Appendix 11.1 Implementation Schedule of Proposed Mitigation Measures 1 Table 1 Implementation Schedule of Proposed Air Quality Mitigation Measures Implementation Stages* EIA Ref # Environmental Protection Measures / Mitigation Measures Location / Timing Implementation Agent Des C O Dec Relevant Legislation and Guidelines S3.8.1 Air Pollution Control (Construction Dust) Regulation & Good Site Practices Use of regular watering, with complete coverage, to reduce dust emissions from exposed site surfaces and unpaved roads, particularly during dry weather. Use of frequent watering for particularly dusty construction areas and areas close to ASRs. Side enclosure and covering of any aggregate or dusty material storage piles to reduce emissions. Where this is not practicable owing to frequent usage, watering shall be applied to aggregate fines. Open stockpiles shall be avoided or covered. Where possible, prevent placing dusty material storage piles near ASRs. Tarpaulin covering of all dusty vehicle loads transported to, from and between site locations. Establishment and use of vehicle wheel and body washing facilities at the exit points of the site. Provision of wind shield and dust extraction units or similar dust mitigation measures at the loading points, and use of water sprinklers at the loading area where dust generation is likely during the loading process of loose material, particularly in dry seasons/ periods. Imposition of speed controls for vehicles on unpaved site roads. Ten kilometers per hour is the recommended limit. Where possible, routing of vehicles and positioning of construction plant should be at the maximum possible distance from ASRs. Work site / During the construction period Contractor Air Pollution Control (Construction Dust) Regulation

itigation Measures Appendix 11.1 Implementation Schedule

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

1

Ta

ble

1 I

mp

lem

enta

tio

n S

ched

ule

of

Pro

po

sed

Air

Qu

ali

ty M

itig

ati

on

Mea

sure

s

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/ T

imin

g

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n a

nd

Gu

idel

ines

S3

.8.1

A

ir P

oll

uti

on C

ontr

ol

(Co

nst

ruct

ion D

ust

) R

egula

tio

n &

Go

od

Sit

e P

ract

ices

Use

of

regula

r w

ater

ing,

wit

h c

om

ple

te c

over

age,

to

red

uce

dust

em

issi

ons

fro

m e

xp

ose

d s

ite

surf

aces

and

unp

aved

road

s, p

arti

cula

rly d

uri

ng d

ry w

eath

er.

Use

of

freq

uen

t w

ater

ing f

or

par

ticu

larl

y d

ust

y c

onst

ruct

ion

area

s an

d a

reas

clo

se t

o A

SR

s.

Sid

e en

clo

sure

and

co

ver

ing o

f an

y a

ggre

gat

e o

r d

ust

y

mat

eria

l st

ora

ge

pil

es t

o r

educe

em

issi

ons.

W

her

e th

is i

s

no

t p

ract

icab

le o

win

g t

o f

req

uen

t usa

ge,

wat

erin

g s

hal

l b

e

app

lied

to

aggre

gat

e fi

nes

.

Op

en s

tock

pil

es s

hal

l b

e av

oid

ed o

r co

ver

ed.

Wher

e

po

ssib

le,

pre

ven

t p

laci

ng d

ust

y m

ater

ial

sto

rage

pil

es n

ear

AS

Rs.

Tar

pau

lin c

over

ing o

f al

l d

ust

y v

ehic

le l

oad

s tr

ansp

ort

ed t

o,

fro

m a

nd

bet

wee

n s

ite

loca

tio

ns.

Est

abli

shm

ent

and

use

of

veh

icle

whee

l an

d b

od

y w

ashin

g

faci

liti

es a

t th

e ex

it p

oin

ts o

f th

e si

te.

Pro

vis

ion o

f w

ind

shie

ld a

nd

dust

extr

acti

on u

nit

s o

r si

mil

ar

dust

mit

igat

ion m

easu

res

at t

he

load

ing p

oin

ts,

and

use

of

wat

er s

pri

nkle

rs a

t th

e lo

adin

g a

rea

wher

e d

ust

gen

erat

ion

is l

ikel

y d

uri

ng t

he

load

ing p

roce

ss o

f lo

ose

mat

eria

l,

par

ticu

larl

y i

n d

ry s

easo

ns/

per

iod

s.

Imp

osi

tio

n o

f sp

eed

co

ntr

ols

fo

r veh

icle

s o

n u

np

aved

sit

e

road

s.

Ten

kil

om

eter

s p

er h

our

is t

he

reco

mm

end

ed l

imit

.

Wher

e p

oss

ible

, ro

uti

ng o

f veh

icle

s an

d p

osi

tio

nin

g o

f

const

ruct

ion p

lant

sho

uld

be

at t

he

max

imum

po

ssib

le

dis

tance

fro

m A

SR

s.

Wo

rk s

ite

/ D

uri

ng t

he

const

ruct

ion p

erio

d

Co

ntr

acto

r

Air

Po

lluti

on

Co

ntr

ol

(Co

nst

ruct

ion D

ust

)

Reg

ula

tio

n

Page 2: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

2

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/ T

imin

g

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n a

nd

Gu

idel

ines

Inst

igat

ion o

f an

envir

onm

enta

l m

onit

ori

ng a

nd

aud

itin

g

pro

gra

m t

o m

onit

or

the

const

ruct

ion p

roce

ss i

n o

rder

to

enfo

rce

contr

ols

and

mo

dif

y m

etho

d o

f w

ork

if

dust

y

cond

itio

ns

aris

e.

S.3

.8.2

O

do

ur

Rem

oval

by D

eod

ori

zers

Deo

do

rize

rs w

ith 9

5%

od

our

rem

oval

eff

icie

ncy

wo

uld

be

inst

alle

d f

or

the

air

ven

tila

ted

fro

m t

he

sto

rage

area

of

sew

age

slud

ge

and

on-s

ite

was

tew

ater

tre

atm

ent

pla

nt

bef

ore

dis

char

ge

to t

he

atm

osp

her

e

Sto

rage

area

of

sew

age

slud

ge

& o

n-s

ite

was

tew

ater

tre

atm

ent

pla

nt/

Duri

ng d

esig

n &

op

erat

ion p

has

e

ST

F O

per

ato

r √

E

IAO

-TM

S.3

.8.2

A

ir P

oll

uti

on C

ontr

ol

and

Sta

ck M

onit

ori

ng

Air

po

lluti

on c

ontr

ol

and

sta

ck m

onit

ori

ng s

yst

em w

ill

be

inst

alle

d f

or

the

ST

F t

o e

nsu

re t

hat

the

emis

sio

ns

fro

m t

he

ST

F s

tack

s w

ill

mee

t th

e st

ringen

t ta

rget

em

issi

on l

imit

s

equiv

alen

t to

tho

se s

tip

ula

ted

in H

ong K

ong a

nd

the

Euro

pea

n C

om

mis

sio

n f

or

was

te i

nci

ner

atio

n.

ST

F s

tack

em

issi

ons

/

Duri

ng d

esig

n &

op

erat

ion

phas

e

ST

F O

per

ato

r √

E

IAO

-TM

Ta

ble

2 I

mp

lem

enta

tio

n S

ched

ule

of

Pro

po

sed

Hu

ma

n H

ealt

h R

isk

Mit

iga

tio

n M

easu

res

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/ T

imin

g

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S4

.3.4

H

um

an

Hea

lth

Ris

k A

sso

cia

ted

wit

h M

icro

bia

l E

mis

sio

ns

fro

m

Dew

ate

red

Sew

ag

e S

lud

ge

The

foll

ow

ing

risk

co

ntr

ol

mea

sure

s (i

den

tifi

ed

as

exis

ting/e

xp

ecte

d

safe

guar

ds)

sh

ould

b

e m

ainta

ined

/

imp

lem

ente

d

when

th

e S

TF

is

in

o

per

atio

n

to

ensu

re

the

find

ings

of

the

risk

ass

essm

ent

rem

ain v

alid

:

