CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ) Item No. Description Unit Unit Rate Amount 1 VRV AIR CONDITIONING SYSTEM BRIDGE A1R Design, manufacture, works testing, supply and deliver to site, moving into position, erection, connecting up, site testing, witness testing, proving to insurance inspectors, demonstrating to the Employer, commissioning and maintenance of the complete mechanical systems and equipment as shown on the drawings and datasheets. Summary as follows: 1.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT Nominal Cooling Capacity : 44.0[kW] No. 4 Supply and install VRV heat pump outdoor units complete with fittings and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for commisioning as specified and shown on the drawing. All units shall be IP addressable ready for BMS connection by others. 1.2 Nominal Cooling Capcity : 173.0[kW] Placed on ground No. 1 1.3 Manufactuers' Refrigerant joints No. 65 1.4 Supply and install the MCU/ BC controller for the VRV system No 1 1.5 Supply and install digital temerature indicators No 2 1.6 Supply and install R410a refrigerant piping c/w refnet joints and and all necessary fixtures and fittings as specified and shown on the drawings. 41.3mm dia m 100 34.9mm dia m 140 28.6mm dia m 150 22.2mm dia m 100 19.1mm dia m 180 15.9mm dia m 65 12.7mm dia m 110 9.5mm dia m 89 6.4mm dia m 120 Allow for drilling and make good of walls sum TOTAL CARRIED FORWARD TO NEXT PAGE R MECHANICAL SERVICES INSTALLATION AIRBRIDGE AR1-1 BILLS OF QUANTITIES

Item No. Description Unit Unit Rate Amount 1 VRV AIR ... 4 - BOQ... · CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ) ... 1,21 Allow for interface with the Building

  • Upload
    lykhue

  • View
    227

  • Download
    0

Embed Size (px)

Citation preview

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

1 VRV AIR CONDITIONING SYSTEM

BRIDGE A1R

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

1.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 44.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

1.2 Nominal Cooling Capcity : 173.0[kW] Placed on ground No. 1

1.3 Manufactuers' Refrigerant joints No. 65

1.4 Supply and install the MCU/ BC controller for the VRV system No 1

1.5 Supply and install digital temerature indicators No 2

1.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 100

34.9mm dia m 140

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE AR1-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE -

BRIDGE A1R

1.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 110

100mm wide m 140

50mm m 80

1.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

1.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

1,10 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

1,11 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

1,12 Size: 1200 x 600mm egg crate return air grille No. 6

1,13 Make good the ceiling after installation sum

1,14 Make good the walls after installation sum

1,15 Make good other disturbed services after installation sum

1,16 Provide 12 months guarantee for the installation sum

1,17 Supply a facilities management system to monitor and control the maintenance

and servicing of the installation during the guarantee period and beyond sum

1,18 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

1,19 Provide training for the FMS sum

1,20 Allow for interface with fire services sum

1,21 Allow for interface with the Building management system (BMS) sum

1,22

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

1,23 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE AR1-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

2 VRV AIR CONDITIONING SYSTEM

BRIDGE A1L

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

2.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 42.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

2.2 Nominal Cooling Capcity : 168.0[kW] placed on ground No. 1

2.3 Manufactuers' Refrigerant joints No. 65

2.4 Supply and install the MCU/ BC controller for the VRV system No 1

2.5 Supply and install digital temerature indicators No 2

2.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 120

34.9mm dia m 140

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A1L-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE A1L

2.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 110

100mm wide m 140

50mm m 80

2.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

2.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

2,10 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

2,11 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

2,12 Size: 1200 x 600mm egg crate return air grille No. 6

2,13 Make good the ceiling after installation sum

2,14 Make good the walls after installation sum

2,15 Make good other disturbed services after installation sum

2,16 Provide 12 months guarantee for the installation sum

2,17Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

2,18 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

2,19 Provide training for the FMS sum

2,20 Allow for interface with fire services sum

2,21Allow for interface with the Building management system (BMS) sum

2,22Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the

airport's operations) sum

2,23 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A1L-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

3 VRV AIR CONDITIONING SYSTEM

BRIDGE A2

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

3.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 44.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

3.2 Nominal Cooling Capcity : 173.0[kW] placed on ground No. 1

3.3 Manufactuers' Refrigerant joints No. 65

3.4 Supply and install the MCU/ BC controller for the VRV system No 1

3.5 Supply and install digital temerature indicators No 2

3.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A2-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE A2

3.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 110

100mm wide m 140

50mm m 80

3.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

3.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

3,10 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

3,11 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

3,12 Size: 1200 x 600mm egg crate return air grille No. 6

3,13 Make good the ceiling after installation sum

3,14 Make good the walls after installation sum

3,15 Make good other disturbed services after installation sum

3,16 Provide 12 months guarantee for the installation sum

3,17 Supply a facilities management system to monitor and control the maintenance

and servicing of the installation during the guarantee period and beyond sum

3,18 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

3,19 Provide training for the FMS sum

3,20 Allow for interface with fire services sum

3,21 Allow for interface with the Building management system (BMS) sum

3,22 Allow for the minimum interuption of the airport operations during the sum

3,23 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A2-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

4 VRV AIR CONDITIONING SYSTEM

BRIDGE A3

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

4.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 48.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

4.2 Nominal Cooling Capcity : 190.0[kW] placed on ground No. 1

4.3 Manufactuers' Refrigerant joints No. 65

4.4 Supply and install the MCU/ BC controller for the VRV system No 1

4.5 Supply and install digital temerature indicators No 2

4.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A3-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE -

BRIDGE A3

4.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

4.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

4.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

4,10 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

4,11 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

4,12 Size: 1200 x 600mm egg crate return air grille No. 6

4,13 Make good the ceiling after installation sum

4,14 Make good the walls after installation sum

4,15 Make good other disturbed services after installation sum

4,16 Provide 12 months guarantee for the installation sum

4,17Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

4,18 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

4,19 Provide training for the FMS sum

4,20 Allow for interface with fire services sum

4,21 Allow for interface with the Building management system (BMS) sum

4,22

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

4,23 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.

Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A3-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

5 VRV AIR CONDITIONING SYSTEM

BRIDGE A4

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

5.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 35.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

5.2 Nominal Cooling Capcity : 140.0[kW] placed on ground No. 1

5.3 Manufactuers' Refrigerant joints No. 65

5.4 Supply and install the MCU/ BC controller for the VRV system No 1

5.5 Supply and install digital temerature indicators No 2

5.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A4-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE A4

5.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

5.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

5.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

5,10 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

5,11 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

5,12 Size: 1200 x 600mm egg crate return air grille No. 6

5,13 Make good the ceiling after installation sum

5,14 Make good the walls after installation sum

5,15 Make good other disturbed services after installation sum

5,16 Provide 12 months guarantee for the installation sum

5,17Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

5,18 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

5,19 Provide training for the FMS sum

5,20 Allow for interface with fire services sum

5,21 Allow for interface with the Building management system (BMS) sum

5,22

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the sum

5,23 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.

Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A4-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

6 VRV AIR CONDITIONING SYSTEM

BRIDGE A5

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

6.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 35.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

6.2 Nominal Cooling Capcity : 140.0[kW] placed on ground No. 1

6.3 Manufactuers' Refrigerant joints No. 65

6.4 Supply and install the MCU/ BC controller for the VRV system No 1

6.5 Supply and install digital temerature indicators No 2

6.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A5-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE A5

6.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

6.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

6.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

6,10 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

6,11 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

6,12 Size: 1200 x 600mm egg crate return air grille No. 6

6,13 Make good the ceiling after installation sum

6,14 Make good the walls after installation sum

6,15 Make good other disturbed services after installation sum

6,16 Provide 12 months guarantee for the installation sum

6,17Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

6,18 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

6,19 Provide training for the FMS sum

6,20 Allow for interface with fire services sum

6,21 Allow for interface with the Building management system (BMS) sum

6,22

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the sum

6,23 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.

Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A5-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

7 VRV AIR CONDITIONING SYSTEM

BRIDGE A6

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

7.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 35.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

7.2 Nominal Cooling Capcity : 140.0[kW] placed on ground No. 1

7.3 Manufactuers' Refrigerant joints No. 65

7.4 Supply and install the MCU/ BC controller for the VRV system No 1

7.5 Supply and install digital temerature indicators No 2

7.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A6-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE A6

7.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

7.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

7.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

7,10 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

7,11 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

7,12 Size: 1200 x 600mm egg crate return air grille No. 6

7,13 Make good the ceiling after installation sum

7,14 Make good the walls after installation sum

7,15 Make good other disturbed services after installation sum

7,16 Provide 12 months guarantee for the installation sum

7,17Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

7,18 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

7,19 Provide training for the FMS sum

7,20 Allow for interface with fire services sum

7,21 Allow for interface with the Building management system (BMS) sum

7,22

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the sum

7,23 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.

Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A6-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

8 CHILLED WATER AIR CONDITIONING SYSTEM

BRIDGE A7

Design, manufacture, works testing, supply and deliver to site, moving into position,

erection, connecting up, site testing, witness testing, proving to insurance inspectors,

demonstrating to the Employer, commissioning and maintenance of the complete

mechanical systems and equipment as shown on the drawings and datasheets.

Summary as follows:

8.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 44.0[kW] No. 4

8.2 Supply and install digital temerature indicators No 2

8.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP

Supply and install heavy grade schedule 40, screw on

black steel chilled water piping complete with pipe

supports and all required fittings and accessories like bends, unions, Tees etc

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

8.4 INSULATION FOR CHILLED WATER PIPEWORK

Supply and install pre-formed closed cell, high density

megaphen chilled water piping insulation complete with

timber blocks, vapour barrier and sealant for heating

water piping and valves as specified.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

8.5 CLADDING FOR CHILLED WATER PIPEWORK

Supply and install 304 Stainless steel cladding for chilled

water piping insulation complete as specified for heating

water piping and valves.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

8.6 VALVES AND ACCESSORIES

Supply and install chilled valves for the chilled water system

Ø40mm No. 4

Ø25mm No. 4

Ø20mm automatic air vent / vacuum breaker. No. 5

temperature gauges. No. 6

flow switches. No. 5

pressure gauges. No. 6

relief valve. No. 5

drain valve & nipple Ø50mm. No. 5

self seal test points

Ø20mm No 6

TOTAL CARRIED FORWARD TO THE NEXT PAGE

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A7-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE A7

8.7 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

8.8 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

8,9 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20

400x300mm LM 30

300x300mm LM 35

200x300mm LM 40

250mm dia LM 42

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

8,10 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric

heating No. 18

8,11 Size: 1200 x 600mm egg crate return air grille No. 6

8,12 Make good the ceiling after installation sum

8,13 Make good the walls after installation sum

8,14 Make good other disturbed services after installation sum

8,15 Provide 12 months guarantee for the installation sum

8,16Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

8,17 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

8,18 Provide training for the FMS sum

8,19 Allow for interface with fire services sum

8,20 Allow for interface with the Building management system (BMS) sum

8,21

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's sum

8,22 TEST & COMMISSION

Test and Commission the Entire Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A7-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

9 CHILLED WATER AIR CONDITIONING SYSTEM

BRIDGE A8

Design, manufacture, works testing, supply and deliver to site, moving into position,

erection, connecting up, site testing, witness testing, proving to insurance inspectors,

demonstrating to the Employer, commissioning and maintenance of the complete

mechanical systems and equipment as shown on the drawings and datasheets.

