ITC Scintillator Project. 1.6. 1.4. E3 C10 B11 E1 D5 A14 - A15 B14 D6 A16 - -. 1.2. D4 A12 A13 B12 - B13 - - - - B15 -. 1.1. 1.0. Responsibilities. MSU - PowerPoint PPT Presentation
Citation preview
USTileCal Planning Meeting @ UTAITC Scintillator Project
R. MillerMay 13, 2002
1
D4D5 D6
B11 B12 B13 B14
A12 A13 A14 A15 A16
B15
E1,2
E3,4
E3 C10 B11 E1 D5 A14 - A15 B14 D6 A16 - -
D4 A12 A13 B12 - B13 - - - - B15 -
1.0 1.1
1.2
1.4
1.6
ITC Scintillator Project
USTileCal Planning Meeting @ UTAITC Scintillator Project
R. MillerMay 13, 2002
2Responsibilities
• MSU– Produce ITC fiber assemblies for EB
instrumentation - 99% completed
– Design, construct and test prototypes of crack (E3, E4) scintillators - completed
– Purchase scintillator (E1:E4)
– Purchase & Prepare WLS fibers (E1:E4)
– Assemble, test & install crack scintillators - purchase and assembly of mechanical components pending submission approval of drawings
• UTA– Design, construct and test prototype of gap
(E1, E2, C10) scintillators - in progress
– Assemble, test & install gap scintillators
USTileCal Planning Meeting @ UTAITC Scintillator Project
R. MillerMay 13, 2002
3Gap Scintillator Design
USTileCal Planning Meeting @ UTAITC Scintillator Project
R. MillerMay 13, 2002
4Crack Scintillator Design
ATLAS IC Scintillator
R. Miller
Dimensions are in mm with a tolerance of ± 0.1 unless stated otherwise. Dimensions in parentheses are in Inches
DRAWNDATEPROJECTMATERIALTITLEDWG. NOSCALE
NOTES:
1.
MICHIGAN STATE UNIVERSITY HIGH ENERGY PHYSICS
REV
ASSEMBLY
A
HEP-B-025-368
227
140
885
Mounting bracket
Outer End piece Optical connectorsockets (2) pinned and sealed into end piece
Bottom cover panel is epoxied to end pieces.Black felt light seals line the surfaces in contact with fibers or scintillator edges.Top cover panel overlaps the bottom cover and end pieces and is taped at the edges.
Compression plate with set screws in same holes as mounting screws
6 mm thickPVT Scintillator, wrapped in Tyvek
OpticalIsolators on edges as necessary
(6) WLS Fibersfor cell E3
Inner End piece
Cell E3478
Cell E4362
19 8-14-01
1:5
C(1/8 x 3/4) pin
E4E3
(6) WLS Fibersfor cell E4
USTileCal Planning Meeting @ UTAITC Scintillator Project
R. MillerMay 13, 2002
5Optical Paths
ATLAS ITC Scintillator
R. Miller
MICHIGAN STATE UNIVERSITY HIGH ENERGY PHYSICS
REVDRAWNDATEPROJECTMATERIALTITLEDWG. NOSCALE
HEP-B-025-
R-PHI VIEW
R-Z VIEW
10-8-01 E
1:5
TileCal EB Plug
R=2288 (Inner radiusof Tilecal)
CrackScintillators
7
Cell E1313
Cell E2341
Z = 3540 (Face of LAr Cryostat)
8
290
227
FIBER ROUTING
Optical fibersin 1.5 mm dia.tubing(8/connector)
GapScintillators
376
Z = 3560 (Surface of Tilecal EB Endplate)
Clear fibers (in profiles) to PMT's
DR = 691
15
USTileCal Planning Meeting @ UTAITC Scintillator Project
R. MillerMay 13, 2002
6Envelope
R=2979
Envelope for Scintillators at Z = 3532 for R < 2891
ITC Plug Section IZ = 3444(source tubes)
R=2891
45˚
Proposed envelope for fibers from ITC scintillators
ITC Fiber Guide Plate
Z = 3560
Z = 3464
Fiber bundles to scintillators
USTileCal Planning Meeting @ UTAITC Scintillator Project
R. MillerMay 13, 2002
7Mounting Proposal
ATLAS ITC Scintillator
R. Miller
MICHIGAN STATE UNIVERSITY HIGH ENERGY PHYSICS
REVDRAWNDATEPROJECTMATERIALTITLEDWG. NOSCALE
HEP-B-025-
227
DR = 885
140
Z=3560
Z=3540
R=1453
GAPSCINTILATOR
INTER-CRYOSTAT SCINTILLATOR MOUNTING
137.
117.
R-PHI VIEW R-Z VIEW
Pin aligns inner end to slot in next ctr.
9-21-01 E
MOUNTING
1:5
Dimensions assume 2 mm between Ctrs.
Cell E4362
Cell E3478
371
E4E3
8*
15*
25
13
20
R=2313
MOUNTING DETAIL
50
10
(2) M4 x 15Socket Hd. CS attaches crack ctr. to bracket
(2 ) M8 x 30Flat Hd. CS Ctrsunk attaches bracket and gap ctr. to EB end plate
Shim as neededto clear LAr Cryost.
eta=1.20
Bracket
R=2288
R=2260
CRACKSCINTILLATOR
* Indicates Envelope DimensionNOTES:
Bar is Integral to crack ctr.
Bar is Integral to gap ctr.
LAR CRYOSTAT
TILECAL EB
USTileCal Planning Meeting @ UTAITC Scintillator Project
R. MillerMay 13, 2002
8Special Mounting
60
61
62
USTileCal Planning Meeting @ UTAITC Scintillator Project
R. MillerMay 13, 2002
9Issues & Status
• Funding/production status– Funding (USATLAS) OK’d for gap
scintillators
– Funding OK’d for crack scintillator mechanical components - Production delayed pending TC approval of drawings
• Special Modules– Fiber assemblies for modules with special
ITC submodules is almost completed (except for 1 special module type)
– Prototype mounting brackets have been made for modules with modified inner R - attached after EB assembly - allows us to use standard scintillators on all modules - one didn’t fit
• Light Covers– Plastic film to cover fiber cables, connectors
- detailed design in progress
USTileCal Planning Meeting @ UTAITC Scintillator Project
R. MillerMay 13, 2002
10
• Further testing– More Test Beam signal levels ?
– Cs Scans - signal levels ?
– Radiation hardness tests ?
– Check mounting & light covers on EB pre-assembly
Issues & Status (cont.)