Slu

dge

coll

ecti

on &

tran

spo

rt a

nd

at

the

ST

F /

Duri

ng t

he

op

erat

ion

per

iod

ST

F O

per

ato

r

Page 3: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

3

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/ T

imin

g

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

Slu

dge

Co

llec

tio

n

Ap

ply

go

od

pra

ctic

e d

uri

ng u

nlo

adin

g o

f d

ewat

ered

sew

age

slud

ge

to s

kip

/co

nta

iner

of

tran

spo

rt v

ehic

le

The

dew

ater

ed s

ewag

e sl

ud

ge

unlo

adin

g p

roce

ss s

ho

uld

be

sup

ervis

ed b

y w

ork

ers

on-s

ite

and

dri

ver

s

Slu

dge

Tra

nsp

ort

The

wo

rker

s han

dli

ng t

he

dew

ater

ed s

ewag

e sl

ud

ge

spil

lage

at r

oad

s/se

a in

cas

e o

f ac

cid

ent

sho

uld

wea

r p

erso

nal

pro

tect

ive

equip

men

t

Slu

dge

Rec

epti

on a

nd

Han

dli

ng a

t S

TF

Pro

vid

e si

gnag

e to

ass

ist

dri

ver

to

sto

p a

t ap

pro

pri

ate

unlo

adin

g p

osi

tio

n

Pro

vid

e su

ffic

ient

trai

nin

g t

o d

river

s fo

r th

e d

ewat

ered

sew

age

slud

ge

tran

spo

rtin

g v

ehic

les

The

on-s

ite

wo

rker

s re

spo

nsi

ble

fo

r cl

eanin

g s

ho

uld

wea

r

per

sonal

pro

tect

ive

equip

men

t

Veh

icle

cle

anin

g s

yst

em s

ho

uld

be

pro

vid

ed t

o c

lean

the

dew

ater

ed s

ewag

e sl

ud

ge

tran

spo

rtin

g v

ehic

le b

efo

re t

hey

leav

e th

e S

TF

Mo

nit

or

and

co

ntr

ol

the

traf

fic

flo

w i

nsi

de

the

rece

pti

on

hal

l o

f th

e S

TF

Pro

vid

e si

gnag

e fo

r cl

ear

ind

icat

ion o

f veh

icle

tra

vel

ing

route

In c

ase

of

man

ual

dew

ater

ed s

ewag

e sl

ud

ge

is n

eed

ed,

the

wo

rker

s in

vo

lved

sho

uld

wea

r p

erso

nal

pro

tect

ive

equip

men

t

Tem

po

rary

Slu

dge

Sto

rage

at S

TF

Det

ecti

on d

evic

e/al

arm

sho

uld

be

inst

alle

d t

o p

reven

t

Page 4: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

4

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/ T

imin

g

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

over

fill

ing o

f te

mp

ora

ry s

lud

ge

sto

rage

tank

Mo

nit

or

and

co

ntr

ol

the

dew

ater

ed s

ewag

e sl

ud

ge

unlo

adin

g p

roce

ss

The

on-s

ite

wo

rker

s re

spo

nsi

ble

fo

r cl

eanin

g s

ho

uld

wea

r

per

sonal

pro

tect

ive

equip

men

t

A s

afet

y m

argin

sho

uld

be

consi

der

ed f

or

the

des

ign

cap

acit

y o

f S

TF

Em

ergen

cy p

lan s

ho

uld

be

esta

bli

shed

and

im

ple

men

ted

to

han

dle

the

situ

atio

n o

f in

ciner

atio

n u

nit

s b

eing d

ow

n

Slu

dge

Inci

ner

atio

n a

t S

TF

Mo

nit

ori

ng a

nd

co

ntr

ol

syst

em s

ho

uld

be

inst

alle

d t

o

mo

nit

or

and

co

ntr

ol

the

per

form

ance

of

inci

ner

atio

n

pro

cess

In c

ase

of

han

dli

ng o

f in

com

ple

te c

om

bust

ed d

ewat

ered

sew

age

slud

ge

is n

eed

ed,

the

wo

rker

s in

vo

lved

sho

uld

wea

r

per

sonal

pro

tect

ive

equip

men

t

Was

h D

ow

n F

acil

itie

s at

ST

F

The

on-s

ite

wo

rker

s re

spo

nsi

ble

fo

r cl

eanin

g s

ho

uld

wea

r

per

sonal

pro

tect

ive

equip

men

t

Fre

quen

t an

d s

uff

icie

nt

mai

nte

nan

ce s

ho

uld

be

pro

vid

ed f

or

the

dra

inag

e sy

stem

of

ST

F

Mult

iple

outl

ets

in d

rain

age

syst

em s

ho

uld

be

des

igned

and

pro

vid

ed t

o r

educe

the

likel

iho

od

of

dra

inag

e b

lock

age

Mai

nte

nan

ce a

nd

Rep

airi

ng a

t S

TF

Mai

nte

nan

ce w

ork

ers

sho

uld

wea

r p

erso

nal

pro

tect

ive

equip

men

t

Page 5: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

5

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/ T

imin

g

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

H

um

an

Hea

lth

Ris

k A

sso

cia

ted

wit

h R

ad

on

Pre

ven

tio

n o

f R

ado

n I

nfl

ux f

rom

PF

A t

o t

he

ST

F B

uil

din

gs

A s

oil

co

ver

can

be

pro

vid

ed b

enea

th t

he

buil

din

gs

on t

op

of

ash l

ago

on p

rio

r to

co

nst

ruct

ion w

ork

s b

ecau

se i

t

red

uce

s th

e le

vel

of

rad

on i

nfl

ux s

ignif

ican

tly

Sla

b-o

n-g

rad

e ca

n b

e an

op

tio

n o

n f

ound

atio

n d

esig

n

So

il s

uct

ion c

an a

lso

pre

ven

t ra

do

n f

rom

ente

ring t

he

buil

din

g b

y d

raw

ing t

he

rad

on f

rom

bel

ow

the

buil

din

g a

nd

ven

ting i

t th

rough a

pip

e, o

r p

ipes

, to

the

air

abo

ve

the

buil

din

g.

Pro

vis

ion o

f S

uff

icie

nt

Ven

tila

tio

n o

f In

teri

or

of

ST

F B

uil

din

gs

Fo

rced

and

nat

ura

l ven

tila

tio

n s

ho

uld

be

intr

od

uce

d

pro

per

ly t

o e

nhan

ce a

ir e

xch

ange

rate

in t

he

ST

F b

uil

din

gs.

Bas

emen

t ar

eas

sho

uld

be

pre

ssuri

zed

by u

sing a

fan

to

blo

w a

ir i

nto

the

bas

emen

t ar

eas

fro

m o

utd

oo

rs i

s

sugges

ted

. T

his

wo

uld

cre

ate

eno

ugh p

ress

ure

at

the

low

est

level

ind

oo

rs t

o p

reven

t ra

do

n f

rom

ente

ring i

nto

the

ST

F

buil

din

gs.

Reg

ula

r M

ainte

nan

ce f

or

Flo

or

Sla

bs

and

Wal

ls

Cra

cks

and

oth

er o

pen

ings

in t

he

found

atio

n s

ho

uld

be

pro

per

ly s

eale

d t

o r

educe

rad

on i

ngre

ss.

Sea

ling t

he

crac

ks

lim

its

the

flo

w o

f ra

do

n i

nto

the

buil

din

g

ther

eby m

akin

g o

ther

rad

on r

educt

ion t

echniq

ues

mo

re

effe

ctiv

e an

d c

ost

-eff

icie

nt.

It

als

o r

educe

s th

e lo

ss o

f

cond

itio

ned

air

.

Rad

on

Co

nce

ntr

atio

n

Mea

sure

men

t P

rio

r to

O

ccup

atio

n

of

ST

F B

uil

din

gs

Rad

on c

once

ntr

atio

n s

hal

l b

e m

easu

red

by p

rofe

ssio

nal

per

sons

in a

cco

rdan

ce w

ith E

PD

’s P

roP

EC

C N

ote

PN

1/9

9

ST

F b

uil

din

gs

/ D

uri

ng t

he

des

ign,

const

ruct

ion

and

op

erat

ion o

f th

e S

TF

.

Co

ntr

acto

r /

ST

F

Op

erat

or

E

PD

’s P

roP

EC

C

No

te P

N 1

/99

Co

ntr

ol

of

Rad

on

Co

nce

ntr

atio

n i

n N

ew

Buil

din

gs

Ap

pen

dix

2

Page 6: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

6

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/ T

imin

g

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

Co

ntr

ol

of

Rad

on C

once

ntr

atio

n i

n N

ew B

uil

din

gs

Ap

pen

dix

2,

”Pro

toco

l o

f R

ado

n M

easu

rem

ent

for

No

n-

resi

den

tial

Buil

din

g”

to e

nsu

re t

he

rad

on c

once

ntr

atio

n i

s in

com

pli

ance

wit

h t

he

guid

ance

val

ue.

Ta

ble

3 I

mp

lem

enta

tio

n S

ched

ule

of

Pro

po

sed

Wa

ste

Ma

na

gem

ent

Mea

sure

s

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S5

.5.1

G

oo

d S

ite

Pra

ctic

es

Rec

om

men

dat

ions

for

go

od

sit

e p

ract

ices

duri

ng t

he

const

ruct

ion

acti

vit

ies

incl

ud

e:

No

min

atio

n o

f an

ap

pro

ved

per

son,

such

as

a si

te m

anag

er,

to b

e

resp

onsi

ble

fo

r go

od

sit

e p

ract

ices

, ar

rangem

ents

fo

r co

llec

tio

n a

nd

effe

ctiv

e d

isp

osa

l to

an a

pp

rop

riat

e fa

cili

ty,

of

all

was

tes

gen

erat

ed

at t

he

site

Tra

inin

g

of

site

p

erso

nnel

in

p

rop

er

was

te

man

agem

ent

and

chem

ical

han

dli

ng p

roce

dure

s

Pro

vis

ion o

f su

ffic

ient

was

te d

isp

osa

l p

oin

ts a

nd

reg

ula

r co

llec

tio

n

of

was

te

Ap

pro

pri

ate

mea

sure

s to

min

imiz

e w

ind

blo

wn l

itte

r an

d d

ust

duri

ng

tran

spo

rtat

ion o

f w

aste

by e

ither

co

ver

ing t

ruck

s o

r b

y t

ransp

ort

ing

was

tes

in e

ncl

ose

d c

onta

iner

s

Reg

ula

r cl

eanin

g

and

m

ainte

nan

ce

pro

gra

mm

e fo

r d

rain

age

syst

ems,

sum

ps

and

oil

inte

rcep

tors

.

Wo

rk s

ite

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Was

te D

isp

osa

l

Ord

inan

ce (

Cap

.35

4)

ET

WB

TC

W N

o.

19

/20

05

Page 7: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

7

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S5

.5.1

W

aste

Red

uct

ion M

easu

res

Was

te r

educt

ion i

s b

est

achie

ved

at

the

pla

nnin

g a

nd

des

ign s

tage,

as

wel

l as

b

y

ensu

ring

the

imp

lem

enta

tio

n

of

go

od

si

te

pra

ctic

es.

Rec

om

men

dat

ions

to a

chie

ve

was

te r

educt

ion i

ncl

ud

e:

The

des

ign o

f th

e fo

und

atio

n w

ork

s sh

ould

min

imiz

e th

e am

ount

of

exca

vat

ed m

ater

ial

to b

e gen

erat

ed.

Exca

vat

ed s

oil

sho

uld

be

reuse

d o

n s

ite

as f

ar a

s p

oss

ible

, e.

g.

for

land

scap

e w

ork

s, i

n o

rder

to

min

imiz

e th

e am

ount

of

pub

lic

fill

to

be

dis

po

sed

off

-sit

e.

Seg

regat

ion an

d st

ora

ge

of

dif

fere

nt

typ

es o

f w

aste

in

d

iffe

rent

conta

iner

s, sk

ips

or

sto

ckp

iles

to

en

han

ce re

use

o

r re

cycl

ing o

f

mat

eria

ls a

nd

thei

r p

rop

er d

isp

osa

l.

Enco

ura

ge

coll

ecti

on o

f al

um

iniu

m c

ans

by i

nd

ivid

ual

co

llec

tors

by

pro

vid

ing

sep

arat

e la

bel

led

b

ins

to

enab

le

this

w

aste

to

b

e

segre

gat

ed f

rom

oth

er g

ener

al r

efuse

gen

erat

ed b

y t

he

wo

rk f

orc

e

Pro

per

st

ora

ge

and

si

te

pra

ctic

es

to

min

imiz

e th

e p

ote

nti

al

for

dam

age

or

conta

min

atio

n o

f co

nst

ruct

ion m

ater

ials

.

Pla

n a

nd

sto

ck c

onst

ruct

ion m

ater

ials

car

efull

y t

o m

inim

ize

amo

unt

of

was

te g

ener

ated

and

avo

id u

nnec

essa

ry g

ener

atio

n o

f w

aste

.

Wo

rk s

ite

/

Duri

ng p

lannin

g

& d

esig

n s

tage,

and

co

nst

ruct

ion

stag

e

Co

ntr

acto

r √

S5

.5.1

G

ener

al R

efuse

Gen

eral

re

fuse

sh

ould

be

sto

red

in e

ncl

ose

d b

ins

or

com

pac

tio

n

unit

s se

par

ate

fro

m C

&D

m

ater

ial.

A

re

puta

ble

w

aste

co

llec

tor

sho

uld

b

e em

plo

yed

b

y th

e co

ntr

acto

r to

re

mo

ve

gen

eral

re

fuse

fro

m

the

site

, se

par

atel

y

fro

m

C&

D

mat

eria

l.

P

refe

rab

ly

an

encl

ose

d

and

co

ver

ed

area

sh

ould

b

e p

rovid

ed

to

red

uce

th

e

occ

urr

ence

of

'win

d b

low

n' l

ight

mat

eria

l.

Wo

rk s

ite

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Pub

lic

Hea

lth a

nd

Munic

ipal

Ser

vic

es

Ord

inan

ce (

Cap

. 1

32

)

Page 8: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

8

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S5

.5.1

Co

nst

ruct

ion a

nd

Dem

oli

tio

n M

ater

ial

In

ord

er

to

min

imiz

e th

e im

pac

t re

sult

ing

fro

m

coll

ecti

on

and

tran

spo

rtat

ion

of

C&

D

mat

eria

l fo

r o

ff-s

ite

dis

po

sal,

th

e ex

cavat

ed

mat

eria

l ar

isin

g f

rom

sit

e fo

rmat

ion a

nd

fo

und

atio

n w

ork

s sh

ould

be

reuse

d o

n-s

ite

as b

ackfi

llin

g m

ater

ial

and

fo

r la

nd

scap

ing w

ork

s as

far

as p

ract

icab

le.

