For discussion PWSC(2015-16)21 (date to be confirmed) ITEM FOR PUBLIC WORKS SUBCOMMITTEE
OF FINANCE COMMITTEE
HEAD 704 – DRAINAGE Environmental Protection – Sewerage and sewage treatment 408DS – Yuen Long effluent polishing plant
Members are invited to recommend to the Finance
Committee –
(a) the upgrading of part of 408DS, entitled “Yuen
Long effluent polishing plant - consultants’ fees
and investigation”, to Category A at an estimated
cost of $88.9 million in money-of-the-day prices;
and
(b) the retention of the remainder of 408DS in
Category B.
PROBLEM
It is necessary to upgrade the Yuen Long sewage treatment works (YLSTW) to the Yuen Long effluent polishing plant (YLEPP) to cope with the expected increase in sewage treatment demand and enhance its environmental performance. PROPOSAL 2. The Director of Drainage Services, with the support of the Secretary for the Environment, proposes to upgrade part of 408DS to Category A at an estimated cost of $88.9 million in money-of-the-day (MOD) prices to carry out the study, design and associated investigation works for upgrading the YLSTW to YLEPP.
/PROJECT …..
PWSC(2015-16)21 Page 2
PROJECT SCOPE AND NATURE 3. The part of 408DS that we propose to upgrade to Category A comprises –
(a) the engagement of consultants for the YLEPP to undertake –
(i) an investigation study as well as preliminary and
detailed design of sewage and sludge treatment facilities;
(ii) impact assessments on the environmental, drainage, geotechnical, traffic and other aspects necessary for the design in (i) above;
(iii) public engagement and consultation with relevant stakeholders;
(iv) preparation of tender documents and assessment
of tenders; and
(v) supervision of the site investigation, surveys and laboratory testing relating to (b) below.
(b) site investigation, surveys and laboratory testing in
support of the detailed design and impact assessments in (a)(i) and (a)(ii) above.
Site plans showing the proposed works and the catchment area of YLSTW are at Enclosures 1 and 2 respectively.
4. Subject to funding approval of the Finance Committee, we plan to commence the proposed study, design and associated investigation works in late 2015 for completion in phases from 2018 to 2021. 5. We will retain the remainder of 408DS in Category B for the construction of the YLEPP. Funding for the construction will be sought at a later stage after completion of the study, design and associated investigation works.
/JUSTIFICATION …..
PWSC(2015-16)21 Page 3
JUSTIFICATION 6. The YLSTW currently provides secondary treatment1 to sewage collected from Yuen Long Old Town, Yuen Long Industrial Estate, Kam Tin, San Tin and Pat Heung areas with a capacity of 70 000 cubic metres (m3) per day. 7. According to the latest planning data and housing development programme, the total volume of sewage in the catchment area of the YLSTW is estimated to reach 150 000 m3 per day in 2036 arising from major housing developments under planning as well as the village sewerage projects in its catchment area. It is therefore necessary to increase the daily treatment capacity of the YLSTW to 150 000 m3. 8. Furthermore, Deep Bay is a semi-enclosed water body very sensitive to pollution loading. To avoid the generation of additional residual pollution loading discharging into Deep Bay due to the increase in treatment capacity, it is also necessary to further enhance the YLSTW’s environmental performance by upgrading it to an effluent polishing plant with tertiary treatment2 to keep the residual pollution loading of the treated effluent to an acceptable level.
FINANCIAL IMPLICATIONS 9. We estimate the cost of the proposed study, design and associated investigation works under 408DS to be $88.9 million in MOD prices (see paragraph 11 below), broken down as follows –
$ million (a) Consultants’ fees for 53.9 (i) investigation study,
preliminary and detailed design
42.3
(ii) impact assessments 5.7 (iii) public engagement and
consultation 1.0
(iv) preparation of tender documents and assessment of tenders
3.6
(v) supervision of site investigation, surveys and laboratory testing
1.3
/(b) ….. ______________________________________________________________________ 1 Secondary treatment is a biological process that uses microorganisms to decompose and remove
organic matters in sewage. 2 Tertiary treatment is a combination of physical, chemical and/or more intensive biological
processes to further remove organic matters and nutrient in sewage.
