The Design Develop Evaluate Process
Project Development Model
Phase Brief description of what the phase encompasses
Design
IdentificationClarification of the issue being examined involving clearstatements of problem identification, rationale and aims.
Docume
ntation
Documentationofallphasesof
theproject,togetherwith
manuals(userand/ortechnical)
SpecificationDescription of the type of outcome required, including the
nature of inputs and outputs, hardware and softwarerequirements and audience, as appropriate.
DesignPlanning the details of the solution using a recognised
methodology.
Develop
Implementation Implementing the design with the chosen software.
TestingTesting for accuracy by checking for logical and syntactical
errors.
Evaluate
EvaluationMaking judgments about the quality of the product, andthe process of development including time-management
issues.
Final Documentation Checklist
Phase Brief description of documentation in each phaseIncluded
(Y/N)
Context Title Page
Company Profile, Disaster Recovery Plan, TeamMember Profiles
Design
Identification Pre-design Planning Checklist
Specification Design Brief including background, outcome
required, target audience, details/specifications, andhardware/software required.
Design
Original sketches and design notes
Storyboards
Navigational Structure/Concept Maps
Develop
Implementatio
n,Testing
Weekly Work Log
Individual Work Log
Evaluate
Evaluation
Project Evaluation information about the processof development, and quality of the product
Team / Individual Evaluation
Appendices
Extras Other
Materials todemonstrate
project
planning andproof of
authorship
Screen Prints Of Project *
Annotated Bibliography / Bibliography
Client Contract *
Design Brief Form Minutes Of Meetings
Signed Authorship Form *
Copies of correspondence (emails etc.)
8/8/2019 ITS Project Documentation v7 - 10MaP
3/22
Project Timeline (Gantt)
8/8/2019 ITS Project Documentation v7 - 10MaP
4/22
Epic Nerd Designs254 Lapwings Cresent
North Lakes, QLD, 4509
Phone: 07 3886 4562Fax: 07 3165 5649
www.epicnerd-designs.com
Designer: Josh Missen
Client: Mr Hoey
Contact Person: Mr Hoey
Contact Email: [email protected]
8/8/2019 ITS Project Documentation v7 - 10MaP
5/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
Company Profile
Epic Nerd is a multimedia design based company. We create all kinds of multi media basedproducts such as graphics designs, logo designs, typography, photo edits, Animation,Interactive Animation, Gaming and a few more.
The staff at Epic Nerd are very experienced in what they do. They all have there own talentsand parts of the company which they contribute to. They are hard working and will get the jobone as quick as possible t the best of their ability.
Prior projects include:
Interactive Comic
Flash Games
Photo Edits
Web Designs
Graphic Designs
Logo Designs
Disaster Recover Plan
Epic Nerd Designs understands that computers and data can, and do, at times fail. However,we have in place a strict disaster recovery policy which gives the client peace of mind thattheir project will be completed on time, without any loss of data. The recovery plan involvesus making 3 backups of our product which we have created for you. We will instantly back upon our server and a backup server also on completion we instantly back up your files createdon a disc which is kept for 3 months.
On completion of the project the files are given to a client through email, mail via CD or USB,or face to face (CD or USB can be picked up at our office. Epic Nerd also retains a copy of allproject files for 3 months should the client lose their copies; after this time the files will bedeleted and/or destroyed unless an extended storage time is purchased.