Oth

er m

itig

atio

n r

equir

emen

ts a

re l

iste

d b

elo

w:

A

Was

te

Man

agem

ent

Pla

n,

whic

h

bec

om

es

par

t o

f th

e

Envir

onm

enta

l M

anag

emen

t P

lan,

sho

uld

b

e p

rep

ared

in

acco

rdan

ce w

ith E

TW

B T

CW

No

.19

/20

05

.

A r

eco

rdin

g s

yst

em f

or

the

amo

unt

of

was

tes

gen

erat

ed,

recy

cled

and

dis

po

sed

(in

clud

ing t

he

dis

po

sal

site

s) s

ho

uld

be

pro

po

sed

.

In o

rder

to

mo

nit

or

the

dis

po

sal

of

C&

D m

ater

ial

at p

ub

lic

fill

ing

faci

liti

es a

nd

lan

dfi

lls

and

to

co

ntr

ol

fly-t

ipp

ing,

a tr

ip-t

icket

syst

em

sho

uld

be

incl

ud

ed.

One

may

mak

e re

fere

nce

to

ET

WB

TC

W N

o.

31

/20

04

fo

r d

etai

ls.

Wo

rk s

ite

/

Duri

ng d

esig

n

stag

e &

const

ruct

ion

per

iod

Co

ntr

acto

r √

ET

WB

TC

W N

o.

33

/20

02

ET

WB

TC

W N

o.

19

/20

05

ET

WB

TC

W N

o.

31

/20

04

S5

.5.1

C

hem

ical

Was

te

If

chem

ical

w

aste

s ar

e p

rod

uce

d

at

the

const

ruct

ion

site

, th

e

Co

ntr

acto

r w

ould

b

e re

quir

ed

to

regis

ter

wit

h

the

EP

D

as

a

Chem

ical

Was

te P

rod

uce

r an

d t

o f

oll

ow

the

guid

elin

es s

tate

d i

n t

he

Co

de

of

Pra

ctic

e o

n

the

Pac

kag

ing,

Lab

elli

ng

and

S

tora

ge

of

Chem

ical

Was

tes.

G

oo

d q

ual

ity c

onta

iner

s co

mp

atib

le w

ith t

he

chem

ical

w

aste

s sh

ould

b

e use

d,

and

in

com

pat

ible

ch

emic

als

sho

uld

be

sto

red

sep

arat

ely.

Ap

pro

pri

ate

lab

els

sho

uld

be

secu

rely

atta

ched

o

n

each

ch

emic

al

was

te

conta

iner

in

dic

atin

g

the

corr

esp

ond

ing c

hem

ical

char

acte

rist

ics

of

the

chem

ical

was

te,

such

as

exp

losi

ve,

fl

amm

able

, o

xid

izin

g,

irri

tant,

to

xic

, har

mfu

l,

corr

osi

ve,

et

c. T

he

Co

ntr

acto

r sh

all

use

a

lice

nse

d co

llec

tor

to

tran

spo

rt

and

d

isp

ose

o

f th

e ch

emic

al

was

tes,

to

ei

ther

th

e

Chem

ical

Was

te T

reat

men

t C

entr

e at

Tsi

ng Y

i, o

r an

oth

er l

icen

sed

faci

lity

, in

acc

ord

ance

wit

h t

he

Was

te D

isp

osa

l (C

hem

ical

Was

te)

(Gen

eral

) R

egula

tio

n.

Wo

rk s

ite

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Was

te D

isp

osa

l

(Chem

ical

Was

te)

(Gen

eral

) R

egula

tio

n

Page 9: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

9

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S5

.5.2

S

tora

ge,

Han

dli

ng,

Tre

atm

ent,

Co

llec

tio

n a

nd

Dis

po

sal

of

Inci

ner

atio

n

By-P

rod

uct

s

The

foll

ow

ing m

easu

res

are

reco

mm

end

ed f

or

the

sto

rage,

han

dli

ng a

nd

coll

ecti

on o

f th

e in

ciner

atio

n b

y-p

rod

uct

s:

Ash

sho

uld

be

sto

red

in s

tora

ge

silo

s.

Ash

sh

ould

b

e han

dle

d

and

co

nvey

ed

in

clo

sed

sy

stem

s fu

lly

segre

gat

ed f

rom

the

amb

ient

envir

onm

ent.

Ash

sho

uld

be

wet

ted

wit

h w

ater

to

co

ntr

ol

fugit

ive

dust

, w

her

e

nec

essa

ry.

The

wet

ted

as

h

sho

uld

b

e tr

ansp

ort

ed

in

cover

ed

truck

s o

r

conta

iner

s to

the

des

ignat

ed l

and

fill

sit

e.

The

ST

F C

ontr

acto

r sh

ould

pro

vid

e E

PD

wit

h c

hem

ical

anal

ysi

s re

sult

s

of

the

inci

ner

atio

n a

sh a

nd

flu

e gas

cle

anin

g r

esid

ue

to c

onfi

rm t

hat

the

ash/r

esid

ue

can

com

ply

w

ith

the

pro

po

sed

In

ciner

atio

n

Res

idue

Po

lluti

on C

ontr

ol

Lim

its.

Sto

rage,

han

dli

ng

& c

oll

ecti

on o

f

inci

ner

atio

n a

sh

at t

he

ST

F /

Duri

ng t

he

op

erat

ion p

erio

d

ST

F O

per

ato

r

Ta

ble

4 I

mp

lem

enta

tio

n S

ched

ule

of

Pro

po

sed

La

nd

Co

nta

min

ati

on

Pre

ven

tiv

e M

easu

res

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S5

.6.3

F

uel

Oil

Tan

k C

onst

ruct

ion a

nd

Tes

t

The

fuel

tan

k t

o b

e in

stal

led

sho

uld

be

of

spec

ifie

d d

ura

bil

ity

Do

ub

le s

kin

tan

ks

are

pre

fera

ble

Und

ergro

und

fuel

sto

rage

tank t

o b

e in

stal

led

sho

uld

be

pla

ced

wit

hin

a c

oncr

ete

pit

Fuel

Oil

Sto

rage

Tan

k/

Des

ign,

Co

nst

ruct

ion a

nd

Op

erat

ion P

has

e

Co

ntr

acto

r/

ST

F O

per

ato

r

Page 10: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

1

0

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

The

concr

ete

pit

shal

l b

e ac

cess

ible

to

all

ow

reg

ula

r ta

nk i

nte

gri

ty

test

s to

be

carr

ied

out

at r

egula

r in

terv

als

The

tank i

nte

gri

ty t

ests

sho

uld

be

cond

uct

ed b

y a

n i

nd

epen

den

t

qual

ifie

d s

urv

eyo

r o

r st

ruct

ura

l en

gin

eer

Any p

ote

nti

al p

rob

lem

s id

enti

fied

in t

he

test

sho

uld

be

rect

ifie

d a

s

soo

n a

s p

oss

ible

S5

.6.3

F

uel

Oil

Pip

elin

e C

onst

ruct

ion a

nd

Tes

t

Inst

alla

tio

n

of

abo

veg

round

fu

el

oil

p

ipel

ines

is

p

refe

rab

le;

if

und

ergro

und

p

ipel

ines

ar

e unav

oid

able

, co

ncr

ete

lined

tr

ench

es

sho

uld

be

const

ruct

ed t

o c

onta

in t

he

pip

elin

es

Do

ub

le s

kin

pip

elin

es a

re p

refe

rab

le

Dis

tance

bet

wee

n t

he

fuel

oil

ref

uel

ling p

oin

ts a

nd

the

fuel

oil

sto

rage

tank s

hal

l b

e m

inim

ized

The

inte

gri

ty t

ests

fo

r th

e p

ipel

ines

sho

uld

be

cond

uct

ed b

y a

n

ind

epen

den

t q

ual

ifie

d s

urv

eyo

r o

r st

ruct

ura

l en

gin

eer

at r

egula

r

inte

rval

s

Any p

ote

nti

al p

rob

lem

s id

enti

fied

in t

he

test

sho

uld

be

rect

ifie

d a

s

soo

n a

s p

oss

ible

Fuel

Oil

Pip

elin

es/

Des

ign,

Co

nst

ruct

ion a

nd

Op

erat

ion P

has

e

Co

ntr

acto

r/

ST

F O

per

ato

r

S5

.6.3

F

uel

Oil

Lea

kag

e D

etec

tio

n

Inst

alla

tio

n o

f le

ak d

etec

tio

n d

evic

e at

sto

rage

tank a

nd

pip

elin

es

Inst

alla

tio

n a

nd

use

of

pre

ssure

gau

ges

(e.

g.

at t

he

two

end

s o

f a

fill

ing l

ine)

in f

uel

fil

ling,

whic

h a

llo

ws

unex

pec

ted

pre

ssure

dro

p

or

dif

fere

nce

and

sig

n o

f le

akag

e to

be

det

ecte

d

Fuel

Oil

Sto

rage

Tan

k a

nd

Pip

elin

es/

Des

ign,

Co

nst

ruct

ion a

nd

Op

erat

ion P

has

e

Co

ntr

acto

r/

ST

F O

per

ato

r

S5

.6.3

F

uel

Oil

Sto

rage

Tan

k R

efuel

ling

Sto

rage

tank

refu

elli

ng

(fro

m

road

ta

nker

) sh

ould

o

nly

b

e

cond

uct

ed

by

auth

ori

zed

st

aff

of

the

oil

co

mp

any

usi

ng

the

com

pan

y’s

sta

nd

ard

pro

ced

ure

s

Fuel

Oil

Ref

uel

ling P

oin

t/

Op

erat

ion P

has

e

ST

F O

per

ato

r

Page 11: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

1

1

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S5

.6.3

F

uel

Oil

Sp

ill

Res

po

nse

Pla

n

An

Oil

S

pil

l R

esp

onse

P

lan

sho

uld

b

e p

rep

ared

to

d

ocu

men

t th

e

app

rop

riat

e re

spo

nse

p

roce

dure

s fo

r o

il sp

illa

ge

inci

den

ts in

d

etai

l.

Gen

eral

p

roce

dure

s to

b

e ta

ken

in

ca

se

of

fuel

o

il

spil

lage

are

pre

sente

d b

elo

w.

Tra

inin

g

- T

rain

ing

on

oil

sp

ill

resp

onse

ac

tio

ns

sho

uld

b

e giv

en

to

rele

van

t st

aff.

T

he

trai

nin

g s

hal

l co

ver

the

foll

ow

ings:

-

>

To

ols

&

re

sourc

es to

co

mb

at o

il sp

illa

ge

and

fi

re,

e.g.

loca

tio

ns

of

oil

sp

ill

han

dli

ng e

quip

men

t an

d f

ire

fighti

ng

equip

men

t;

>

Gen

eral

m

etho

ds

to

dea

l w

ith

oil

sp

illa

ge

and

fi

re

inci

den

ts;

>

Pro

ced

ure

s fo

r em

ergen

cy d

rill

s in

the

even

t o

f o

il s

pil

ls

and

fir

e; a

nd

>

Reg

ula

r d

rill

s sh

all

be

carr

ied

out.

