19
PT Jabbaru Elektrodaya Telematika CivilTransmission Line and Substation Construction Engineering Company Profile Main Office: Renewable Energy Division: Jl Gayung Kebonsari X / 7 Contact: Ms. Wati Roberts Surabaya 60231 Email: [email protected] Telp / Fax : 031- 8280451 Website: www.surya-tek.com The sun does a lot! But it does more. .

Jabbaru company profile

Embed Size (px)

DESCRIPTION

PT Jabbaru Elektrodaya TelematikaCivil—Transmission Line and Substation Construction Engineering

Citation preview

Page 1: Jabbaru company profile

PT Jabbaru Elektrodaya Telematika Civil—Transmission Line and Substation Construction Engineering

Company Profile

Main Office: Renewable Energy Division:

Jl Gayung Kebonsari X / 7 Contact: Ms. Wati Roberts

Surabaya – 60231 Email: [email protected]

Telp / Fax : 031- 8280451 Website: www.surya-tek.com

The sun does a lot! But it does more. .

Page 2: Jabbaru company profile

Content

Page

Company Milestone 3

Vision & Mission Company 4

Company Value 5

Company data 6

Core Business 7

Project experiences 8 - 15

Equipment 16 - 19

Page 3: Jabbaru company profile

Company Milestone PT Jabbaru Elektrodaya Telematika

PT Jabbaru Elektrodaya Telematika is a company that was formally founded in 1999 by Mr. Fachroedin. Establishment of this company aims to achieve development in the electricity sector in Indonesia. The main focus of the company's activities is the transmission line and substation. Many experience the work done by the members, especially the construction of transmission line and substations in Java, Sumatra, Kalimantan, Bali and Lombok. On May 15, 2008, a change in the articles of association as well as the management of the PT Jabbaru Elektrodaya Telematika. PT Jabbaru Elektrodaya Telematika strive to be a company that gives more value to customers and achieve positive growth and profitability. In order to realize it, Jabbaru constantly strive to work more professionally with delivering products to customers on time without any delay and to make improvements in the company to satisfy the stakeholders. The awareness to Renewable Energy importance to help easing energy problem is just recently spreading and a portfolio of renewable energy technologies is becoming cost-competitive in an increasingly broad range circumstances. And in order to accelerate the utilization of solar energy for the benefit of both on-grid and off-grid in particular increase access to electricity in the entire Indonesian archipelago, in 2011 we expanded our business field into renewable energy in particular photovoltaic (PV) system. Rapid deployment of renewable energy and energy efficiency, along with technological diversification of energy sources, would result in significant energy security and economical benefits.

Page 4: Jabbaru company profile

Vision & Mission Company

PT Jabbaru Elektrodaya Telematika

Vision : Being a superior field of electricity companies and trusted in Indonesia

Mission: 1. Be a transmission services provider. 2. Certify and standardize the system.

Page 5: Jabbaru company profile

Company Value

PT Jabbaru Elektrodaya Telematika

"We are proud to be part of a big family Jabbaru, so always apply in every

activity of the company value the work we do".

Value Energetic, Honest, Tough

Page 6: Jabbaru company profile

Company data PT Jabbaru Elektrodaya Telematika

Deed No. 3 dated January 29, 1999 Notary Sri Maryami, SH in Sidoarjo.

Amendment No. 80 dated May 15, 2008 Notary Julia Seloadji, SH in Surabaya.

NPWP No 01.874.500.0-609.000

SIUJK contractor of the Department of Human Settlements and Spatial Planning

Surabaya.

TDP of the Department of Trade and Industry, Surabaya City Government is

valid until March 2, 2016.

Medium Business License from the Department of Trade, Industry and

Investment Surabaya City Government is valid until September 3, 2018.

Director: Ms. Farida

Page 7: Jabbaru company profile

Core Business PT Jabbaru Elektrodaya Telematika

High power transmission line construction and extra high power.

Page 8: Jabbaru company profile

Project experience

PT Jabbaru Elektrodaya Telematika

Stringing conductor 500 kV PKK; in 2002.

Installation of 500 kV Conductors, OPGW / GSW Earthwire and Spacer Damper Works 500 kV Transmission Lines Tasikmalaya-Depok Depok III & III incomers; in 2003.

Amendment No. 3 Installation of 500 kV Conductors, OPGW / GSW Earthwire

and Spacer Damper Works 500 kV Transmission Lines Tasikmalaya-Depok Depok III & III incomers; in 2004.