8/8/2019 ITS Project Documentation v7 - 10MaP
6/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
8/8/2019 ITS Project Documentation v7 - 10MaP
7/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
Pre-Design Planning Checklist
1. The purpose of the project is:a) to sellb) to informc) to entertaind) other: _______________________
2. The target audience of the product is:a) a Home/Personal userb) a Business user
c) an Educational userd) some other group : _________________
3. The finished product will:a) contain imagesb) be strictly topographicc) contain cartoons, animation, illustrationd) contain a combination of the above
4. Design documents needed will be:a) sketchesb) design notesc) a CMAPd) storyboards
5. The finished project will be distributed:a) on CD/DVDb) on the Internetc) on a local networkd) other: __________________
6. The project is a:a) a practical taskb) an oral taskc) a written taskd) a minor/major project
7. The storage space for the project files is:a) sufficientb) not sufficient
8. The required software is:a) available for useb) not available for use
9. The necessary hardware is:a) available for useb) not available for use
10. The project will be:a) a completely new designb) an adaptation of an existing design
11. In terms of completing the required task I feel I have:a) sufficient knowledge of the software to achieve successb) insufficient knowledge of the software to achieve success
c) a great deal of knowledge of the software and will achieve success
12. The project deadline is:
a) realistic I will most likely finish the project by the desired due dateb) unrealistic I will most likely not finish the project by the desired due date
c) too easy I will definitely finish the project by the desired date
8/8/2019 ITS Project Documentation v7 - 10MaP
8/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
Design Brief
BACKGROUND
North Lakes State College is a proud and innovative college that offers high quality educationfor both boys and girls from the Preparatory school year through to Year 12.
The College is defined by a nurturing literacy and numeracy focused Prep and Junior School,a challenging and developmentally appropriate Middle School and an innovative communitybased, multiple pathway Urban Learning Senior School.
The school has an educational orientation designed for the maximisation of learningoutcomes deemed of value for the future by the community and by Education Queensland.
OUTCOME REQUIRED:
Epic Nerd Designs has been contracted by the school to create a website re-designfor an existing website.
TARGET AUDIENCE:
Home users
Business users
DETAILS/SPECIFICATIONS:
Flash Based Game
Top Down Shooter
Aim to be a extremely fun and playable game, with minimal glitches and good design
HARDWARE/SOFTWARE REQUIRED: Flash
MS Word
8/8/2019 ITS Project Documentation v7 - 10MaP
9/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
8/8/2019 ITS Project Documentation v7 - 10MaP
10/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
8/8/2019 ITS Project Documentation v7 - 10MaP
11/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
Weekly Work Log
Week Major ActivityMajor
AccomplishmentsProblems Encountered Planning
What, if any, problemsarose?
How were they handled?
What needs to be donenext?
1
I got multiple weaponsdesigned to their full ability
and ready to beimplemented in the gameplay whenever Dominic
needs them.
Got manyweapons. Traced
with a tablet.
Had a few problems withtracing with the tablet at
first. Once i got the hang ofit it was quite easy to do.
The hardest weapon to dowas the chainsaw.
More weapons and our maincharacter needs to be
designed soon.
2
All weapons are nowbasically complete (bar 1
or 2) and we have nostarted to get our character
designed
Most weapons nowcomplete.
Had a few problems withcorrect shading and linework but was easily fixed
with tablet corrections andline sizing.
Character to be designednext week.
3Character and enemy
designed and animated
Character andenemy designed
and animated
Animating was hard buteventually handled with time
and use of the onion skinfeature on flash
More enemies and possiblya few level backgrounds.
4
5
6
7
8
9
10
8/8/2019 ITS Project Documentation v7 - 10MaP
12/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
11
8/8/2019 ITS Project Documentation v7 - 10MaP
13/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
Individual Work Log
This log is to document your progress throughout the project. Each day you have ITS youshould fill in the details of the tasks accomplished in the log below either for the last fiveminutes of class or at home. A completed log must be submitted as part of the project.
Date Work Undertaken (Including Meetings and Outcomes)ApproximateTime Spent
13/04/10 We began planning our weapons and characters, with around 15 weaponsplanned and a story line + specifications thought out we are ready to startdesigning the weapons of the game first.
1hr 30 mins
14/04/10 I have designed a few weapons using the line tool, very basically because ihave planned on using a tablet to make them look nice and give them a more
cartoon/flash based look. So far I have a spear and fight club soap designed,although the designs are very basic due to further altercations being made.