Co

mm

unic

atio

n

- E

stab

lish

co

mm

unic

atio

n

chan

nel

w

ith

the

Fir

e S

ervic

es

Dep

artm

ent

(FS

D)

and

EP

D t

o r

epo

rt a

ny o

il s

pil

lage

inci

den

t

so t

hat

nec

essa

ry a

ssis

tance

fro

m r

elev

ant

dep

artm

ent

can b

e

quic

kly

so

ught.

Res

po

nse

Pro

ced

ure

s

- A

ny

fuel

o

il

spil

lage

wit

hin

th

e S

TF

si

te

sho

uld

b

e

imm

edia

tely

re

po

rted

to

th

e P

lant

Man

ager

w

ith nec

essa

ry

det

ails

incl

ud

ing l

oca

tio

n,

sourc

e, p

oss

ible

cau

se a

nd

exte

nt

of

the

spil

lage.

- P

lant

Man

ager

sho

uld

im

med

iate

ly a

tten

d t

o t

he

spil

lage

and

init

iate

an

y ap

pro

pri

ate

acti

on to

co

nfi

ne

and

cl

ean up

th

e

spil

lage.

The

resp

onse

p

roce

dure

s sh

all

incl

ud

e th

e

Who

le S

ite

/

Op

erat

ion P

has

e

ST

F O

per

ato

r

Page 12: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

1

2

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

foll

ow

ing:

- Id

enti

fy a

nd

iso

late

the

sourc

e o

f sp

illa

ge

as s

oo

n a

s p

oss

ible

.

- C

onta

in

the

oil

sp

illa

ge

and

av

oid

in

filt

rati

on

into

so

il/

gro

und

wat

er a

nd

dis

char

ge

to s

torm

wat

er c

han

nel

s.

- R

emo

ve

the

oil

sp

illa

ge.

- C

lean

up

the

conta

min

ated

are

a.

- If

the

oil

sp

illa

ge

occ

urs

duri

ng s

tora

ge

tank r

efuel

ling,

the

refu

elli

ng o

per

atio

n s

ho

uld

im

med

iate

ly b

e st

op

ped

.

- R

eco

ver

ed c

onta

min

ated

fuel

oil

and

the

asso

ciat

ed m

ater

ial

to r

emo

ve

the

spil

led

oil

sho

uld

be

consi

der

ed a

s ch

emic

al

was

te.

S5

.6.3

C

hem

ical

s an

d C

hem

ical

Was

tes

Sto

rage

Chem

ical

s an

d c

hem

ical

was

tes

sho

uld

only

be

sto

red

in s

uit

able

conta

iner

s in

purp

ose

-buil

t ar

eas

The

sto

rage

of

chem

ical

w

aste

s sh

ould

co

mp

ly

wit

h

the

req

uir

emen

ts o

f th

e C

od

e o

f P

ract

ice

on t

he

Pac

kag

ing,

Lab

elli

ng

and

Sto

rage

of

Chem

ical

Was

tes

The

sto

rage

area

s fo

r ch

emic

als

and

chem

ical

was

tes

shal

l hav

e an

imp

erm

eab

le

flo

or

or

surf

ace.

The

imp

erm

eab

le

flo

or/

surf

ace

shal

l p

oss

ess

the

foll

ow

ing p

rop

erti

es:

No

t li

able

to

ch

emic

ally

re

act

wit

h

the

mat

eria

ls

and

th

eir

conta

iner

s to

be

sto

red

Ab

le t

o w

ithst

and

no

rmal

lo

adin

g a

nd

physi

cal

dam

age

cause

d b

y

conta

iner

han

dli

ng

The

inte

gri

ty a

nd

co

nd

itio

n o

f th

e im

per

mea

ble

flo

or

or

surf

ace

sho

uld

b

e in

spec

ted

at

re

gula

r in

terv

als

to

ensu

re

that

it

is

sati

sfac

tori

ly m

ainta

ined

Fo

r li

quid

ch

emic

als/

chem

ical

w

aste

s st

ora

ge,

th

e st

ora

ge

area

Chem

ical

s an

d

Chem

ical

Was

tes

Sto

rage

Are

a /

Op

erat

ion P

has

e

ST

F O

per

ato

r

Co

de

of

Pra

ctic

e o

n t

he

Pac

kag

ing,

Lab

elli

ng

and

Sto

rage

of

Chem

ical

Was

tes

Page 13: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

1

3

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

sho

uld

be

bund

ed t

o c

onta

in a

t le

ast

11

0%

of

the

sto

rage

cap

acit

y

of

the

larg

est

conta

iner

s o

r 2

0%

o

f th

e to

tal

quan

tity

o

f th

e

chem

ical

s/ch

emic

al w

aste

s st

ore

d,

whic

hev

er i

s th

e gre

ater

Sto

rage

conta

iner

s sh

all

be

chec

ked

at

regula

r in

terv

als

for

thei

r

stru

ctura

l in

tegri

ty a

nd

to

ensu

re t

hat

the

cap

s o

r fi

ll p

oin

ts a

re

tightl

y c

lose

d

Chem

ical

fi

llin

g

shal

l b

e co

nd

uct

ed

by

trai

ned

w

ork

ers

und

er

sup

ervis

ion

S5

.6.3

C

hem

ical

and

Chem

ical

Was

tes

Sp

ill

Res

po

nse

Pla

n

A

Chem

ical

an

d

Chem

ical

W

aste

s S

pil

l R

esp

onse

P

lan

sho

uld

b

e

pre

par

ed

to

do

cum

ent

the

app

rop

riat

e re

spo

nse

p

roce

dure

s fo

r o

il

spil

lage

inci

den

ts i

n d

etai

l. G

ener

al p

roce

dure

s to

be

und

erta

ken

in

case

of

chem

ical

s/ c

hem

ical

was

te s

pil

lages

are

pre

sente

d b

elo

w.

Tra

inin

g

- T

rain

ing o

n s

pil

l re

spo

nse

act

ions

sho

uld

be

giv

en t

o r

elev

ant

staf

f.

The

trai

nin

g s

hal

l co

ver

the

foll

ow

ings:

-

>

To

ols

&

re

sourc

es to

han

dle

sp

illa

ge,

e.

g.

loca

tio

ns

of

spil

l han

dli

ng e

quip

men

t;

>

Gen

eral

met

ho

ds

to d

eal

wit

h s

pil

lage;

and

>

Pro

ced

ure

s fo

r em

ergen

cy d

rill

s in

the

even

t o

f sp

ills

.

Co

mm

unic

atio

n

- E

stab

lish

co

mm

unic

atio

n

chan

nel

w

ith

FS

D

and

E

PD

to

rep

ort

the

spil

lage

inci

den

t so

that

nec

essa

ry a

ssis

tance

fro

m

rele

van

t d

epar

tmen

t ca

n b

e q

uic

kly

so

ught.

Res

po

nse

Pro

ced

ure

s

- A

ny s

pil

lage

wit

hin

the

ST

F s

ite

sho

uld

be

rep

ort

ed t

o t

he

Pla

nt

Man

ager

.

- P

lant

Man

ager

sh

all

atte

nd

to

th

e sp

illa

ge

and

in

itia

te an

y

Who

le S

ite

/

Op

erat

ion P

has

e

ST

F O

per

ato

r

Page 14: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

1

4

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

app

rop

riat

e ac

tio

ns

nee

ded

to

co

nfi

ne

and

cl

ean

up

th

e

spil

lage.

T

he

resp

onse

p

roce

dure

s sh

all

incl

ud

e th

e

foll

ow

ings:

-

>

Iden

tify

an

d

iso

late

th

e so

urc

e o

f sp

illa

ge

as

soo

n

as

po

ssib

le;

>

Co

nta

in

the

spil

lage

and

av

oid

in

filt

rati

on

into

so

il/

gro

und

wat

er an

d d

isch

arge

to st

orm

w

ater

ch

annel

s (i

n

case

the

spil

lage

occ

urs

at

loca

tio

ns

out

of

the

des

ignat

ed

sto

rage

area

s);

>

Rem

ove

the

spil

lage;

th

e re

mo

val

m

etho

d/

pro

ced

ure

s

do

cum

ente

d i

n t

he

Mat

eria

l S

afet

y D

ata

Shee

t (M

SD

S)

of

the

chem

ical

s sp

ille

d s

ho

uld

be

ob

serv

ed;

>

Cle

an

up

th

e co

nta

min

ated

ar

ea

(in

case

th

e sp

illa

ge

occ

urs

at

loca

tio

ns

out

of

the

des

ignat

ed s

tora

ge

area

s);

and

>

The

was

te a

risi

ng f

rom

the

clea

nup

op

erat

ion s

ho

uld

be

consi

der

ed a

s ch

emic

al w

aste

s.

S5

.6.3

M

easu

res

for

Inci

ner

atio

n B

y-p

rod

uct

s H

and

ling

Ash

sho

uld

be

sto

red

in s

tora

ge

silo

s

Ash

sh

ould

b

e han

dle

d

and

co

nvey

ed

in

clo

sed

sy

stem

s fu

lly

segre

gat

ed f

rom

the

amb

ient

envir

onm

ent

Ash

sho

uld

be

wet

ted

wit

h w

ater

to

co

ntr

ol

fugit

ive

dust

, w

her

e

nec

essa

ry

The

wet

ted

as

h

sho

uld

b

e tr

ansp

ort

ed

in

cover

ed

truck

s o

r

conta

iner

s to

the

des

ignat

ed l

and

fill

sit

e

Sto

rage,

han

dli

ng

& c

oll

ecti

on o

f

inci

ner

atio

n a

sh

at t

he

ST

F /

Duri

ng t

he

op

erat

ion p

erio

d

ST

F O

per

ato

r

S5

.6.3

In

cid

ent

Rep

ort

Aft

er a

ny s

pil

lage

inci

den

t, a

n i

nci

den

t re

po

rt s

ho

uld

be

pre

par

ed

by t

he

Pla

nt

Man

ager

. T

he

inci

den

t re

po

rt s

ho

uld

co

nta

in d

etai

ls

ST

F S

ite

/

Op

erat

ion P

has

e

ST

F O

per

ato

r

Page 15: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

1

5

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

of

the

inci

den

t in

clud

ing t

he

cause

of

the

inci

den

t, t

he

mat

eria

l

spil

led

an

d

esti

mat

ed

spil

lage

amo

unt,

an

d

also

th

e re

spo

nse

acti

ons

taken

. T

he

inci

den

t re

cord

sho

uld

be

kep

t ca

refu

lly a

nd

able

to

be

retr

ieved

when

nec

essa

ry.

The

inci

den

t re

po

rt

sho

uld

p

rovid

e su

ffic

ient

det

ails

fo

r th

e

eval

uat

ion o

f an

y e

nvir

onm

enta

l im

pac

ts d

ue

to t

he

spil

lage

and

asse

ssm

ent

of

the

effe

ctiv

enes

s o

f m

easu

res

taken

.

