91
HP BYPASS SYSTEM SERVO VALVES - ST 10/4, ST- 10/63 BLOCKING ELEMENT BL 10 HYDRAULIC ACTUATOR ASM 63, 100, 160, 200 250 STEPPING CONTROL APL-6 QUICK STROKING DEVICE SSB-10 OIL SUPPLY UNIT FEEDBACK TRANSMITTER

Iyappan Engg Products

Embed Size (px)

DESCRIPTION

Iyappan Engg Products Presentation

Citation preview

Page 1: Iyappan Engg Products

HP BYPASS SYSTEMHP BYPASS SYSTEM

SERVO VALVES - ST 10/4, ST-10/63

SERVO VALVES - ST 10/4, ST-10/63

BLOCKING ELEMENT BL 10

BLOCKING ELEMENT BL 10

HYDRAULIC ACTUATOR ASM

63, 100, 160, 200 250

HYDRAULIC ACTUATOR ASM

63, 100, 160, 200 250

STEPPING CONTROL APL-6

STEPPING CONTROL APL-6

QUICK STROKING DEVICE SSB-10

QUICK STROKING DEVICE SSB-10

OIL SUPPLY UNIT

OIL SUPPLY UNIT

FEEDBACK TRANSMITTER

FEEDBACK TRANSMITTER

Page 2: Iyappan Engg Products

electro hydraulic servo valves...

Page 3: Iyappan Engg Products

Electro Hydraulic Servo Valves

Servo Valve -Feedback Mechanism

- An Introduction

COLD WATER

HOT WATER

- A person wants to take bath.

- He opens both the control valves of hot water & cold water

- He feels the temperature

- He is not comfortable with it

Page 4: Iyappan Engg Products

Servo Valve -Feedback Mechanism

Electro Hydraulic Servo Valves- An Introduction

HOT WATER

- His brain gives feedback to his hands

- And his hand in turn adjusts the valves

- This process continues until he feels comfortable

COLD WATER

Page 5: Iyappan Engg Products

Servo Valve -Feedback Mechanism

Electro Hydraulic Servo Valves- An Introduction

- He is satisfied and continues to have bath.

HOT WATER

COLD WATER

Page 6: Iyappan Engg Products

Electro Hydraulic Servo ValvesSimple Servo Valve Feedback System

BLOCK DIAGRAM OF SERVO FEEDBACK MECHANISM

CHENNAI - 600 098IYAPPAN ENGINEERING INDUSTRIES PVT LTD

VALVE

INPUT ERROR

LOAD

OUTPUT

+-HYD. CYLINDER

ORHYD.MOTOR

PUMP

FEEDBACK

Page 7: Iyappan Engg Products

Electro Hydraulic Servo Valves

Electro hydraulic Actuator System - Continuous Control

Page 8: Iyappan Engg Products

Electro Hydraulic Servo Valves

Servo System - Uses

- POSITION CONTROL

- PRESSURE CONTROL

- SPEED CONTROL

- TEMERATURE CONTROL

Servo system is used for

Page 9: Iyappan Engg Products

Electro Hydraulic Servo ValvesServo Valve - Applications

• CONTROL VALVES

• ROBOTS

•PLASTIC INJECTION MOULDING MACHINES

•AUTOMATIC GAUGE CONTROL FOR STEEL ROLLING MILLS

•DEEP SEA RESEARCH MANIPULATOR

•SIX AXIS MOTION SYSTEM FOR FLIGHT SIMULATOR

•STEERING SYSTEM FOR SHIP

•HONING MACHINE & MACHINE TOOL INDUSTRIES

•TESTING MACHINES

Page 10: Iyappan Engg Products

Electro Hydraulic Servo ValvesServo Valve - STAGES

Servo valve consists of 2 stages

SERVO VALVE

FIRST STAGE

SECOND STAGE

HYDRAULICELECTRICAL

Page 11: Iyappan Engg Products

Electro Hydraulic Servo Valves

Page 12: Iyappan Engg Products

Electro Hydraulic Servo Valves

Page 13: Iyappan Engg Products

Electro Hydraulic Servo Valves

Page 14: Iyappan Engg Products

Electro Hydraulic Servo Valves

Page 15: Iyappan Engg Products

Electro Hydraulic Servo Valves

Page 16: Iyappan Engg Products

blocking element...

Page 17: Iyappan Engg Products

Blocking Element

Page 18: Iyappan Engg Products

Blocking Element

Page 19: Iyappan Engg Products

maintenance of servo valves...