Amendment No. 4 Installation of 500 kV Conductors, OPGW / GSW Earthwire

and Spacer Damper Works 500-kV Transmission Lines Tasikmalaya and Depok Depok III; 2005.

Stringing 500 kV Tanjung Jati B; in 2005.

Stringing 500 kV Tanjung Jati B Ekspansion; in 2010.

Page 9: Jabbaru company profile
Page 10: Jabbaru company profile

Stringing SUTT 150 kV PIER-Malang East; 2004.

Providing Manpower Employment Settlement for High Voltage 150 kV (SUTT

150 kV) stringing along the East Malang PIER- 52318.54 - 27000.00 m = 25318.54 m (2 CCT) (self-management); in 2005.

Providing Manpower for Stringing SUTT 150 kV Rungkut-South Surabaya (T.18

s / d T.34) along: 4.5984 Kms = 56838.70 m (double conductor 2 CCT), in 2005.

Cilegon Combined Cycle Power Plant (740 MW) and Associated 150 kV Transmission Line and Substation Cilegon-Banten, Indonesia, in 2006.

Stringing SUTT 150 kV Lamongan-Brondong (Paciran); Lamongan Paciran

Phase I; in 2006.

Tower security SUTT 70 kV Buduran - Bangil between T 42 and 43; in 2007.

Uprating GSW SUTT 70 kV Kebonagung-Polehan-Blimbing and Kebonagung-Karangkates-Sengguruh; 2008.

Uprating GSW 35 mm ² to 55 mm ² SUTT 70 kV in Kebonagung-Sengguruh-

Karangkates-Gampingan; 2008.

Stringing SUTT 150 kV Ampenan-Praya and T11 (Ampenan-Endok-Praya); 2008.

Installation Circuit to 2 SUTT 150 kV-Pemaron Gilimanuk, Bali; 2009.

Dismantling Conductor, Hardware Fittings & Accessories from Span T47-T48-

T49-Section A Wonosari-Solo Baru; 2009.

Stringing SUTT 150 kV Babat-Mliwang; 2009.

Transmission Line Stringing Work Uprating 70 kV to 150 kV Pacitan - Ponorogo; 2010.

Transmission Line Stringing Work Uprating 70 kV to 150 kV Ponorogo-Manisrejo;

2011.

Procurement Tower, E / M, Foundations, Tower Erection and Stringing of 150 kV Transmission power plant 3 East Java (Tanjung Awar-Awar) Tuban (Deficiency Phase 1); in 2011.

Page 11: Jabbaru company profile
Page 12: Jabbaru company profile
Page 13: Jabbaru company profile

Rekonduktoring SUTT 150 kV Mranggen Incomer (TX46-GI Mranggen) of conductor 2 x ACSR 240/40 mm ² (Hawk) to 2 x High Temperature Low Sag conductor capacity ≥ 2500 A and Capacity Building Substation 150 kV Kudus, Purwodadi, Unggaran and Configuration changes from Single to Double PHI in GI Mranggen; 2011.

Page 14: Jabbaru company profile

Rekonduktoring HTLS Gilimanuk - Celukan Bawang ; 2012.

Page 15: Jabbaru company profile

Installation Work Downlead to Swtichyard in Ponorogo GI & GI Manisrejo; 2012.

Stringing SUTT 70 kV Atapupu - Atambua - Kefamenanu; 2012.

Downlead OPGW Line 1 Pacitan - Ponorogo in GI Pacitan.

Downlead OPGW Line 1 Ponorogo - GI Manisrejo in GI Ponorogo

Stringing and splicing Gantry Box and OTB in GI Ponorogo direction Manisrejo

Stringing and Splicing FA in Gantry Box and OTB in GI Manisrejo to Ponorogo

Transposition Tower normalization T.66

Transposition Tower normalization T.173

OPGW test Pacitan - Ponorogo, Ponorogo – Manisrejo in 2012.

Page 16: Jabbaru company profile

Equipments

PT Jabbaru Elektrodaya Telematika

Puller & Tensioner Tesmec Press Machine

Montage Roll Puller & Tensioner

Page 17: Jabbaru company profile

Truck Crane

Spacer Car

Come Along

Snatch Block

Page 18: Jabbaru company profile

Cable Cutter

Temporary Mesh

Sock Joint

Swivel

Connector

Steel Wire Rope

Conector

Page 19: Jabbaru company profile

Thank you for your kind attention Copyright © PT Jabbaru Elektrodaya Telematika. All Rights Reserved.

Megger (Insulation

Tester)

Tension Meter

Ground Stick