Summary as follows:

9.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 44.0[kW] No. 4

9.2 Supply and install digital temerature indicators No 2

9.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP

Supply and install heavy grade schedule 40, screw on

black steel chilled water piping complete with pipe

supports and all required fittings and accessories like bends, unions, Tees etc

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

9.4 INSULATION FOR CHILLED WATER PIPEWORK

Supply and install pre-formed closed cell, high density

megaphen chilled water piping insulation complete with

timber blocks, vapour barrier and sealant for heating

water piping and valves as specified.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

9.5 CLADDING FOR CHILLED WATER PIPEWORK

Supply and install 304 Stainless steel cladding for chilled

water piping insulation complete as specified for heating

water piping and valves.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

9.6 VALVES AND ACCESSORIES

Supply and install chilled valves for the chilled water system

Ø40mm No. 4

Ø25mm No. 4

Ø20mm automatic air vent / vacuum breaker. No. 5

temperature gauges. No. 6

flow switches. No. 5

pressure gauges. No. 6

relief valve. No. 5

drain valve & nipple Ø50mm. No. 5

self seal test points

Ø20mm No 6

TOTAL CARRIED FORWARD TO THE NEXT PAGE -

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A8-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE A8

9.7 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

9.8 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

9,9 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20

400x300mm LM 30

300x300mm LM 35

200x300mm LM 40

250mm dia LM 42

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

9,10 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric

heating No. 18

9,11 Size: 1200 x 600mm egg crate return air grille No. 6

9,12 Make good the ceiling after installation sum

9,13 Make good the walls after installation sum

9,14 Make good other disturbed services after installation sum

9,15 Provide 12 months guarantee for the installation sum

9,16Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

9,17 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

9,18 Provide training for the FMS sum

9,19 Allow for interface with fire services sum

9,20 Allow for interface with the Building management system (BMS) sum

9,21

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's sum

9,22 TEST & COMMISSION

Test and Commission the Entire Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A8-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

10 CHILLED WATER AIR CONDITIONING SYSTEM

BRIDGE A9

Design, manufacture, works testing, supply and deliver to site, moving into position,

erection, connecting up, site testing, witness testing, proving to insurance inspectors,

demonstrating to the Employer, commissioning and maintenance of the complete

mechanical systems and equipment as shown on the drawings and datasheets.

Summary as follows:

10.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 44.0[kW] No. 4

10.2 Supply and install digital temerature indicators No 2

10.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP

Supply and install heavy grade schedule 40, screw on

black steel chilled water piping complete with pipe

supports and all required fittings and accessories like bends, unions, Tees etc

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

10.4 INSULATION FOR CHILLED WATER PIPEWORK

Supply and install pre-formed closed cell, high density

megaphen chilled water piping insulation complete with

timber blocks, vapour barrier and sealant for heating

water piping and valves as specified.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

10.5 CLADDING FOR CHILLED WATER PIPEWORK

Supply and install 304 Stainless steel cladding for chilled

water piping insulation complete as specified for heating

water piping and valves.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

10.6 VALVES AND ACCESSORIES

Supply and install chilled valves for the chilled water system

Ø40mm No. 4

Ø25mm No. 4

Ø20mm automatic air vent / vacuum breaker. No. 5

temperature gauges. No. 6

flow switches. No. 5

pressure gauges. No. 6

relief valve. No. 5

drain valve & nipple Ø50mm. No. 5

self seal test points

Ø20mm No 6

TOTAL CARRIED FORWARD TO THE NEXT PAGE -

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A9-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE A9

10.7 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

10.8 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

10,9 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20

400x300mm LM 30

300x300mm LM 35

200x300mm LM 40

250mm dia LM 42

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

10,10 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric

heating No. 18

10,11 Size: 1200 x 600mm egg crate return air grille No. 6

10,12 Make good the ceiling after installation sum

10,13 Make good the walls after installation sum

10,14 Make good other disturbed services after installation sum

10,15 Provide 12 months guarantee for the installation sum

10,16Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

10,17 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

10,18 Provide training for the FMS sum

10,19 Allow for interface with fire services sum

10,20 Allow for interface with the Building management system (BMS) sum

10,21

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's sum

10,22 TEST & COMMISSION

Test and Commission the Entire Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A9-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

11 CHILLED WATER AIR CONDITIONING SYSTEM

BRIDGE A10

Design, manufacture, works testing, supply and deliver to site, moving into position,

erection, connecting up, site testing, witness testing, proving to insurance inspectors,

demonstrating to the Employer, commissioning and maintenance of the complete

mechanical systems and equipment as shown on the drawings and datasheets.