PWSC(2015-16)21 Page 4
$ million (b) Investigation works 11.4 (i) site investigation 3.7 (ii) surveys 3.6 (iii) laboratory testing 3.8 (iv) environmental mitigation
measures 0.3
(c) Contingencies 6.5
Sub-total 71.8 (in September 2014 prices)
(d) Provision for price adjustment 17.1 Total 88.9 (in MOD
prices)
10. Due to inadequate in-house resources, we propose to engage consultants to conduct the study, design and supervision of the associated investigation works. A detailed breakdown of the estimates for the consultants’ fees by man-months is at Enclosure 3. 11. Subject to funding approval, we will phase the expenditure as follows –
Year
$ million
(Sept 2014)
Price adjustment
factor
$ million (MOD)
2015 – 2016 7.4 1.05725 7.8
2016 – 2017 21.3 1.12069 23.9
2017 – 2018 16.2 1.18793 19.2
2018 – 2019 3.8 1.25920 4.8
2019 – 2020 3.9 1.33475 5.2
2020 – 2021 8.0 1.40483 11.2
2021 – 2022 8.0 1.47507 11.8
2022 – 2023 1.9 1.54882 2.9
2023 – 2024 1.3 1.62626 2.1 71.8 88.9
/12. …..
PWSC(2015-16)21 Page 5
12. We have derived the MOD estimates on the basis of the Government’s latest set of assumptions on the trend rate of change in the prices of public sector building and construction output for the period from 2015 to 2024. We will tender the proposed consultancy mentioned in paragraph 3(a) under a lump-sum contract as the scope of works is well defined. We will deliver the site investigation, surveys and laboratory testing mentioned in paragraph 3(b) under re-measurement contracts because the quantities of works involved will vary depending on actual site conditions. The contracts will provide for price adjustment.
13. The proposed study, design and associated investigation works will not give rise to any recurrent consequences.
PUBLIC CONSULTATION 14. We consulted the Ping Shan Rural Committee and the Environmental Improvement Committee of the Yuen Long District Council on the project on 24 October and 10 November 2014 respectively. Both committees generally supported the proposed study, design and associated investigation works. 15. We consulted the Legislative Council Panel on Environmental Affairs on 26 January 2015 and Members supported the project. ENVIRONMENTAL IMPLICATIONS 16. The proposed study, design and associated investigation works are not designated projects under the Environmental Impact Assessment Ordinance (Cap. 499) (EIAO) and will not cause any long-term environmental impact. We have included a sum of $0.3 million (in September 2014 prices) in the project estimate for implementing suitable mitigation measures to control the short-term environmental impacts arising from the investigation works. 17. The proposed investigation works will only generate a small quantity of construction waste. We will require the consultants to minimise the generation of construction waste and to reuse or recycle construction waste as much as possible during the implementation of the construction stage of the project in future.
/18. …..
PWSC(2015-16)21 Page 6
18. The construction and operation of the YLEPP is a designated project under Schedule 2 of the EIAO and an Environmental Permit is required. We will conduct an Environmental Impact Assessment (EIA) in accordance with the requirements of the EIAO during the study to address the environmental impacts. We will prepare and submit an EIA report to the Director of Environmental Protection for approval under the EIAO. We will follow the statutory procedures, including provision of the EIA report for inspection and comment by the public and the Advisory Council on the Environment.
HERITAGE IMPLICATIONS 19. The proposed study, design and associated investigation works will not affect any heritage site, i.e. all declared monuments, proposed monuments, graded historic sites or buildings, sites of archaeological interest and government historic sites identified by the Antiquities and Monuments Office. LAND ACQUISITION 20. The proposed study, design and associated investigation works do not require any land acquisition. BACKGROUND INFORMATION 21. In July 2013, Drainage Services Department commissioned a consultancy to carry out the treatment process study during which the sewage flow projection and treatment process at the YLSTW were reviewed. The total cost of the study was about $1.3 million. We have charged this amount to 350DS “Yuen Long and Kam Tin sewerage and sewage disposal – consultants’ fees and investigations”. The study was completed in mid-2014 and concluded the technical feasibility of upgrading the YLSTW for providing the required treatment capacity and treatment level within its existing site. 22. In September 2014, we upgraded 408DS “Yuen Long effluent polishing plant” to Category B. 23. The proposed study, design and associated investigation works will not involve any tree removal or planting proposals. We will require the consultants to take into consideration the need for tree preservation during the proposed study and design. We will also incorporate tree planting proposals in the construction stage in the future.
/24. …..
PWSC(2015-16)21 Page 7
24. We estimate that the proposed study, design and associated investigation works will create about 13 jobs (one for labourer and another 12 for professional or technical staff), providing a total employment of 890 man-months.
