Wall Detail
Roof Detail
Internal Detail
Pool Detail
General Design Notes:
All works to comply with all current, Relevant building regulations and codes of Practice.
Design Guidance is taken from Sports England Documents and also The Metric Handbook, TGD-B, TGD-M, BS:9999.
All works to be passed by building Control officer inspections.
Cast in-situ concrete to comply with BS 8004.
Steel reinforcement & structural steel Frame to engineer’s details & design.
All timbers to be preservative treated, Structurally graded & sourced from an fsc Managed forests
Do not scale off drawings, dimensions Shown to be used. Consult architect's Office for clarification.
I.T CarlowDept. Of Built Enviroment
Architetural Technology Year 3Technical Desgn and Detailing
Mark Grincell - C00162901
Project No.3 - Thesis
Lecture: Noel D/ Dan O'SFinal Hand Up: 24/04/2015
Contents
Sheet Number Sheet Number
Cover Sheet GA - 001Ground Floor Plan GA - 100First Floor Plan GA - 101Basement Plan GA - 102Site Layout GA - 103Elevations - Finish GA - 104Elevations - Render GA - 105Building Section AA - DD GA - 106Changing Room Layout GA - 107Building Section GA - 1083D Sections GA - 109Front Canopy GA - 110Structural Arrangment GA - 111Environmental Strategy SS - 100Section AA - Wall Section No.1 TD - 100Section AA - Roof Section No.1 TD - 101Section AA - Internal Section No.1 TD - 102Section BB - Wall Section No.2 TD - 103Section BB - Roof Section No.2 TD - 104Section BB - Internal Section No.2 TD - 105Section CC - Wall Section No.3 TD - 106Section CC - Structural Glazing TD - 107Section DD - Wall Section No.4 TD - 109Section DD - CC - Swimming Pool Details TD - 110Complience Part M TGD - 100Complience Part M TGD - 101Complience Part B TGD - 102Complience Part B TGD - 103Site Map - OSI Ortho 2005 - 1:2000 Site Map - OSI Street Map - 1:2000 Site Map - Proposed Building Outline - 1:2000
List of Details
Detail Name Sheet Name Sheet Number
Section AA - Wall - Detail No.1 - Basement Retaining Wall Section AA - Wall Section No.1 TD - 100Section AA - Wall - Detail No.2 - Retaining Wall / First Floor Junction Section AA - Wall Section No.1 TD - 100Section AA - Wall - Detail No.3 - Rainscreen Cladding / First Floor Junction Section AA - Wall Section No.1 TD - 100Section AA - Roof - Detail No.4 - Green Roof Step Up / Accoya Cladding Section AA - Roof Section No.1 TD - 101Section AA - Roof - Detail No.5 - Green Roof / Barrow Center Junction Section AA - Roof Section No.1 TD - 101Section AA - Internal - Detail No.6 - Internal Balcony Section AA - Internal Section No.1 TD - 102Section AA - Internal - Detail No.7 - Internal Ceiling / Skylight Upstand Section AA - Internal Section No.1 TD - 102Section AA - Internal - Detail No.8 - Internal Door Section AA - Internal Section No.1 TD - 102Section BB - Wall - Detail No.1 - Secant Piles / Barrow Center Junction Section BB - Wall Section No.2 TD - 103Section BB - Wall - Detail No.3 - First Floor / Barrow Center Junction Section BB - Wall Section No.2 TD - 103Section BB - Wall - Detail No.2 - Ground Floor / Barrow Center Junction Section BB - Wall Section No.2 TD - 103Section BB - Roof - Detail No.5 - Rainscreen Cladding Parapet / Green Roof Junction Section BB - Roof Section No.2 TD - 104Section BB - Roof- Detail No.6 - Green Roof / Skylight Upstand Junction Section BB - Roof Section No.2 TD - 104Section BB - Internal - Detail No.7 - Balcony Suspension Section BB - Internal Section No.2 TD - 105Section BB - Internal - Detail No.8 - Glulam Column Base Seat Section BB - Internal Section No.2 TD - 105Section BB - Internal - Detail No.9 - Glulam Column Head Section BB - Internal Section No.2 TD - 105Section CC - Wall - Detail No.4 - Glass Panels / Ground Floor Junction Section CC - Wall Section No.3 TD - 106Section CC - Wall - Detail No.5 - Glass Panels / First Floor Junction Section CC - Wall Section No.3 TD - 106Section CC - Wall - Detail No.6 - Glass Panels / Roof Junction Section CC - Wall Section No.3 TD - 106Section CC - Structural Glazing - Detail No.1 - Structural Glazing Base Section CC - Structural Glazing TD - 107Section CC - Structural Glazing - Detail No.3 - Structural Glazing Head Section CC - Structural Glazing TD - 107Section CC - Structural Glazing - Detail No.2 - Structural Glazing Mid Joint Section CC - Structural Glazing TD - 107Section DD - Wall - Detail No.1 - Entrance Threshold Section DD - Wall Section No.4 TD - 109Section DD - Wall - Detail No.2 - Entrance Glazing / First Floor Junction Section DD - Wall Section No.4 TD - 109Section DD - Wall - Detail No.3 - Entrance Glazing Canopy Section DD - Wall Section No.4 TD - 109Section CC - Swimming Pool - Detail No.1 Section DD - CC - Swimming Pool Details TD - 110Section CC - Swimming Pool - Detail No.2 Section DD - CC - Swimming Pool Details TD - 110Section DD - Swimming Pool - Detail No.3 Section DD - CC - Swimming Pool Details TD - 110Section DD - Swimming Pool - Detail No.4 Section DD - CC - Swimming Pool Details TD - 110
ABCDEFGHI
32
1
6140 6140 6140 6140 5500 7500 8300 6700
111005825
5
6
7
3530
8
4200
J
4
GA - 106
3
GA - 106
1
GA - 106
2
GA - 106
48675
6140
North
3655
----
1200
3240
25000
10000
19300
5459
2700
4500
5000 1800
Barrow Center
Barrow Center
Barrow Center
2600 2600
2600 2600
22002200
13701370
G-1
G-22
G-27
G-21
G-28
Entry / Exit
30 m²Stairs No.1
2
38 m²Group Changing
10
6 m²G.C No.1
12
6 m²G.C No.2
13
6 m²G.C No.4
15
6 m²G.C No.3
14
7 m²CR Lobby
3
13 m²CR Hallway
4
5 m²GF Store
5
9 m²M.Showers
8
9 m²F.Showers
9
40 m²Pool Hallway
16
14 m²Female W.C
17
14 m²Male W.C
18
6 m²Hallway
19
29 m²Female Changing
7
30 m²Male Changing
6
17 m²Stairs No.3
27
22 m²First Aid
26
21 m²Office
23
8 m²Staff Changing
254 m²WC24
10 m²Reception Desk
22
14 m²Barrow Escape Corridor
21
8 m²Lobby
1