Page 20: Iyappan Engg Products

Importance of oil cleanliness :

Hydraulic oil should conform to NAS Grade -6 for the following reasons:

1. The control oil has to pass through 0.17mm & 0.25mm diameter orifices - any blockage will cause malfunction of the system.

2. The diameter clearance between the Spool & Bush is 6 to 8 microns.

- any dirt will cause scoring mark on the Spool & the Bush.- the Spool may also get stuck

Maintenance - Servo Valves

Page 21: Iyappan Engg Products

Servo Valve

Page 22: Iyappan Engg Products

Servo Valve

Page 23: Iyappan Engg Products

Servo Valves

Page 24: Iyappan Engg Products

Servo Valve

Page 25: Iyappan Engg Products

Servo Valve

Page 26: Iyappan Engg Products

Servo Valve

Page 27: Iyappan Engg Products

Servo Valve

Page 28: Iyappan Engg Products

Servo Valve

Page 29: Iyappan Engg Products

Servo Valve

Page 30: Iyappan Engg Products

Servo Valve

Page 31: Iyappan Engg Products

SL.NO.

FAULTS PROBABLE CAUSES REMEDIES

1 Actuatormoves in onedirection

a)b)

c)d)

In spool dia. 0.25 holeblocked.Throttle Pin dia.0.17hole blocked.Balancing of R6zdisturbedTorque Motor & R6zstruck up.

a)b)

c)d)

Clean the spool Clean the throttlepin

Balance the R6zClean it by Air

2 Actuator notmoving inboth directions

a)

b)

c)

d)

Spool wrong assy.

In spool dia.0.25 holeblocked in both sidesTorque Motor Rotarypart stuck up.Connecting wires areloose and discontinued

a)

b)

c)

d)

Assemble the spoolcorrectly.Clean the spool

Clean it by air

Correct the wiringand loads properly.

Trouble shooting of Servo Valves

Page 32: Iyappan Engg Products

SL.NO.

FAULTS

PROBABLE CAUSES

REMEDIES

3 a) 3b) 3c) 3d) 3e)

Oil Leak through Filter Support Oil leak through Torque Motor Oil leak through Manual Cover Assembly Oil leak through Stud Coupling side Oil leak through Servo Valve Face side

a) b) c) a) b) a) b) a) b) c) a)

'O'Ring flat or damaged Scoring mark on dia.17.5 of Filter Support or Filter Support damaged Housing bore of Filter Support hole damaged Diaphragm damaged 'O'Ring flat or damaged Cover 'O'Ring or Piston, 'O'Ring damaged Scoring Mark on Cover Assy. ID or OD Hose, 'O'Ring damaged Stud coupling Broken or damaged Hose connection damaged Face 'O'Ring flat or damaged

a) b) c) a) b) a) b) a) b) c) a)

Change 'O'Ring Change Filter Support Change the valve Change the Diaphragm Change the 'O'Ring Change the 'O'Ring Change the Cover Assembly. Change the 'O'Ring Change the Stud Coupling Change hose Change the 'O'Ring

Trouble shooting of Servo Valves

Page 33: Iyappan Engg Products

SL.NO.

FAULTS PROBABLE CAUSES REMEDIES

4. Irregularoperation

a)

b)

Electrical connectingplug loose

Discontinuity of supply

a)

b)

Correct the connection

Check and correct thesupply.

5. Spool jammedand rusted

a)

b)

Oil contamination

Water mixed in the oil

a)

b)

Change the Servo valve

Clean the oil

Change the oil (send theservo valve to Factory forservicing.

Trouble shooting of Servo Valves

Page 34: Iyappan Engg Products

maintenance of blocking elements...

Page 35: Iyappan Engg Products

Blocking Element - Maintenance

Page 36: Iyappan Engg Products

Blocking Element - Maintenance

Page 37: Iyappan Engg Products

Blocking Element - Maintenance

Page 38: Iyappan Engg Products

SL.NO.

FAULTS PROBABLE CAUSES REMEDIES

1. Irregular operation a)

b)

Electrical Plug loose

Discontinuity of ElectricSupply

a)

b)

Correct theconnectionCheck and correct theElectric supply

2. Valve opening andActuator drifting

a)

b)

c)

Piston 'O'Ring damaged

Pistron Struck-up.

Solenoid Valve notfunctioning

a)

b)

c)

Change the 'O'Rings

Service and clean thePiston & bore

Check & servicesolenoid valve. (Ifproblem continues,change the solenoidvalve)

3. Oil leak throughManual Cover Assy.

a)

b)

Cover & Piston Rod'O'Ring damaged

Cover OD or Piston RodOD damaged

a)

b)

Change the 'O'Ring

Change the ManualCover Assy.