------------------------------
Environment Bureau June 2015
10
10
20
¦ì
¤¸
¤ñ
«n¥
ªþ¥
¤¸®Ô¤
K. W. CHAN 18 DEC 2014
18 DEC 2014
18 DEC 2014
AS SHOWNOR
1:10000
¦Z®
Ir S. K. PUN
¤Ñ¤
¥Ï
DSP/S1403/11022
DEEP BAY
LOCATION
TIN SHUI WAI
YUEN LONG
¯Á¤ KEY PLAN
ENCLOSURE 1
LUT CHAU
KAM TIN RIVER
ÀA¥
NAM SANG WAI
INDUSTRIAL ESTATE
YUEN LONG
SHAN PUI RIVER
¤s¨
¹Ï LEGEND:
²{¦³¤¸®Ô¦Ã¤ô³
ÀÀ«Ø¤¸®Ô²b
POLISHING PLANT
- YUEN LONG EFFLUENT
PWP ITEM NO. 408DS
SEWAGE TREATMENT WORKS
SITE BOUNDARY OF EXISTING YUEN LONG
POLISHING PLANT LOCATED WITHIN THE
PROPOSED YUEN LONG EFFLUENT
SCALE 1:100 000
- ¤¸®Ô²b
¤uµ{p¹º¶µ¥Ø²
Ir W. L. LEE
TS
TS
TS
R
TS
R
R
R
R
R
R
R
TS
R
TS
RR
R
R
R
R
RR
R
¤¸®Ô¦Ã¤Yuen Long Sewage Treatment Works
¬
¬¬
¬
¬ ¬ ¬¬
¬¬
CUL
CUL
Tank
TankTank
Tank
TankTankTank Tank
Tank
Tank
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO PO
POPO
L
L
L
L
L
L
L
L
L
L
L
L
L
L
E
E
E
L
E
E
E
E
L
L
L
L
E
L
L
L
L
E
L
E
E
E
E
E
E
E
E
E
H
ET
ET
ET
E
E
BO
RD
ER
FE
NC
E
RO
AD
Ãä¹
Ãä¹
ªd
ªd
ªd
ªd
ªd
ªd
ªd
±×
¹D
¹D
¹D
¹D
Tra
ck
Ra
mp
Tra
ck
Track
FP
FP
FP
Track
Track
Trac
k
FB FP
FP
FP
Road
Road
Road
Road
FB
R
TS
TS
R
R
TS
TS
TSTS
TS
TS
TS
TS TSR
TS
TS
P
RR
TS
TS
RR
RR
RR R
RTS TS
R TSR
R
TSZ
TS
TS
R
R
R
TSTS
R TS
TS
VO
TS
TS
TS
S̄̈ Î
¥ì¤h°
»́ 䦳
¥¿©÷
°ª•Y«Ø§÷¡]»
§E¤¯¥
¥Ã̄
¾ú
¬ìµ
Ü®¦¡]¤¤°
»´ä¥
Ûªo¤
Æ
«H¸q¬Á¼þ»
TOPFINE
Eastman C
hemical
Hong Kon
g Limited
Dunwell Group
Eastern Pretech (H.K) Ltd
Eu Yan Sang Centre
Richardson Pacific (Asia) Ltd
Clariant (C
hina)
Ltd
HK Petr
oche
mical C
o., L
td
Block C
Block D
Block
A
XYG (HK) Limited
Block B
Block B
Block
A
Block C
1-3
2
1
7
4-8
110
6
10
83C 83
77
76
A
7675 74
73
69
64 63 62 6160 59 58
57 56
43 42 41
12
4039
3F
38 37 36 35
28
D
28C28B
282728A
3E
26 2524
3D
10C
18 3A17 1516
10A
10
14
9
12
13-12
8
3
711
11A
11B2A4
11C5A
6-51
15-17
2
210
211
215
19
212
¤̧ ®Ô¦Ã¤
Âײ±¿ûÅK
ÅS¤Ñ
ÅS¤Ñ
½ì©É
§d« ¤¸®Ô¤
ÄR¦w
ÅS¤ÑÅS¤Ñ
ÅS¤Ñ
°±¨
Yuen Long Sewage Treatment Works
Fung Shing Steel Co Ltd
Open Storage
Open Storage
Open Storage
NG UK TSUEN
YUEN LONG INDUSTRIAL ESTATE
Leon House
Open Storage
Open Storage
Car Park
¬ ¬
¬¬
¬
¬¬
¬
¬¬
¬
¬
¬
¬
¬
¬¬
¬
¬
¬
¬
¬¬
¬
¬¬
¬
¬
¹Ó
¹Ó
