Upload
roxanne-lyons
View
219
Download
0
Tags:
Embed Size (px)
Citation preview
ITS Technology ServicesSummer Projects
2013 SUMMER PROJECTS
MavPRINT – Student Mobile Device Printing (September) *
* Awaiting web skinning and documentation
2013 SUMMER PROJECTS
Printing (Faculty and Staff) – Xerox Mobile Printing (October)*
* Delayed from summer due to workload
2013 SUMMER PROJECTS
MavAPPS – Office 2013 (in addition to Office 2010)
2013 SUMMER PROJECTS
MavMAIL – Office 365 Student E-Mail (Over 34,000 student mailboxes moved to the cloud)
2013 SUMMER PROJECTS
Data Warehouse and Analytics (September) *
* Delayed awaiting funding
2013 SUMMER PROJECTS
Event Management System – Migration from R25 / Integration
2013 SUMMER PROJECTS
MavTUBE – video streaming and media management
2013 SUMMER PROJECTS
MavNET – Expand Wireless Coverage (73 Access Points)
MavNET – Wireless Controller Replacement (NOT DONE) *
* Delayed awaiting FY14 Budget Allocation
2013 SUMMER PROJECTS
Cellular Repeater – Distributed Antenna System *
* Upgrade for Julia Sears and Preska (Phase 1)
2013 SUMMER PROJECTS
StarID – Implementation / Migration Planning
2013 SUMMER PROJECTS
New Services – Implementation / Migration Planning
2013 SUMMER PROJECTS
Symantec Anti-Virus -> System Center Endpoint Protection
PointSec – Full-Disk Encryption Replacement (Extended)
2013 SUMMER PROJECTS System Upgrades:
Class Climate (NOT DONE) *
Qualtrix
Visix (Digital Signage System)
FusionRV (Crestron Centralized Monitoring System)
Medicat Server Upgrade (Student Health Services)
SHS Pharmacy Software (Student Health Services)
Blackboard Transaction System Upgrade
ImageNow System Upgrade
ImageNow MnSCU Audit
Dentrix Upgrade
HC 2010 Classroom Network Replacement
Copy Shoppe Point Of Sale Replacement
Alumni Call Center Software Replacement* Workload
2013 SUMMER PROJECTS
Power – USB Charging Stations for Students
2013 SUMMER PROJECTS
TelePresence – Normandale Endpoint TX9200
2013 SUMMER PROJECTS
Moves – Morris Hall, Armstrong Hall, etc.
2013 SUMMER PROJECTS Delayed
2013 SUMMER PROJECTS Delayed Campus Network – Begin Switch Replacement Project (10x Bandwidth) *
- Firewall Replacement (MnSCU) **
- Network Monitoring (NOT DONE) ***
* Delayed awaiting FY14 Budget Allocation** Awaiting equipment from MnSCU*** Delayed - Workload
2013 SUMMER PROJECTS Delayed
SharePoint – 2010 to 2013 Upgrade (September) *
* Workload Delay