CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
1 VRV AIR CONDITIONING SYSTEM
BRIDGE A1R
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
1.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 44.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
1.2 Nominal Cooling Capcity : 173.0[kW] Placed on ground No. 1
1.3 Manufactuers' Refrigerant joints No. 65
1.4 Supply and install the MCU/ BC controller for the VRV system No 1
1.5 Supply and install digital temerature indicators No 2
1.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 100
34.9mm dia m 140
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE AR1-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE -
BRIDGE A1R
1.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 110
100mm wide m 140
50mm m 80
1.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
1.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
1,10 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
1,11 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
1,12 Size: 1200 x 600mm egg crate return air grille No. 6
1,13 Make good the ceiling after installation sum
1,14 Make good the walls after installation sum
1,15 Make good other disturbed services after installation sum
1,16 Provide 12 months guarantee for the installation sum
1,17 Supply a facilities management system to monitor and control the maintenance
and servicing of the installation during the guarantee period and beyond sum
1,18 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
1,19 Provide training for the FMS sum
1,20 Allow for interface with fire services sum
1,21 Allow for interface with the Building management system (BMS) sum
1,22
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
1,23 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE AR1-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
2 VRV AIR CONDITIONING SYSTEM
BRIDGE A1L
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
2.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 42.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
2.2 Nominal Cooling Capcity : 168.0[kW] placed on ground No. 1
2.3 Manufactuers' Refrigerant joints No. 65
2.4 Supply and install the MCU/ BC controller for the VRV system No 1
2.5 Supply and install digital temerature indicators No 2
2.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 120
34.9mm dia m 140
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A1L-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE A1L
2.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 110
100mm wide m 140
50mm m 80
2.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
2.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
2,10 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
2,11 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
2,12 Size: 1200 x 600mm egg crate return air grille No. 6
2,13 Make good the ceiling after installation sum
2,14 Make good the walls after installation sum
2,15 Make good other disturbed services after installation sum
2,16 Provide 12 months guarantee for the installation sum
2,17Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
2,18 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
2,19 Provide training for the FMS sum
2,20 Allow for interface with fire services sum
2,21Allow for interface with the Building management system (BMS) sum
2,22Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the
airport's operations) sum
2,23 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A1L-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
3 VRV AIR CONDITIONING SYSTEM
BRIDGE A2
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
3.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 44.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
3.2 Nominal Cooling Capcity : 173.0[kW] placed on ground No. 1
3.3 Manufactuers' Refrigerant joints No. 65
3.4 Supply and install the MCU/ BC controller for the VRV system No 1
3.5 Supply and install digital temerature indicators No 2
3.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A2-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE A2
3.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 110
100mm wide m 140
50mm m 80
3.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
3.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
3,10 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
3,11 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
3,12 Size: 1200 x 600mm egg crate return air grille No. 6
3,13 Make good the ceiling after installation sum
3,14 Make good the walls after installation sum
3,15 Make good other disturbed services after installation sum
3,16 Provide 12 months guarantee for the installation sum
3,17 Supply a facilities management system to monitor and control the maintenance
and servicing of the installation during the guarantee period and beyond sum
3,18 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
3,19 Provide training for the FMS sum
3,20 Allow for interface with fire services sum
3,21 Allow for interface with the Building management system (BMS) sum
3,22 Allow for the minimum interuption of the airport operations during the sum
3,23 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A2-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
4 VRV AIR CONDITIONING SYSTEM
BRIDGE A3
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
4.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 48.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
4.2 Nominal Cooling Capcity : 190.0[kW] placed on ground No. 1
4.3 Manufactuers' Refrigerant joints No. 65
4.4 Supply and install the MCU/ BC controller for the VRV system No 1
4.5 Supply and install digital temerature indicators No 2
4.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A3-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE -
BRIDGE A3
4.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
4.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
4.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
4,10 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
4,11 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
4,12 Size: 1200 x 600mm egg crate return air grille No. 6
4,13 Make good the ceiling after installation sum
4,14 Make good the walls after installation sum
4,15 Make good other disturbed services after installation sum
4,16 Provide 12 months guarantee for the installation sum
4,17Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
4,18 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
4,19 Provide training for the FMS sum
4,20 Allow for interface with fire services sum
4,21 Allow for interface with the Building management system (BMS) sum
4,22
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
4,23 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.
Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A3-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
5 VRV AIR CONDITIONING SYSTEM
BRIDGE A4
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
5.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 35.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
5.2 Nominal Cooling Capcity : 140.0[kW] placed on ground No. 1
5.3 Manufactuers' Refrigerant joints No. 65
5.4 Supply and install the MCU/ BC controller for the VRV system No 1
5.5 Supply and install digital temerature indicators No 2
5.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A4-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE A4
5.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
5.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
5.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
5,10 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
5,11 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
5,12 Size: 1200 x 600mm egg crate return air grille No. 6
5,13 Make good the ceiling after installation sum
5,14 Make good the walls after installation sum
5,15 Make good other disturbed services after installation sum
5,16 Provide 12 months guarantee for the installation sum
5,17Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
5,18 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
5,19 Provide training for the FMS sum
5,20 Allow for interface with fire services sum
5,21 Allow for interface with the Building management system (BMS) sum
5,22
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the sum
5,23 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.
Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A4-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
6 VRV AIR CONDITIONING SYSTEM
BRIDGE A5
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
6.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 35.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
6.2 Nominal Cooling Capcity : 140.0[kW] placed on ground No. 1
6.3 Manufactuers' Refrigerant joints No. 65
6.4 Supply and install the MCU/ BC controller for the VRV system No 1
6.5 Supply and install digital temerature indicators No 2
6.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A5-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE A5
6.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
6.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
6.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
6,10 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
6,11 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
6,12 Size: 1200 x 600mm egg crate return air grille No. 6
6,13 Make good the ceiling after installation sum
6,14 Make good the walls after installation sum
6,15 Make good other disturbed services after installation sum
6,16 Provide 12 months guarantee for the installation sum
6,17Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
6,18 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
6,19 Provide training for the FMS sum
6,20 Allow for interface with fire services sum
6,21 Allow for interface with the Building management system (BMS) sum
6,22
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the sum
6,23 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.
Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A5-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
7 VRV AIR CONDITIONING SYSTEM
BRIDGE A6
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
7.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 35.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
7.2 Nominal Cooling Capcity : 140.0[kW] placed on ground No. 1
7.3 Manufactuers' Refrigerant joints No. 65
7.4 Supply and install the MCU/ BC controller for the VRV system No 1
7.5 Supply and install digital temerature indicators No 2
7.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A6-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE A6
7.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
7.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
7.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
7,10 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
7,11 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
7,12 Size: 1200 x 600mm egg crate return air grille No. 6
7,13 Make good the ceiling after installation sum
7,14 Make good the walls after installation sum
7,15 Make good other disturbed services after installation sum
7,16 Provide 12 months guarantee for the installation sum
7,17Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
7,18 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
7,19 Provide training for the FMS sum
7,20 Allow for interface with fire services sum
7,21 Allow for interface with the Building management system (BMS) sum
7,22
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the sum
7,23 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.
Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A6-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
8 CHILLED WATER AIR CONDITIONING SYSTEM
BRIDGE A7
Design, manufacture, works testing, supply and deliver to site, moving into position,
erection, connecting up, site testing, witness testing, proving to insurance inspectors,
demonstrating to the Employer, commissioning and maintenance of the complete
mechanical systems and equipment as shown on the drawings and datasheets.
Summary as follows:
8.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 44.0[kW] No. 4
8.2 Supply and install digital temerature indicators No 2
8.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP
Supply and install heavy grade schedule 40, screw on
black steel chilled water piping complete with pipe
supports and all required fittings and accessories like bends, unions, Tees etc
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
8.4 INSULATION FOR CHILLED WATER PIPEWORK
Supply and install pre-formed closed cell, high density
megaphen chilled water piping insulation complete with
timber blocks, vapour barrier and sealant for heating
water piping and valves as specified.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
8.5 CLADDING FOR CHILLED WATER PIPEWORK
Supply and install 304 Stainless steel cladding for chilled
water piping insulation complete as specified for heating
water piping and valves.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
8.6 VALVES AND ACCESSORIES
Supply and install chilled valves for the chilled water system
Ø40mm No. 4
Ø25mm No. 4
Ø20mm automatic air vent / vacuum breaker. No. 5
temperature gauges. No. 6
flow switches. No. 5
pressure gauges. No. 6
relief valve. No. 5
drain valve & nipple Ø50mm. No. 5
self seal test points
Ø20mm No 6
TOTAL CARRIED FORWARD TO THE NEXT PAGE
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A7-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE A7
8.7 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
8.8 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
8,9 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20
400x300mm LM 30
300x300mm LM 35
200x300mm LM 40
250mm dia LM 42
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
8,10 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric
heating No. 18
8,11 Size: 1200 x 600mm egg crate return air grille No. 6
8,12 Make good the ceiling after installation sum
8,13 Make good the walls after installation sum
8,14 Make good other disturbed services after installation sum
8,15 Provide 12 months guarantee for the installation sum
8,16Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
8,17 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
8,18 Provide training for the FMS sum
8,19 Allow for interface with fire services sum
8,20 Allow for interface with the Building management system (BMS) sum
8,21
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's sum
8,22 TEST & COMMISSION
Test and Commission the Entire Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A7-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
9 CHILLED WATER AIR CONDITIONING SYSTEM
BRIDGE A8
Design, manufacture, works testing, supply and deliver to site, moving into position,
erection, connecting up, site testing, witness testing, proving to insurance inspectors,
demonstrating to the Employer, commissioning and maintenance of the complete
mechanical systems and equipment as shown on the drawings and datasheets.
Summary as follows:
9.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 44.0[kW] No. 4
9.2 Supply and install digital temerature indicators No 2
9.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP
Supply and install heavy grade schedule 40, screw on
black steel chilled water piping complete with pipe
supports and all required fittings and accessories like bends, unions, Tees etc
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
9.4 INSULATION FOR CHILLED WATER PIPEWORK
Supply and install pre-formed closed cell, high density
megaphen chilled water piping insulation complete with
timber blocks, vapour barrier and sealant for heating
water piping and valves as specified.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
9.5 CLADDING FOR CHILLED WATER PIPEWORK
Supply and install 304 Stainless steel cladding for chilled
water piping insulation complete as specified for heating
water piping and valves.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
9.6 VALVES AND ACCESSORIES
Supply and install chilled valves for the chilled water system
Ø40mm No. 4
Ø25mm No. 4
Ø20mm automatic air vent / vacuum breaker. No. 5
temperature gauges. No. 6
flow switches. No. 5
pressure gauges. No. 6
relief valve. No. 5
drain valve & nipple Ø50mm. No. 5
self seal test points
Ø20mm No 6
TOTAL CARRIED FORWARD TO THE NEXT PAGE -
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A8-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE A8
9.7 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
9.8 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
9,9 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20
400x300mm LM 30
300x300mm LM 35
200x300mm LM 40
250mm dia LM 42
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
9,10 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric
heating No. 18
9,11 Size: 1200 x 600mm egg crate return air grille No. 6
9,12 Make good the ceiling after installation sum
9,13 Make good the walls after installation sum
9,14 Make good other disturbed services after installation sum
9,15 Provide 12 months guarantee for the installation sum
9,16Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
9,17 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
9,18 Provide training for the FMS sum
9,19 Allow for interface with fire services sum
9,20 Allow for interface with the Building management system (BMS) sum
9,21
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's sum
9,22 TEST & COMMISSION
Test and Commission the Entire Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A8-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
10 CHILLED WATER AIR CONDITIONING SYSTEM
BRIDGE A9
Design, manufacture, works testing, supply and deliver to site, moving into position,
erection, connecting up, site testing, witness testing, proving to insurance inspectors,
demonstrating to the Employer, commissioning and maintenance of the complete
mechanical systems and equipment as shown on the drawings and datasheets.
Summary as follows:
10.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 44.0[kW] No. 4
10.2 Supply and install digital temerature indicators No 2
10.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP
Supply and install heavy grade schedule 40, screw on
black steel chilled water piping complete with pipe
supports and all required fittings and accessories like bends, unions, Tees etc
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
10.4 INSULATION FOR CHILLED WATER PIPEWORK
Supply and install pre-formed closed cell, high density
megaphen chilled water piping insulation complete with
timber blocks, vapour barrier and sealant for heating
water piping and valves as specified.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
10.5 CLADDING FOR CHILLED WATER PIPEWORK
Supply and install 304 Stainless steel cladding for chilled
water piping insulation complete as specified for heating
water piping and valves.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
10.6 VALVES AND ACCESSORIES
Supply and install chilled valves for the chilled water system
Ø40mm No. 4
Ø25mm No. 4
Ø20mm automatic air vent / vacuum breaker. No. 5
temperature gauges. No. 6
flow switches. No. 5
pressure gauges. No. 6
relief valve. No. 5
drain valve & nipple Ø50mm. No. 5
self seal test points
Ø20mm No 6
TOTAL CARRIED FORWARD TO THE NEXT PAGE -
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A9-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE A9
10.7 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
10.8 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
10,9 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20
400x300mm LM 30
300x300mm LM 35
200x300mm LM 40
250mm dia LM 42
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
10,10 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric
heating No. 18
10,11 Size: 1200 x 600mm egg crate return air grille No. 6
10,12 Make good the ceiling after installation sum
10,13 Make good the walls after installation sum
10,14 Make good other disturbed services after installation sum
10,15 Provide 12 months guarantee for the installation sum
10,16Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
10,17 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
10,18 Provide training for the FMS sum
10,19 Allow for interface with fire services sum
10,20 Allow for interface with the Building management system (BMS) sum
10,21
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's sum
10,22 TEST & COMMISSION
Test and Commission the Entire Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A9-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
11 CHILLED WATER AIR CONDITIONING SYSTEM
BRIDGE A10
Design, manufacture, works testing, supply and deliver to site, moving into position,
erection, connecting up, site testing, witness testing, proving to insurance inspectors,
demonstrating to the Employer, commissioning and maintenance of the complete
mechanical systems and equipment as shown on the drawings and datasheets.
Summary as follows:
11.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 44.0[kW] No. 4
11.2 Supply and install digital temerature indicators No 2
11.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP
Supply and install heavy grade schedule 40, screw on
black steel chilled water piping complete with pipe
supports and all required fittings and accessories like bends, unions, Tees etc
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
11.4 INSULATION FOR CHILLED WATER PIPEWORK
Supply and install pre-formed closed cell, high density
megaphen chilled water piping insulation complete with
timber blocks, vapour barrier and sealant for heating
water piping and valves as specified.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
11.5 CLADDING FOR CHILLED WATER PIPEWORK
Supply and install 304 Stainless steel cladding for chilled
water piping insulation complete as specified for heating
water piping and valves.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
11.6 VALVES AND ACCESSORIES
Supply and install chilled valves for the chilled water system
Ø40mm No. 4
Ø25mm No. 4
Ø20mm automatic air vent / vacuum breaker. No. 5
temperature gauges. No. 6
flow switches. No. 5
pressure gauges. No. 6
relief valve. No. 5
drain valve & nipple Ø50mm. No. 5
self seal test points
Ø20mm No 6
TOTAL CARRIED FORWARD TO THE NEXT PAGE
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A10-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE -
BRIDGE A10
11.7 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
11.8 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
11,9 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20
400x300mm LM 30
300x300mm LM 35
200x300mm LM 40
250mm dia LM 42
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
11,10 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric
heating No. 18
11,11 Size: 1200 x 600mm egg crate return air grille No. 6
11,12 Make good the ceiling after installation sum
11,13 Make good the walls after installation sum
11,14 Make good other disturbed services after installation sum
11,15 Provide 12 months guarantee for the installation sum
11,16Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
11,17 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
11,18 Provide training for the FMS sum
11,19 Allow for interface with fire services sum
11,20 Allow for interface with the Building management system (BMS) sum
11,21
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's sum
11,22 TEST & COMMISSION
Test and Commission the Entire Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A10-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
12 CHILLED WATER AIR CONDITIONING SYSTEM
BRIDGE A11
Design, manufacture, works testing, supply and deliver to site, moving into position,
erection, connecting up, site testing, witness testing, proving to insurance inspectors,
demonstrating to the Employer, commissioning and maintenance of the complete
mechanical systems and equipment as shown on the drawings and datasheets.
Summary as follows:
12.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 44.0[kW] No. 4
12.2 Supply and install digital temerature indicators No 2
12.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP
Supply and install heavy grade schedule 40, screw on
black steel chilled water piping complete with pipe
supports and all required fittings and accessories like bends, unions, Tees etc
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
12.4 INSULATION FOR CHILLED WATER PIPEWORK
Supply and install pre-formed closed cell, high density
megaphen chilled water piping insulation complete with
timber blocks, vapour barrier and sealant for heating
water piping and valves as specified.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
12.5 CLADDING FOR CHILLED WATER PIPEWORK
Supply and install 304 Stainless steel cladding for chilled
water piping insulation complete as specified for heating
water piping and valves.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
12.6 VALVES AND ACCESSORIES
Supply and install chilled valves for the chilled water system
Ø40mm No. 4
Ø25mm No. 4
Ø20mm automatic air vent / vacuum breaker. No. 5
temperature gauges. No. 6
flow switches. No. 5
pressure gauges. No. 6
relief valve. No. 5
drain valve & nipple Ø50mm. No. 5
self seal test points
Ø20mm No 6
TOTAL CARRIED FORWARD TO THE NEXT PAGE
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A11-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE A11
12.7 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
12.8 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
12,9 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20
400x300mm LM 30
300x300mm LM 35
200x300mm LM 40
250mm dia LM 42
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
12,10 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric
heating No. 18
12,11 Size: 1200 x 600mm egg crate return air grille No. 6
12,12 Make good the ceiling after installation sum
12,13 Make good the walls after installation sum
12,14 Make good other disturbed services after installation sum
12,15 Provide 12 months guarantee for the installation sum
12,16Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
12,17 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
12,18 Provide training for the FMS sum
12,19 Allow for interface with fire services sum
12,20 Allow for interface with the Building management system (BMS) sum
12,21
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's sum
12,22 TEST & COMMISSION
Test and Commission the Entire Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A11-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
13 CHILLED WATER AIR CONDITIONING SYSTEM
BRIDGE A12
Design, manufacture, works testing, supply and deliver to site, moving into position,
erection, connecting up, site testing, witness testing, proving to insurance inspectors,
demonstrating to the Employer, commissioning and maintenance of the complete
mechanical systems and equipment as shown on the drawings and datasheets.
Summary as follows:
13.1 HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 44.0[kW] No. 4
13.2 Supply and install digital temerature indicators No 2
13.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP
Supply and install heavy grade schedule 40, screw on
black steel chilled water piping complete with pipe
supports and all required fittings and accessories like bends, unions, Tees etc
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
13.4 INSULATION FOR CHILLED WATER PIPEWORK
Supply and install pre-formed closed cell, high density
megaphen chilled water piping insulation complete with
timber blocks, vapour barrier and sealant for heating
water piping and valves as specified.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
13.5 CLADDING FOR CHILLED WATER PIPEWORK
Supply and install 304 Stainless steel cladding for chilled
water piping insulation complete as specified for heating
water piping and valves.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
13.6 VALVES AND ACCESSORIES
Supply and install chilled valves for the chilled water system
Ø40mm No. 4
Ø25mm No. 4
Ø20mm automatic air vent / vacuum breaker. No. 5
temperature gauges. No. 6
flow switches. No. 5
pressure gauges. No. 6
relief valve. No. 5
drain valve & nipple Ø50mm. No. 5
self seal test points
Ø20mm No 6
TOTAL CARRIED FORWARD TO THE NEXT PAGE
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A12-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE A12
13.7 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
13.8 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
13,9 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20
400x300mm LM 30
300x300mm LM 35
200x300mm LM 40
250mm dia LM 42
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
13,10 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric
heating No. 18
13,11 Size: 1200 x 600mm egg crate return air grille No. 6
13,12 Make good the ceiling after installation sum
13,13 Make good the walls after installation sum
13,14 Make good other disturbed services after installation sum
13,15 Provide 12 months guarantee for the installation sum
13,16Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
13,17 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
13,18 Provide training for the FMS sum
13,19 Allow for interface with fire services sum
13,20 Allow for interface with the Building management system (BMS) sum
13,21
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's sum
13,22 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A12-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
14 CHILLED WATER AIR CONDITIONING SYSTEM
BRIDGE A13
Design, manufacture, works testing, supply and deliver to site, moving into position,
erection, connecting up, site testing, witness testing, proving to insurance inspectors,
demonstrating to the Employer, commissioning and maintenance of the complete
mechanical systems and equipment as shown on the drawings and datasheets.
Summary as follows:
14.1 HYDRONIC HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 44.0[kW] No. 4
14.2 Supply and install digital temerature indicators No 2
14.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATER FROM THE ROFTOP
Supply and install heavy grade schedule 40, screw on
black steel chilled water piping complete with pipe
supports and all required fittings and accessories like bends, unions, Tees etc
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
14.4 INSULATION FOR CHILLED WATER PIPEWORK
Supply and install pre-formed closed cell, high density
megaphen chilled water piping insulation complete with
timber blocks, vapour barrier and sealant for heating
water piping and valves as specified.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
14.5 CLADDING FOR CHILLED WATER PIPEWORK
Supply and install 304 Stainless steel cladding for chilled
water piping insulation complete as specified for heating
water piping and valves.
Ø42mm m 100
Ø32mm m 120
Ø25mm m 140
Ø20mm m 85
14.6 VALVES AND ACCESSORIES
Supply and install chilled valves for the chilled water system
Ø40mm No. 4
Ø25mm No. 4
Ø20mm automatic air vent / vacuum breaker. No. 5
temperature gauges. No. 6
flow switches. No. 5
pressure gauges. No. 6
relief valve. No. 5
drain valve & nipple Ø50mm. No. 5
self seal test points
Ø20mm No 6
TOTAL CARRIED FORWARD TO THE NEXT PAGE
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A13-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE A13
14.7 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
14.8 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
14,9 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 20
400x300mm LM 30
300x300mm LM 35
200x300mm LM 40
250mm dia LM 42
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
14,10 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric
heating No. 18
14,11 Size: 1200 x 600mm egg crate return air grille No. 6
14,12 Make good the ceiling after installation sum
14,13 Make good the walls after installation sum
14,14 Make good other disturbed services after installation sum
14,15 Provide 12 months guarantee for the installation sum
14,16Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
14,17 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
14,18 Provide training for the FMS sum
14,19 Allow for interface with fire services sum
14,20 Allow for interface with the Building management system (BMS) sum
14,21
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's sum
14,22 TEST & COMMISSION
Test and Commission the Entire Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE A13-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
15 VRV AIR CONDITIONING SYSTEM
BRIDGE C1
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
15.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 48.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
15.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1
15.3 Manufactuers' Refrigerant joints No. 65
15.4 Supply and install the MCU/ BC controller for the VRV system No 1
15.5 Supply and install digital temerature indicators No 2
15.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C1-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE C1
15.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
15.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
15.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
15,10 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer. Item 1
15,11 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
15,12 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
15,13 Size: 1200 x 600mm egg crate return air grille No. 6
15,14 Make good the ceiling after installation sum
15,15 Make good the walls after installation sum
15,16 Make good other disturbed services after installation sum
15,17 Provide 12 months guarantee for the installation sum
15,18Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
15,19 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
15,20 Provide training for the FMS sum
15,21 Allow for interface with fire services sum
15,22 Allow for interface with the Building management system (BMS) sum
15,23
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C1-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
16 VRV AIR CONDITIONING SYSTEM
BRIDGE C2
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
16.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 48.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
16.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1
16.3 Manufactuers' Refrigerant joints No. 65
16.4 Supply and install the MCU/ BC controller for the VRV system No 1
16.5 Supply and install digital temerature indicators No 2
16.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C2-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE C2
16.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
16.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
16.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
16,10 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer. Item 1
16,11 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
16,12 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
16,13 Size: 1200 x 600mm egg crate return air grille No. 6
16,14 Make good the ceiling after installation sum
16,15 Make good the walls after installation sum
16,16 Make good other disturbed services after installation sum
16,17 Provide 12 months guarantee for the installation sum
16,18Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
16,19 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
16,20 Provide training for the FMS sum
16,21 Allow for interface with fire services sum
16,22 Allow for interface with the Building management system (BMS) sum
16,23
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C2-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
17 VRV AIR CONDITIONING SYSTEM
BRIDGE C3
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
17.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 48.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
17.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1
17.3 Manufactuers' Refrigerant joints No. 65
17.4 Supply and install the MCU/ BC controller for the VRV system No 1
17.5 Supply and install digital temerature indicators No 2
17.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C3-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE C3
17.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
17.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
17.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
17,10 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer. Item 1
17,11 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
17,12 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
17,13 Size: 1200 x 600mm egg crate return air grille No. 6
17,14 Make good the ceiling after installation sum
17,15 Make good the walls after installation sum
17,16 Make good other disturbed services after installation sum
17,17 Provide 12 months guarantee for the installation sum
17,18Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
17,19 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
17,20 Provide training for the FMS sum
17,21 Allow for interface with fire services sum
17,22 Allow for interface with the Building management system (BMS) sum
17,23
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C3-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
18 VRV AIR CONDITIONING SYSTEM
BRIDGE C4
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
18.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 48.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
18.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1
18.3 Manufactuers' Refrigerant joints No. 65
18.4 Supply and install the MCU/ BC controller for the VRV system No 1
18.5 Supply and install digital temerature indicators No 2
18.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C4-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE C4
18.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
18.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
18.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