¹Ó
¹Ó
Tank Tank
TankTank
CUL
TankTank
Tank Tank
AerationTankTank
Tank
AerationTank
Tank
Tank
Tank
Tank
Tank
TankTank
Tank
Tank
Tank
GT
Tank
Tank
GT
Tank
Tank
Tank
Tank
TanksAnd
Valves
Graves
Graves
Graves
Graves
CUL
SHR
TanksAnd
Valves
G
G
G
G
G
G
G
G
GG
G
G
G
G
G
G
G
G
G
G
G G
G
G
G
G
GG
G
G
G
G
G
G
G
G
G
G
G
W
SHR
±Æ¤
±Æ¤
±Æ¤±Æ¤´
´
´
±Æ¤
±Æ¤
POPO
POPO
POPO
Outfall
PO
POPO
PO
PO
PO
OutfallPO
PO
PO
PO
PO
PO
OutfallOutfall
Nullah
Nullah
Nullah
Outfall
Outfall
EL
L
L
L
LL
L
L
L
LL
L
ET
L L
L
E
L
L
L
E
L
L
E LL
E
L LE
L
L
LL
LL
LH
L
L
LL
E
L
L
LL
HL
HL
ET
L
L
E
L
L
L
EL
HET
L L
L
L
L
L
L
H
L
E
E
E
E
E
E
E
E
E
E
E
E
E
E
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
H
L
L
L
H
E
ET
E
E
E
L
L
EL
L
L
E
E
ET
WANG LEE STREET
WA
NG
LO
K
ST
RE
ET
WA
NG
LE
E
ST
RE
ET
§»§
§»
¼
§»
§
ªd
ªd
¹D
¹D
¹D
¹D
¹D
ªd
¹D
¹D
¹D
¹D±×
¹D
¹D
Track
Tra
ck
Road
FB
Road
FP
Road
Road
Road
Road
Track
FP
Road
FP
FP
Road
RampRoad
Road
FP
FP
Road
FP
FP
TS
R
TS
TS
TS
TSTS
TS
TS
TS
TS
TS
TS
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
ÀA¥
º®¹A¦ÛµÀã¦a¤Î°Êª«Å
Enforcement Section,Wetland & Fauna Conservation Division
Agriculture, Fisheries andConservation Department
KAM TIN RIVER
±Æ¤
±Æ¤
±Æ¤
PO
PO
PO
PO
PO
PO
PO
PO
POPO
PO
PO
PO
Outfall PO
PO
PO
Outfall
Outfall
E
E
E
EE
E
E
E
E
E
E
E E
E
E
E
L
L
L
L
LL
L
L
L
L
L
L
L
L
LL
L
L
L
L
L
L
L
L
L
L
L
L
L
E
E
ET
H
ET
L
L
L
L
L
L
E
E
E
E
E
E
E
YAU POK ROAD
BO
RD
ER
FE
NC
E
RO
AD
YAU POK ROAD
NAM SANGWAI
ROAD
§ñé
§ñé
«¥³̧
ªd
ªd
ªd
ªd
ªd
ªd
±×
±×
Track
FP
Track
FP
Track
Tra
ck
FP
FP
FP
FP
Track
Track
Ra
mp
TS
TS
R
TSRTS
TS
TS
TS
TS
TSTS
TS
TS
TSTS
¢Ð
»´ä±
»s
ÃÄ
¼t¦
Hong K
ong
Hong Y
an T
ong
Pharm
aceutical Limited
´ç
Jetty
SH
AN P
UI RIV
ER
±Æ¤
±Æ¤
±Æ¤
±Æ¤
Outfall
PO
Outfall
PO
PO
Outfall
OutfallPO
PO
PO PO
PO PO
PO
PO
PO
POPO
PO
POPO
PO
PO
PO
L
L
L
LE
L
L
L
L
E
L
L
L
L
L
E
L
E
E
L
L
L
L E
L
E
L
EL
E
L
L
L
EL
L
L
L
L
E
ET
E
E
E
L
NAM SANG WAI ROAD
NA
M
SA
NG
WAI R
OA
D
NA
M S
AN
G
WAI R
OA
D
«n¥Í
«n
¥Í
«n¥Í
¹D
±×
ªd
ªd
±×
Road
FB
Ra
mp
Track
Track
Ramp
FP
R
R
¨K
Ä˦³
»´ä¤é
Äq§
÷
¿D¬ü»s
Waysery Ind
ustrial B
uilding
Top
pan
Form
s Car
d Tec
hnologies
Ltd.
36-38
37-53
48
¤¤°ê¬V¼t¶°China Dyeing Holding Ltd
Water
Tank
WT
WT
Water
Tank
±Æ¤
±Æ¤
±Æ¤
PO
PO
PO
PO
PO
PO
Outfall
Outfall
PO
PO
Outfall
PO
PO
POOutfa
ll
PO
PO
4.8
4.3
3.7
4.2
3.2
4.5
4.7
4.8
4.0
3.43.9
4.3
3.7
3.3
4.6
4.3
4.6
4.4
2.43.5
4.0
4.4
3.9
4.6 4.3
4.3
3.0
4.5
4.4
4.24.1
4.4
4.5
4.0
4.3
4.3
3.14.1
4.03.7
4.1
4.34.5
4.1
4.2
4.5
4.3
3.5
4.3
3.2
4.5
4.4 3.7
4.4 4.5
4.4
3.9
4.5
4.1
3.7
5.04.4
3.6
3.3
4.6
4.8
4.2
4.3 4.9
3.5
3.4
4.93.8
3.5
4.2
3.3
4.8
4.84.4
3.4
3.7
4.2
3.74.0
2.9
4.9
4.5 4.6
4.3
4.3
4.9
4.9
3.8
3.9
4.5
4.3
4.5
4.4
4.7
4.4
4.4 4.5
4.74.54.5
L
L
L
L
L
L
L
L
H
LL
L
L
L
L
H
L
LL
LL
L
L
LL
L
L
L
L
H
LL
L
L
L
L
L
L
L
HL
LL
L L
E
L
H
LL
L
L
H
L
L
L
L
L
L
L
L
L
L
H
L
HET
L
«n
¥Í
Ra
mp
FP
FP
R
TS
PO
PO
PO
PO
PO
PO
PO
PO
PO
3.4
2.82.8
3.4
3.2
3.0
3.3
3.5
3.4
3.6
3.2
3.2
3.5
3.1
3.43.8
3.6
3.8
3.6
3.5
3.83.6
2.9
2.8
3.1
3.4
3.0
3.3
E
ªd
Track
Tra
ck
TS
TS
R
R
R
TS
R
R
R
R
R
R
RRR
TS
R
R
TS
TS
RCP
¤Ñ¥j
J®
K®
M®I®
R®
B®
C®
¤Q¤¤Q
¤Q¤
¤Ü¤
¤G
¤»
Temple
Block NBlock M
Bloc
k G
Bloc
k B
Bloc
k A
Block S
Block T
Block 25Block 26
Bloc
k18
Block
11
Block
2
Block
13A
8791
82-8180-7978121
55
51
43
23A
153
22 2119
131
49D
59
33
159150
20
10
8
4
ÄRªá
ºû¶é
¤Ñ
»A¦
Lai Yin Garden
Jade Court
Vienna Villa
¹ÓGraves
G
G
G
G
G
G
G
G
G
G
U
W
SHR
SHR
PO
POPO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
POPO
POPO
PO PO
3.7
2.9
3.5
4.0
3.9
4.1
3.1
3.9
3.8
4.4
4.8
4.4
11.64.4
10.2
12.8
3.7 3.9
3.94.7 4.4
3.6
4.1
19.5
3.4
4.0
17.015.3
18.316.9
17.3
23.2 20.1
21.9
32.9
21.0
3.7
21.7
4.3
21.8
21.5
12.0
20.0
3.5
13.2
9.7
12.1
8.6
13.59.2
10.4
3.49.9
16.1
15.78.28.2
7.0
8.2
5.9
7.69.2
7.4
8.1
6.7
5.4
4.9
10.1
6.7
7.1
9.1
6.7
5.8
5.1
8.56.3
6.1
10.7
8.35.8
9.2
4.9
5.6
4.1
7.09.0
6.5
6.0
5.4
10.8
7.9
ET
E
E
E
E
E
ET
E
LET
L
L L
LL
LLL
L
L
L
L
L
ET
E
L
E
L
E
H
L
H
L
E
L
EE
L
L
ET
E
ET
E
EE
ET
FUK SHUN STREETºÖ¶
ªd
¹D
FB
FB
FB
Tra
ck
TS
TS
TSTS
R
RR
R
RR
R
RRR
TS
RTSR
RTS
RTS R
R
RR
RR
R RTS
R R
R
TSZ
RR
R
R
R
RR
TS
TS
TS
TS
E®
C®
B®
G®H®
J®
«nµØ³y¯
È
Bloc
k17
Block F
Block E
Block C
Block B
Block A
BlockG
BlockK
Sout
h Chin
a Pa
per
Limite
d
150B
11A
25A
11
12A
12
23
B
153
9
822
563
6
22A
1529
17
32
83
6 1621A
60
83B
18 42
41
46
20 3981B
47A
2130
58
37 80
38
67-6
8
61
2 81
25 1312
5A
78
39 25255
A
55
40
78B
5650
41 2
728
52
84
54
130
87A
263
54
110
127
114
201
200
51B
20
´º¦
¯Ñ
Ȭ
Äx²
CAROLE GARDEN
SHING UK TSUEN
Cultivation
Lux Court
TAI TSENG WAI
¹ÓGraves
G
G
G
G
G
SHR
Nulla
h
6.0
3.69.4
4.2
13.9
4.05.0
13.6
4.6
6.2
3.7
4.9
8.96.6
3.8
10.913.9
4.75.0
9.1
3.412.7
4.76.8
8.3
3.811.4
6.8
3.6
3.7
3.814.9
11.28.3
3.6
6.3
15.6
4.0
2.8
5.4
6.8
3.2
5.9 5.3
3.6
3.5
3.54.9
3.7
7.1
3.6
3.1
4.6
27.3
3.6
3.4
4.3
4.2
4.1
3.5
3.67.73.1
4.9
13.5
3.9
11.9
3.7
11.8 8.9 6.6
9.4
9.44.5
8.4
3.03.77.8
3.5
10.4
6.4
3.8
4.1
E
E
E
E
E
E
EE
E
E
E
E
E
E
E
L
L
E
E
E
E
L
L
L
L
L
L
L
H
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
H
H
L
L
ET
E
L
L
L
E
¹D
ªd
¹D
Ro
Track
FP
Road
Road
Road
FP
FP
FB
FB
TSTS
TS
TS
TS
TS
ºÖ¶¶µó
¨È¬üºÏ±a
«nµØ³y¯
È
¨K
Ä˦³
¤¸
¤u·
¿ì¨
Blk 17Blk 2
4
Blk 16
Blk 2
3
Blk 2
2
Blk 15X
YG (H
K)
Limited
Bright
Fut
ure
Pharm
aceuticals Fty
Blk
5
Blk
4
Blk
2
TDK Man
ufacturin
g (H
ong
Kong)
Co., Ltd.