In

inci

den

ts

that

th

e sp

illa

ge

may

re

sult

in

si

gnif

ican

t la

nd

conta

min

atio

n,

EP

D s

ho

uld

be

info

rmed

im

med

iate

ly a

nd

the

ST

F

op

erat

or

sho

uld

be

resp

onsi

ble

fo

r th

e cl

ean u

p o

f th

e af

fect

ed

area

. T

he

resp

onse

s p

roce

dure

s d

escr

ibed

in S

ecti

on 5

.6.3

.3 a

nd

Sec

tio

n 5

.6.3

.5 o

f th

e E

IA R

epo

rt s

ho

uld

be

foll

ow

ed a

cco

rdin

gly

toget

her

wit

h t

he

land

co

nta

min

atio

n a

sses

smen

t an

d r

emed

iati

on

guid

elin

es st

ipula

ted

in

th

e G

uid

an

ce M

an

ua

l fo

r U

se o

f R

isk-

ba

sed

R

em

ed

iati

on

G

oa

ls fo

r C

on

tam

ina

ted

La

nd

Ma

na

gem

en

t

an

d t

he G

uid

an

ce N

ote

fo

r C

on

tam

ina

ted

La

nd

an

d R

em

ed

iati

on

.

Ta

ble

5 I

mp

lem

enta

tio

n S

ched

ule

of

Pro

po

sed

Wa

ter

Po

llu

tio

n C

on

tro

l M

easu

res

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S6

.7.2

Co

nst

ruct

ion R

uno

ff a

nd

Dra

inag

e

Sit

e p

ract

ices

outl

ined

in P

roP

EC

C P

N 1

/94

“C

onst

ruct

ion S

ite

Dra

inag

e”

shal

l b

e fo

llo

wed

as

far

as p

ract

icab

le i

n o

rder

to

min

imiz

e su

rfac

e ru

no

ff

and

the

chan

ce o

f er

osi

on:

At

the

star

t o

f si

te e

stab

lish

men

t, i

nte

rnal

dra

inag

e w

ork

s an

d e

rosi

on

and

sed

imen

tati

on c

ontr

ol

faci

liti

es s

hal

l b

e im

ple

men

ted

. C

han

nel

s,

eart

h b

und

s o

r sa

nd

bag

bar

rier

s sh

all

be

pro

vid

ed o

n s

ite

to d

irec

t

Wo

rk s

ite

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Pro

PE

CC

PN

1/9

4;

WP

CO

Page 16: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

1

6

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

sto

rmw

ater

to

si

lt

rem

oval

fa

cili

ties

.

The

det

aile

d

des

ign

and

inst

alla

tio

n

of

the

tem

po

rary

o

n-s

ite

dra

inag

e sy

stem

sh

all

be

und

erta

ken

b

y

the

contr

acto

r p

rio

r to

th

e co

mm

ence

men

t o

f

const

ruct

ion.

Bef

ore

co

mm

enci

ng a

ny s

ite

form

atio

n w

ork

, al

l se

wer

and

dra

inag

e

connec

tio

ns

shal

l b

e se

aled

to

p

reven

t d

ebri

s, so

il,

sand

et

c. fr

om

ente

ring p

ub

lic

sew

ers/

dra

ins.

Bo

und

arie

s o

f ea

rthw

ork

s sh

all

be

surr

ound

ed

by

dykes

o

r

emb

ankm

ents

fo

r fl

oo

d p

rote

ctio

n,

as n

eces

sary

.

San

d/s

ilt

rem

oval

fac

ilit

ies

such

as

sand

tra

ps,

sil

t tr

aps

and

sed

imen

t

bas

ins

shal

l b

e p

rovid

ed t

o r

emo

ve

sand

/sil

t p

arti

cles

fro

m r

uno

ff t

o

mee

t th

e st

and

ard

s o

f th

e T

echnic

al M

emo

rand

um

und

er t

he

Wat

er

Po

lluti

on C

ontr

ol

Ord

inan

ce.

T

he

des

ign o

f si

lt r

emo

val

fac

ilit

ies

shal

l b

e b

ased

on t

he

guid

elin

es p

rovid

ed i

n P

roP

EC

C P

N 1

/94

. A

ll

dra

inag

e fa

cili

ties

and

ero

sio

n a

nd

sed

imen

t co

ntr

ol

stru

cture

s sh

all

be

insp

ecte

d

mo

nth

ly

and

m

ainta

ined

to

en

sure

p

rop

er

and

ef

fici

ent

op

erat

ion a

t al

l ti

mes

and

par

ticu

larl

y d

uri

ng r

ainst

orm

s.

Wat

er p

um

ped

out

fro

m f

ound

atio

n p

iles

shal

l b

e d

isch

arged

into

sil

t

rem

oval

fac

ilit

ies.

Duri

ng r

ainst

orm

s, e

xp

ose

d s

lop

e/so

il s

urf

aces

shal

l b

e co

ver

ed b

y a

tarp

auli

n o

r o

ther

mea

ns,

as

far

as p

ract

icab

le.

Oth

er m

easu

res

that

nee

d

to

be

imp

lem

ente

d

bef

ore

, d

uri

ng

and

af

ter

rain

sto

rms

are

sum

mar

ized

in

P

roP

EC

C

PN

1

/94

.Exp

ose

d

soil

ar

eas

shal

l b

e

min

imiz

ed

to

red

uce

p

ote

nti

al

for

incr

ease

d

silt

atio

n

and

conta

min

atio

n o

f ru

no

ff.

Ear

thw

ork

fi

nal

su

rfac

es

shal

l b

e w

ell

com

pac

ted

an

d

sub

seq

uen

t

per

man

ent

wo

rk

or

surf

ace

pro

tect

ion

shal

l b

e im

med

iate

ly

per

form

ed.

Op

en s

tock

pil

es o

f co

nst

ruct

ion m

ater

ials

or

const

ruct

ion w

aste

s o

n-

site

o

f m

ore

th

an 5

0m

3 sh

all

be

cover

ed w

ith t

arp

auli

n o

r si

mil

ar

fab

ric

duri

ng r

ainst

orm

s.

Page 17: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

1

7

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

All

veh

icle

s sh

all

be

clea

ned

bef

ore

lea

vin

g t

he

wo

rks

area

to

ensu

re

no

ea

rth,

mud

an

d

deb

ris

is

dep

osi

ted

o

n

road

s.

A

n

adeq

uat

ely

des

igned

and

sit

ed w

hee

l w

ashin

g b

ay s

hal

l b

e p

rovid

ed a

t ev

ery s

ite

exit

. T

he

whee

l w

ashin

g f

acil

ity s

hal

l b

e d

esig

ned

to

min

imiz

e th

e

inta

ke

of

surf

ace

wat

er (

rain

wat

er).

W

ash-w

ater

shal

l hav

e sa

nd

and

silt

set

tled

out

and

rem

oved

at

leas

t o

n a

wee

kly

bas

is t

o e

nsu

re t

he

conti

nued

eff

icie

ncy

of

the

pro

cess

.

S6

.7.2

Gen

eral

Co

nst

ruct

ion A

ctiv

itie

s

Deb

ris

and

ref

use

gen

erat

ed o

n-s

ite

shal

l b

e co

llec

ted

, han

dle

d a

nd

dis

po

sed

of

pro

per

ly t

o a

vo

id e

nte

ring t

he

nea

rby w

ater

bo

die

s an

d

pub

lic

dra

inag

e sy

stem

. S

tock

pil

es o

f ce

men

t an

d o

ther

co

nst

ruct

ion

mat

eria

ls s

hal

l b

e kep

t co

ver

ed w

hen

no

t b

eing u

sed

.

Oil

s an

d f

uel

s sh

all

only

be

use

d a

nd

sto

red

in d

esig

nat

ed a

reas

whic

h

hav

e p

oll

uti

on p

reven

tio

n f

acil

itie

s.

To

pre

ven

t sp

illa

ge

of

fuel

s an

d

solv

ents

to

nea

rby w

ater

bo

die

s an

d p

ub

lic

dra

ins,

all

fuel

tan

ks

and

sto

rage

area

s sh

all

be

pro

vid

ed w

ith lo

cks

and

b

e si

ted

o

n se

aled

area

s,

wit

hin

b

und

s o

f a

cap

acit

y

equal

to

1

10

%

of

the

sto

rage

cap

acit

y o

f th

e la

rges

t ta

nk.

The

bund

shal

l b

e d

rain

ed o

f ra

inw

ater

afte

r a

rain

even

t.

Wo

rk s

ite

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Pro

PE

CC

PN

1/9

4;

WP

CO

S6

.7.2

S

ewag

e E

fflu

ents

Tem

po

rary

san

itar

y f

acil

itie

s, s

uch

as

po

rtab

le c

hem

ical

to

ilet

s, s

hal

l

be

emp

loyed

o

n-s

ite

wher

e nec

essa

ry

to

han

dle

se

wag

e fr

om

th

e

wo

rkfo

rce.

A

lice

nse

d

contr

acto

r w

ould

b

e re

spo

nsi

ble

fo

r

app

rop

riat

e d

isp

osa

l an

d m

ainte

nan

ce o

f th

ese

faci

liti

es.

Wo

rk s

ite

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Pro

PE

CC

PN

1/9

4;

WP

CO

S6

.7.2

R

elea

se o

f P

FA

Lea

chat

e fr

om

Ash

Lag

oo

n i

nto

the

Aq

uat

ic E

nvir

onm

ent

Envir

onm

enta

l m

onit

ori

ng a

nd

aud

it (

EM

&A

) sh

ould

be

incl

ud

ed t

o

ensu

re

that

th

e fo

und

atio

n

const

ruct

ion

wo

uld

no

t ca

use

an

unac

cep

tab

le r

elea

se o

f P

FA

lea

chat

e in

to t

he

Dee

p B

ay w

ater

s.

The

par

amet

ers

to b

e m

easu

red

sho

uld

incl

ud

e th

e hea

vy m

etal

s su

ch a

s

cad

miu

m,

chro

miu

m

and

al

um

iniu

m,

whic

h

hav

e th

e gre

ates

t

tend

ency

to

lea

ch f

rom

the

lago

oned

PF

A i

nto

the

seaw

ater

. D

etai

ls

Dee

p B

ay

Wat

er o

uts

ide

the

Ash

Lag

oo

n

/ D

uri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Page 18: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

1

8

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

of

the

mea

sure

men

t re

quir

emen

ts a

re p

rese

nte

d i

n t

he

EM

&A

man

ual

S6

.7.3

R

ecei

vin

g A

rea

at t

he

ST

F

An a

deq

uat

e num

ber

of

dra

ins

shal

l b

e p

rovid

ed a

t th

e re

ceiv

ing a

rea

of

the

ST

F w

ith d

rain

pip

ing f

or

dra

inin

g a

nd

cle

anin

g a

ll a

reas

of

the

flo

or.

The

flo

ors

sh

all

be

adeq

uat

ely

slo

ped

to

fl

oo

r d

rain

s fo

r

coll

ecti

on o

f d

rain

age

wat

er d

uri

ng c

lean

ing.

Such

flo

or

dra

ins

shal

l

conta

in n

o t

rap

s. T

he

dra

inag

e w

ater

shal

l b

e ro

ute

d t

o a

n o

utd

oo

r

ven

ted

and

tra

pp

ed m

anho

le f

or

connec

tio

n t

o t

he

on-s

ite

was

tew

ater

trea

tmen

t p

lant

Rec

eivin

g A

rea

at t

he

ST

F /

Duri

ng t

he

op

erat

ion

per

iod

ST

F O

per

ato

r

S6

.7.3

W

ash D

ow

n F

acil

itie

s at

the

ST

F

Fre

quen

t an

d

suff

icie

nt

mai

nte

nan

ce

shal

l b

e p

rovid

ed

for

the

dra

inag

e sy

stem

, an

d m

ult

iple

outl

ets

in t

he

dra

inag

e sy

stem

shal

l b

e

des

igned

and

pro

vid

ed t

o r

educe

the

likel

iho

od

of

dra

inag

e b

lock

age.