18,10 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer. Item 1
18,11 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
18,12 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
18,13 Size: 1200 x 600mm egg crate return air grille No. 6
18,14 Make good the ceiling after installation sum
18,15 Make good the walls after installation sum
18,16 Make good other disturbed services after installation sum
18,17 Provide 12 months guarantee for the installation sum
18,18Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
18,19 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
18,20 Provide training for the FMS sum
18,21 Allow for interface with fire services sum
18,22 Allow for interface with the Building management system (BMS) sum
18,23
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C4-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
19 VRV AIR CONDITIONING SYSTEM
BRIDGE C5
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
19.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 48.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
19.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1
19.3 Manufactuers' Refrigerant joints No. 65
19.4 Supply and install the MCU/ BC controller for the VRV system No 1
19.5 Supply and install digital temerature indicators No 2
19.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C5-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE C5
19.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
19.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
19.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
19,10 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer. Item 1
19,11 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
19,12 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
19,13 Size: 1200 x 600mm egg crate return air grille No. 6
19,14 Make good the ceiling after installation sum
19,15 Make good the walls after installation sum
19,16 Make good other disturbed services after installation sum
19,17 Provide 12 months guarantee for the installation sum
19,18Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
19,19 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
19,20 Provide training for the FMS sum
19,21 Allow for interface with fire services sum
19,22 Allow for interface with the Building management system (BMS) sum
19,23
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C5-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
20 VRV AIR CONDITIONING SYSTEM
BRIDGE C6
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
20.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 48.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
20.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1
20.3 Manufactuers' Refrigerant joints No. 65
20.4 Supply and install the MCU/ BC controller for the VRV system No 1
20.5 Supply and install digital temerature indicators No 2
20.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C6-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE C6
20.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
20.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
20.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
20,10 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer. Item 1
20,11 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
20,12 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
20,13 Size: 1200 x 600mm egg crate return air grille No. 6
20,14 Make good the ceiling after installation sum
20,15 Make good the walls after installation sum
20,16 Make good other disturbed services after installation sum
20,17 Provide 12 months guarantee for the installation sum
20,18Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
20,19 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
20,20 Provide training for the FMS sum
20,21 Allow for interface with fire services sum
20,22 Allow for interface with the Building management system (BMS) sum
20,23
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C6-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
21 CHILLED WATER SYSTEM
BRIDGE C7
Design, manufacture, works testing, supply and deliver to site, moving into position,
erection, connecting up, site testing, witness testing, proving to insurance inspectors,
demonstrating to the Employer, commissioning and maintenance of the complete
mechanical systems and equipment as shown on the drawings and datasheets.
Summary as follows:
21.1 HIDEAWAY UNIT/ FAN COIL UNIT (HYDRONIC)
Nominal Cooling Capacity : 40.0[kW] No. 4
21.2 Supply and install digital temerature indicators No 2
21.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATERIN THE CEILING
Supply and install heavy grade schedule 40, screw on
black steel chilled water piping complete with pipe
supports and all required fittings and accessories like bends, unions, Tees etc
Ø42mm m 140
Ø32mm m 180
Ø25mm m 120
Ø20mm m 110
21.4 INSULATION FOR CHILLED WATER PIPEWORK
Supply and install pre-formed closed cell, high density
megaphen chilled water piping insulation complete with
timber blocks, vapour barrier and sealant for heating
water piping and valves as specified.
Ø42mm m
Ø32mm m 140
Ø25mm m 180
Ø20mm m 120
110
21.5 CLADDING FOR CHILLED WATER PIPEWORK
Supply and install 304 Stainless steel cladding for chilled
water piping insulation complete as specified for heating
water piping and valves.
Ø42mm m
Ø32mm m 140
Ø25mm m 180
Ø20mm m 120
21.6 VALVES AND ACCESSORIES 110
Supply and install chilled valves for the chilled water system
Ø40mm No. 6
Ø25mm No. 6
Ø20mm automatic air vent / vacuum breaker. No. 7
temperature gauges. No. 6
flow switches. No. 5
pressure gauges. No. 6
relief valve. No. 5
drain valve & nipple Ø50mm. No. 5
self seal test points
Ø20mm No 6
TOTAL CARRIED FORWARD TO THE NEXT PAGE
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C7-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE C7
21.7 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
21.8 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
21,9 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 25
400x300mm LM 35
300x300mm LM 40
200x300mm LM 45
250mm dia LM 44
250mm dia flexible insulated LM 25
300mm dia flexible insulated LM 30
21,10 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric
heating No. 20
21,11 Size: 1200 x 600mm egg crate return air grille No. 8
21,12 Make good the ceiling after installation sum
21,13 Make good the walls after installation sum
21,14 Make good other disturbed services after installation sum
21,15 Provide 12 months guarantee for the installation sum
21,16Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
21,17 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
21,18 Provide training for the FMS sum
21,19 Allow for interface with fire services sum
21,20 Allow for interface with the Building management system (BMS) sum
21,21
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's sum
21,22 TEST & COMMISSION
Test and Commission the Entire Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C7-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
22 CHILLED WATER SYSTEM
BRIDGE C8
Design, manufacture, works testing, supply and deliver to site, moving into position,
erection, connecting up, site testing, witness testing, proving to insurance inspectors,
demonstrating to the Employer, commissioning and maintenance of the complete
mechanical systems and equipment as shown on the drawings and datasheets.
Summary as follows:
22.1 HIDEAWAY UNIT/ FAN COIL UNIT (HYDRONIC)
Nominal Cooling Capacity : 40.0[kW] No. 4
22.2 Supply and install digital temerature indicators No 2
22.3 CHILLED WATER PIPEWORK TO TAP CHILLED WATERIN THE CEILING
Supply and install heavy grade schedule 40, screw on
black steel chilled water piping complete with pipe
supports and all required fittings and accessories like bends, unions, Tees etc
Ø42mm m 140
Ø32mm m 180
Ø25mm m 120
Ø20mm m 110
22.4 INSULATION FOR CHILLED WATER PIPEWORK
Supply and install pre-formed closed cell, high density
megaphen chilled water piping insulation complete with
timber blocks, vapour barrier and sealant for heating
water piping and valves as specified.