4. Oil leak throughSpring Cover Assy.

a)

b)

Spring Cover, 'O'RingdamagedImproper seating ofCover Assy.

a)

b)

Change the 'O'Ring

Correctly assemblethe Spring CoverAssy.

TROUBLE SHOOTING OF BLOCKING ELEMENT

Page 39: Iyappan Engg Products

SL.NO. FAULTS PROBABLE CAUSES REMEDIES5. Oil leak through

Solenoid ValveConnecting Plate

a)'O'Rings of Solenoid ValveConnection face damaged

a) Change both 'O'Rings

6. Oil leak through the faceof the ConnectingManifold and face of theBlocking Unit

a)

b)

c)

Face 'O'Rings damaged

Improper seating of ServoValves, Blocking Element onConnecting Manifold

Threads of connectingManifold damaged

a)

b)

c)

Change the 'O'Rings

Correct and properlyassemble the Servo Valve& Blocking Element onthe connecting Manifold

Change connectingManifold

7. Piston Jammed a)

b)

Piston rusted

Mix up of water in the oil

a)

b)

Change the BlockingElement (Send theBlocking element forservicing)Change Oil

TROUBLE SHOOTING OF BLOCKING ELEMENT

Page 40: Iyappan Engg Products

oil supply unit...

Page 41: Iyappan Engg Products

OIL SUPPLY UNIT

Page 42: Iyappan Engg Products

OIL SUPPLY UNIT

Page 43: Iyappan Engg Products

OIL SUPPLY UNIT

Page 44: Iyappan Engg Products

OIL SUPPLY UNIT

Page 45: Iyappan Engg Products

OIL SUPPLY UNIT

Page 46: Iyappan Engg Products

OIL SUPPLY UNIT

Page 47: Iyappan Engg Products

OIL SUPPLY UNIT

Page 48: Iyappan Engg Products

hydraulic actuator...

Page 49: Iyappan Engg Products

ACTUATOR

Page 50: Iyappan Engg Products

ON OF F CONTROL ASSY

Page 51: Iyappan Engg Products

QUICK STROKING ASSY

Page 52: Iyappan Engg Products

feedback transmitter...

Page 53: Iyappan Engg Products

FEEDBACK TRANSMITTER

Feedback Transmitter

Page 54: Iyappan Engg Products

electro hydraulic actuator…

Page 55: Iyappan Engg Products

Electro Hydraulic Actuator

Page 56: Iyappan Engg Products

Electro Hydraulic Actuator

Iyappan Engg Industries Pvt Ltd

Page 57: Iyappan Engg Products

Electro Hydraulic Actuator

Iyappan Engg Industries Pvt Ltd

Page 58: Iyappan Engg Products

List of Tests Conducted for E.H.AEHA. TESTS - FINAL STAGE

(FULLY ASSEMBLED)

OIL TANK PRE. TEST1

CYLINDER ASSY. PRE.TEST

2

HAND PUMP ASSY. TEST4

SAFETY VALVE ASSY. TEST

5

SHUT OFF VALVE ASSY. TEST

6

PRESSURE FILTER ASSY. TEST

7

DIFFERNTIAL PRESSURE ASSY. TEST

7a

CHECK VALVE ASSY. TEST

8

9 TOP PLATE ASSY. TEST

FEEDBACK TRANSMITTER

TEST

10

3 TANK & CYLINDER ASSY. TEST

Page 59: Iyappan Engg Products

List of Tests Conducted for E.H.A

Page 60: Iyappan Engg Products

List of Tests Conducted for E.H.A

Page 61: Iyappan Engg Products

List of Tests Conducted for E.H.A

Page 62: Iyappan Engg Products

List of Tests Conducted for E.H.A

Page 63: Iyappan Engg Products

List of Tests Conducted for E.H.A

Page 64: Iyappan Engg Products

List of Tests Conducted for E.H.A

Page 65: Iyappan Engg Products

List of Tests Conducted for E.H.A

Page 66: Iyappan Engg Products

List of Tests Conducted for E.H.A

Page 67: Iyappan Engg Products

List of Tests Conducted for E.H.A

Page 68: Iyappan Engg Products

ASSEMBLY CYCLIC TEST

All the assemblies are tested for a cyclic test for 3 days in our Test Bench for the total stroke length at 54 cycles per minute. Totally 10000 cycles in operation before taking out the final reading as per the data given.