Was

h D

ow

n

Fac

ilit

ies

at t

he

ST

F /

Duri

ng

the

op

erat

ion

per

iod

ST

F O

per

ato

r

S6

.7.3

T

emp

ora

ry S

lud

ge/

GT

W S

tora

ge

at t

he

ST

F

A d

etec

tio

n d

evic

e/al

arm

shal

l b

e in

stal

led

to

pre

ven

t o

ver

fill

ing o

f

tem

po

rary

slu

dge/

GT

W s

tora

ge

tank.

Tem

po

rary

Slu

dge/

GT

W

Sto

rage

at t

he

ST

F /

Duri

ng

the

op

erat

ion

per

iod

ST

F O

per

ato

r

Page 19: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

1

9

Ta

ble

6 I

mp

lem

enta

tio

n S

ched

ule

of

Pro

po

sed

Eco

log

ica

l M

itig

ati

on

Mea

sure

s

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s/M

itig

ati

on

Mea

sure

s L

oca

tio

n/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S7

.8.2

M

easu

res

to M

inim

ize

Dis

turb

ance

Im

pac

t to

Wil

dli

fe

Ho

ard

ing o

f 3

m h

igh s

hal

l b

e se

t up

alo

ng t

he

bo

und

ary o

f th

e

wo

rks

area

s an

d

asso

ciat

ed

site

ac

cess

to

sh

ield

th

e fa

una

and

bre

edin

g p

op

ula

tio

n o

f L

ittl

e G

reb

e in

the

Mid

dle

Lag

oo

n f

rom

the

dis

turb

ance

im

pac

t o

f m

achin

ery.

The

wo

rks

bo

und

arie

s sh

all

no

t go

bey

ond

the

pro

po

sed

Pro

ject

Are

a.

All

wo

rk c

rew

s, e

quip

men

t an

d h

um

an a

ctiv

itie

s sh

all

be

confi

ned

w

ithin

th

e d

esig

nat

ed w

ork

s ar

ea o

nly

. N

o p

erso

nnel

sho

uld

en

cro

ach

or

wil

full

y

dis

turb

an

y

wil

d

anim

als

and

th

eir

hab

itat

s.

Tra

ffic

and

hum

an a

cces

s fr

om

the

wes

tern

sid

e o

f th

e

Pro

ject

Are

a sh

ould

be

avo

ided

.

Bo

und

ary o

f

wo

rks

area

s/

Co

nst

ruct

ion

Phas

e

Co

ntr

acto

r

Fen

cing

wit

h

clim

ber

s o

r p

lanta

tio

n

shal

l b

e p

rovid

ed,

wher

e

app

rop

riat

e,

alo

ng

the

ST

F

site

b

ound

ary

and

th

e tw

o si

des

o

f

acce

ss r

oad

to

scr

een t

he

surr

ound

ing h

abit

ats

fro

m t

he

ST

F w

ork

s

area

s.

Bo

und

ary o

f

wo

rks

area

s/

Op

erat

ion P

has

e

Co

ntr

acto

r

S7

.8.2

M

easu

res

to M

inim

ize

Imp

act

to n

atura

l hab

itat

s

Wher

e p

ract

icab

le,

all

pro

po

sed

w

ork

s sh

all

be

cond

uct

ed

in

exis

ting b

uil

t up

are

a to

min

imiz

e im

pac

t to

nat

ura

l hab

itat

s.

Wo

rks

area

s/

Des

ign a

nd

Co

nst

ruct

ion

Phas

e

ST

F D

esig

ner

/

Co

ntr

acto

r √

The

abutm

ent

(per

man

ent

stru

cture

) fo

r th

e veh

icula

r b

rid

ge

shal

l

avo

id s

trea

mb

ed.

The

num

ber

and

siz

e o

f th

e te

mp

ora

ry s

up

po

rtin

g

stru

cture

s to

be

inst

alle

d o

ver

the

stre

amb

ed d

uri

ng c

onst

ruct

ion

shal

l b

e m

inim

ized

as

far

as p

ract

icab

le.

Veh

icula

r b

rid

ge/

Des

ign a

nd

Co

nst

ruct

ion

Phas

e

ST

F D

esig

ner

/

Co

ntr

acto

r √

The

tem

po

rari

ly

affe

cted

nat

ura

l hab

itat

s,

incl

ud

ing

stre

amb

ed,

shal

l b

e re

inst

ated

aft

er t

he

com

ple

tio

n o

f w

ork

s.

Fo

r af

fect

ed

nat

ura

l st

ream

se

ctio

n,

pla

cem

ent

of

sub

stra

tes

of

sim

ilar

siz

e an

d c

om

po

siti

on t

o t

ho

se o

f o

rigin

al s

trea

mb

ed s

hal

l b

e

consi

der

ed t

o e

nco

ura

ge

colo

niz

atio

n.

Wo

rks

Are

a/

Op

erat

ion P

has

e

Co

ntr

acto

r

ET

WB

TC

(W

ork

s)

No

. 5

/20

05

Pro

tect

ion o

f nat

ura

l

stre

ams/

riv

ers

fro

m

adver

se i

mp

acts

aris

ing f

rom

Page 20: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

2

0

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s/M

itig

ati

on

Mea

sure

s L

oca

tio

n/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

const

ruct

ion w

ork

s

S7

.8.2

M

inim

ise

sed

imen

tati

on/w

ater

qual

ity i

mp

acts

to

wat

erb

od

ies

Mea

sure

s to

co

ntr

ol

po

tenti

al s

edim

enta

tio

n/

wat

er q

ual

ity i

mp

acts

duri

ng t

he

const

ruct

ion p

has

e sh

all

be

imp

lem

ente

d.

To

m

inim

ize

the

po

tenti

al

wat

er

qual

ity

imp

acts

fr

om

th

e

const

ruct

ion w

ork

s lo

cate

d a

t o

r nea

r an

y r

iver

chan

nel

s, n

atura

l

stre

ams

or

seaf

ront,

the

pra

ctic

es o

utl

ined

in E

TW

B T

C (

Wo

rks)

No

. 5

/20

05

“P

rote

ctio

n

of

nat

ura

l st

ream

s/ri

ver

s fr

om

ad

ver

se

imp

acts

ari

sing f

rom

co

nst

ruct

ion w

ork

s” s

hal

l b

e ad

op

ted

wher

e

app

lica

ble

.

Who

le S

ite/

Co

nst

ruct

ion

Phas

e

Co

ntr

acto

r

ET

WB

TC

(W

ork

s)

No

. 5

/20

05

Pro

tect

ion o

f nat

ura

l

stre

ams/

riv

ers

fro

m

adver

se i

mp

acts

aris

ing f

rom

const

ruct

ion w

ork

s

S7

.8.2

Min

imiz

e no

ise

dis

turb

ance

No

ise

mit

igat

ion

mea

sure

s in

clud

ing

the

use

o

f q

uie

ter

pil

ing

mac

hin

ery a

nd

co

nst

ruct

ion p

lants

shal

l b

e im

ple

men

ted

to

lo

wer

the

no

ise

level

due

to c

onst

ruct

ion w

ork

s.

Only

wel

l-m

ainta

ined

pla

nt

shal

l b

e o

per

ated

on-s

ite

and

pla

nt

shal

l

be

serv

iced

reg

ula

rly d

uri

ng t

he

const

ruct

ion p

rogra

mm

e.

Mac

hin

es a

nd

pla

nt

whic

h m

ay b

e in

inte

rmit

tent

use

shal

l b

e sh

ut

do

wn t

o a

min

imum

.

Pla

nt

kno

wn

to

emit

no

ise

stro

ngly

in

o

ne

dir

ecti

on,

shal

l b

e

ori

ente

d s

o t

hat

the

no

ise

is d

irec

ted

aw

ay f

rom

the

Mid

dle

Lag

oo

n,

wher

e p

oss

ible

.

Sil

ence

rs o

r m

uff

lers

on c

onst

ruct

ion e

quip

men

t sh

all

be

uti

lize

d

and

shal

l b

e p

rop

erly

mai

nta

ined

duri

ng t

he

const

ruct

ion p

erio

d.

Mo

bil

e p

lant

(such

as

gen

erat

or)

shal

l b

e si

ted

as

far

away

fro

m t

he

Mid

dle

Lag

oo

n a

s p

oss

ible

.

Mat

eria

l st

ock

pil

es a

nd

oth

er s

truct

ure

s sh

all

be

effe

ctiv

ely u

tili

zed

,

wher

e p

ract

icab

le,

to

scre

en

no

ise

fro

m

on-s

ite

const

ruct

ion

acti

vit

ies.

Who

le S

ite/

Co

nst

ruct

ion

Phas

e

Co

ntr

acto

r

Page 21: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

2

1

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s/M

itig

ati

on

Mea

sure

s L

oca

tio

n/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S7

.8.2

M

inim

ise

Gen

eral

Dis

turb

ance

in C

onst

ruct

ion P

has

e:

Pla

cem

ent

of

equip

men

t o

r st

ock

pil

e in

des

ignat

ed w

ork

s ar

eas

and

acce

ss r

oute

s se

lect

ed o

n e

xis

ting r

oad

s to

min

imiz

e d

istu

rban

ce t

o

nat

ura

l hab

itat

s.

Co

nst

ruct

ion a

ctiv

itie

s sh

all

be

rest

rict

ed t

o w

ork

s ar

eas

that

shal

l

be

clea

rly d

emar

cate

d.

Acc

ess

to a

reas

of

the

ash l

ago

on o

uts

ide

the

wo

rks

area

s sh

all

be

stri

ctly

pro

hib

ited

.

Was

te

skip

s sh

all

be

pro

vid

ed

to

coll

ect

gen

eral

re

fuse

an

d

const

ruct

ion w

aste

s. T

he

was

tes

shal

l b

e d

isp

ose

d o

f ti

mel

y a

nd

pro

per

ly o

ff-s

ite.

Dra

inag

e ar

rangem

ents

sh

all

incl

ud

e se

dim

ent

trap

s to

co

ntr

ol

const

ruct

ion r

un-o

ff.

Op

en

burn

ing

on

wo

rks

site

s is

il

legal

, an

d

shal

l b

e st

rict

ly

pro

hib

ited

, te

mp

ora

ry f

ire

fighti

ng e

quip

men

t in

the

wo

rks

area

s

shal

l b

e p

rovid

ed t

o p

reven

t an

y o

pen

fir

e.

Ere

ct

fence

s al

ong

the

bo

und

ary

of

wo

rks

area

s b

efo

re

the

com

men

cem

ent

of

wo

rks

to p

reven

t ti

pp

ing,

veh

icle

mo

vem

ents

,

and

en

cro

achm

ent

of

per

sonnel

in

to

adja

cent

area

s,

par

ticu

larl

y

wher

e cl

ose

to

the

wat

erco

urs

e W

1.