163 m²Hallway
30
15 m²Stairs No.2
31
22 m²Disabled WC/ Changing
28
14 m²Store
29
168 m²Main Lobby
20
17 m²G.Showers
11
G-11
1200
5000
524 m²Pool Area No.2
32
380 m²Pool Area No.1
33
G-26
G-25
2100
320081002850
1600
1600
200200
1500
3650 2220
7870
3220
2000
2220
3300
4180
5500
2200
3000
3100
3000
3100
2200
4200
4200
5500
4100
5100
2800
4800
2000
7800
9200
1100
300
20001200
1100
2100
4300
4200
2500
1600
2000
4300
3700
4500
G-14
41
Native Planting
NativeVegetation
Permeable Pavement
4700
1400
Balcony Above
Void Above
Double Space Above
Double Space Above
FF Above
LG
LG
16400
Site BoundarySite Boundary Site Boundary
Glazed Partition(Staff Entrance to Pool) Draft Lobby
GlazedPartition
Fire RatedGlazedPartition
RinseShowers
Pool PodChair Lift
Pool PodChair Lift
Spectator SeatingSpectator Seating
Legend
Boundary Line
30Min Fire Protected
60Min Fire Protected
90Min Fire Protected
30Min Fire Rated Door
60Min Fire Rated Door
90Min Fire Rated Door
Disabled Refuge (1.5x1.0m)
Service Shaft/ Run
1800mm Wc Turning Circle
Life Guard Stand Area
Entrance
Air Circulation / Smoke
Void Below
DR
LG
Building Compliance Notes:
All Fire Rated construction is to comply with TGDB 2006 andwhere need be BS:9999.
All Fire Rated doors will be fitted with self closing devices,intrumescent strips and smoke seals.All Escape route fire doors will be held open on magnetic padsthat will release on fire alarm activation.
Doors Tags - B: Basement Level - G: Ground Floor Level - F: FirstFloor.
Fire doors will have a vision panel to comply with TGD B Diagram10. Intrumescent strips, smoke seals. Doors automatic closer's willbe fitted to all fire doors.
The Building will be fitted with a Type M (L4) Fire Alarm to BS9999.
Skylight windows to act as smoke vent, activated by smoke/firealarm will allow smoke to exit.( Hydraulic arm system to beinstalled on window)
1m² aov smoke vent, activated by smoke/fire alarm will allowsmoke to exit in all stair wells as well an open vet incoperatedinto lift shaft.
A Wet sprinkler, fire suppression system will be used in thebasement store and plant room.
Emergency escape lighting to be installed On all escape routesto table 9, bs 5266-1 and Bs 5266-7. (Bs 9999 - 38.4).
Escape route Signage to comply with ; Bs 5499-4:2013; safety signscode of practice For escape route signing.
Fire extinguishing installations and Equipment on premisesselection and Positioning of portable fire extinguishers to Complywith Bs 5306-8:2012.
Building Layout will comply with TGD M. All Doors are Min 1000mmWide and 2200mm High in accordance with Table 2 andDiagram 10. Door handles will be located at a height of 900 mm(preferred) above finished floor level.
Reception desk to comply with Section 1.3.3.1 TGD-M.It will beeasily identifiable. The floor surface will be slip resistant (refer to BS8300:2009 Annex E) The reception desk will be designed tofacilitate both wheelchair users and standing people.
Audible Loop listen will be installed at the reception area to aidpeople with Audible disability in compliance with TGD-M 1.6.6
Where artificial lighting is provided, it will give good colourrendering of all surfaces, and will not create glare or pools ofbright light and strong shadows, which poorly located up-lightersmay create in accordance with TGD -M 1.6.5
Construction SpecificationSteel Structure:All Structural Steel to have 60min fireresistance. Structural design is aprovisional design and needs to beconsulted with Structural Engineer. AllSteel reinforced and structural steel tocomply with engineers details, specsand design.
Primary Steel StructureColumns (UKC - Blue)Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red)Serial Size - 356mm x 171mm. Kg/m - 67Skylight Columns (UKC - Baby Blue)Serial Size - 203mm x 203mm. Kg/m -54Structural Hollow Section (HC - Pink)Outside Diameter - 355.6. Thickness -8mm. Kg/m - 54Beams (UKB - Yellow)Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green)Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray)Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange)Kingspan Multichannel will be advisedto be used.Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for bothprecast and cast insitu to be ecocembased cement. All concrete works tocomply with BS:8004 and tested with BSEN 12350-1 2009. Exposed concretefinished to comply with BS:8110. (BoardPanel Finish). All Concrete construction tocomply with engineers details, specsand design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting assupport for concrete beams with holdingdown bolts cast in to secure steelcolumns above.
Concrete Columns (White)Cast in-situ, steel reinforced concretecolumns with cap with holding downbolts cast in to secure steel columnsabove, 300mm x 300mm.
Concrete Beams (Purple)Transfer structure in place wherestructural steel column grid & basementconcrete column grids do not coincide.Seating for hollow core floor slabsincorporated in beams.
Glulam Structure:Structural Engineer design to be followedwith the Glulam structure. The Steel shoesare to be designed to resist watercorrosion.
Floor Build Up:Ground Floor Suspended - InsulatedHollowcore Slab.
Max Span 9m, Min 50mm bearing and25mm Side bearing. All Gaps filled withlean mix concrete before insulationinstall. All columns wrapped incompressible insulation layer to meetscreed height. Movement joints also tobe accommodated.
-150mm precast concrete floor slab withedge thickening and steel reinforced.-150mm rigid PIR Insulation.(HighCompressive Strength)-75mm Concrete Screed.- Various Floor Finish.
Ground Floor Bearing - InsulatedConcrete Slab
All Gaps filled with lean mix concretebefore insulation install. All columnswrapped in compressible insulationlayer to meet screed height. Movementjoints also to be accommodated.
-150mm concrete floor slab with edgethickening & steel reinforced, oncontinuous radon membrane to exitabove ground outside building.-150mm rigid PIR Insulation.(HighCompressive Strength)-50mm sand blinding layer oncompacted layers of suitable hardcore225mm.
Stairs:Precast concrete stairs used through out thebuilding for stairs no1+2+3. Exposed boardpanel finish on concrete. All doors 60 minutefire rated with smoke seal & automaticcloser to all stairs, opening in direction ofescape. All stairs cores to have 1m²automatic opening vent, linked to firealarm.
All 3 stairs will be fire protected up to 60minincluding any glazing incorporated into theshaft design. Stairs No.1 will lead directly toan external exit. Stairs No. 2+3 will lead into aprotected corridor and to a final exit.
All stairs are in accordance with TGD M1.2.4.1.2 - TGD L 1.1 - TGD B Part B1 (1.3).
Lift/ Lift Shaft:OTIS Gen2 Premier ED Passenger lift.3stops, Basement, Ground Floor, First Floor.Max load - 2000KG (20 People)Speed - 1m/sCar Size - 2350mm - 1700mm, Height -2200mm.Entrance door 1200mm x 2100mm, 2 panelCenter open.Shaft Width - 3050 mm x 2000mm
Lift shaft 150mm cast insitu concrete withboard panel finish externally. Internal of shaftto be coated with white paint and fitted withemergency lighting.Vent of 1m² located at top of shaft.
Basement Entrance/Exit Ramp:2400mm wide vehicle ramp to be 50mmcompacted tarmac on 150mmcompacted hardcore substrate. Rampslope to be 1:9 with 7m landing betweenrises. Head Clearance of 3000mm.One Way Traffic Lights operated system tobe applied.Water channel at basement entrance &exit to minimize water ingress, piped tothe site water attenuation tank.
Service Shaft:Service shaft to be 60mm fire resistant,metal stud construction, including allaccess panels fitted with smoke seals ataccess panels points.
Curtain Walling:APA curtain walling system, TB50 SGsystem which will also be used to supportstructurally.Double glazed Units incorporated. Alljoints to be weathered using silicone seals.
Double glazed unit sizes - 1200mm x2000mm.All curtain walling to have trench heatingbelow to aid in stopping condensation.
Doors:Internal -Protected escape routes will be 60 minute resistance.Doors will open in the direction of escape but not ontoan escape route as per TGD B2006 1.4.3.3. Escape routedoors will be fitted with an electromagnetic that willallow doors to close in the event of fire.
60 minute fire doors will be installed to all stair cores,store rooms and where needed.
Fire doors will have a vision panel to comply with TGD MDiagram 10. Intrumescent strips, smoke seals. Doorsautomatic closer's will be fitted to all fire doors.
External -The main entrance had a lobby entrance with electronicswing doors. There are activated by a sensory system. Theclear width of the opening will be 2000mm and a heightof 2200mm. The Doors will meet the requirement set outin TGD M 1.2.
Structural Glazing:The Structural glazing is a compliment to the Casa DaMusica in Portugal Designed by OMA. The curved glassfacade is deigned by ABT Arnhem.
Hot bended curved and laminated strips of glass 1200mm wide and 400 mm deep.
Good sound insulation can be achieved by placing twosheets of glass at some distance from each other,preferably over an expansion joint, 500mm.
First Floor Suspended - Hollowcore Slab
Max Span 9m, Min 50mm bearing and25mm Side bearing. All Gaps filled with leanmix concrete before insulation install. Allcolumns wrapped in compressible insulationlayer to meet screed height. Movementjoints also to be accommodated.
-150mm precast concrete floor slab withedge thickening and steel reinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete beforeinsulation install. Floor Thickening aroundperimeters of columns. Movement joints alsoto be accommodated.
-150mm concrete floor slab with edgethickening & steel reinforced, on continuousradon membrane to exit above groundoutside building.-50mm sand blinding layer on compactedlayers of suitable hardcore 225mm.
Swimming Pool:Design guidance for the swimming poolarea design and construction is taken fromthe metric handbook and various SportsEngland Documents. Both Pools share thesame filtration system but share separateheating systems. There will be a store for poolequipment in the area and the lane ropeswill be kept at the return end of the pool inthe service corridor. Lighting in pool inaccordance with Sport England ArtificialSports Lights.The both pools will have a "Poolpod" Liftinstalled to facilitate wheelchair users.
Competition Pool - 25000mm x 10000mm, 8Lane Pool. Side Lanes Kept as Margin.PoolMarking in accordance with ASA/FINAStandards following 25m Pools GeneralGuidance. Shallow 1300mm - Mid 1600mm -Deep 1900mm. Tank Colour - White.Leisure Pool - 1200mm Sloping to 1800mm.Stepped Access point using 300mm Treadsaccompanied with hand rail in accordancewith TGD L at the shallowest area and thepool slopes the width. Tank Colour - White.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughoutthe building as each zone has differentrequirements (fire) and uses. The basic buildup is a 2.5mm Plasterskim, 12.5mmPlasterboard, 100mm Steed Stud System,12.5mm Plasterboard, 2.5mm Plasterskim.10mm Shadow Gap to be incorporated onperimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium FireFrame System, with 23mm PilkingtonPyrostop Glass. This will achieve a 60Min FireRating. System to incorporate fire-ratedinsulation (Mineral Wool) as well asintumescent tape.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel35mm Thickness. Various Width and Lengths(300x300mm - 600x600mm - 900x900mm -1200x1200mm). Hidden Fix System toVertical Rail System.Proprietary Vertical Railing System securedto Steel Multichannel (CPB). (Thermal BreakIncorporated)50mm PIR Rainscreen Insulation secured toCement Particle Board 12mm, secured to200mm Multichannel. CPB Taped at joints toform air tight barrier. 200mm Space inMultichannel filled with Fire Rated MineralQuilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondarystructure. Internally Steel Channels providea 50mm service cavity for electrical Works.Required Plasterboard finish secured to steelchannels.
Accoya Timber Cladding -Vertical Accoya Cladding 50mm Width, ShiplapJoint (50year Warranty). Secured to verticalsupport system.Proprietary Vertical Railing System secured to SteelMultichannel (CPB). (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured toCement Particle Board 12mm, secured to 200mmMultichannel. CPB Taped at joints to form air tightbarrier. 200mm Space in Multichannel filled withFire Rated Mineral Quilt Insulation. Continuous Firerated Vapour barrier on inner face pf secondarystructure. Internally Steel Channels provide a50mm service cavity for electrical Works. RequiredPlasterboard finish secured to steel channels.
Roof Build Up:Green Roof Build Up- 175mm growing substrate with sedum planting.- Filter fleece to prevent any soil particles washinginto the drainage layer, dressed betweendrainage channel and growing substrate.- 60mm Bauder DSE 60 board, filled with mineraldrain material.-Root resistant layer on waterproofing under layer.-Bauder FSM 1100 protection mat, polyester &polypropylene fiber.-150mm rigid PIR insulation.-Vapor barrier layer.-75mm concrete screed.-150mm precast concrete floor slab with edgethickening and steel reinforced.
Copper Mesh Vision Panel -OkaTech Sealed Glazed ExpandedCopper Mesh Panels. This facade is acurtain wall assembly and supported byaluminium brackets at each level. Designguidance is required from Okalux for finaldeign.GL Support brackets (650x105mm)cantilevered anchor supports boltedConcrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm)in Pockets at 1200mm centres in First FloorSlab. High Steel Curtain walling supportangles (250x165x50mm).
- 8 mm low-iron outer pane with coppercoloured frit around edges to concealstructural silicone.- 2 mm cavity with expanded copper meshsecured in corners with spots of silicone.- 8 mm solar control glass with low-e coating.- 16 mm air cavity.- 10 mm laminated inner pane comprisingtwo panes 5 mm fl oat glass and 0.76 mmPVB (polyvinylbutyral) interlayer.
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed ExpandedCopper Mesh Spandrel Panels. This facadeis a curtain wall assembly and supportedby aluminium brackets at each level.Design guidance is required from Okalux forfinal deign.GL Support brackets (650x105mm)cantilevered anchor supports boltedConcrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm)in Pockets at 1200mm centres in First FloorSlab. High Steel Curtain walling supportangles (250x165x50mm).
- 8 mm low-iron outer pane with coppercoloured frit around edges to concealstructural silicone.- 2 mm cavity with expanded copper meshsecured in corners with spots of silicone.- 8 mm solar control glass with low-ecoating.- 30 mm air cavity.- 120 mm rigid insulation.- 3 mm folded aluminium backing sheet.
Pool Area (Wet Zone)Non Slip Tiles
Curved Strutural Glazing
Permeable Paving at Entrance
Changing Room and Toilets(Wet Zone) Non Slip Tiles
Hallway (Dry Zone)Concrete Screed
Lobby (Dry Zone)Concrete Screed
Carpets in Door Lobby(Well Mats)
Native VegetationPlanted for privacy.
Dri - Design Copper Cladding
General Design Notes:
All works to comply with all current, Relevant building regulationsand codes of Practice.
Design Guidance is taken from Sports England Documents and alsoThe Metric Handbook, TGD-B, TGD-M, BS:9999.
All works to be passed by building Control officer inspections.
Cast in-situ concrete to comply with BS 8004.
Steel reinforcement & structural steel Frame to engineer’s details &design.
All timbers to be preservative treated, Structurally graded &sourced from an fsc Managed forests
Do not scale off drawings, dimensions Shown to be used. Consultarchitect's Office for clarification.
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
1 : 100
23/04/2015 09:05:57
Ground Floor Plan
Issue Date
GA - 100
1 : 100GA - 100
Level 0 - Ground Floor1
Ground Level - Room Schedule
Name Number Area Floor Finish
Lobby 1 8 m² Polished Concrete SrceedStairs No.1 2 30 m² Polished Concrete SrceedCR Lobby 3 7 m² Non Slip TilesCR Hallway 4 13 m² Non Slip TilesGF Store 5 5 m² Non Slip TilesMale Changing 6 30 m² Non Slip TilesFemale Changing 7 29 m² Non Slip TilesM.Showers 8 9 m² Non Slip TilesF.Showers 9 9 m² Non Slip TilesGroup Changing 10 38 m² Non Slip TilesG.Showers 11 17 m² Non Slip TilesG.C No.1 12 6 m² Non Slip TilesG.C No.2 13 6 m² Non Slip TilesG.C No.3 14 6 m² Non Slip TilesG.C No.4 15 6 m² Non Slip TilesPool Hallway 16 40 m² Non Slip TilesFemale W.C 17 14 m² Non Slip TilesMale W.C 18 14 m² Non Slip TilesHallway 19 6 m² Polished Concrete SrceedMain Lobby 20 168 m² Polished Concrete SrceedBarrow Escape Corridor 21 14 m² Polished Concrete SrceedReception Desk 22 10 m² Carpet and UnderlayOffice 23 21 m² Carpet and UnderlayWC 24 4 m² Non Slip TilesStaff Changing 25 8 m² Non Slip TilesFirst Aid 26 22 m² Non Slip TilesStairs No.3 27 17 m² Polished Concrete SrceedDisabled WC/ Changing 28 22 m² Non Slip TilesStore 29 14 m² Non Slip TilesHallway 30 163 m² Polished Concrete SrceedStairs No.2 31 15 m² Polished Concrete SrceedPool Area No.2 32 524 m² Non Slip TilesPool Area No.1 33 380 m² Non Slip Tiles
Ground Level - Door Schedule
Type Width Height Count Mark
White Oak Door Set - Vision Panel 1000 2200 1 G-1White Oak Door Set - Vision Panel 1000 2200 1 G-2White Oak Door Set - Vision Panel 1000 2200 1 G-3White Oak Door Set - No Vision Panel 1000 2200 1 G-4White Oak Door Set - No Vision Panel 1000 2200 1 G-5White Oak Door Set - No Vision Panel 1000 2200 1 G-6White Oak Door Set - No Vision Panel 1000 2200 1 G-7White Oak Door Set - No Vision Panel 1000 2200 1 G-8White Oak Door Set - No Vision Panel 1000 2200 1 G-9White Oak Door Set - No Vision Panel 1000 2200 1 G-10White Oak Door Set - No Vision Panel 1000 2200 1 G-11White Oak Door Set - No Vision Panel 1000 2200 1 G-12White Oak Door Set - No Vision Panel 1000 2200 1 G-13Door and Half - Vision Panel 1500 2200 1 G-14White Oak Door Set - No Vision Panel 1000 2200 1 G-15White Oak Door Set - No Vision Panel 1000 2200 1 G-16White Oak Door Set - No Vision Panel 1000 2200 1 G-17White Oak Door Set - No Vision Panel 1000 