1hr 30 mins
16/04/10 I now have a tablet and traced both my previous weapons created lastlesson. I also talked to Lachlan about his designs and how he should do themain designs and I should draw over them with the tablet because he seemsto be better at detailing and designing the weapons whereas i seem to bebetter at drawing them.
1hr 30 mins
20/04/10 I traced a few more of Lachlans weapons, while also designing and creatinga chainsaw and samurai sword myself. The chainsaw was difficialut to makeand even though it is not correctly positioned for a top down game wedecided that it would work best for the enjoyment of the user of the game ifthey could see the chainsaw this way (side on)
1hr 30 mins
21/04/10 I traced a few more of Lachlans weapons with the tablet, while designing afew more of my own. There were a few problems encountered with theweapons which were mainly due to hard to trace lines and such. But wereresolved with some thinner lines used.
1hr 30 mins
24/04/10 I traced one of Lachlans weapons, and touched up my old ones with someshading and made sure they looked ok at their original sizes for the game.
1hr 30 mins
27/04/10 Lachlan designed a character this lesson and I traced it with the tablet, itlooks very well done and now needs to be animated for a walking cycle forgame play. Only had trouble with tracing the hair of the character but Imgoing to fix that next lesson.
1hr 30 mins
28/04/10 I fixed up our character so it now has a centre point, and gave it a walk cyclefor every direction he can go. I had many problems with getting it lined up on
every frame, so i had to use the onion skin feature and that resolved theproblem. I also partly designed and drew an enemy with Lachlan and got itdoing a similar walk cycle to the main character.
1hr 30 mins
8/8/2019 ITS Project Documentation v7 - 10MaP
14/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
8/8/2019 ITS Project Documentation v7 - 10MaP
15/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
8/8/2019 ITS Project Documentation v7 - 10MaP
16/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
8/8/2019 ITS Project Documentation v7 - 10MaP
17/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
PROJECT EVALUATION
PROCESS OF DEVELOPMENT
[Summarise the design process use your individual and weekly logs to fill this in. Talkespecially about the problems you encountered, how you resolved them, and how you dealtwith time-management]
QUALITY OF THE PRODUCT
The completed product
Improvements I would have liked to have made, if time allowed, would be to
8/8/2019 ITS Project Documentation v7 - 10MaP
18/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
Individual Evaluation
SELF-EVALUATION
What I did well on this project was
What I should have done better was
If I had to grade my work on this project, I would give myself an [A,B,C,D,E] with respect tothe amount of effort I personally put into the project.
8/8/2019 ITS Project Documentation v7 - 10MaP
19/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
8/8/2019 ITS Project Documentation v7 - 10MaP
20/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
Screen Prints of Project
[insert description of above screen shot] [insert description of above screen shot]
[insert description of above screen shot] [insert description of above screen shot]
8/8/2019 ITS Project Documentation v7 - 10MaP
21/22
[Logo] [Company Name]Street Address
Suburb, State, Postcode
(07) [Phone]
(07) [Fax]www.[webadress].com
Client Contract
Date:
Project Name: [01OR]
Client Name: North Lakes State College
Contact Person: [e.g. Mr Hoey]
Phase Name: Client Proposal
Sign Off Title and Items: Design Brief and Client Proposal
This letter signifies your review and approval of the items provided in the Design phase of thisproject. This is the final sign-off for these items. Any changes made to these items followingthis sign-off may constitute a Change of Scope.
If this is required a Change of Scope letter will be completed outlining the time and costsassociated with the changes. Please sign and date both copies of this letter, keeping one foryour records and returning the second copy to my attention. If you have any questions pleasedo not hesitate to contact me.
Regards,
[Signatures Here]
[Team Member(s) Name(s) here]
I ___________________________________ approve the reviewed and revised items, withno additional changes or revisions.
[Signature Here]
Date: [Date Here]