Who

le S

ite/

Co

nst

ruct

ion

Phas

e

Co

ntr

acto

r

S7

.8.3

M

easu

res

to M

itig

ate

the

Lo

ss o

f V

eget

atio

n

All

veg

etat

ion l

oca

ted

wit

hin

the

wo

rk a

reas

shal

l b

e p

rese

rved

as

far

as p

ract

icab

le.

To

co

mp

ensa

te fo

r th

e lo

ss o

f th

e veg

etat

ion an

d hab

itat

s, tr

ee

pla

nti

ng s

hal

l b

e p

rovid

ed o

n t

he

cut

slo

pe

of

the

acce

ss r

oad

and

wit

hin

the

pro

po

sed

ST

F s

ites

as

app

rop

riat

e.

Sp

ecie

s ch

ose

n f

or

pla

nti

ng s

hal

l b

e si

mil

ar t

o t

he

spec

ies

iden

tifi

ed i

n t

he

surv

ey a

nd

be

nat

ive

to H

ong K

ong o

r th

e S

outh

ern C

hin

a.

Who

le S

ite/

Des

ign,

Co

nst

ruct

ion a

nd

Op

erat

ion P

has

e

Co

ntr

acto

r /

ST

F

Op

erat

or

S7

.8.4

E

nhan

cem

ent

Mea

sure

s to

Cre

ate

Ad

dit

ional

Hab

itat

fo

r L

ittl

e G

reb

e

An ad

dit

ional

hab

itat

fo

r L

ittl

e G

reb

e sh

all

be

crea

ted

in a

les

s

Wit

hin

Pro

ject

Are

a/ D

esig

n

Co

ntr

acto

r /

ST

F

Op

erat

or

Page 22: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

2

2

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s/M

itig

ati

on

Mea

sure

s L

oca

tio

n/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

dis

turb

ed a

rea

loca

ted

at

the

no

rthea

ster

n p

art

of

the

pro

po

sed

ST

F.

The

crea

ted

hab

itat

shal

l b

e p

rovid

ed i

n f

orm

of

shal

low

po

nd

(s)

inco

rpo

rati

ng s

uit

able

hab

itat

char

acte

rist

ics

for

Lit

tle

Gre

be.

T

he

wat

er l

evel

of

the

crea

ted

po

nd

shal

l b

e kep

t b

etw

een 1

.5 m

to

2 m

.

Em

ergen

t veg

etat

ion s

hal

l b

e p

lante

d a

nd

fis

h p

op

ula

tio

n s

hal

l b

e

contr

oll

ed

to

allo

w

dev

elo

pm

ent

of

aquat

ic

inver

teb

rate

po

pula

tio

ns

as p

rey o

f L

ittl

e G

reb

e.

To

sc

reen

th

e cr

eate

d

hab

itat

fr

om

d

istu

rban

ce

due

to

nea

rby

land

fill

tra

ffic

, p

lanti

ng o

f nat

ive

pla

nts

shal

l b

e p

rovid

ed o

n t

he

bo

und

ary o

f th

e p

ond

(s)

as a

pp

rop

riat

e.

Pri

or

to c

onst

ruct

ion o

f th

e p

ond

(s),

det

aile

d H

abit

at C

reat

ion a

nd

Man

agem

ent

Pla

n

(HC

MP

) o

f th

e cr

eate

d

hab

itat

p

rep

ared

b

y

exp

erie

nce

d

eco

logis

t(s)

w

ith

over

se

ven

yea

r ex

per

ience

in

rele

van

t fi

eld

shal

l b

e ci

rcula

ted

to

rel

evan

t d

epar

tmen

ts i

ncl

ud

ing

AF

CD

fo

r co

mm

ent.

Phas

e,

Co

nst

ruct

ion a

nd

Op

erat

ion P

has

e

Page 23: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

2

3

Ta

ble

7 I

mp

lem

enta

tio

n S

ched

ule

fo

r L

an

dsc

ap

e a

nd

Vis

ua

l Im

pa

ct

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

Tab

le 9

.6

CM

-01

Co

nta

min

ant/

Sed

imen

t C

ontr

ol

Suit

able

tem

po

rary

bar

rier

s, c

over

s an

d d

rain

age

pro

vis

ions

shal

l

be

pro

vid

ed

aro

und

co

nst

ruct

ion

wo

rks

to

avo

id

dis

char

ge

of

conta

min

ants

(su

ch a

s b

leed

ing f

rom

in-s

itu c

oncr

ete

wo

rks)

and

sed

imen

ts i

nto

sen

siti

ve

wat

er-b

ased

hab

itat

s, e

spec

iall

y t

he

tid

al

stre

ams

and

the

man

gro

ve.

Wo

rk s

ite

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Tab

le 9

.6

CM

-02

Exis

ting T

rees

wit

hin

Wo

rks

Are

as

All

exis

ting t

rees

wit

hin

wo

rk s

ites

shal

l b

e p

rop

erly

mai

nta

ined

and

pro

tect

ed f

or

thei

r cr

ow

ns,

tru

nks

and

ro

ots

.

Wo

rk s

ite

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Tab

le 9

.6

CM

-03

Tre

e T

ransp

lant

The

affe

cted

tre

es w

ith m

ediu

m s

urv

ival

rat

e af

ter

tran

spla

nti

ng

wo

uld

be

tran

spla

nte

d.

Sit

e ar

ea o

r o

ther

area

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Tab

le 9

.6

CM

-04

Tre

e P

lanti

ng

The

affe

cted

tre

es w

ith l

ow

surv

ival

rat

e af

ter

tran

spla

nti

ng a

re

pro

po

sed

to

be

fell

ed.

Hea

vy s

tand

ard

tre

es w

ill

be

pla

nte

d t

o

com

pen

sate

fo

r th

e lo

ss o

f th

e ex

isti

ng t

rees

. T

he

rati

o o

f th

e

com

pen

sato

ry t

rees

to

the

fell

tre

es w

ould

no

t b

e le

ss t

han

1:1

.

Sit

e ar

ea o

r o

ther

area

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Tab

le 9

.6

CM

-05

Lig

hti

ng C

ontr

ol

All

sec

uri

ty f

loo

dli

ghts

fo

r th

e co

nst

ruct

ion s

ite

shal

l b

e eq

uip

ped

wit

h a

dju

stab

le s

hie

ld,

fro

sted

dif

fuse

rs a

nd

ref

lect

ive

cover

s, a

nd

be

care

full

y c

ontr

oll

ed t

o m

inim

ize

light

po

lluti

on a

nd

nig

ht-

tim

e

gla

re.

Wo

rk s

ite

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Tab

le 9

.6

CM

-06

Ho

ard

ing

Dec

ora

tive

scre

en

ho

ard

ing

com

pat

ible

w

ith

the

surr

ound

ing

sett

ing w

ill

be

erec

ted

to

scr

een t

he

wo

rks

area

.

Wo

rk s

ite

/

Duri

ng t

he

const

ruct

ion

per

iod

Co

ntr

acto

r

Page 24: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

2

4

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s /

Mit

iga

tio

n M

easu

res

Lo

cati

on

/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

Tab

le 9

.7

OM

-01

Aes

thet

ic D

esig

n

Co

mp

atib

le d

esig

n,

const

ruct

ion m

ater

ials

and

surf

ace

finis

hes

of

the

pro

po

sed

st

ruct

ure

s sh

ould

m

atch

w

ith

the

surr

ound

ing

sett

ings

to c

reat

e har

mo

nic

envir

onm

ent.

Fin

ishin

g m

ater

ials

shal

l

hav

e d

ue

consi

der

atio

n t

o f

orm

, b

asic

co

lor,

co

lor/

tone

var

iati

on,

mic

ro-

and

m

acro

-tex

ture

, an

d

refl

ecti

vit

y/l

ight

abso

rban

ce

to

avo

id g

lare

.

ST

F S

truct

ure

/

Duri

ng t

he

des

ign

& c

onst

ruct

ion

phas

es

Co

ntr

acto

r √

Tab

le 9

.7

OM

-02

Shru

b a

nd

Cli

mb

ing P

lanti

ng

Pla

nti

ng,

such

as

turf

and

cli

mb

ers,

may

als

o b

e p

lante

d o

n t

he

ST

F

buil

din

gs,

w

her

ever

p

oss

ible

, to

so

ften

th

e p

rop

ose

d

stru

cture

s.

ST

F B

uil

din

gs/

Duri

ng t

he

des

ign

& construction

phas

es

Co

ntr

acto

r √

Tab

le 9

.7

OM

-03

Tre

e P

lanti

ng

Hea

vy s

tand

ard

tre

es w

ill

be

pla

nte

d s

urr

ound

ing t

he

ST

F a

rea

and

alo

ng t

he

sid

es o

f th

e ac

cess

ro

ad t

o p

rovid

e sc

reen

ing o

f th

e

ST

F b

uil

din

gs

and

fac

ilit

ies.

Perimeter of

works area &

acce

ss r

oad

/

Duri

ng t

he

des

ign

& construction

phas

es

Co

ntr

acto

r √

Tab

le 9

.7

OM

-04

Suit

able

Rei

nst

atem

ent

of

Dis

turb

ed A

rea

Aff

ecte

d p

erim

eter

o

f th

e p

rop

ose

d w

ork

s ar

ea w

ithin

th

e as

h-

lago

on s

hal

l b

e re

inst

ated

wit

h s

uit

able

pla

nti

ng m

ater

ials

.

Perimeter of

works area /

During the

construction

phases

Co

ntr

acto

r √

Page 25: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

2

5

Ta

ble

8 I

mp

lem

enta

tio

n S

ched

ule

of

Pro

po

sed

La

nd

fill

Ga

s H

aza

rd P

rote

ctio

n M

easu

res

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s/M

itig

ati

on

Mea

sure

s L

oca

tio

n/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S1

0.7

.2

Ap

po

intm

ent

of

Saf

ety O

ffic

er

Ap

po

int

a p

rop

erly

tr

ained

sa

fety

o

ffic

er

and

p

rovid

e w

ith

app

rop

riat

e eq

uip

men

t to

mea

sure

and

mo

nit

or

LF

G h

azar

d.

The

mo

nit

ori

ng

freq

uen

cy

and

ar

eas

to

be

mo

nit

ore

d

sho

uld

b

e se

t

do

wn p

rio

r to

co

mm

ence

men

t o

f gro

und

-wo

rks

eith

er b

y t

he

Saf

ety

Off

icer

or

an a

pp

roved

and

ap

pro

pri

atel

y q

ual

ifie

d p

erso

n.

Wo

rk S

ite

/

Duri

ng t

he

const

ruct

ion

phas

e

Co

ntr

acto

r

S1

0.7

.2

Saf

ety M

easu

res

- E

xca

vat

ion

Sta

ff

sho

uld

re

ceiv

e ap

pro

pri

ate

trai

nin

g

on

wo

rkin

g

in

area

s

susc

epti

ble

to

lan

dfi

ll g

as,

fire

and

exp

losi

on h

azar

ds.

E

xca

vat

ion

pro

ced

ure

s an

d c

od

e o

f p

ract

ice

sho

uld

be

imp

lem

ente

d.

Wo

rk S

ite

/

Duri

ng t

he

const

ruct

ion

phas

e

Co

ntr

acto

r

S1

0.7

.2

Saf

ety M

easu

res

– W

eld

ing,

Fla

me-

Cutt

ing a

nd

Ho

t w

ork

s

Ho

t w

ork

s sh

ould

be

confi

ned

to

op

en a

reas

aw

ay f

rom

any t

rench

or

exca

vat

ion.

