INSPECTION AND TESTING PROCEDURE 1) Rubber dlaphragm closure shall be tested by mounting two diaphragms as shown in above sketch in the direction as requ the testlng jig shall be tight with the required torque (T = 41 00 Ib-inch aprox. On assumption that clearance between diaphra
I I with standard wrench dlmenslons. Also tightening torque value is assumed with no leakage, if leakage found in the sys 1 1 2) Charge water through injector assembly up to the testing pressure of 12.45 kg/cm2 pressure at room temperature. ' I1
I 1 10) diaphragm closur~also to cdnfirm to requirement of ciause I .5.4.4 of 6001f
3) As soon as the pressure reaches to the required testing pressure close the stop valve. U 2, with minor commentr, vlork may .
I 1 NOTE : - STANDARDTOLERANCES OF s 3% SHALL APPLY, OTHERWISE AS SPECIFIED. 'ALL DIMENSIONS ARE IN mm OTHERWISE AS SPECIFIED. www.hitechelastorners.corn
4) Check the closure assembly with the soap foam on flange side. 5) Record the pressure at 10 Minutes interval up to 30 Minutes. (Test report will be submmited) 6) Pressure droop due to change in atmospheric temperature and expansion of rubber shall be allowed. 7) Release the pressure after satisfactory testing. (Test report will be submmited) 8) The dlaphragm Closure assembly should be cleaned.
I 1 I I I
FOR APPROVAL
PROJECT : B1 93 WELIHEAD PLATFORM
I I - - - - .
FOR APPROVAL
REV.NO. DATE STATUS DSCRIPTION I I
9) Diaphragm closure plate shall be of reinforced rubber and shall be tested to a pressure eaual to 1.5 times hydrostatic pressure due to water depth (+)I 0.0mtr of sea water. I Retained for infnrma+i,-,-
k
a R
Proceed with C~mments incorporated and resubmit within 7 days I
and Resubmit before pmceed
Rejected
I I DRG. NO. 1 RN.NO. TITLE REVISION 1 DRG : HEL/9-78/ORD/DRG/01-02/100327 REFERENCE DRAWING STANS CODE : I.PRELIMINARY Z.FOR APPRWAL %TENDER 4 . G W FOR PRODUCTION LINSPECnMI REPORT N.T.s.~ 1
I
1 . 1 . 3 HDC DIAPHRAGM TESTING DETAILS
TESTING PILE ASSEMBLY: P
PRESSURE GAUGE AS
GROUT INJECTING NOZZLE
EQ. GROUT MATERIAL
PART-X WELDED WITH GROUT SEAL ASSEMBLY FOR TESTING
ERANCES OF * 3% SHALL APPLY, OTHERWISE AS SPECIFIED. S ARE IN rnm OTHERWISE AS SPECIFIED.
1 m1 m 4 H G S GROUT SEAL DRAWING:
HEL 9-78 1 8/06/2010
7 18/06/2010
I
TITLE: APPROVAL OF DOCUMENT PROJECT: I ONGC Tender for B 193 WELL HEAD PLATFORM PROJECT CODE: I HELJ9-78/COSB/R2/1006 18
ORDER REF NO: DATE:
PAGE NO: e-MAIL DATE:
1.2 MATERIAL SPECIFICATION:
1) DIMENSIONS:- AS PER ENCLOSED DRAWING NO: HEL/9-78/ORD/DRG/0 1 / 100327 Rev.0
HEL/9-78/ORD/DRG/02/ 100327 Rev.0
2) MATERIALS :- FOR, RUBBER : AS PER ONGC SPEC 6001 F REQUIRED FOR 50 ksi. FOR STRUCTURAL STEEL : AS PER ONGC SPEC 6001 F REQUIRED FOR 50 ksi.
FOR FASTENERS : BOLT : ASTM A-193 Gr.B7 (FLOUROPOLYMER COATED "XYLAN TYPE") NUT &WASHER : ASTM A-194 Gr.2H (FLOUROPOLYMER COATED "XYLAN TYPE")
BI TESTING OF PRODUCTS :-
THE ABOVE PRODUCTS CAN BE TESTED AS PER QUALITY ASSURANCE PLAN ENCLOSED HEREWITH.
C) TEST APPARATUS :-
THE TEST SAMPLE WILL BE MADE FROM THE SAME COMPOUND IN PRESENCE OF THIRD PARTY INSPECTOR AND CAN BE TESTED AS PER REQUIREMENT IN NOCIL LABRATORY.
D) TEST CERTIFICATES :-
THE COMPLETE TEST CERTIFICATES WILL BE PROVIDED AS MENTIONED IN THE QUALITY ASSURANCE PLAN AND SPECIFICAT
n 4 r w j Scd h t 4 de wort p ~ j +
SD ENGFERING S D N BHD T
1 &roved
. A P P ~ Q V ~ ~ with minor comments, Work m g Proceed with Comments incorporated and resubmit within 7 days I .
n 3. k v i ~ aPPRCIYh.,lhrtnr.
1 . 3 QUALITY ASSURANCE PLAN
INSPECTION POINTS : A, H, W, S, R, M .RW
: 8193 WELLHEAD PLATFORM : Approval Required CATEGORY:-'C"
: Hold Point
: O.N.G.C. : Witness Point
HEL Doc No. : HEU9-78/ORDIQAP/01.02/100327 REV : 0 : Operation Surveillance
Description : DIAPHRAGM CLOSURE 8 GROUT SEAL ASSY. : Review of Documentation
: HI-TECH ELASTOMERS LTD. : Monitoring by resident inspector
: Performance
CHARACTERISTIC TO BE VERIFIED ACCEPTANCE CRITERIA
ANNEXURE 2:
H S F SHEAR FENDER
DRAWING 1 12.2 MATERIAL SPECIFICATION
1 1 2.3 11 QUALITY ASSURANCE PLAN I
2 . 1 HSF S H E A R F E N D E R DRAWING: