To improve reliability, enable wind energy connections, and meet the region’s growing energy needs, ITC Midwest LLC (ITC) and MidAmerican Energy Co. are working to develop critical electric transmission lines in north central Iowa and southwest Minnesota. The proposed projects represent approximately 400 total miles of 345 kilovolt (kV) lines. ITC will construct and own approximately 225 miles of those lines.
PROJECT BACKGROUND – The proposed lines are the product of extensive analysis of the energy needs of the region. As proposed by MISO, the regional independent transmission planning organization, these lines reflect input from studies and initiatives including the Upper Midwest Transmission Development Initiative sponsored by five Midwest states and MISO’s Regional Generation Outlet studies. The final proposal was defined in MISO’s multi-year Multi-Value Project (MVP) study, conducted with substantial input from transmission-owning utilities, load-serving entities, generation developers and state utility commissions.
In proposing the projects, MISO set out to accomplish several objectives, including:
n Improve the operations and efficiency of the regional energy markets,
n Provide access to low-cost generation,
n Reduce the need for utilities to build future generation to meet their reserve requirements,
n Reduce energy wasted because of constraints, inefficiency and line losses on the system,
n Allow for the optimal use of wind energy resources,
n Provide optionality for future energy solutions.
The resulting package of 17 MVPs provides real and tangible benefits under several different future economic and regulatory scenarios. MISO approved the group of projects in December 2011 and authorized transmission owners to begin the activities (such as routing, designing and seeking regulatory approvals) to build the lines to meet the objectives that MISO established.
PROJECT PLANS – Two of the 17 MVPs, Projects 3 and 4, will be interconnected with the existing transmission infrastructure owned and operated by ITC and MidAmerican Energy. The two companies worked closely with MISO to define the specific configuration based on the operating needs in the area, and continued their joint efforts to define construction plans and ownership of the line segments.
ITC’s portion of MVP 3 is proposed to originate at ITC’s Lakefield Junction substation in southwest Minnesota, connecting east to ITC’s proposed Huntley substation in south central Minnesota, and south to a new MidAmerican Energy substation that will be constructed in Kossuth County, Iowa. MidAmerican Energy will construct additional lines in Iowa as part of MVP 3. The final project will require the construction of approximately 145 miles of 345 kV line in Iowa and 75 miles of 345 kV line in Minnesota. [continued, reverse]
P R O J E C T P R O F I L E :
ITC Multi-Value Project Transmission Lines
Proposed ITC Midwest Line Project
Proposed MidAmerican Energy Line Project
Proposed ITC Substation Project
Proposed MEC Substation Project
Adair
Allamakee
Audubon
Benton
Black Hawk
Boone
Bremer
Buchanan
Buena VistaButler
Calhoun
Carroll
Cass
Cedar
Cerro Gordo
Cherokee
ChickasawClay
Clayton
Clinton
Crawford
Dallas
Delaware
DickinsonEmmet
Fayette
Floyd
Franklin
Greene
Grundy
Guthrie
Hamilton
Hancock
Hardin
Harrison
Howard
Humboldt
Ida
Iowa
Jackson
JasperJohnson
Jones
Keokuk
Kossuth
Linn
Louisa
Lyon
Madison MahaskaMarion
Marshall
Mitchell
Monona
Muscatine
O'Brien Palo Alto
Plymouth Pocahontas
Polk
Pottawattamie
PoweshiekScott
Shelby
Sioux
Story Tama
Warren Washington
Webster
Winnebago
Woodbury
Worth
Wright
Adams
Buffalo
Clark
Crawford
Dane
Dunn
Eau Claire
GrantGreen
Iowa
Jackson
Juneau
La Crosse
Lafayette
Marathon
Monroe
Pepin
Pierce
Portage
Richland
Sauk
Trempealeau
Vernon
Wood
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Dodge
FaribaultFillmoreFreeborn
Goodhue
Houston
Jackson
Lac Qui Parle
Le SueurLincoln Lyon
Martin
McLeod
Mower
Murray
Nicollet
Nobles
OlmstedPipestone
Redwood
Renville
Rice
Rock
ScottSibley
Steele
Wabasha
WasecaWatonwan Winona
Yellow Medicine
Carroll
Henry
JoDaviess
Mercer
Rock Island
Stark
Stephenson
Whiteside
Adams
Appanoose
Clarke
DavisDecatur
Des Moines
Fremont
HenryJefferson
Lee
LucasMills MonroeMontgomery
Page RinggoldTaylor
Union
Van Buren
Wapello
Wayne
Sac
Dubuque
WinneshiekOsceola
Proposed ITC Midwest Line Project
Proposed MidAmerican Energy Line Project
Proposed ITC Substation Project
Proposed MEC Substation Project
Adair
Allamakee
Audubon
Benton
Black Hawk
Boone
Bremer
Buchanan
Buena VistaButler
Calhoun
Carroll
Cass
Cedar
Cerro Gordo
Cherokee
ChickasawClay
Clayton
Clinton
Crawford
Dallas
Delaware
DickinsonEmmet
Fayette
Floyd
Franklin
Greene
Grundy
Guthrie
Hamilton
Hancock
Hardin
Harrison
Howard
Humboldt
Ida
Iowa
Jackson
JasperJohnson
Jones
Keokuk
Kossuth
Linn
Louisa
Lyon
Madison MahaskaMarion
Marshall
Mitchell
Monona
Muscatine
O'Brien Palo Alto
Plymouth Pocahontas
Polk
Pottawattamie
PoweshiekScott
Shelby
Sioux
Story Tama
Warren Washington
Webster
Winnebago
Woodbury
Worth
Wright
Adams
Buffalo
Clark
Crawford
Dane
Dunn
Eau Claire
GrantGreen
Iowa
Jackson
Juneau
La Crosse
Lafayette
Marathon
Monroe
Pepin
Pierce
Portage
Richland
Sauk
Trempealeau
Vernon
Wood
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Dodge
FaribaultFillmoreFreeborn
Goodhue
Houston
Jackson
Lac Qui Parle
Le SueurLincoln Lyon
Martin
McLeod
Mower
Murray
Nicollet
Nobles
OlmstedPipestone
Redwood
Renville
Rice
Rock
ScottSibley
Steele
Wabasha
WasecaWatonwan Winona
Yellow Medicine
Carroll
Henry
JoDaviess
Mercer
Rock Island
Stark
Stephenson
Whiteside
Adams
Appanoose
Clarke
DavisDecatur
Des Moines
Fremont
HenryJefferson
Lee
LucasMills MonroeMontgomery
Page RinggoldTaylor
Union
Van Buren
Wapello
Wayne
Sac
Dubuque
WinneshiekOsceola
877.ITC.ITC9 (877.482.4829)www.itctransco.com
123 Fifth Street SE Cedar Rapids, Iowa 52401
6/1/2015
877.ITC.ITC9 (877.482.4829)www.itctransco.com
123 Fifth Street SE Cedar Rapids, Iowa 52401
Q: Why are you building these lines? A. These lines will provide many benefits to the region. As a result, they warranted the “Multi-Value” designation through the
MISO planning process. Among other values, these lines will help efficiently capture wind energy production, improve regional
reliability, encourage efficient generation investment to keep energy costs low, allow more efficient dispatch of generation
throughout the Midwest, and reduce energy losses. These lines reflect years of analysis of energy needs today and in the future
and a broad perspective approach to produce the greatest benefit for the entire region.
Q: Whose approval is required to build this line?A. These projects have been planned, reviewed and approved by MISO. In addition, for the Iowa portion of the projects, ITC
must request and secure a franchise from the Iowa Utilities Board and local approval prior to construction of each line segment.
For the Minnesota portion of the projects, ITC has secured approvals from the Minnesota Public Utilities Commission.
Q. How were the final line routes chosen?A. Transmission developers must strictly adhere to state requirements when selecting routes for transmission lines. In Iowa,
ITC must carefully consider the factors mandated by Iowa Code and the Iowa Administrative Code in order to minimize the
impact of the line on landowners. In Minnesota, the company must consider factors specified in Minnesota statutes and rules.
ITC worked closely with an engineering consultant to take statutory factors, local land uses and engineering requirements into
account to develop its siting proposal. The final desirable factor in siting is to secure voluntary easements from landowners
who agree to have the line placed on their property in return for compensation. The company also will compensate landowners
for damage that may occur during the construction process. ITC believes it is in everyone’s best interests to work with local
landowners throughout the process.
Q. What is the timing for construction?A. Construction will depend on the timetable for obtaining state regulatory approvals and acquiring landowner easements.
Construction on these segments is expected to take place between 2015 and 2018.
F R E Q U E N T L Y A S K E D Q U E S T I O N S
6/1/2015
MVP 4 will connect MVP 3 to ITC’s existing Hazleton substation northeast of Waterloo, Iowa. The
line will connect ITC’s Ledyard substation in Kossuth County to the
Mason City area, south to Franklin County, then east to the Hazleton substation.
MidAmerican Energy will be responsible for roughly 80 miles of line on the easterly
portion of the project. ITC will be responsible for approximately 110 miles of 345 kV
line as part of MVP 4.
ITC must secure state regulatory approvals before it can build any lines. Those
approvals will come only after routing studies are completed, detailed plans are
prepared, and regulatory proceedings are completed. The company also will need
to secure easements from landowners to construct the lines.