Sout
h Chin
a Pa
per
Limite
d
209
232
220
91-93
8
215
213
91A
90A
96
87-8
9
103
98
99
83
Manag
ement
Offic
e
67-73
34-36
4
»´ä¥Ûªo¤Æ
¥Yª©¸
ê°T¡
]»
ÅS¤Ñ
¤¸®Ô¤
ÄR¦w
¥Yª©¦L¨ê¡]»
°±¨
ÅS¤Ñ
Hong Kong Petrochemical Co., Ltd
Open Storage
YUEN LONGINDUSTRIAL ESTATE
Leon Court
Toppan Printing Co.,(H.K.)Ltd
San Miguel Brewery Hong Kong Ltd.
Car Park
ESS
Open Storage
¬
¬
¬
Âo¤
Tank
Tank
Filter Bed
ET
WIP Aug 2008
´
Nullah
Nullah
4.74.6
3.9
4.0
4.9
4.2
4.6
5.0
5.04.94.5
5.44.7
4.54.1
4.1
4.64.2
3.4 4.24.7
4.85.1
5.14.5
4.4
4.25.5
5.0 5.1 2.84.2
4.4
4.4
4.94.3
4.83.1
3.94.4
4.4
4.2
4.3
4.64.5
4.5
4.2
4.34.54.2
3.4
4.34.6
4.6
4.0
4.72.7
3.93.4
4.7
4.8
4.2
4.3
4.3
3.9
4.8
4.8
4.54.3
4.84.7
4.8
4.44.3
5.0
4.3
4.1
4.8
4.9
4.2
4.4
4.5
4.54.74.2
4.9
4.4
4.5
5.2
4.1
4.2
5.1
4.54.6
4.2
4.24.3
4.2 4.0
4.2
5.3
5.0
4.84.4
4.4
4.54.74.2
4.4
4.2
4.3
4.7 4.1
4.2
4.14.3
4.2
4.24.3 4.64.6
4.2
4.5
4.34.3
4.5
4.7
4.3
4.9
4.5
4.5
4.3
H
L
L
L
L
L
L
E
L
H
L
LLE
H
L
HL
L
L
L
L
LL
LL
L
L L
L
E
L
H
L
L
L
H
L
L
L
L
LL L
L H
LL
H L
L
LL
LL
LL
L
H
LL
LL
L
LL
L
LL
L
LL
L
LL
H
L
L
L
LL
L
LL
LL
L
L
L
L
L
L
LL
HL
H
L
L
L
L
L
L
L
L
ET
L
ET
L
L
L
L
L
L
H
H
L
L
H
H
L
H
ET
H
L
§»´
¹D
ªd
¹D
³æ¨
±×
Ram
p
Roa
d
Bicycle Track
Ra
mp
TS
TS
TS
TS
TS
TS
TS
TS
TS
¶×¥Í¤u
¥Yª
©¸ê°T¥
¤û§
À»´ä
¤¹aµv¤l¡]»
°ê»ÚÀÙÂׯ
È
¬f°í³f
Âd¾÷±ñ
US
HIO (H
K)
Co Lt
d
ISUZ
U
GLA
SS(H
K)Ltd
Nikko
Materials Hong
Kong Ltd.
