19
July 13, 2005 ITE District 6 Annual Meeting Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone Master of Urban and Regional Planning Candidate Portland State University [email protected] Chris Monsere, Ph.D., P.E. Research Assistant Professor, Portland State University Robert L. Bertini, Ph.D., P.E. Associate Professor, Portland State University Director, Center for Transportation Studies

ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

  • Upload
    diep

  • View
    50

  • Download
    0

Embed Size (px)

DESCRIPTION

Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages. ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone Master of Urban and Regional Planning Candidate Portland State University [email protected] - PowerPoint PPT Presentation

Citation preview

Page 1: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time MessagesITE District 6 Annual MeetingJuly 13, 2005

Aaron Breakstone Master of Urban and Regional Planning CandidatePortland State [email protected]

Chris Monsere, Ph.D., P.E.Research Assistant Professor, Portland State University

Robert L. Bertini, Ph.D., P.E.Associate Professor, Portland State UniversityDirector, Center for Transportation Studies

Page 2: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Outline

• Project Overview

• Summary of Test Area

• Experimental Design

• Data Collection

• Data Comparison

• Results

• Next Steps

Page 3: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Project Overview

Goals

1. Evaluate Oregon Department of Transportation’s (ODOT) travel time estimating and reporting capabilities

2. Identify locations where additional detectors might improve estimates

Page 4: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Project Overview

• ODOT Region 1 Traffic Management Operations Center (TMOC) – 485 inductive loop detectors – 19 variable message signs

(VMS), 3 currently displaying travel times

– Advanced Traveler Information Systems (ATIS): www.TripCheck.com

Page 5: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Project Overview

• Funded by NSF• Direct fiber-optic

connection between ODOT and PSU

• 20-second loop detector data– Volume– Speed– Occupancy

• Customized travel time area

Portland Regional Transportation Archive Listing (PORTAL) http://portal.its.pdx.edu

Page 6: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Summary of Test Area

• 18 original directional freeway links

• 3 links eliminated– Construction – Detectors not functional– Not pertinent to study

Downtown Portland

£¤26

217

§̈¦5

§̈¦5§̈¦205

§̈¦84

§̈¦5

Page 7: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Experimental Design• Analysis of PORTAL

estimates to determine required number of runs

• Data collection plan– 5-10 runs required for

most links– 4 routes designed– Transitional periods

targeted– Groups with 5-7 minute

headways– Standard probe vehicle

instructions

217 Southbound: US26 Interchange to I-5 Interchange [Link 9]

0

10

20

30

40

50

60

0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00

Time

Tra

ve

l T

ime

s

Cu

mu

lativ

e T

rav

el T

ime

Page 8: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Data Collection• Hardware

– Palm handheld computers

– Magellan GPS devices

• Software– ITS-GPS

Free! Available at www.its.pdx.edu

• Individual runs and groups of probe vehicles

• Variety of traffic conditions

Page 9: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Data Collection• 87 probe vehicle runs• 904 minutes (~15 hours) of collection time• 516 miles of data• 12 drivers• 7 days

Page 10: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Data Comparison• Probe data

– Individual runs downloaded

– Runs plotted on freeway network map showing link endpoints

– Pertinent data segments extracted

Page 11: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Data Comparison• Detector data

– Assignment of influence areas1. Midpoint method

2. ODOT modified midpoint method

– Aggregation1. Nearest 20-second interval

2. Average of nearest interval and 1 minute before

3. Average of nearest interval and 3 minutes before

Page 12: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Results• ATMS estimates reasonably accurate