2200 1 G-18White Oak Door Set - Vision Panel 1000 2200 1 G-19White Oak Door Set - No Vision Panel 1000 2200 1 G-20Sliding Double Door 1970 2155 1 G-21White Oak Door Set - Vision Panel 1000 2200 1 G-22White Oak Door Set - No Vision Panel 1000 2200 1 G-23White Oak Door Set - No Vision Panel 1000 2200 1 G-24White Oak Door Set - No Vision Panel 1000 2200 1 G-25White Oak Door Set - No Vision Panel 1000 2200 1 G-26Door and Half - Vision Panel 1500 2200 1 G-27Glass Door Single 12mm Thickness 1355 2155 1 G-28Sliding Double Door 2000 2652 1 G-29Sliding Double Door 2000 2625 1 G-30Structural Opening 1000 2200 1 G-31Structural Opening 1000 2200 1 G-32Structural Opening 1000 2200 1 G-33Structural Opening 1000 2200 1 G-34Structural Opening 1000 2200 1 G-35Structural Opening 1000 2200 1 G-36Structural Opening 1000 2200 1 G-37Structural Opening 1000 2200 1 G-38Glass Door Single 12mm Thickness 1170 2652 1 G-39Glass Door Single 12mm Thickness 1170 2141 1 G-40Copper Vision Panel - E.Door 2000 2200 1 G-41
Basment Access Ramp
GA - 100
GA - 3D - Ground Floor2
GA - 100
Front Entrance - 1st Person Perspective3
ABCDEFGHI
32
1
5
6
7
8
J
4
GA - 106
3
GA - 106
1
GA - 106
2
GA - 106
4
3533
4200
111005825
8675
6140 6140 6140 6140 6140 5500 7500 8300 6700
3655
----
Void Below
Barrow Center
North
Barrow Center
Barrow Center
Void Below
Void Below
Void Below
Void Below
18001700
1800
1500
1800
1300
5 m²Store
42
134 m²Lecture Room No.1
41
133 m²Lecture Room No.2
43
31 m²Stairs No.1
44
233 m²Exhibition Space
40
9 m²Disabled WC
35
22 m²Stairs No.3
34
14 m²F.WC
39
9 m²M.WC
38
187 m²First Floor Lobby
36
F-53
F-41
F-47
F-51
F-44
F-52
15 m²Stairs No.2
37
79003300
93005100
900
2000
2500
3800 1000 11001000 1500 3000 3100 1500 600 1000 1200 800 1500
11200
12500
14500
3100
4500
2100
1100 1000 400 1000 800 2300 2000 400
Site BoundrySite Boundry Site Boundry
Void Below
Void BelowGlazed Railing Surroundof Void
StackVentiltionCavity
Glazed Partition
Glazed Railingon Balcony
1
TD - 104
2
TD - 107
1
TD - 109
1
TD - 100
1
TD - 101
1
TD - 102
1
TD - 103
1
TD - 105
1
TD - 106
Building Compliance Notes:
All Fire Rated construction is to comply with TGDB 2006 andwhere need be BS:9999.
All Fire Rated doors will be fitted with self closing devices,intrumescent strips and smoke seals.All Escape route fire doors will be held open on magnetic padsthat will release on fire alarm activation.
Doors Tags - B: Basement Level - G: Ground Floor Level - F: FirstFloor.
Fire doors will have a vision panel to comply with TGD B Diagram10. Intrumescent strips, smoke seals. Doors automatic closer's willbe fitted to all fire doors.
The Building will be fitted with a Type M (L4) Fire Alarm to BS9999.
Skylight windows to act as smoke vent, activated by smoke/firealarm will allow smoke to exit.( Hydraulic arm system to beinstalled on window)
1m² aov smoke vent, activated by smoke/fire alarm will allowsmoke to exit in all stair wells as well an open vet incoperatedinto lift shaft.
A Wet sprinkler, fire suppression system will be used in thebasement store and plant room.
Emergency escape lighting to be installed On all escape routesto table 9, bs 5266-1 and Bs 5266-7. (Bs 9999 - 38.4).
Escape route Signage to comply with ; Bs 5499-4:2013; safety signscode of practice For escape route signing.
Fire extinguishing installations and Equipment on premisesselection and Positioning of portable fire extinguishers to Complywith Bs 5306-8:2012.
Building Layout will comply with TGD M. All Doors are Min 1000mmWide and 2200mm High in accordance with Table 2 andDiagram 10. Door handles will be located at a height of 900 mm(preferred) above finished floor level.
Reception desk to comply with Section 1.3.3.1 TGD-M.It will beeasily identifiable. The floor surface will be slip resistant (refer to BS8300:2009 Annex E) The reception desk will be designed tofacilitate both wheelchair users and standing people.
Audible Loop listen will be installed at the reception area to aidpeople with Audible disability in compliance with TGD-M 1.6.6
Where artificial lighting is provided, it will give good colourrendering of all surfaces, and will not create glare or pools ofbright light and strong shadows, which poorly located up-lightersmay create in accordance with TGD -M 1.6.5
General Design Notes:
All works to comply with all current, Relevant building regulationsand codes of Practice.
Design Guidance is taken from Sports England Documents and alsoThe Metric Handbook, TGD-B, TGD-M, BS:9999.
All works to be passed by building Control officer inspections.
Cast in-situ concrete to comply with BS 8004.
Steel reinforcement & structural steel Frame to engineer’s details &design.
All timbers to be preservative treated, Structurally graded &sourced from an fsc Managed forests
Do not scale off drawings, dimensions Shown to be used. Consultarchitect's Office for clarification.
Legend
Boundary Line
30Min Fire Protected
60Min Fire Protected
90Min Fire Protected
30Min Fire Rated Door
60Min Fire Rated Door
90Min Fire Rated Door
Disabled Refuge (1.5x1.0m)
Service Shaft/ Run
1800mm Wc Turning Circle
Life Guard Stand Area
Entrance
Air Circulation / Smoke
Void Below
DR
LG
Construction SpecificationSteel Structure:All Structural Steel to have 60min fireresistance. Structural design is aprovisional design and needs to beconsulted with Structural Engineer. AllSteel reinforced and structural steel tocomply with engineers details, specsand design.