Page 69: Iyappan Engg Products

SL.NO. IY-14STROKE 40MM

BEFORE STARTING THE CYCLE TEST

SERVO VALVE INPUT (mA)

TRAVEL OF PISTON UPWARD

(mm)

TRAVEL OF PISTON

DOWNWARD (mm)

OUTPUT OF FEEDBACK

TRANSMITTER - UPWARD (mA)

OUTPUT OF FEEDBACK

TRANSMITTER - DOWNWARD

(mA)4.00 0.00 0.00 4.00 4.016.00 5.12 5.18 5.97 6.008.00 10.33 10.50 7.97 8.04

10.00 15.65 15.80 10.13 10.1712.00 20.47 20.60 12.07 12.1114.00 25.44 25.48 14.02 14.0616.00 30.41 30.48 16.00 16.0318.00 35.25 35.30 17.94 17.9620.00 40.15 40.15 19.94 19.94

CONCLUSION: Hysterisis in Travel - 0.17mmHysterisis in Feedback - 0.07mA

IYAPPAN ENGINEERING INDUSTRIES PRIVATE LIMITED: CHENNAI-600098

TYPE TEST FOR EHA

Page 70: Iyappan Engg Products

GRAPH PLOTTED BEFORE STARTING THE CYCLE TESTInput Current vs Piston Travel (Sl.No.IY-14, Stroke - 40mm)

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

45.00

0.00 5.00 10.00 15.00 20.00 25.00

Input Current (mA)

Pis

ton T

ravel (

mm

)

TRAVEL OF PISTON UPWARD (mm) Piston down (mm)

Page 71: Iyappan Engg Products

GRAPH PLOTTED BEFORE STARTING THE CYCLE TESTInput Current vs Feedback Transmitter Output

(Sl.No.IY-14, Stroke - 40mm)

0.00

5.00

10.00

15.00

20.00

25.00

0.00 5.00 10.00 15.00 20.00 25.00

Input Current (mA)

Feedback

Tra

nsm

itter

Outp

ut (m

A)

OUTPUT OF FEEDBACK TRANSMITTER - UPWARD (mA)

OUTPUT OF FEEDBACK TRANSMITTER - DOWNWARD (mA)

Page 72: Iyappan Engg Products

SL.NO. IY-14STROKE 40MM

SERVO VALVE INPUT (mA)

TRAVEL OF PISTON UPWARD

(mm)

TRAVEL OF PISTON

DOWNWARD (mm)

OUTPUT OF FEEDBACK

TRANSMITTER - UPWARD (mA)

OUTPUT OF FEEDBACK

TRANSMITTER - DOWNWARD (mA)

4.00 0.00 0.00 3.98 3.976.00 5.12 5.12 5.93 5.928.00 10.24 10.35 7.87 7.90

10.00 15.48 15.61 9.97 10.0312.00 20.60 20.75 12.04 12.0914.00 25.65 25.75 14.02 14.0416.00 30.58 30.72 16.00 16.0518.00 35.48 35.58 17.94 17.9720.00 40.20 40.20 19.94 19.94

CONCLUSION: Hysterisis in Travel - 0.15mmHysterisis in Feedback - 0.06mA

AFTER COMPLETING 10000 CYCLES

IYAPPAN ENGINEERING INDUSTRIES PRIVATE LIMITED: CHENNAI-600098

TYPE TEST FOR EHA

Page 73: Iyappan Engg Products

GRAPH PLOTTED AFTER THE CYCLE TEST Input Current vs Piston Travel (Sl.No.IY-14, Stroke - 40mm)

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

45.00

0.00 5.00 10.00 15.00 20.00 25.00

Input Current (mA)

Pis

ton

Trav

el (m

m)

TRAVEL OF PISTON UPWARD (mm) TRAVEL OF PISTON DOWNWARD (mm)

Page 74: Iyappan Engg Products

GRAPH PLOTTED AFTER THE CYCLE TEST Input Current vs Feedback Transmitter Output

(Sl.No.IY-14, Stroke - 40mm)

0.00

5.00

10.00

15.00

20.00

25.00

0.00 5.00 10.00 15.00 20.00 25.00

Input Current (mA)

Fee

dbac

k Tr

ansm

itter

Out

put

(mA

)

OUTPUT OF FEEDBACK TRANSMITTER - UPWARD (mA)

OUTPUT OF FEEDBACK TRANSMITTER - DOWNWARD (mA)

Page 75: Iyappan Engg Products

ELECTRO HYDRAULIC ACTUATORASSY. (MODEL HSA-1-K-02)

SECTIONAL VIEW

MODIFIED ELECTRO HYDRAULIC ACTUATOR ASSEMBLY.