Summary as follows:

11.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 44.0[kW] No. 4

11.2 Supply and install digital temerature indicators No 2

11.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP

Supply and install heavy grade schedule 40, screw on

black steel chilled water piping complete with pipe

supports and all required fittings and accessories like bends, unions, Tees etc

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

11.4 INSULATION FOR CHILLED WATER PIPEWORK

Supply and install pre-formed closed cell, high density

megaphen chilled water piping insulation complete with

timber blocks, vapour barrier and sealant for heating

water piping and valves as specified.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

11.5 CLADDING FOR CHILLED WATER PIPEWORK

Supply and install 304 Stainless steel cladding for chilled

water piping insulation complete as specified for heating

water piping and valves.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

11.6 VALVES AND ACCESSORIES

Supply and install chilled valves for the chilled water system

Ø40mm No. 4

Ø25mm No. 4

Ø20mm automatic air vent / vacuum breaker. No. 5

temperature gauges. No. 6

flow switches. No. 5

pressure gauges. No. 6

relief valve. No. 5

drain valve & nipple Ø50mm. No. 5

self seal test points

Ø20mm No 6

TOTAL CARRIED FORWARD TO THE NEXT PAGE

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A10-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE -

BRIDGE A10

11.7 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

11.8 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

11,9 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20

400x300mm LM 30

300x300mm LM 35

200x300mm LM 40

250mm dia LM 42

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

11,10 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric

heating No. 18

11,11 Size: 1200 x 600mm egg crate return air grille No. 6

11,12 Make good the ceiling after installation sum

11,13 Make good the walls after installation sum

11,14 Make good other disturbed services after installation sum

11,15 Provide 12 months guarantee for the installation sum

11,16Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

11,17 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

11,18 Provide training for the FMS sum

11,19 Allow for interface with fire services sum

11,20 Allow for interface with the Building management system (BMS) sum

11,21

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's sum

11,22 TEST & COMMISSION

Test and Commission the Entire Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A10-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

12 CHILLED WATER AIR CONDITIONING SYSTEM

BRIDGE A11

Design, manufacture, works testing, supply and deliver to site, moving into position,

erection, connecting up, site testing, witness testing, proving to insurance inspectors,

demonstrating to the Employer, commissioning and maintenance of the complete

mechanical systems and equipment as shown on the drawings and datasheets.

Summary as follows:

12.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 44.0[kW] No. 4

12.2 Supply and install digital temerature indicators No 2

12.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP

Supply and install heavy grade schedule 40, screw on

black steel chilled water piping complete with pipe

supports and all required fittings and accessories like bends, unions, Tees etc

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

12.4 INSULATION FOR CHILLED WATER PIPEWORK

Supply and install pre-formed closed cell, high density

megaphen chilled water piping insulation complete with

timber blocks, vapour barrier and sealant for heating

water piping and valves as specified.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

12.5 CLADDING FOR CHILLED WATER PIPEWORK

Supply and install 304 Stainless steel cladding for chilled

water piping insulation complete as specified for heating

water piping and valves.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

12.6 VALVES AND ACCESSORIES

Supply and install chilled valves for the chilled water system

Ø40mm No. 4

Ø25mm No. 4

Ø20mm automatic air vent / vacuum breaker. No. 5

temperature gauges. No. 6

flow switches. No. 5

pressure gauges. No. 6

relief valve. No. 5

drain valve & nipple Ø50mm. No. 5

self seal test points

Ø20mm No 6

TOTAL CARRIED FORWARD TO THE NEXT PAGE

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A11-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE A11

12.7 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

12.8 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

12,9 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20

400x300mm LM 30

300x300mm LM 35

200x300mm LM 40

250mm dia LM 42

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

12,10 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric

heating No. 18

12,11 Size: 1200 x 600mm egg crate return air grille No. 6

12,12 Make good the ceiling after installation sum

12,13 Make good the walls after installation sum

12,14 Make good other disturbed services after installation sum

12,15 Provide 12 months guarantee for the installation sum

12,16Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

12,17 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

12,18 Provide training for the FMS sum

12,19 Allow for interface with fire services sum

12,20 Allow for interface with the Building management system (BMS) sum

12,21

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's sum

12,22 TEST & COMMISSION

Test and Commission the Entire Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A11-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

13 CHILLED WATER AIR CONDITIONING SYSTEM

BRIDGE A12

Design, manufacture, works testing, supply and deliver to site, moving into position,

erection, connecting up, site testing, witness testing, proving to insurance inspectors,

demonstrating to the Employer, commissioning and maintenance of the complete

mechanical systems and equipment as shown on the drawings and datasheets.

Summary as follows:

13.1 HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 44.0[kW] No. 4

13.2 Supply and install digital temerature indicators No 2

13.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP

Supply and install heavy grade schedule 40, screw on

black steel chilled water piping complete with pipe

supports and all required fittings and accessories like bends, unions, Tees etc

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

13.4 INSULATION FOR CHILLED WATER PIPEWORK

Supply and install pre-formed closed cell, high density

megaphen chilled water piping insulation complete with

timber blocks, vapour barrier and sealant for heating

water piping and valves as specified.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

13.5 CLADDING FOR CHILLED WATER PIPEWORK

Supply and install 304 Stainless steel cladding for chilled

water piping insulation complete as specified for heating

water piping and valves.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

13.6 VALVES AND ACCESSORIES

Supply and install chilled valves for the chilled water system

Ø40mm No. 4

Ø25mm No. 4

Ø20mm automatic air vent / vacuum breaker. No. 5

temperature gauges. No. 6

flow switches. No. 5

pressure gauges. No. 6

relief valve. No. 5

drain valve & nipple Ø50mm. No. 5

self seal test points

Ø20mm No 6

TOTAL CARRIED FORWARD TO THE NEXT PAGE

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A12-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE A12