P- Value -Statistical Significance

Link Number Midpoint ODOTMidpt -1

minMidpt -3

minODOT -1

minODOT -3

minLINK 2 - I-5 NB 0.073 0.103 0.034 0.071 0.038 0.079LINK 3 - I-5 NB 0.272 0.012 0.214 0.202 0.010 0.035LINK 4 - I-5 NB 0.651 0.665 0.545 0.287 0.560 0.301LINK 5 - I-5 SB 0.470 0.470 0.503 0.256 0.503 0.256LINK 6 - I-5 SB 0.435 0.095 0.676 0.605 0.052 0.045LINK 7 - I-5 SB 0.009 0.009 0.021 0.016 0.021 0.016LINK 8 - OR-217 NB 0.016 0.011 0.012 0.024 0.009 0.011LINK 9 - OR-217 SB 0.381 0.040 0.199 0.159 0.146 0.205LINK 10 - I-205 NB 0.532 0.460 0.277 0.040 0.896 0.965LINK 12 - I-205 SB 0.537 0.020 0.478 0.731 0.003 0.003LINK 13 - I-84 EB 0.273 0.070 0.518 0.402 0.098 0.077LINK 14 - I-84 WB 0.736 0.736 0.754 0.530 0.754 0.530LINK 16 - US 26 EB 0.026 0.026 0.009 0.012 0.009 0.012LINK 17 - US 26 WB 0.013 0.013 0.014 0.012 0.013 0.011

Page 13: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Results• ATMS estimates reasonably accurate

Run 1

303.5

304.0

304.5

305.0

305.5

306.0

306.5

307.0

307.5

308.0

8:03:00 8:05:00 8:07:00 8:09:00 8:11:00 8:13:00 8:15:00 8:17:00 8:19:00 8:21:00

Time

Mile

po

st

Run 9

0.3

0.8

1.3

1.8

2.3

2.8

3.3

16:30:00 16:32:00 16:34:00 16:36:00 16:38:00 16:40:00 16:42:00 16:44:00 16:46:00 16:48:00

Time

Mile

post

Page 14: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Results• Detector density and location critical

Run 7

292.3

293.3

294.3

295.3

296.3

297.3

298.3

299.3

300.3

8:05:00 8:10:00 8:15:00 8:20:00 8:25:00 8:30:00

Time

Mile

post

Run 1

303.5

304.0

304.5

305.0

305.5

306.0

306.5

307.0

307.5

308.0

8:06:00 8:08:00 8:10:00 8:12:00 8:14:00 8:16:00

Time

Mile

post

Run 6

68.9

69.4

69.9

70.4

70.9

71.4

71.9

72.4

72.9

8:17:00 8:18:30 8:20:00 8:21:30 8:23:00 8:24:30 8:26:00 8:27:30

Time

Mile

post

Page 15: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Results• Incidents difficult to capture

Run 1

69.7

70.2

70.7

71.2

71.7

72.2

72.7

73.2

73.7

16:26:00 16:28:00 16:30:00 16:32:00 16:34:00 16:36:00 16:38:00 16:40:00 16:42:00

Time

Mile

post

Run 3

0.3

1.1

1.9

2.7

3.5

4.3

5.1

5.9

6.7

8:18:00 8:23:00 8:28:00 8:33:00 8:38:00 8:43:00 8:48:00 8:53:00 8:58:00

Time

Mile

post

Page 16: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Results• No uniform difference between methods• Aggregation improves accuracy

-65%

-55%

-45%

-35%

-25%

-15%

-5%

5%

15%

25%

35%

45%

55%

65%

1 2 3 4 5 6 7 8 9 12 13 14 16 17

Link

Per

cen

t E

rro

r

Midpoint

ODOT

Midpt -1 min

Midpt -3 min

ODOT -1 min

ODOT -3 min

Travel Time Observations (95% CI)

0.00

1.00

2.00

3.00

4.00

5.00

6.00

Probe Midpoint ODOT Midpt -1

min

Midpt -3

min

ODOT -1

min

ODOT -3

min

Travel Time Differences

-1.00

-0.50

0.00

0.50

1.00

1.50

2.00

Midpoint ODOT Midpt -1

min

Midpt -3

min

ODOT -1

min

ODOT -3

min

AVG MIN MAX

Page 17: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

ResultsCandidate locations for increased detection

– Recurring congestion– Detector spacing > 1 mile

1. Hwy 217 NB at MP 3.22. US-26 EB at MP 703. US-26 WB at MP 694. US-26 WB at MP 705. I-5 NB at MP 298.56. I-5 SB at MP 306.57. I-84 EB at MP 2.0

Page 18: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Next Steps

• More data– Incidents– Capture transitions

• Different algorithms

Page 19: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Acknowledgements

• Oregon Department of Transportation– Stacy Shetler– Galen McGill– Dennis Mitchell– Jack Marchant

• Castle Rock

Consultants– Dean Deeter

• Volunteer drivers