    The Design Develop Evaluate Process

    Project Development Model

    Phase Brief description of what the phase encompasses

    Design

    IdentificationClarification of the issue being examined involving clearstatements of problem identification, rationale and aims.

    Docume

    ntation

    Documentationofallphasesof

    theproject,togetherwith

    manuals(userand/ortechnical)

    SpecificationDescription of the type of outcome required, including the

    nature of inputs and outputs, hardware and softwarerequirements and audience, as appropriate.

    DesignPlanning the details of the solution using a recognised

    methodology.

    Develop

    Implementation Implementing the design with the chosen software.

    TestingTesting for accuracy by checking for logical and syntactical

    errors.

    Evaluate

    EvaluationMaking judgments about the quality of the product, andthe process of development including time-management

    issues.

    Final Documentation Checklist

    Phase Brief description of documentation in each phaseIncluded

    (Y/N)

    Context Title Page

    Company Profile, Disaster Recovery Plan, TeamMember Profiles

    Design

    Identification Pre-design Planning Checklist

    Specification Design Brief including background, outcome

    required, target audience, details/specifications, andhardware/software required.

    Design

    Original sketches and design notes

    Storyboards

    Navigational Structure/Concept Maps

    Develop

    Implementatio

    n,Testing

    Weekly Work Log

    Individual Work Log

    Evaluate

    Evaluation

    Project Evaluation information about the processof development, and quality of the product

    Team / Individual Evaluation

    Appendices

    Extras Other

    Materials todemonstrate

    project

    planning andproof of

    authorship

    Screen Prints Of Project *

    Annotated Bibliography / Bibliography

    Client Contract *

    Design Brief Form Minutes Of Meetings

    Signed Authorship Form *

    Copies of correspondence (emails etc.)

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    3/22

    Project Timeline (Gantt)

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    4/22

    Epic Nerd Designs254 Lapwings Cresent

    North Lakes, QLD, 4509

    Phone: 07 3886 4562Fax: 07 3165 5649

    www.epicnerd-designs.com

    Designer: Josh Missen

    Client: Mr Hoey

    Contact Person: Mr Hoey

    Contact Email: [email protected]

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    5/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

    Company Profile

    Epic Nerd is a multimedia design based company. We create all kinds of multi media basedproducts such as graphics designs, logo designs, typography, photo edits, Animation,Interactive Animation, Gaming and a few more.

    The staff at Epic Nerd are very experienced in what they do. They all have there own talentsand parts of the company which they contribute to. They are hard working and will get the jobone as quick as possible t the best of their ability.

    Prior projects include:

    Interactive Comic

    Flash Games

    Photo Edits

    Web Designs

    Graphic Designs

    Logo Designs

    Disaster Recover Plan

    Epic Nerd Designs understands that computers and data can, and do, at times fail. However,we have in place a strict disaster recovery policy which gives the client peace of mind thattheir project will be completed on time, without any loss of data. The recovery plan involvesus making 3 backups of our product which we have created for you. We will instantly back upon our server and a backup server also on completion we instantly back up your files createdon a disc which is kept for 3 months.

    On completion of the project the files are given to a client through email, mail via CD or USB,or face to face (CD or USB can be picked up at our office. Epic Nerd also retains a copy of allproject files for 3 months should the client lose their copies; after this time the files will bedeleted and/or destroyed unless an extended storage time is purchased.

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    6/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    7/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

    Pre-Design Planning Checklist

    1. The purpose of the project is:a) to sellb) to informc) to entertaind) other: _______________________

    2. The target audience of the product is:a) a Home/Personal userb) a Business user

    c) an Educational userd) some other group : _________________

    3. The finished product will:a) contain imagesb) be strictly topographicc) contain cartoons, animation, illustrationd) contain a combination of the above

    4. Design documents needed will be:a) sketchesb) design notesc) a CMAPd) storyboards

    5. The finished project will be distributed:a) on CD/DVDb) on the Internetc) on a local networkd) other: __________________

    6. The project is a:a) a practical taskb) an oral taskc) a written taskd) a minor/major project

    7. The storage space for the project files is:a) sufficientb) not sufficient

    8. The required software is:a) available for useb) not available for use

    9. The necessary hardware is:a) available for useb) not available for use

    10. The project will be:a) a completely new designb) an adaptation of an existing design

    11. In terms of completing the required task I feel I have:a) sufficient knowledge of the software to achieve successb) insufficient knowledge of the software to achieve success

    c) a great deal of knowledge of the software and will achieve success

    12. The project deadline is:

    a) realistic I will most likely finish the project by the desired due dateb) unrealistic I will most likely not finish the project by the desired due date

    c) too easy I will definitely finish the project by the desired date

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    8/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

    Design Brief

    BACKGROUND

    North Lakes State College is a proud and innovative college that offers high quality educationfor both boys and girls from the Preparatory school year through to Year 12.

    The College is defined by a nurturing literacy and numeracy focused Prep and Junior School,a challenging and developmentally appropriate Middle School and an innovative communitybased, multiple pathway Urban Learning Senior School.

    The school has an educational orientation designed for the maximisation of learningoutcomes deemed of value for the future by the community and by Education Queensland.

    OUTCOME REQUIRED:

    Epic Nerd Designs has been contracted by the school to create a website re-designfor an existing website.