Pacific
Mille
nnium
Paper
Manufact
uring
& Distributio
n Lt
d
BF Pharm
aceutic
al C
entre
Briga
ntine S
ervic
es Limite
d
21
27
29-31
35
1
8
°±¨
SH
AN P
UI RIV
ER
Car
Park
±Æ¤
±Æ¤
±Æ¤
Outfall
Outfall
WAN
G FU STREET
WA
NG
LO
K S
TR
EET
NA
M
SA
NG
WAI R
OA
D
WA
NG
LE
E S
TR
EE
T
«n¥Í
§»´
§»§
¹D
±×
³æ¨
FP
Roa
d
FP
FP
Ra
mp
Bic
ycle Track
R
ªd
ªd
ªdTr
ack
Tra
ck
TS
TS
TS
TS
RTS
TS
TS
TS
TS
TS
L® N® ¿³©MH®
F®G®
B®
D®A®
B®
T®
A®A®
¤Q¤¤Q¤
¤Q¤
¤@
¤Q
A®¤Q¤
¤Ü¤¢²A
¤¤Ü
A®
¤C¤Q¤
¤K
Block J
Block K
Block L
Bloc
k I
Bloc
k H
Bloc
k F
Bloc
k E
Blo
ck
B
Block R
Bloc
k C
Bloc
k B
Block ABloc
k A
Block
10
Block
12
Block
1Bloc
k20
Block
3
Block 3
A
Bloc
k22
Block 5
Block 6
Block
15
Bloc
k23
Bloc
k23A
Block 7
Block 8
Bloc
k16
88
85 84 84
A
12068
128
67
66
655453 5250 4950A
4847
4645
129
31 30-29
154
23
20130A
130
49A 3
8A
49
G
28
49
49E
49C
49F
38
49B
170
70
168
169
71
100
158
99
10
20
40
10
20
10
6
22
PO
PO
¹D
FP
FP
FP
Track
Road
FP
TS
TS
VO
Temple
¤E
F®
D®
A®
I®
K®L®
M®
C®B®
Block D
BlockH
BlockI
BlockJ
BlockL
BlockM
Block
CBlock
B
150A156
25C
96
36
A
64
48
66
5
77 15
0C
154
48
A
4-4A
151A
35
3626
7
8
6A2
9A
13
13
14 1
13A
12
18A
14
1020
1821
11
7
28
47
82
36-37
1935
29A
4330
5
3413644
13531
42A
31A
133 38
31
19
4745
41A
228
3283
E
5948
63
4966A
22
70-6
9
6245-4
6
23
7665
7175
64
24
5774
251
7973
46
G
67A
54
1 57A
78A
5156A
44
42
53
56
B
78C
43
43
B
116
87
46A
85
106
109107
86
129
12887
B
125
126
87C
112
124
123
202
120
203
205
51A
51
20
6
10
10
10
20
¤j¤
¹C¼Playground
G
W
W
´
¹D
ªd
¹D
Road
ad
FP
FP
FP
FBFP
«H¸q¬
Á¼þ»
¿D¬ü»
³ì¶øµ
ؤu·
ªF¹q
¤Æ¹q¤
¡]»
´ä¡^
«Â
ÃÀ¦³
·s¬w¦
L¨ê¶
°
Blk 19
Blk
6
Blk 21
Blk7 Blk8Blk 18
Blk10
Blk 20
Blk
3
Blk11Blk12
Blk13
Blk
1
Blk14
Fuk Shun Stre
et S
ubstatio
n
ACME AGENT
Vikings a
nd Elliso
n Lt
d
New
Islan
d Printing H
olding Ltd
18
208
95-9
9
233
217
92
253
91B
91
255
95
101
100
104
84
105
80-8
2
32
1
32
B
8
6
4
20
4
¤Ú¤h
²Ä¤
¦³¥Í¹]¤ô¡]
¼ö
®
TOPPAN Form
s (H
K) L
TD.
Bus
Terminus
Yau S
ang
Galva
nizers (
Hot -
Dip)
Co., Ltd.
Pipelines
´
´
WA
NG
LEE ST
REET
FUK
HI S
TREE
T
FUK W
ANG STREET
WAN
G FU STREET
ºÖ¶
ºÖ³
ºÖ§
±×
¹D
¹D
³æ¨
Road
Road
Trac
k
Trac
k
Road
Ramp
FP
¤s¨
NA
M S
AN
G
WAI R
OA
D
§»
¼
±×
R
FB
FB
FB
TS
R
Q®
S®
¤Ü¤
Block Q
Bloc
k D
Block C
Block
13
Bloc
k21
Block 9
90
34A 34 33 32
10
A®Block
A
10 23
A
35A 151
9
1516-17
132
37
A
66
72
26
55
50
84
A
113
89
115
²±«
Basketball Court
G
ªd
Track
FP
¡@¢
Blk9
KY
OW
A Industrial Co., Ltd.