13.7 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

13.8 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

13,9 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20

400x300mm LM 30

300x300mm LM 35

200x300mm LM 40

250mm dia LM 42

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

13,10 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric

heating No. 18

13,11 Size: 1200 x 600mm egg crate return air grille No. 6

13,12 Make good the ceiling after installation sum

13,13 Make good the walls after installation sum

13,14 Make good other disturbed services after installation sum

13,15 Provide 12 months guarantee for the installation sum

13,16Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

13,17 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

13,18 Provide training for the FMS sum

13,19 Allow for interface with fire services sum

13,20 Allow for interface with the Building management system (BMS) sum

13,21

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's sum

13,22 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A12-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

14 CHILLED WATER AIR CONDITIONING SYSTEM

BRIDGE A13

Design, manufacture, works testing, supply and deliver to site, moving into position,

erection, connecting up, site testing, witness testing, proving to insurance inspectors,

demonstrating to the Employer, commissioning and maintenance of the complete

mechanical systems and equipment as shown on the drawings and datasheets.

Summary as follows:

14.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 44.0[kW] No. 4

14.2 Supply and install digital temerature indicators No 2

14.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP

Supply and install heavy grade schedule 40, screw on

black steel chilled water piping complete with pipe

supports and all required fittings and accessories like bends, unions, Tees etc

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

14.4 INSULATION FOR CHILLED WATER PIPEWORK

Supply and install pre-formed closed cell, high density

megaphen chilled water piping insulation complete with

timber blocks, vapour barrier and sealant for heating

water piping and valves as specified.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

14.5 CLADDING FOR CHILLED WATER PIPEWORK

Supply and install 304 Stainless steel cladding for chilled

water piping insulation complete as specified for heating

water piping and valves.

Ø42mm m 100

Ø32mm m 120

Ø25mm m 140

Ø20mm m 85

14.6 VALVES AND ACCESSORIES

Supply and install chilled valves for the chilled water system

Ø40mm No. 4

Ø25mm No. 4

Ø20mm automatic air vent / vacuum breaker. No. 5

temperature gauges. No. 6

flow switches. No. 5

pressure gauges. No. 6

relief valve. No. 5

drain valve & nipple Ø50mm. No. 5

self seal test points

Ø20mm No 6

TOTAL CARRIED FORWARD TO THE NEXT PAGE

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A13-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE A13

14.7 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

14.8 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

14,9 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20

400x300mm LM 30

300x300mm LM 35

200x300mm LM 40

250mm dia LM 42

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

14,10 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric

heating No. 18

14,11 Size: 1200 x 600mm egg crate return air grille No. 6

14,12 Make good the ceiling after installation sum

14,13 Make good the walls after installation sum

14,14 Make good other disturbed services after installation sum

14,15 Provide 12 months guarantee for the installation sum

14,16Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

14,17 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

14,18 Provide training for the FMS sum

14,19 Allow for interface with fire services sum

14,20 Allow for interface with the Building management system (BMS) sum

14,21

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's sum

14,22 TEST & COMMISSION

Test and Commission the Entire Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE A13-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

15 VRV AIR CONDITIONING SYSTEM

BRIDGE C1

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

15.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 48.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

15.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1

15.3 Manufactuers' Refrigerant joints No. 65

15.4 Supply and install the MCU/ BC controller for the VRV system No 1

15.5 Supply and install digital temerature indicators No 2

15.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C1-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE C1

15.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

15.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

15.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

15,10 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer. Item 1

15,11 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

15,12 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

15,13 Size: 1200 x 600mm egg crate return air grille No. 6

15,14 Make good the ceiling after installation sum

15,15 Make good the walls after installation sum

15,16 Make good other disturbed services after installation sum

15,17 Provide 12 months guarantee for the installation sum

15,18Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

15,19 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

15,20 Provide training for the FMS sum

15,21 Allow for interface with fire services sum

15,22 Allow for interface with the Building management system (BMS) sum

15,23

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C1-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

16 VRV AIR CONDITIONING SYSTEM

BRIDGE C2

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

16.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 48.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

16.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1

16.3 Manufactuers' Refrigerant joints No. 65

16.4 Supply and install the MCU/ BC controller for the VRV system No 1

16.5 Supply and install digital temerature indicators No 2

16.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C2-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE C2

16.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

16.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

16.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

16,10 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer. Item 1

16,11 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

16,12 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

16,13 Size: 1200 x 600mm egg crate return air grille No. 6

16,14 Make good the ceiling after installation sum

16,15 Make good the walls after installation sum

16,16 Make good other disturbed services after installation sum

16,17 Provide 12 months guarantee for the installation sum

16,18Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

16,19 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

16,20 Provide training for the FMS sum

16,21 Allow for interface with fire services sum

16,22 Allow for interface with the Building management system (BMS) sum

16,23

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C2-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

17 VRV AIR CONDITIONING SYSTEM

BRIDGE C3

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

17.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 48.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

17.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1

17.3 Manufactuers' Refrigerant joints No. 65

17.4 Supply and install the MCU/ BC controller for the VRV system No 1

17.5 Supply and install digital temerature indicators No 2

17.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C3-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE C3