Primary Steel StructureColumns (UKC - Blue)Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red)Serial Size - 356mm x 171mm. Kg/m - 67Skylight Columns (UKC - Baby Blue)Serial Size - 203mm x 203mm. Kg/m -54Structural Hollow Section (HC - Pink)Outside Diameter - 355.6. Thickness -8mm. Kg/m - 54Beams (UKB - Yellow)Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green)Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray)Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange)Kingspan Multichannel will be advisedto be used.Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for bothprecast and cast insitu to be ecocembased cement. All concrete works tocomply with BS:8004 and tested with BSEN 12350-1 2009. Exposed concretefinished to comply with BS:8110. (BoardPanel Finish). All Concrete construction tocomply with engineers details, specsand design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting assupport for concrete beams with holdingdown bolts cast in to secure steelcolumns above.
Concrete Columns (White)Cast in-situ, steel reinforced concretecolumns with cap with holding downbolts cast in to secure steel columnsabove, 300mm x 300mm.
Concrete Beams (Purple)Transfer structure in place wherestructural steel column grid & basementconcrete column grids do not coincide.Seating for hollow core floor slabsincorporated in beams.
Glulam Structure:Structural Engineer design to be followedwith the Glulam structure. The Steel shoesare to be designed to resist watercorrosion.
Floor Build Up:Ground Floor Suspended - InsulatedHollowcore Slab.
Max Span 9m, Min 50mm bearing and25mm Side bearing. All Gaps filled withlean mix concrete before insulationinstall. All columns wrapped incompressible insulation layer to meetscreed height. Movement joints also tobe accommodated.
-150mm precast concrete floor slab withedge thickening and steel reinforced.-150mm rigid PIR Insulation.(HighCompressive Strength)-75mm Concrete Screed.- Various Floor Finish.
Ground Floor Bearing - InsulatedConcrete Slab
All Gaps filled with lean mix concretebefore insulation install. All columnswrapped in compressible insulationlayer to meet screed height. Movementjoints also to be accommodated.
-150mm concrete floor slab with edgethickening & steel reinforced, oncontinuous radon membrane to exitabove ground outside building.-150mm rigid PIR Insulation.(HighCompressive Strength)-50mm sand blinding layer oncompacted layers of suitable hardcore225mm.
Stairs:Precast concrete stairs used through out thebuilding for stairs no1+2+3. Exposed boardpanel finish on concrete. All doors 60 minutefire rated with smoke seal & automaticcloser to all stairs, opening in direction ofescape. All stairs cores to have 1m²automatic opening vent, linked to firealarm.
All 3 stairs will be fire protected up to 60minincluding any glazing incorporated into theshaft design. Stairs No.1 will lead directly toan external exit. Stairs No. 2+3 will lead into aprotected corridor and to a final exit.
All stairs are in accordance with TGD M1.2.4.1.2 - TGD L 1.1 - TGD B Part B1 (1.3).
Lift/ Lift Shaft:OTIS Gen2 Premier ED Passenger lift.3stops, Basement, Ground Floor, First Floor.Max load - 2000KG (20 People)Speed - 1m/sCar Size - 2350mm - 1700mm, Height -2200mm.Entrance door 1200mm x 2100mm, 2 panelCenter open.Shaft Width - 3050 mm x 2000mm
Lift shaft 150mm cast insitu concrete withboard panel finish externally. Internal of shaftto be coated with white paint and fitted withemergency lighting.Vent of 1m² located at top of shaft.
Basement Entrance/Exit Ramp:2400mm wide vehicle ramp to be 50mmcompacted tarmac on 150mmcompacted hardcore substrate. Rampslope to be 1:9 with 7m landing betweenrises. Head Clearance of 3000mm.One Way Traffic Lights operated system tobe applied.Water channel at basement entrance &exit to minimize water ingress, piped tothe site water attenuation tank.
Service Shaft:Service shaft to be 60mm fire resistant,metal stud construction, including allaccess panels fitted with smoke seals ataccess panels points.
Curtain Walling:APA curtain walling system, TB50 SGsystem which will also be used to supportstructurally.Double glazed Units incorporated. Alljoints to be weathered using silicone seals.
Double glazed unit sizes - 1200mm x2000mm.All curtain walling to have trench heatingbelow to aid in stopping condensation.
Doors:Internal -Protected escape routes will be 60 minute resistance.Doors will open in the direction of escape but not ontoan escape route as per TGD B2006 1.4.3.3. Escape routedoors will be fitted with an electromagnetic that willallow doors to close in the event of fire.
60 minute fire doors will be installed to all stair cores,store rooms and where needed.
Fire doors will have a vision panel to comply with TGD MDiagram 10. Intrumescent strips, smoke seals. Doorsautomatic closer's will be fitted to all fire doors.
External -The main entrance had a lobby entrance with electronicswing doors. There are activated by a sensory system. Theclear width of the opening will be 2000mm and a heightof 2200mm. The Doors will meet the requirement set outin TGD M 1.2.
Structural Glazing:The Structural glazing is a compliment to the Casa DaMusica in Portugal Designed by OMA. The curved glassfacade is deigned by ABT Arnhem.
Hot bended curved and laminated strips of glass 1200mm wide and 400 mm deep.
Good sound insulation can be achieved by placing twosheets of glass at some distance from each other,preferably over an expansion joint, 500mm.
First Floor Suspended - Hollowcore Slab
Max Span 9m, Min 50mm bearing and25mm Side bearing. All Gaps filled with leanmix concrete before insulation install. Allcolumns wrapped in compressible insulationlayer to meet screed height. Movementjoints also to be accommodated.
-150mm precast concrete floor slab withedge thickening and steel reinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete beforeinsulation install. Floor Thickening aroundperimeters of columns. Movement joints alsoto be accommodated.
-150mm concrete floor slab with edgethickening & steel reinforced, on continuousradon membrane to exit above groundoutside building.-50mm sand blinding layer on compactedlayers of suitable hardcore 225mm.
Swimming Pool:Design guidance for the swimming poolarea design and construction is taken fromthe metric handbook and various SportsEngland Documents. Both Pools share thesame filtration system but share separateheating systems. There will be a store for poolequipment in the area and the lane ropeswill be kept at the return end of the pool inthe service corridor. Lighting in pool inaccordance with Sport England ArtificialSports Lights.The both pools will have a "Poolpod" Liftinstalled to facilitate wheelchair users.