Ø42mm m
Ø32mm m 140
Ø25mm m 180
Ø20mm m 120
110
22.5 CLADDING FOR CHILLED WATER PIPEWORK
Supply and install 304 Stainless steel cladding for chilled
water piping insulation complete as specified for heating
water piping and valves.
Ø42mm m
Ø32mm m 140
Ø25mm m 180
Ø20mm m 120
22.6 VALVES AND ACCESSORIES 110
Supply and install chilled valves for the chilled water system
Ø40mm No. 6
Ø25mm No. 6
Ø20mm automatic air vent / vacuum breaker. No. 7
temperature gauges. No. 6
flow switches. No. 5
pressure gauges. No. 6
relief valve. No. 5
drain valve & nipple Ø50mm. No. 5
self seal test points
Ø20mm No 6
TOTAL CARRIED FORWARD TO THE NEXT PAGE
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C8-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE C8
22.7 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
22.8 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
22,9 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 25
400x300mm LM 35
300x300mm LM 40
200x300mm LM 45
250mm dia LM 44
250mm dia flexible insulated LM 25
300mm dia flexible insulated LM 30
22,10 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa with electric
heating No. 20
22,11 Size: 1200 x 600mm egg crate return air grille No. 8
22,12 Make good the ceiling after installation sum
22,13 Make good the walls after installation sum
22,14 Make good other disturbed services after installation sum
22,15 Provide 12 months guarantee for the installation sum
22,16Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
22,17 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
22,18 Provide training for the FMS sum
22,19 Allow for interface with fire services sum
22,20 Allow for interface with the Building management system (BMS) sum
22,21
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's sum
22,22 TEST & COMMISSION
Test and Commission the Entire Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer.Item 1
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE C8-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
23 VRV AIR CONDITIONING SYSTEM
BRIDGE E1
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
23.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 48.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
23.2 Nominal Cooling Capcity : 190.0[kW] placed on the wall No. 1
23.3 Manufactuers' Refrigerant joints No. 65
23.4 Supply and install the MCU/ BC controller for the VRV system No 1
23.5 Supply and install digital temerature indicators No 2
23.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE E1-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE E1
23.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
23.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
23.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
23,10 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer. Item 1
23,11 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
23,12 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
23,13 Size: 1200 x 600mm egg crate return air grille No. 6
23,14 Make good the ceiling after installation sum
23,15 Make good the walls after installation sum
23,16 Make good other disturbed services after installation sum
23,17 Provide 12 months guarantee for the installation sum
23,18Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
23,19 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
23,20 Provide training for the FMS sum
23,21 Allow for interface with fire services sum
23,22 Allow for interface with the Building management system (BMS) sum
23,23
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE E1-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
24 VRV AIR CONDITIONING SYSTEM
BRIDGE E2
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
24.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 35.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
24.2 Nominal Cooling Capcity : 140.0[kW] placed on the wall No. 1
24.3 Manufactuers' Refrigerant joints No. 65
24.4 Supply and install the MCU/ BC controller for the VRV system No 1
24.5 Supply and install digital temerature indicators No 2
24.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE E2-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE E2
24.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
24.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
24.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
24,10 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer. Item 1
24,11 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
24,12 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
24,13 Size: 1200 x 600mm egg crate return air grille No. 6
24,14 Make good the ceiling after installation sum
24,15 Make good the walls after installation sum
24,16 Make good other disturbed services after installation sum
24,17 Provide 12 months guarantee for the installation sum
24,18Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
24,19 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
24,20 Provide training for the FMS sum
24,21 Allow for interface with fire services sum
24,22 Allow for interface with the Building management system (BMS) sum
24,23
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE E2-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
25 VRV AIR CONDITIONING SYSTEM
BRIDGE E5
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
25.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 35.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
25.2 Nominal Cooling Capcity : 140.0[kW] placed on the wall No. 1
25.3 Manufactuers' Refrigerant joints No. 65
25.4 Supply and install the MCU/ BC controller for the VRV system No 1
25.5 Supply and install digital temerature indicators No 2
25.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE E5-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE E5
25.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
25.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
25.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
25,10 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer. Item 1
25,11 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
25,12 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
25,13 Size: 1200 x 600mm egg crate return air grille No. 6
25,14 Make good the ceiling after installation sum
25,15 Make good the walls after installation sum
25,16 Make good other disturbed services after installation sum
25,17 Provide 12 months guarantee for the installation sum
25,18Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
25,19 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
25,20 Provide training for the FMS sum
25,21 Allow for interface with fire services sum
25,22 Allow for interface with the Building management system (BMS) sum
25,23
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
TOTAL CARRIED FORWARD TO SUMMARY PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE E5-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
23 VRV AIR CONDITIONING SYSTEM
BRIDGE E8
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
26.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 35.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
26.2 Nominal Cooling Capcity : 140.0[kW] placed on the wall No. 1
26.3 Manufactuers' Refrigerant joints No. 65
26.4 Supply and install the MCU/ BC controller for the VRV system No 1
26.5 Supply and install digital temerature indicators No 2
26.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO NEXT PAGE R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE E8-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE E8
26.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
26.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
26.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
26,10 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer. Item 1
26,11 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
26,12 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
26,13 Size: 1200 x 600mm egg crate return air grille No. 6
26,14 Make good the ceiling after installation sum
26,15 Make good the walls after installation sum
26,16 Make good other disturbed services after installation sum
26,17 Provide 12 months guarantee for the installation sum
26,18Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
29,19 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
26,20 Provide training for the FMS sum
26,21 Allow for interface with fire services sum
26,22 Allow for interface with the Building management system (BMS) sum
26,23
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE E8-2 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
27 VRV AIR CONDITIONING SYSTEM
BRIDGE E11
Design, manufacture, works testing, supply and deliver to site, moving
into position, erection, connecting up, site testing, witness testing,
proving to insurance inspectors, demonstrating to the Employer,
commissioning and maintenance of the complete mechanical systems
and equipment as shown on the drawings and datasheets.