213
22
219
72-7
8
»´ä¥Í¤O°à°
Nulla
h
WA
NG
LO
K ST
REET
FU
K S
HU
N STREET
FU
K
YA
N S
TR
EE
T
§»
¼
ºÖ³
ºÖª
FP
¤Ü
¤Q¤
Bloc
k19
FP
90
97
R
E®
C®
¤T
Bicy
cle
Trac
k
TS
±Æ¤
PO
PO
PO
PO
PO
PO
Outfall
PO
ET
E
L
L
L
L
E L
L
ETET
L
¹D
ªd
FP
FP
FP
FP
FP
Road
Tra
ck
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TSTS
TSTS
R
TS
TS
TSTS
TS
TS
TS
¤s¨
¥Ï
SH
AN
PUI R
IVE
R
LUT CHAU
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
PO
POPO
PO
PO
PO
PO
PO
E E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E E
E
E
ªd
ªd
ªd
ªd
ªdªd
ªd
Track
Track
Track
Track
Track Track
FP
Track
SH
AN
PUI R
IVE
R
PO
FP
°±¨
Car
Park
(Y
UE
N
LO
NG
CR
EE
K)
WIP Jul 2014
L L
L
L
L
H
2.0
2.2
2.5
2.5
2.5
2.7
2.7
2.7
2.7
2.8
2.8
2.8
2.9
2.9
2.9
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.4
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.7
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
3.9
4.0
4.0
4.0
4.0
4
4
4
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.6
4.6
4.6
4.6
4.64.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.6
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.9
4.9
4.9
4.9
4.9
4.9
4.9
4.9
5.0
5.0
5.0
5.0
5.1
5.1
5.2
5.2
5.2
5.2
5.2
5.3
5.3
5.3
5.3
5.3
5.4
5.4
5.4
5.5
5.5
5.6
5.7
5.7
5.8
5.9
5.9
6.0
6
6
6
6
6
6
6.0
6.0
6
6.1
6.1
6.1
6.2
6.2
6.3
6.3
6.3
6.3
6.3
6.3
6.4
6.4
6.5
6.7
6.8
6.9
6.9
7.0
7.1
7.1
7.2
7.2
7.2
7.3
7.4
7.9
8.8
9.2
11.8
12
14.0
15.4
16.3
16.6
16.7
19.2
20
20
20
20
20
20
20.3
20.6
21.2
34.4
40
40
40
43.4
45.7
52.9
55.7
55.7
55.8
56.8
60
61.7
C. L. KWAN 29 MAY 2015
29 MAY 2015
29 MAY 2015
Ir S. K. PUN
DSP/S1403/11031
POLISHING PLANT
- YUEN LONG EFFLUENT
PWP ITEM NO. 408DS
- ¤¸®Ô²b
¤uµ{p¹º¶µ¥Ø²
Ir W. L. LEE
KAM TIN
1:100000
¹Ï LEGEND:
ÀA
ªþ¥ENCLOSURE 2
SAN TIN
·s
¤KPAT HEUNG
¤¸®Ô¤
¤¸®Ô
KAU HUI
YUEN LONGESTATE
INDUSTRIAL
YUEN LONG
¤¸®Ô¦Ã¤
TREATMENT WORKS
YUEN LONG SEWAGE
¤¸®Ô¦Ã¤ô³B
CATCHMENT AREA
TREATMENT WORKS
YUEN LONG SEWAGE
10
10
20
Enclosure 3 to PWSC(2015-16)21
408DS – Yuen Long effluent polishing plant Breakdown of the estimate for consultants’ fees (in September 2014 prices)
Consultants’ staff costs
(Note 2)
Estimated man-
months
Average MPS* salary point
Multiplier (Note 1)
Estimated fees
($ million) Consultants’ fees for –
(i) investigation study,
preliminary and detailed design
Professional Technical
227 203
38 14
2.0 2.0
32.4 9.9
(ii) impact assessments Professional
Technical 32 23
38 14
2.0 2.0
4.6 1.1
(iii) public engagement
and consultation Professional Technical
6 3
38 14
2.0 2.0
0.9 0.1
(iv) preparation of tender
documents and assessment of tenders
Professional Technical
21 12
38 14
2.0 2.0
3.0 0.6
(v) supervision of site investigation, surveys and laboratory testing
Professional Technical
5 13
38 14
2.0 2.0
0.7 0.6
Total 53.9
* MPS = Master Pay Scale Notes 1. A multiplier of 2.0 is applied to the average MPS point to estimate the full staff costs
including the consultants’ overhead and profit, as the staff will be employed in the consultants’ offices (as at now, MPS point 38 = $71,385 per month and MPS point 14 = $24,380 per month).
2. The actual man-months and fees will only be known when we have selected the consultants through the usual competitive lump sum fee bidding system.