Competition Pool - 25000mm x 10000mm, 8Lane Pool. Side Lanes Kept as Margin.PoolMarking in accordance with ASA/FINAStandards following 25m Pools GeneralGuidance. Shallow 1300mm - Mid 1600mm -Deep 1900mm. Tank Colour - White.Leisure Pool - 1200mm Sloping to 1800mm.Stepped Access point using 300mm Treadsaccompanied with hand rail in accordancewith TGD L at the shallowest area and thepool slopes the width. Tank Colour - White.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughoutthe building as each zone has differentrequirements (fire) and uses. The basic buildup is a 2.5mm Plasterskim, 12.5mmPlasterboard, 100mm Steed Stud System,12.5mm Plasterboard, 2.5mm Plasterskim.10mm Shadow Gap to be incorporated onperimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium FireFrame System, with 23mm PilkingtonPyrostop Glass. This will achieve a 60Min FireRating. System to incorporate fire-ratedinsulation (Mineral Wool) as well asintumescent tape.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel35mm Thickness. Various Width and Lengths(300x300mm - 600x600mm - 900x900mm -1200x1200mm). Hidden Fix System toVertical Rail System.Proprietary Vertical Railing System securedto Steel Multichannel (CPB). (Thermal BreakIncorporated)50mm PIR Rainscreen Insulation secured toCement Particle Board 12mm, secured to200mm Multichannel. CPB Taped at joints toform air tight barrier. 200mm Space inMultichannel filled with Fire Rated MineralQuilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondarystructure. Internally Steel Channels providea 50mm service cavity for electrical Works.Required Plasterboard finish secured to steelchannels.
Accoya Timber Cladding -Vertical Accoya Cladding 50mm Width, ShiplapJoint (50year Warranty). Secured to verticalsupport system.Proprietary Vertical Railing System secured to SteelMultichannel (CPB). (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured toCement Particle Board 12mm, secured to 200mmMultichannel. CPB Taped at joints to form air tightbarrier. 200mm Space in Multichannel filled withFire Rated Mineral Quilt Insulation. Continuous Firerated Vapour barrier on inner face pf secondarystructure. Internally Steel Channels provide a50mm service cavity for electrical Works. RequiredPlasterboard finish secured to steel channels.
Roof Build Up:Green Roof Build Up- 175mm growing substrate with sedum planting.- Filter fleece to prevent any soil particles washinginto the drainage layer, dressed betweendrainage channel and growing substrate.- 60mm Bauder DSE 60 board, filled with mineraldrain material.-Root resistant layer on waterproofing under layer.-Bauder FSM 1100 protection mat, polyester &polypropylene fiber.-150mm rigid PIR insulation.-Vapor barrier layer.-75mm concrete screed.-150mm precast concrete floor slab with edgethickening and steel reinforced.
Copper Mesh Vision Panel -OkaTech Sealed Glazed ExpandedCopper Mesh Panels. This facade is acurtain wall assembly and supported byaluminium brackets at each level. Designguidance is required from Okalux for finaldeign.GL Support brackets (650x105mm)cantilevered anchor supports boltedConcrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm)in Pockets at 1200mm centres in First FloorSlab. High Steel Curtain walling supportangles (250x165x50mm).
- 8 mm low-iron outer pane with coppercoloured frit around edges to concealstructural silicone.- 2 mm cavity with expanded copper meshsecured in corners with spots of silicone.- 8 mm solar control glass with low-e coating.- 16 mm air cavity.- 10 mm laminated inner pane comprisingtwo panes 5 mm fl oat glass and 0.76 mmPVB (polyvinylbutyral) interlayer.
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed ExpandedCopper Mesh Spandrel Panels. This facadeis a curtain wall assembly and supportedby aluminium brackets at each level.Design guidance is required from Okalux forfinal deign.GL Support brackets (650x105mm)cantilevered anchor supports boltedConcrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm)in Pockets at 1200mm centres in First FloorSlab. High Steel Curtain walling supportangles (250x165x50mm).
- 8 mm low-iron outer pane with coppercoloured frit around edges to concealstructural silicone.- 2 mm cavity with expanded copper meshsecured in corners with spots of silicone.- 8 mm solar control glass with low-ecoating.- 30 mm air cavity.- 120 mm rigid insulation.- 3 mm folded aluminium backing sheet.
First Floor Lobby(Dry Zone)Also Coffee,Viewing Area andFFToilets.
Glulam StructuralColumn(MoistureResistance)
CurvedStructuralGlazing
Stairs No.1Access to Upstairs+ Emergency Exit
Lecture Rooms(Dry Zone)
Exibition Area(Dry Zone)
Copper Mesh VisionPanel Facade
Lift Shaft
Dri Design Copper Cladding
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
1 : 100
23/04/2015 08:49:48
First Floor Plan
Issue Date
GA - 101
1 : 100GA - 101
Level 1 - First Floor1
First Floor Level - Room Schedule
Name Number Area Floor Finish
Stairs No.3 34 22 m² Polished Concrete SrceedDisabled WC 35 9 m² Non Slip TilesFirst Floor Lobby 36 187 m² Polished Concrete SrceedStairs No.2 37 15 m² Polished Concrete SrceedM.WC 38 9 m² Non Slip TilesF.WC 39 14 m² Non Slip TilesExhibition Space 40 233 m² Polished Concrete SrceedLecture Room No.1 41 134 m² Carpet and UnderlayStore 42 5 m² Non Slip TilesLecture Room No.2 43 133 m² Carpet and UnderlayStairs No.1 44 31 m² Polished Concrete Srceed
First Floor Level - Door Schedule
wt Width Height Count Mark
White Oak Door Set - Vision Panel 1000 2200 1 F-41Door and Half - Vision Panel 1500 2200 1 F-42White Oak Door Set - No Vision Panel 1000 2200 1 F-43White Oak Door Set - Vision Panel 1000 2200 1 F-44White Oak Door Set - No Vision Panel 1000 2200 1 F-45White Oak Door Set - No Vision Panel 1000 2200 1 F-46White Oak Door Set - Vision Panel 1000 2200 1 F-47White Oak Door Set - Vision Panel 1000 2200 1 F-48Door and Half - Vision Panel 1500 2200 1 F-49Door and Half - Vision Panel 1500 2200 1 F-50White Oak Door Set - No Vision Panel 1000 2200 1 F-51Door and Half - Vision Panel - Escape 1500 2200 1 F-52White Oak Door Set - Vision Panel 1000 2200 1 F-53
GA - 101
GA - 3D - First Floor2
GA - 101
Internal Exhibition Space3
ABCDEFGHI
32
1
5
6
7
8
J 4
GA - 106
3
GA - 106
1
GA - 106
2
GA - 106
411100
58258675
6140 6140 6140 6140 6090 5550 7500 8300 6700
3533
3655
----
Barrow Center
North
Barrow Center
Barrow Center
4200
Deep End Shallow End
94 m²Plant Room
48
96 m²Lesuire Pool
53
253 m²Training Pool
52
69 m²Basenent Store / Services
47
28 m²Staits No.1
46
21 m²Stairs No.3
45
589 m²Parking Area
51
3200
9000
7600
12000
10700
115.91°
64.09°
B-54
61001500
2900
3100
3600
3500
3100
1500
1500
1500
1500
21001500
2400
Site BoundarySite Boundary Site Boundary
Entrance
to carpark
5900
2400
4800
2900
4800
1500
Traffic ManagementCar Yield Spot
Traffic ManagementTraffic Light
Walkway
Walkway
Walkway
B-60
2400
2300
B-611700
1700
Bike Storage Area
B-56
B-57
B-58
B-59
B-55
3800
830
Balancing Tank No.1 - Leisure Pool
Balancing Tank No.2 -Training Pool
General Design Notes:
All works to comply with all current, Relevant building regulationsand codes of Practice.