02

01

4-PD-E5(1)-SPEC-0064-PD-E5(1)-SPEC-006

MODIFIED ITEMS:-

SECTIONAL VIEW OF EHA - HSA-1-K-02

Page 76: Iyappan Engg Products

IYAPPAN ENGG. INDUSTRIES PVT.LTD.

HYDRAULIC CIRCUIT DIAGRAMFOR E.H.A MODEL HSA-1-K-02

4-PD-E5(1)-SPEC-0054-PD-E5(1)-SPEC-005

M

m

HYDRAULIC CIRCUIT DIAGRAM OF EHA - HSA-1-K-02

Page 77: Iyappan Engg Products

COMBINED PRESSURE RELIEF AND CONTROL VALVE ASSEMBLY

Page 78: Iyappan Engg Products

COMBINED PRESSURE RELIEF AND CONTROL VALVE ASSEMBLY

Page 79: Iyappan Engg Products

SL.NO.

FAULTS PROBABLE CAUSES REMEDIES

1) Pressure gauge not working 1) Change the pressuregauge

2) Insufficient oil in sump 2) Fill oil upto sight glasslevel

3) Leak in pressure line 3) Tighten up allconnections(Check for pipe fractureif require change)

4) Suction Filter clogged 4) Clean the filter5) a)

b)

Motor Running inwrong direction or twophase supply

Defective Motor

5) a)

b)

Correct the supplyand direction as perthe indication mark.

Replace the Motor6) Coupling between Motor and

pump defective6) Replace the coupling

7) Pump not pumping oil 7) Replace Pump (send thepump for servicing)

8) Pressure limiting valveincorrectly adjusted

8) Adjust the pressurelimiting valve correctly

I Oil pressuregauge indicateslittle or no oilpressure

9) Accumulator Safety Blocknot working properly

9) Change the Safety Block(Send the Safety Blockfor servicing

TROUBLE SHOOTING OF ELECTRO HYDRAULIC ACTUATOR

Page 80: Iyappan Engg Products

SL.NO.

FAULTS PROBABLE CAUSES REMEDIES

1) Feed Back Spring orRetaining spring of the Servovalve damaged

1) Replace the spring andreadjust the range

2) Feed back rod not rigidlysecured

2) Tighten and secure thefeed back rod correctly.

3) One Restrictor blocked 3) Clean the restrictor withcompressed air.

4) Dirt between flappor and oneof the nozzle

4) Clean the Nozzle

II Piston moves toone end andremainsstationary

5) Leakage in oil line tocylinder

5) Tighten oil lineconnection and to be leakfree

1) Change the ambienttemperature in over a widerange, ie. Between summerand winter

1) The displacement canonly be in the order of3% and should becorrected by means offine adjustment screw

III The stroke of theactuator shifts

2) Iron particles between thepole shoes

2) Clean the pole shoesarmature and magnet.

TROUBLE SHOOTING OF ELECTRO HYDRAULIC ACTUATOR

Page 81: Iyappan Engg Products

SL.NO.

FAULTS PROBABLE CAUSES REMEDIES

1) Filter element blocked 1) Clean the Filter.IV Stroke time forthe operatingrange too long

2) More Load on the Actuator 2) Deflect the servo valvefully and note pressuregauge reading. Thismust always fall. Themaximum workingpressure atleast 3 barbelow the set oilpressure.

Hand pump isnot operative

Hand pump blocked due to dirt inreturn flow restrictor

Clean the restrictor

1) Pressure filter choked 1) Clean the filter2) Blockage in Nozzle of

Restrictor assy.2) Clean the Nozzle of

restrictor assy.

V Hunting of theActuator

3)

4)

Feed back spring andRetaining spring mounting isimproper and springtouching the body.

The pressure on both side ofthe flapper is not equal.

3)

4)

Mount the springsproperly. If required,change the Feed BackSpring

To send to Factory forcaliberation.

TROUBLE SHOOTING OF ELECTRO HYDRAULIC ACTUATOR

Page 82: Iyappan Engg Products

SL.NO.