Sho

uld

ho

t w

ork

s m

ust

be

carr

ied

out

in t

rench

es o

r

confi

ned

sp

ace,

“p

erm

it t

o w

ork

” p

roce

dure

s sh

ould

be

foll

ow

ed.

Wo

rk S

ite

/

Duri

ng t

he

const

ruct

ion

phas

e

Co

ntr

acto

r

S1

0.7

.2

Saf

ety M

easu

res

– E

ncl

ose

d S

pac

es

Sit

e o

ffic

es

or

buil

din

gs

loca

ted

w

ithin

W

EN

T

Lan

dfi

ll

Co

nsu

ltat

ion Z

one

whic

h h

ave

the

cap

acit

y t

o a

ccum

ula

te l

and

fill

gas

, th

en t

hey

sho

uld

eit

her

be

loca

ted

in a

n a

rea

whic

h h

as b

een

pro

ven

to

be

free

of

land

fill

gas

; o

r b

e ra

ised

cle

ar o

f th

e gro

und

by

a m

inim

um

of

50

0m

m.

Encl

ose

d S

pac

es

wit

hin

WE

NT

Co

nsu

ltan

t Z

one

/

Duri

ng t

he

const

ruct

ion

phas

e

Co

ntr

acto

r

S1

0.7

.2

Saf

ety M

easu

res

– E

lect

rica

l E

quip

men

t

Any

elec

tric

al

equip

men

t,

such

as

m

oto

rs

and

ex

tensi

on

cord

s,

sho

uld

be

intr

insi

call

y s

afe.

Wo

rk S

ite

/

Duri

ng t

he

const

ruct

ion

phas

e

Co

ntr

acto

r

S1

0.7

.2

Saf

ety M

easu

res

– P

ipin

g

Duri

ng p

ipin

g a

ssem

bly

or

cond

uit

ing c

onst

ruct

ion,

all

val

ves

/sea

ls

sho

uld

be

clo

sed

im

med

iate

ly a

fter

inst

alla

tio

n.

As

const

ruct

ion

Wo

rk S

ite

/

Duri

ng t

he

const

ruct

ion

Co

ntr

acto

r

Page 26: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

2

6

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s/M

itig

ati

on

Mea

sure

s L

oca

tio

n/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

pro

gre

sses

, al

l val

ves

/sea

ls s

ho

uld

be

clo

sed

as

inst

alle

d t

o p

reven

t

the

mig

rati

on

of

gas

es

thro

ugh

the

pip

elin

e/co

nd

uit

.

All

pip

ing/c

ond

uit

ing s

ho

uld

be

cap

ped

at

the

end

of

each

wo

rkin

g d

ay.

phas

e

S1

0.7

.2

Saf

ety M

easu

res

– F

ire

Saf

ety

Ad

equat

e fi

re

safe

ty

equip

men

ts

sho

uld

b

e p

rovid

ed

on

site

.

Wo

rker

s an

d

vis

ito

rs

sho

uld

b

e no

tifi

ed

of

the

po

tenti

al

fire

haz

ard

s.

Saf

ety n

oti

ces

sho

uld

be

po

sted

aro

und

the

site

war

nin

g

the

anger

and

po

tenti

al h

azar

ds.

Wo

rk S

ite

/

Duri

ng t

he

const

ruct

ion

phas

e

Co

ntr

acto

r

S1

0.7

.2

Saf

ety M

easu

res

– C

onfi

ned

Sp

aces

Pre

cauti

onar

y m

easu

res

sho

uld

incl

ud

e en

suri

ng t

hat

sta

ff m

emb

ers

are

awar

e o

f th

e p

ote

nti

al h

azar

ds

of

wo

rkin

g i

n c

onfi

ned

sp

aces

,

and

that

ap

pro

pri

ate

mo

nit

ori

ng p

roce

dure

s ar

e in

pla

ce t

o p

reven

t

haz

ard

s in

co

nfi

ned

sp

aces

.

Co

nfi

ned

Sp

aces

at W

ork

Sit

e /

Duri

ng t

he

const

ruct

ion

phas

e

Co

ntr

acto

r

S1

0.7

.2

Mo

nit

ori

ng

Per

iod

ical

ly d

uri

ng g

round

-wo

rks

wit

hin

the

Co

nsu

ltat

ion Z

one,

the

wo

rks

area

sho

uld

be

mo

nit

ore

d f

or

met

han

e, c

arb

on d

ioxid

e an

d

oxygen

usi

ng

app

rop

riat

ely

cali

bra

ted

p

ort

able

gas

d

etec

tio

n

equip

men

t.

The

mo

nit

ori

ng f

req

uen

cy a

nd

are

as t

o b

e m

onit

ore

d

shal

l b

e se

t d

ow

n

pri

or

to

com

men

cem

ent

of

gro

und

-wo

rks.

Dep

end

ing o

n th

e re

sult

s o

f th

e m

easu

rem

ents

, ac

tio

ns

req

uir

ed

wil

l var

y.

As

a m

inim

um

th

ese

sho

uld

en

com

pas

s th

ose

ac

tio

ns

spec

ifie

d i

n T

able

10

.6 o

f th

e E

IA R

epo

rt.

Wo

rk S

ite

/

Duri

ng t

he

const

ruct

ion

phas

e

Co

ntr

acto

r

S1

0.7

.3

Gas

Bar

rier

A c

ut-

off

tre

nch

bar

rier

to

sho

uld

be

buil

t al

ong i

n b

etw

een t

he

bo

und

ary o

f th

e S

TF

sit

e fa

cili

ty a

nd

the

exis

ting W

EN

T l

and

fill

.

In a

dd

itio

n,

in t

he

WE

NT

exte

nsi

on p

roje

ct,

a cu

t-o

ff t

rench

bar

rier

wil

l b

e b

uil

t al

ong t

he

bo

und

ary b

etw

een t

he

ST

F a

nd

the

WE

NT

Exte

nsi

on u

nd

er t

he

WE

NT

Exte

nsi

on p

roje

ct.

This

wil

l cu

t o

ff

any g

as m

igra

tio

n t

o t

he

ST

F f

rom

WE

NT

exte

nsi

on.

Alo

ng S

TF

bo

und

ary/

Duri

ng

the

des

ign p

has

e

ST

F D

esig

ner

Page 27: itigation Measures Appendix 11.1 Implementation Schedule

Appendix 11.1

Implementation Schedule of Proposed Mitigation Measures

2

7

Imp

lem

enta

tio

n

Sta

ges

*

EIA

Ref

#

En

vir

on

men

tal

Pro

tect

ion

Mea

sure

s/M

itig

ati

on

Mea

sure

s L

oca

tio

n/

Tim

ing

Imp

lem

enta

tio

n

Ag

ent

Des

C

O

D

ec

Rel

eva

nt

Leg

isla

tio

n

an

d G

uid

elin

es

S1

0.7

.3

Buil

din

g P

rote

ctio

n D

esig

n M

easu

re

Pas

sive

contr

ol

mea

sure

s (s

uch

as

gas

-res

ista

nt

po

lym

eric

mem

bra

nes

, sy

nth

etic

co

mp

osi

te geo

texti

le,

clea

r vo

id und

er th

e

stru

cture

, et

c) f

or

buil

din

gs

stru

cture

s w

ith g

round

lev

el o

r b

elo

w

gro

und

ro

om

s /

vo

ids.

Buil

din

gs

wit

hin

ST

F/

Duri

ng t

he

des

ign p

has

e

ST

F D

esig

ner

S1

0.7

.3

Des

ign M

easu

res

for

Sub

-surf

ace

Buil

din

g S

ervic

es

As

sho

wn i

n F

igure

10

.4b

- F

igure

10

.4f

of

the

EIA

Rep

ort

, gen

eric

pro

tect

ion m

easu

res

(such

as

bar

rier

s m

ade

of

HD

PE

, ven

t p

ipes

,

etc)

fo

r th

e d

esig

n m

easu

res

for

sub

-surf

ace

buil

din

g s

ervic

es.

Buil

din

g s

ervic

es/

Duri

ng t

he

des

ign

phas

e

ST

F D

esig

ner

S1

0.7

.3

Guid

ance

fo

r E

ntr

y

into

S

ervic

e R

oo

ms

/ V

oid

s,

Man

ho

les

and

Cham

ber

Saf

ety G

uid

e to

Wo

rkin

g i

n C

onfi

ned

Sp

aces

sho

uld

be

foll

ow

ed t

o

ensu

re c

om

pli

ance

wit

h t

he

Fac

tori

es a

nd

Ind

ust

rial

Und

erta

kin

gs

(Co

nfi

ned

Sp

aces

) R

egula

tio

n.

In g

ener

al,

app

rop

riat

e sa

fety

eq

uip

men

ts s

ho

uld

be

avai

lab

le f

or

wo

rks

in co

nfi

ned

sp

aces

. W

ork

ers

and

S

up

ervis

ors

sh

ould

b

e

trai

ned

. A

per

mit

-to

-wo

rk s

yst

em f

or

entr

y s

ho

uld

be

dev

elo

ped

and

co

nsi

sten

tly e

mp

loyed

. T

he

safe

ty m

easu

res

reco

mm

end

ed i

n

Chap

ter

8 o

f th

e L

and

fill

Gas

Haz

ard

Ass

essm

ent

Guid

ance

No

te

sho

uld

als

o b

e st

rict

ly f

oll

ow

ed.

Ser

vic

e R

oo

ms

Vo

ids,

Man

ho

les

and

Cham

ber

/

Duri

ng t

he

op

erat

ion p

has

e

ST

F O

per

ato

r

Saf

ety G

uid

e to

Wo

rkin

g i

n C

onfi

ned

Sp

aces

Fac

tori

es a

nd

Ind

ust

rial

Und

erta

kin

gs

(Co

nfi

ned

Sp

aces

)

Reg

ula

tio

n

S1

0.7

.3

Lan

dfi

ll G

as M

onit

ori

ng D

uri

ng O

per

atio

n

Reg

ula

r M

onit

ori

ng o

f la

nd

fill

gas

sho

uld

be

do

ne

at t

he

abo

ve

wel

ls a

s w

ell

as u

nd

ergro

und

(se

rvic

e vo

ids

and

man

ho

les)

by t

he

ST

F c

ontr

acto

r.

Mo

nit

ori

ng i

s re

quir

ed t

o v

erif

y t

he

effe

ctiv

enes

s

and

to

en

sure

th

e co

nti

nued

p

erfo

rman

ce

of

the

imp

lem

ente

d

pro

tect

ion m

easu

res.

Ser

vic

e R

oo

ms

Vo

ids,

Man

ho

les

and

Cham

ber

/

Duri

ng t

he

op

erat

ion p

has

e

ST

F O

per

ato

r

# A

ll r

eco

mm

end

atio

ns

and

req

uir

emen

ts r

esult

ed d

uri

ng t

he

cours

e o

f E

IA P

roce

ss,

incl

ud

ing A

CE

and

/ o

r ac

cep

ted

pub

lic

com

men

t to

the

pro

po

sed

pro

ject

.

Des

- D

esig

n,

C -

Co

nst

ruct

ion,

O -

Op

erat

ion a

nd

Dec

– D

eco

mm

issi

onin

g