IntelliDrive (Connected Vehicle) Task Force Survey

December 8, 2010Roger Berg (Denso), Dmitri Khijniak (Kapsch)

Bob Rausch (Transcore)

Page 2: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 2/20

Discussion• Task Force Charge and Activity

• About the Survey

• Survey Focus and Measures

–  Respondent Profile

–  Quick Summary of Results

• Lessons Learned

• Next Steps

Chair, Greg Krueger (MDOT)Task Force POC: Steven Bayless (ITSA)

Page 3: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 3/20

Chair's Charge to Task Force Membership: January 2010 

• How do we define what "deployment" is and what it looks like?

• Define those benefits in a tangible way that can withstand the rigorsof intense public scrutiny when every dollar spent is challenged by anincreasingly skeptical public?

• How can we support the US DOT objective of High ValueDemonstrations?

• Are there things we can do as a 501(c)3 that US DOT cannot do?

IntelliDrive (Connected Vehicle ) Task Force

Page 4: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 4/20

Task Force Activity• Currently there are three Task Force Subgroups

– Two are looking are exploring “early” commercialadoption of DSRC before USDOT regulatory activity.

–  Is there a broad understanding of Connected Vehicle

challenges among diverse stakeholders? If not, formulatesome “common questions” to address

–  Understand universe of roadblocks or risks that are criticallyburdening the start of Connected Vehicle deployment.

FreightRail

Airport

EMS

Light Vehicle

Transit

Roadside

Motorcycle

Intersection

MobileDevices

Applications

Page 5: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 5/20

About the Survey• Survey focused on

–  early application deployments in 1-4 year 

–  risks for early deployments of the Connected Vehicle system

• Survey focused on applications enabled by use of the 5.9GHzDSRC technology

• Survey was limited to Connected Vehicle taskforce members

• Survey is short - 14 questions

• Conducted on-line

• Survey had higher than expected response rate ~ over11% (30responses from about 250 members of Connected Vehicletaskforce)

Page 6: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 6/20

Survey Focus• Measure attitude and opinion on the priorities, issues and

risks related to the start of commercial deployment ofConnected Vehicle in the short term (1-4 years).

• Connected Vehicle Task Force members are largely supportiveUSDOT research needed to support a regulatory decision byNHTSA starting in 2013.

• However, many members of the Task Force would also like toidentify issues that would enable earlier, smaller scalecommercial deployments of Connected Vehicle.

• Discover issues to facilitate discussions and self-organizing effortsof the taskforce

Page 7: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 7/20

Survey Questions

• Individual understanding, experience and level of interest

• Organizational experience

• Rank of three applications as best candidates for early (1-4

years) deployment • Most likely deployed platforms -Intersection, Roadside/Tolling,

Device, or Vehicle

• Identify top three highest priority roadblocks to applications

• Identify risks by categories -Deployment, Funding, Operations

• Rank risk categories by importance to progress in short term

* questions in bold italics ask for free formwrite-in responses

Page 8: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 8/20

What kind of organization/perspective does yourresponse to this survey represent?

• Representation

from all segments–  Over 60% of the

respondents wereprivate enterprise or consultants, the rest

academia andgovernment

Page 9: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 9/20

Respondents’ experience • Majority of respondents are familiar with the Connected

Vehicle program

–  Majority of the surveyed have spoken at conferences on

the topic, with a small percentage “still learning” about theprogram

• Most respondents are focused on design, systems integrationand planning in ITS– majority of people appear to be veryfamiliar with overall systems approach and Connected

Vehicle objectives

Page 10: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 10/20

Rate your organization's current levelof interest in Connected Vehicle

• 86% of respondents claim thattheir organizations are “veryinterested” (ranked 4-5) inConnected VehicleSM

• 60% of respondents reported

interest in contributing to adiscussion of issues identified inthe survey (a result fromanother question)

Page 11: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 11/20

What applications are the best

candidates for early (1-4 years)commercial deployment?

• Top 5applications:

–  Traveler Information

–  Tolling

–  Safety

–  Commercialvehicle

–  Probe

Page 12: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 12/20

What are the highest priority roadblocks tocommercial deployment of early Intellidriveapplications?

• Top risks identified

as generallyexpected:–  uncertainty in funding

–  value proposition

–  deployment strategy

–  concerns about lowDSRC penetration

–  maturity of standards,technology andproducts

Page 13: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 13/20

Rate risks that need to be resolved to see

Connected Vehicle deployment movingforward

• Legal concerns and O&M funding are rated

higher than initial deployment funding

Page 14: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 14/20

Lessons Learned

• Need to cross-interpret answers between

free form questions and multiple choice

– example: biggest “early deployment” risk ? 

• free form shows funding/business model

–  free form gave nineteen different types of risk across threecategories

• multiple choice is liability 

More task force discussion necessary to ensure a common understanding of terminology.

Page 15: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 15/20

Next steps• Engage survey respondents in further 

discussions

–  60% of respondents interested in contributing tofuture discussions

• Develop task force consensus on highest

priority focal points

• Utilize on-line forum and face-to-facemeetings to formulate critical definitions and

task force perspectives

• Document outcomes

Page 16: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 16/20

THANK YOU!

Questions?

Page 17: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 17/20

Caveats• Not a statistically valid survey – respondents are self selected.

• Survey questions are subject to multiple interpretation acrossand within stakeholders groups

–  Survey designers included both multiple choice and free-form answers on the same topics.

–  Compiling and reporting free-form answers to the task force

• Widget surveys generally are an introduction into a discussion

on the topic raised by the poll – that is what this poll does.

Page 18: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 18/20

Prerequisite issues for early deployment (1/2)

Early deployment risks

• Technology/Standards

maturity• Marketing and outreach

• Interoperability, agencycoordination

• System reliability, scalability

• Availability of infrastructure• Application/Value

proposition

• Liability

Early funding risks

• Budget priorities

• Funding O&M model• Technology/Standards

maturity

• Political consensus

• Incentives to deploy

Page 19: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 19/20

Prerequisite issues for early deployment (2/2)

Operating risks

• Funding model for O&M

• O&M staffing and personnelexpertise

• Liability

• System governance

• Obsolescence

• Public/private partnershiparrangement

• Technology alternatives

Page 20: ITSA IntelliDrive Task Force Survey Dec 15 2010a

8/7/2019 ITSA IntelliDrive Task Force Survey Dec 15 2010a

http://slidepdf.com/reader/full/itsa-intellidrive-task-force-survey-dec-15-2010a 20/20

What do you see most likely deployed within theshort time frame of 1-3 years

• 5.9 Tolling has made to the top of early

deployment applications