FAULTS PROBABLE CAUSES REMEDIES

1) Wiper seal damaged 1) Change the wiper sealVI Oil leakage inPiston Rod 2) Cylinder seat 'O'Ring

damaged2) Change the 'O'Ring

VII Oil leakage insight glassmounting

Gasket damaged Change the Gasket

1) Shut-off valve not open 1) Open the shut off valve2) 4/3 way valve or movable

plate set for incorrectdirection

2) Set 4/3 way valve tocorrect direction

3) Non-return valve to pumpdoes not close andAccumulator oil is forcedthrough Pump

3) Change the Non-returnvalve

VIII Accumulator notoperating duringpower failure

4) Leakage in oil pipe 4) Correct the oil lineIX During Power

failure theActuator notoperating to fullstroke

1)

2)

Oil in the Accumulator islow due to Nitrogen gaspressure is highAccumulator envelopdefective

Correct the Nitrogen gaspressure in the Accumulatorby charging.

Change the Accumulator(Return the defectiveAccumulator to theManufacturer for repair)

TROUBLE SHOOTING OF ELECTRO HYDRAULIC ACTUATOR

Page 83: Iyappan Engg Products

SL.NO.

FAULTS PROBABLE CAUSES REMEDIES

X Accumulatoroperates slowly

Load on Actuator too great Discuss with manufacturer.Possibility of increasing oilpressure

XI Irregular feedback from theFeed BackTransmitter

1)

2)

Feed Back TransmitterStem Struck up.

Guide plate dislocated

1)

2)

Clean the stem (ifrequired change the FBT

Correct the guide plateand mount correctly.

TROUBLE SHOOTING OF ELECTRO HYDRAULIC ACTUATOR

Page 84: Iyappan Engg Products

IYAPPAN ENGINEERING INDUSTRIES PRIVATE LIMITED: CHENNAI-600 098

IMPROVEMENT DONE ON EHA FROM THE FEED BACK

Sl.no.

Description of item Earlier used Used atpresent Improvement

1 Tank Alumionium sand casting Aluminium fabricated out of platesand anodized

Contamination from the casting iscompletely eliminated

2 Internal Pipelines Seamless Steel carbonSteel Tube

SS Tube after acid cleaning is used This prevents contamination of particlesfrom the pipelines

3 Feed Back Transmitter Linear variable Transmitterwith cam was used

Direct mounting imported SiemensAngular Transducer is used

Avoided all linkage mechanism and playis completely removed . Now, Hysterisisis found less and repeatability is good

4 'O'Rings and seals Nitrile was used Viton O rings and seals are used Withstanding higher temperature5 D P Switch Differential pressure gauge

of Indian make was usedClogging indicator imported fromMAHLE-GERMANY is used

More accurate and compact. Damageduring transit of pressure gauges avoided

6 Motor 0.25 KW 0.33KW Tripping is totally avoided and heating ofthe motor is reduced.

7 Hand pump operation Suction was less Suction Area was increased. Suction was increased and it takes only25 strokes instead of 45 strokes takenearlier for the movement of Actuator for40mm.

8 Tests Only assembly test andfinal test was conducted

Assembly stage inspection wasintroduced and all the actuators areindividually checked cyclically for10000 times

After cyclical tests repeatability ischecked and found well within the limitincluding hysterisis.

NOW, FOR THE NEW SERIES UNDER DEVELOPMENT, FOLLOWING WERE INTRODUCED.

1. Double filteration system - this enables to change the filter during the operation without stopping the actuator.

2. Tandem Pump with combined pressure relief valve is used- this reduces volume of pressurised oil and hence, heat generated is less during idlecondition..

3. Yoke length is increased. This reduces conduction of heat from the valve of the actuator.

FINALLY TO CONCLUDE, ALL THE DIFFICULTIES WERE OVERCOME AND NOW THE EHA IS PERFORMING VERY WELL.

Page 85: Iyappan Engg Products

IMPORTANT POINTS TO NOTE

1. Electro Hydraulic Actuator Assembly is selective assembly.

2. Spool is not interchangeable

3. Spool is to be fit in correct direction only

4. Oil contamination to be maintained to NAS 6 level

5. While dismantling the nozzle, care should be taken to reassemble in the same position and also locking screw position should not be disturbed.

ELECTRO HYDRAULIC ACTUATOR

Page 86: Iyappan Engg Products

bypass limit controller...

Page 87: Iyappan Engg Products

Bypass Limit Controller

Page 88: Iyappan Engg Products

Bypass Limit Controller

Page 89: Iyappan Engg Products

electro hydraulic converter...

Page 90: Iyappan Engg Products

Electro Hydraulic Converter

Page 91: Iyappan Engg Products

Electro Hydraulic Converter