Summary as follows:
27.1 HEAT PUMP HIDEAWAY UNIT/ FAN COIL UNIT
Nominal Cooling Capacity : 35.0[kW] No. 4
Supply and install VRV heat pump outdoor units complete with fittings
and fixtures, avm and additional topup 20 kg (R410a) refrigerant gas for
commisioning as specified and shown on the drawing. All units shall be
IP addressable ready for BMS connection by others.
27.2 Nominal Cooling Capcity : 140.0[kW] placed on the wall No. 1
27.3 Manufactuers' Refrigerant joints No. 65
27.4 Supply and install the MCU/ BC controller for the VRV system No 1
27.5 Supply and install digital temerature indicators No 2
27.6
Supply and install R410a refrigerant piping c/w refnet joints and and all
necessary fixtures and fittings as specified and shown on the drawings.
41.3mm dia m 140
34.9mm dia m 160
28.6mm dia m 150
22.2mm dia m 100
19.1mm dia m 180
15.9mm dia m 65
12.7mm dia m 110
9.5mm dia m 89
6.4mm dia m 120
Allow for drilling and make good of walls sum
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE E11-1 BILLS OF QUANTITIES
CLIENT: ACSA - MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION (Mechanical BOQ)
Item No. Description Unit Unit Rate Amount
BALANCE BROUGHT FORWARD FROM PREVIOUS PAGE
BRIDGE E11
27.7
Supply and install cable rack for refrigerant piping c/w joints and fixtures and
fittings.
200mm wide m 100
100mm wide m 120
50mm m 80
27.8 Supply PVC condensate pipes c/w joints and fixtures and fittings
50mm dia m 180
25mm dia m 150
20mm dia m 160
27.9 ELECTRICAL WORK AND CONTROLS
Supply and install electrical work including power and control cabling and
connections as specified for the VRV air conditioning unitsItem 1
27,10 TEST & COMMISSION
Test and Commission the Entire VRV Air conditioning system Item 1
Ditto but in the presence of and to the entire satisfaction of the Consulting
Engineer. Item 1
27,11 DUCTWORK FOR HIDEAWAY UNITs
Supply and install galvanized sheet metal ducting, low pressure cw 25mm foil
backed insulation, stop ends, transformations, fixtures and fittings suspended 1200 x 500 x 500 mm Plenum box No. 6
400x300mm LM 10
300x300mm LM 15
200x300mm LM 12
250mm dia LM 20
250mm dia flexible insulated LM 23
300mm dia flexible insulated LM 24
27,12 Supply and install CAV swirl diffusers (VSD type or equivalent)
Size: 600 x 600 c/w OBD 250mm dia spigots at 90l/s and 50 Pa No. 18
27,13 Size: 1200 x 600mm egg crate return air grille No. 6
27,14 Make good the ceiling after installation sum
27,15 Make good the walls after installation sum
27,16 Make good other disturbed services after installation sum
27,17 Provide 12 months guarantee for the installation sum
27,18Supply a facilities management system to monitor and control the
maintenance and servicing of the installation during the guarantee period and
beyond sum
27,19 Allow for hardware for the air conditioning system to communicate with the
FMS and/or the maintenance team (e.g sensors, controllers, transimitters etc) sum
27,20 Provide training for the FMS sum
27,21 Allow for interface with fire services sum
27,22 Allow for interface with the Building management system (BMS) sum
27,23
Allow for the minimum interuption of the airport operations during the
installation (e.g working in the night on sections which interfer with the airport's
operations) sum
TOTAL CARRIED FORWARD TO PRICING (C2.2) in the Bid Document R
MECHANICAL SERVICES INSTALLATION AIRBRIDGE E11-2 BILLS OF QUANTITIES
CLIENT: ACSA -MECHANICAL BILL OF QUANTITIES
PROJECT: PROPOSED AIR CONDITIONING OF FIXED BRIDGES
CONTRACT: AIR CONDITIONING SERVICES INSTALLATION
Item No. Description Amount
(FINAL SUMMARY )
BRIDGE
1 A1R
2 A1L
3 A2
4 A3
5 A4
6 A5
7 A6
8 A7
9 A8
10 A9
11 A10
12 A11
13 A12
14 A13
15 C1
16 C2
17 C3
18 C4
19 C5
20 C6
21 C7
22 C8
23 E1
24 E2
25 E5
26 E8
27 E11
TOTAL (excl VAT)