17.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

17.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

17.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

17,10 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer. Item 1

17,11 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

17,12 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

17,13 Size: 1200 x 600mm egg crate return air grille No. 6

17,14 Make good the ceiling after installation sum

17,15 Make good the walls after installation sum

17,16 Make good other disturbed services after installation sum

17,17 Provide 12 months guarantee for the installation sum

17,18Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

17,19 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

17,20 Provide training for the FMS sum

17,21 Allow for interface with fire services sum

17,22 Allow for interface with the Building management system (BMS) sum

17,23

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C3-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

18 VRV AIR CONDITIONING SYSTEM

BRIDGE C4

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

18.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 48.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

18.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1

18.3 Manufactuers' Refrigerant joints No. 65

18.4 Supply and install the MCU/ BC controller for the VRV system No 1

18.5 Supply and install digital temerature indicators No 2

18.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C4-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE C4

18.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

18.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

18.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

18,10 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer. Item 1

18,11 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

18,12 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

18,13 Size: 1200 x 600mm egg crate return air grille No. 6

18,14 Make good the ceiling after installation sum

18,15 Make good the walls after installation sum

18,16 Make good other disturbed services after installation sum

18,17 Provide 12 months guarantee for the installation sum

18,18Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

18,19 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

18,20 Provide training for the FMS sum

18,21 Allow for interface with fire services sum

18,22 Allow for interface with the Building management system (BMS) sum

18,23

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C4-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

19 VRV AIR CONDITIONING SYSTEM

BRIDGE C5

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

19.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 48.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

19.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1

19.3 Manufactuers' Refrigerant joints No. 65

19.4 Supply and install the MCU/ BC controller for the VRV system No 1

19.5 Supply and install digital temerature indicators No 2

19.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C5-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE C5

19.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

19.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

19.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

19,10 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer. Item 1

19,11 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

19,12 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

19,13 Size: 1200 x 600mm egg crate return air grille No. 6

19,14 Make good the ceiling after installation sum

19,15 Make good the walls after installation sum

19,16 Make good other disturbed services after installation sum

19,17 Provide 12 months guarantee for the installation sum

19,18Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

19,19 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

19,20 Provide training for the FMS sum

19,21 Allow for interface with fire services sum

19,22 Allow for interface with the Building management system (BMS) sum

19,23

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C5-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

20 VRV AIR CONDITIONING SYSTEM

BRIDGE C6

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

20.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 48.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

20.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1

20.3 Manufactuers' Refrigerant joints No. 65

20.4 Supply and install the MCU/ BC controller for the VRV system No 1

20.5 Supply and install digital temerature indicators No 2

20.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C6-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE C6

20.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

20.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

20.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

20,10 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer. Item 1

20,11 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

20,12 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

20,13 Size: 1200 x 600mm egg crate return air grille No. 6

20,14 Make good the ceiling after installation sum

20,15 Make good the walls after installation sum

20,16 Make good other disturbed services after installation sum

20,17 Provide 12 months guarantee for the installation sum

20,18Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

20,19 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

20,20 Provide training for the FMS sum

20,21 Allow for interface with fire services sum

20,22 Allow for interface with the Building management system (BMS) sum

20,23

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C6-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

21 CHILLED WATER SYSTEM

BRIDGE C7

Design, manufacture, works testing, supply and deliver to site, moving into position,

erection, connecting up, site testing, witness testing, proving to insurance inspectors,

demonstrating to the Employer, commissioning and maintenance of the complete

mechanical systems and equipment as shown on the drawings and datasheets.

Summary as follows:

21.1 HIDEAWAY UNIT/ FAN COIL UNIT (HYDRONIC)

Nominal Cooling Capacity : 40.0[kW] No. 4

21.2 Supply and install digital temerature indicators No 2

21.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATERIN THE CEILING

Supply and install heavy grade schedule 40, screw on

black steel chilled water piping complete with pipe

supports and all required fittings and accessories like bends, unions, Tees etc

Ø42mm m 140

Ø32mm m 180

Ø25mm m 120

Ø20mm m 110

21.4 INSULATION FOR CHILLED WATER PIPEWORK

Supply and install pre-formed closed cell, high density

megaphen chilled water piping insulation complete with

timber blocks, vapour barrier and sealant for heating

water piping and valves as specified.

Ø42mm m

Ø32mm m 140

Ø25mm m 180

Ø20mm m 120

110

21.5 CLADDING FOR CHILLED WATER PIPEWORK

Supply and install 304 Stainless steel cladding for chilled

water piping insulation complete as specified for heating

water piping and valves.

Ø42mm m

Ø32mm m 140

Ø25mm m 180

Ø20mm m 120

21.6 VALVES AND ACCESSORIES 110

Supply and install chilled valves for the chilled water system

Ø40mm No. 6

Ø25mm No. 6

Ø20mm automatic air vent / vacuum breaker. No. 7

temperature gauges. No. 6

flow switches. No. 5

pressure gauges. No. 6

relief valve. No. 5

drain valve & nipple Ø50mm. No. 5

self seal test points

Ø20mm No 6

TOTAL CARRIED FORWARD TO THE NEXT PAGE

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C7-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE C7

21.7 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

21.8 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

21,9 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 25

400x300mm LM 35

300x300mm LM 40

200x300mm LM 45

250mm dia LM 44

250mm dia flexible insulated LM 25

300mm dia flexible insulated LM 30

21,10 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric

heating No. 20

21,11 Size: 1200 x 600mm egg crate return air grille No. 8

21,12 Make good the ceiling after installation sum

21,13 Make good the walls after installation sum

21,14 Make good other disturbed services after installation sum

21,15 Provide 12 months guarantee for the installation sum

21,16Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

21,17 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

21,18 Provide training for the FMS sum

21,19 Allow for interface with fire services sum

21,20 Allow for interface with the Building management system (BMS) sum

21,21

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's sum

21,22 TEST & COMMISSION

Test and Commission the Entire Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C7-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

22 CHILLED WATER SYSTEM

BRIDGE C8

Design, manufacture, works testing, supply and deliver to site, moving into position,

erection, connecting up, site testing, witness testing, proving to insurance inspectors,

demonstrating to the Employer, commissioning and maintenance of the complete

mechanical systems and equipment as shown on the drawings and datasheets.

