13
JPAR, LLC May 27, 2015

J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

JPAR, LLCMay 27, 2015

Page 2: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

Project Renews

• Location Map

Sahuarita Road

Pima Mine Road

Sahuarita

Page 3: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

Project Renews

Project Features • Existing CAP Terminus

• Phase II Pipeline

• River Crossing

• “T” Connection

• Phase I – Completed Pipeline

• Basin Site

• CWC Well #11 (existing)

Page 4: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

Project Renews

Project Waterline

Overview

Page 5: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

Project Renews

• 72 Acres• 26 Acres of

Recharge• Basins have

“organic” shape• Basins designed

with some flatter slopes for shorebird habitat

AZ State Land Property

Page 6: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

Project Renews

• Reference Images

Page 7: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

• Reference Images

Project Renews

Page 8: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

Project RenewsTerminus CAP Connection

Page 9: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

(GREEN VALLEY WATER SUPPLY STUDY)

Page 10: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

Project Renews

REFERENCES(GREEN VALLEY WATER SUPPLY STUDY)

Page 11: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

Water use in the Green Valley/ Sahuarita area:

• Agriculture• Mining• Golf Courses• Municipal use

Page 12: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

Green ValleyWater Supply Study

In cooperation with:

Upper Santa CruzProviders & Users Group

(USCPUG)

Page 13: J2278 CWAC TPP Project Renews PPT Presentation 150624.ppt€¦ · Green Valley Use Turnout Union Pacific *--f PMR 36" Railroad ASARCO Turnout (8") O CAP ROW 100 Feet N o 50 18" Steel

Recharge Alternatives

Groundwater Savings Facility

Basin Centralized De-Centralized

In-channel Santa Cruz Arroyos