    TARGET AUDIENCE:

    Home users

    Business users

    DETAILS/SPECIFICATIONS:

    Flash Based Game

    Top Down Shooter

    Aim to be a extremely fun and playable game, with minimal glitches and good design

    HARDWARE/SOFTWARE REQUIRED: Flash

    MS Word

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    9/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    10/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    11/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

    Weekly Work Log

    Week Major ActivityMajor

    AccomplishmentsProblems Encountered Planning

    What, if any, problemsarose?

    How were they handled?

    What needs to be donenext?

    1

    I got multiple weaponsdesigned to their full ability

    and ready to beimplemented in the gameplay whenever Dominic

    needs them.

    Got manyweapons. Traced

    with a tablet.

    Had a few problems withtracing with the tablet at

    first. Once i got the hang ofit it was quite easy to do.

    The hardest weapon to dowas the chainsaw.

    More weapons and our maincharacter needs to be

    designed soon.

    2

    All weapons are nowbasically complete (bar 1

    or 2) and we have nostarted to get our character

    designed

    Most weapons nowcomplete.

    Had a few problems withcorrect shading and linework but was easily fixed

    with tablet corrections andline sizing.

    Character to be designednext week.

    3Character and enemy

    designed and animated

    Character andenemy designed

    and animated

    Animating was hard buteventually handled with time

    and use of the onion skinfeature on flash

    More enemies and possiblya few level backgrounds.

    4

    5

    6

    7

    8

    9

    10

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    12/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

    11

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    13/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

    Individual Work Log

    This log is to document your progress throughout the project. Each day you have ITS youshould fill in the details of the tasks accomplished in the log below either for the last fiveminutes of class or at home. A completed log must be submitted as part of the project.

    Date Work Undertaken (Including Meetings and Outcomes)ApproximateTime Spent

    13/04/10 We began planning our weapons and characters, with around 15 weaponsplanned and a story line + specifications thought out we are ready to startdesigning the weapons of the game first.

    1hr 30 mins

    14/04/10 I have designed a few weapons using the line tool, very basically because ihave planned on using a tablet to make them look nice and give them a more

    cartoon/flash based look. So far I have a spear and fight club soap designed,although the designs are very basic due to further altercations being made.

    1hr 30 mins

    16/04/10 I now have a tablet and traced both my previous weapons created lastlesson. I also talked to Lachlan about his designs and how he should do themain designs and I should draw over them with the tablet because he seemsto be better at detailing and designing the weapons whereas i seem to bebetter at drawing them.

    1hr 30 mins

    20/04/10 I traced a few more of Lachlans weapons, while also designing and creatinga chainsaw and samurai sword myself. The chainsaw was difficialut to makeand even though it is not correctly positioned for a top down game wedecided that it would work best for the enjoyment of the user of the game ifthey could see the chainsaw this way (side on)

    1hr 30 mins

    21/04/10 I traced a few more of Lachlans weapons with the tablet, while designing afew more of my own. There were a few problems encountered with theweapons which were mainly due to hard to trace lines and such. But wereresolved with some thinner lines used.

    1hr 30 mins

    24/04/10 I traced one of Lachlans weapons, and touched up my old ones with someshading and made sure they looked ok at their original sizes for the game.

    1hr 30 mins

    27/04/10 Lachlan designed a character this lesson and I traced it with the tablet, itlooks very well done and now needs to be animated for a walking cycle forgame play. Only had trouble with tracing the hair of the character but Imgoing to fix that next lesson.

    1hr 30 mins

    28/04/10 I fixed up our character so it now has a centre point, and gave it a walk cyclefor every direction he can go. I had many problems with getting it lined up on

    every frame, so i had to use the onion skin feature and that resolved theproblem. I also partly designed and drew an enemy with Lachlan and got itdoing a similar walk cycle to the main character.

    1hr 30 mins

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    14/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    15/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    16/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    17/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

    PROJECT EVALUATION

    PROCESS OF DEVELOPMENT

    [Summarise the design process use your individual and weekly logs to fill this in. Talkespecially about the problems you encountered, how you resolved them, and how you dealtwith time-management]

    QUALITY OF THE PRODUCT

    The completed product

    Improvements I would have liked to have made, if time allowed, would be to

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    18/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

    Individual Evaluation

    SELF-EVALUATION

    What I did well on this project was

    What I should have done better was

    If I had to grade my work on this project, I would give myself an [A,B,C,D,E] with respect tothe amount of effort I personally put into the project.

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    19/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    20/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

    Screen Prints of Project

    [insert description of above screen shot] [insert description of above screen shot]

    [insert description of above screen shot] [insert description of above screen shot]

  • 8/8/2019 ITS Project Documentation v7 - 10MaP

    21/22

    [Logo] [Company Name]Street Address

    Suburb, State, Postcode

    (07) [Phone]

    (07) [Fax]www.[webadress].com

    Client Contract

    Date:

    Project Name: [01OR]

    Client Name: North Lakes State College

    Contact Person: [e.g. Mr Hoey]

    Phase Name: Client Proposal

    Sign Off Title and Items: Design Brief and Client Proposal

    This letter signifies your review and approval of the items provided in the Design phase of thisproject. This is the final sign-off for these items. Any changes made to these items followingthis sign-off may constitute a Change of Scope.

    If this is required a Change of Scope letter will be completed outlining the time and costsassociated with the changes. Please sign and date both copies of this letter, keeping one foryour records and returning the second copy to my attention. If you have any questions pleasedo not hesitate to contact me.

    Regards,

    [Signatures Here]

    [Team Member(s) Name(s) here]

    I ___________________________________ approve the reviewed and revised items, withno additional changes or revisions.

    [Signature Here]

    Date: [Date Here]