Summary as follows:

22.1 HIDEAWAY UNIT/ FAN COIL UNIT (HYDRONIC)

Nominal Cooling Capacity : 40.0[kW] No. 4

22.2 Supply and install digital temerature indicators No 2

22.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATERIN THE CEILING

Supply and install heavy grade schedule 40, screw on

black steel chilled water piping complete with pipe

supports and all required fittings and accessories like bends, unions, Tees etc

Ø42mm m 140

Ø32mm m 180

Ø25mm m 120

Ø20mm m 110

22.4 INSULATION FOR CHILLED WATER PIPEWORK

Supply and install pre-formed closed cell, high density

megaphen chilled water piping insulation complete with

timber blocks, vapour barrier and sealant for heating

water piping and valves as specified.

Ø42mm m

Ø32mm m 140

Ø25mm m 180

Ø20mm m 120

110

22.5 CLADDING FOR CHILLED WATER PIPEWORK

Supply and install 304 Stainless steel cladding for chilled

water piping insulation complete as specified for heating

water piping and valves.

Ø42mm m

Ø32mm m 140

Ø25mm m 180

Ø20mm m 120

22.6 VALVES AND ACCESSORIES 110

Supply and install chilled valves for the chilled water system

Ø40mm No. 6

Ø25mm No. 6

Ø20mm automatic air vent / vacuum breaker. No. 7

temperature gauges. No. 6

flow switches. No. 5

pressure gauges. No. 6

relief valve. No. 5

drain valve & nipple Ø50mm. No. 5

self seal test points

Ø20mm No 6

TOTAL CARRIED FORWARD TO THE NEXT PAGE

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C8-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE C8

22.7 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

22.8 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

22,9 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 25

400x300mm LM 35

300x300mm LM 40

200x300mm LM 45

250mm dia LM 44

250mm dia flexible insulated LM 25

300mm dia flexible insulated LM 30

22,10 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric

heating No. 20

22,11 Size: 1200 x 600mm egg crate return air grille No. 8

22,12 Make good the ceiling after installation sum

22,13 Make good the walls after installation sum

22,14 Make good other disturbed services after installation sum

22,15 Provide 12 months guarantee for the installation sum

22,16Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

22,17 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

22,18 Provide training for the FMS sum

22,19 Allow for interface with fire services sum

22,20 Allow for interface with the Building management system (BMS) sum

22,21

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's sum

22,22 TEST & COMMISSION

Test and Commission the Entire Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer.Item 1

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE C8-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

23 VRV AIR CONDITIONING SYSTEM

BRIDGE E1

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

23.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 48.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

23.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1

23.3 Manufactuers' Refrigerant joints No. 65

23.4 Supply and install the MCU/ BC controller for the VRV system No 1

23.5 Supply and install digital temerature indicators No 2

23.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE E1-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE E1

23.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

23.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

23.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

23,10 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer. Item 1

23,11 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

23,12 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

23,13 Size: 1200 x 600mm egg crate return air grille No. 6

23,14 Make good the ceiling after installation sum

23,15 Make good the walls after installation sum

23,16 Make good other disturbed services after installation sum

23,17 Provide 12 months guarantee for the installation sum

23,18Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

23,19 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

23,20 Provide training for the FMS sum

23,21 Allow for interface with fire services sum

23,22 Allow for interface with the Building management system (BMS) sum

23,23

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE E1-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

24 VRV AIR CONDITIONING SYSTEM

BRIDGE E2

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

24.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 35.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

24.2 Nominal Cooling Capcity : 140.0[kW] placed on the wall No. 1

24.3 Manufactuers' Refrigerant joints No. 65

24.4 Supply and install the MCU/ BC controller for the VRV system No 1

24.5 Supply and install digital temerature indicators No 2

24.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE E2-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE E2

24.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

24.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

24.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

24,10 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer. Item 1

24,11 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

24,12 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

24,13 Size: 1200 x 600mm egg crate return air grille No. 6

24,14 Make good the ceiling after installation sum

24,15 Make good the walls after installation sum

24,16 Make good other disturbed services after installation sum

24,17 Provide 12 months guarantee for the installation sum

24,18Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

24,19 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

24,20 Provide training for the FMS sum

24,21 Allow for interface with fire services sum

24,22 Allow for interface with the Building management system (BMS) sum

24,23

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE E2-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

25 VRV AIR CONDITIONING SYSTEM

BRIDGE E5

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

25.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 35.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

25.2 Nominal Cooling Capcity : 140.0[kW] placed on the wall No. 1

25.3 Manufactuers' Refrigerant joints No. 65

25.4 Supply and install the MCU/ BC controller for the VRV system No 1

25.5 Supply and install digital temerature indicators No 2

25.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE E5-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE E5

25.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

25.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

25.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

25,10 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer. Item 1

25,11 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

25,12 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

25,13 Size: 1200 x 600mm egg crate return air grille No. 6

25,14 Make good the ceiling after installation sum

25,15 Make good the walls after installation sum

25,16 Make good other disturbed services after installation sum

25,17 Provide 12 months guarantee for the installation sum

25,18Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

25,19 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

25,20 Provide training for the FMS sum

25,21 Allow for interface with fire services sum

25,22 Allow for interface with the Building management system (BMS) sum

25,23

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

TOTAL CARRIED FORWARD TO SUMMARY PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE E5-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

23 VRV AIR CONDITIONING SYSTEM

BRIDGE E8

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

26.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 35.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

26.2 Nominal Cooling Capcity : 140.0[kW] placed on the wall No. 1

26.3 Manufactuers' Refrigerant joints No. 65

26.4 Supply and install the MCU/ BC controller for the VRV system No 1

26.5 Supply and install digital temerature indicators No 2

26.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO NEXT PAGE R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE E8-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE E8

26.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

26.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

26.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

26,10 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer. Item 1

26,11 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

26,12 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

26,13 Size: 1200 x 600mm egg crate return air grille No. 6

26,14 Make good the ceiling after installation sum

26,15 Make good the walls after installation sum

26,16 Make good other disturbed services after installation sum

26,17 Provide 12 months guarantee for the installation sum

26,18Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

29,19 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

26,20 Provide training for the FMS sum

26,21 Allow for interface with fire services sum

26,22 Allow for interface with the Building management system (BMS) sum

26,23

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE E8-2 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

27 VRV AIR CONDITIONING SYSTEM

BRIDGE E11

Design, manufacture, works testing, supply and deliver to site, moving

into position, erection, connecting up, site testing, witness testing,

proving to insurance inspectors, demonstrating to the Employer,

commissioning and maintenance of the complete mechanical systems

and equipment as shown on the drawings and datasheets.

Summary as follows:

27.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT

Nominal Cooling Capacity : 35.0[kW] No. 4

Supply and install VRV heat pump outdoor units complete with fittings

and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for

commisioning as specified and shown on the drawing. All units shall be

IP addressable ready for BMS connection by others.

27.2 Nominal Cooling Capcity : 140.0[kW] placed on the wall No. 1

27.3 Manufactuers' Refrigerant joints No. 65

27.4 Supply and install the MCU/ BC controller for the VRV system No 1

27.5 Supply and install digital temerature indicators No 2

27.6

Supply and install R410a refrigerant piping c/w refnet joints and and all

necessary fixtures and fittings as specified and shown on the drawings.

41.3mm dia m 140

34.9mm dia m 160

28.6mm dia m 150

22.2mm dia m 100

19.1mm dia m 180

15.9mm dia m 65

12.7mm dia m 110

9.5mm dia m 89

6.4mm dia m 120

Allow for drilling and make good of walls sum

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE E11-1 BILLS OF QUANTITIES

CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)

Item No. Description Unit Unit Rate Amount

BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE

BRIDGE E11

27.7

Supply and install cable rack for refrigerant piping c/w joints and fixtures and

fittings.

200mm wide m 100

100mm wide m 120

50mm m 80

27.8 Supply PVC condensate pipes c/w joints and fixtures and fittings

50mm dia m 180

25mm dia m 150

20mm dia m 160

27.9 ELECTRICAL WORK AND CONTROLS

Supply and install electrical work including power and control cabling and

connections as specified for the VRV air conditioning unitsItem 1

27,10 TEST & COMMISSION

Test and Commission the Entire VRV Air conditioning system Item 1

Ditto but in the presence of and to the entire satisfaction of the Consulting

Engineer. Item 1

27,11 DUCTWORK FOR HIDEAWAY UNITs

Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil

backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6

400x300mm LM 10

300x300mm LM 15

200x300mm LM 12

250mm dia LM 20

250mm dia flexible insulated LM 23

300mm dia flexible insulated LM 24

27,12 Supply and install CAV swirl diffusers (VSD type or equivalent)

Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18

27,13 Size: 1200 x 600mm egg crate return air grille No. 6

27,14 Make good the ceiling after installation sum

27,15 Make good the walls after installation sum

27,16 Make good other disturbed services after installation sum

27,17 Provide 12 months guarantee for the installation sum

27,18Supply a facilities management system to monitor and control the

maintenance and servicing of the installation during the guarantee period and

beyond sum

27,19 Allow for hardware for the air conditioning system to communicate with the

FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum

27,20 Provide training for the FMS sum

27,21 Allow for interface with fire services sum

27,22 Allow for interface with the Building management system (BMS) sum

27,23

Allow for the minimum interuption of the airport operations during the

installation (e.g working in the night on sections which interfer with the airport's

operations) sum

TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R

MECHANICAL SERVICES INSTALLATION AIRBRIDGE E11-2 BILLS OF QUANTITIES

CLIENT: ACSA -MECHANICAL BILL OF QUANTITIES

PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES

CONTRACT: AIR CONDITIONING SERVICES INSTALLATION

Item No. Description Amount

(FINAL SUMMARY )

BRIDGE

1 A1R

2 A1L

3 A2

4 A3

5 A4

6 A5

7 A6

8 A7

9 A8

10 A9

11 A10

12 A11

13 A12

14 A13

15 C1

16 C2

17 C3

18 C4

19 C5

20 C6

21 C7

22 C8

23 E1

24 E2

25 E5

26 E8

27 E11

TOTAL (excl VAT)

MECHANICAL SERVICES INSTALLATION SUMMARY BILL OF QUANTITIES