Design Guidance is taken from Sports England Documents and alsoThe Metric Handbook, TGD-B, TGD-M, BS:9999.
All works to be passed by building Control officer inspections.
Cast in-situ concrete to comply with BS 8004.
Steel reinforcement & structural steel Frame to engineer’s details &design.
All timbers to be preservative treated, Structurally graded &sourced from an fsc Managed forests
Do not scale off drawings, dimensions Shown to be used. Consultarchitect's Office for clarification.
Legend
Boundary Line
30Min Fire Protected
60Min Fire Protected
90Min Fire Protected
30Min Fire Rated Door
60Min Fire Rated Door
90Min Fire Rated Door
Disabled Refuge (1.5x1.0m)
Service Shaft/ Run
1800mm Wc Turning Circle
Life Guard Stand Area
Entrance
Air Circulation / Smoke
Void Below
DR
LG
Building Compliance Notes:
All Fire Rated construction is to comply with TGDB 2006 andwhere need be BS:9999.
All Fire Rated doors will be fitted with self closing devices,intrumescent strips and smoke seals.All Escape route fire doors will be held open on magnetic padsthat will release on fire alarm activation.
Doors Tags - B: Basement Level - G: Ground Floor Level - F: FirstFloor.
Fire doors will have a vision panel to comply with TGD B Diagram10. Intrumescent strips, smoke seals. Doors automatic closer's willbe fitted to all fire doors.
The Building will be fitted with a Type M (L4) Fire Alarm to BS9999.
Skylight windows to act as smoke vent, activated by smoke/firealarm will allow smoke to exit.( Hydraulic arm system to beinstalled on window)
1m² aov smoke vent, activated by smoke/fire alarm will allowsmoke to exit in all stair wells as well an open vet incoperatedinto lift shaft.
A Wet sprinkler, fire suppression system will be used in thebasement store and plant room.
Emergency escape lighting to be installed On all escape routesto table 9, bs 5266-1 and Bs 5266-7. (Bs 9999 - 38.4).
Escape route Signage to comply with ; Bs 5499-4:2013; safety signscode of practice For escape route signing.
Fire extinguishing installations and Equipment on premisesselection and Positioning of portable fire extinguishers to Complywith Bs 5306-8:2012.
Building Layout will comply with TGD M. All Doors are Min 1000mmWide and 2200mm High in accordance with Table 2 andDiagram 10. Door handles will be located at a height of 900 mm(preferred) above finished floor level.
Reception desk to comply with Section 1.3.3.1 TGD-M.It will beeasily identifiable. The floor surface will be slip resistant (refer to BS8300:2009 Annex E) The reception desk will be designed tofacilitate both wheelchair users and standing people.
Audible Loop listen will be installed at the reception area to aidpeople with Audible disability in compliance with TGD-M 1.6.6
Where artificial lighting is provided, it will give good colourrendering of all surfaces, and will not create glare or pools ofbright light and strong shadows, which poorly located up-lightersmay create in accordance with TGD -M 1.6.5
Construction SpecificationSteel Structure:All Structural Steel to have 60min fireresistance. Structural design is aprovisional design and needs to beconsulted with Structural Engineer. AllSteel reinforced and structural steel tocomply with engineers details, specsand design.
Primary Steel StructureColumns (UKC - Blue)Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red)Serial Size - 356mm x 171mm. Kg/m - 67Skylight Columns (UKC - Baby Blue)Serial Size - 203mm x 203mm. Kg/m -54Structural Hollow Section (HC - Pink)Outside Diameter - 355.6. Thickness -8mm. Kg/m - 54Beams (UKB - Yellow)Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green)Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray)Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange)Kingspan Multichannel will be advisedto be used.Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for bothprecast and cast insitu to be ecocembased cement. All concrete works tocomply with BS:8004 and tested with BSEN 12350-1 2009. Exposed concretefinished to comply with BS:8110. (BoardPanel Finish). All Concrete construction tocomply with engineers details, specsand design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting assupport for concrete beams with holdingdown bolts cast in to secure steelcolumns above.
Concrete Columns (White)Cast in-situ, steel reinforced concretecolumns with cap with holding downbolts cast in to secure steel columnsabove, 300mm x 300mm.
Concrete Beams (Purple)Transfer structure in place wherestructural steel column grid & basementconcrete column grids do not coincide.Seating for hollow core floor slabsincorporated in beams.
Glulam Structure:Structural Engineer design to be followedwith the Glulam structure. The Steel shoesare to be designed to resist watercorrosion.
Floor Build Up:Ground Floor Suspended - InsulatedHollowcore Slab.
Max Span 9m, Min 50mm bearing and25mm Side bearing. All Gaps filled withlean mix concrete before insulationinstall. All columns wrapped incompressible insulation layer to meetscreed height. Movement joints also tobe accommodated.
-150mm precast concrete floor slab withedge thickening and steel reinforced.-150mm rigid PIR Insulation.(HighCompressive Strength)-75mm Concrete Screed.- Various Floor Finish.
Ground Floor Bearing - InsulatedConcrete Slab
All Gaps filled with lean mix concretebefore insulation install. All columnswrapped in compressible insulationlayer to meet screed height. Movementjoints also to be accommodated.
-150mm concrete floor slab with edgethickening & steel reinforced, oncontinuous radon membrane to exitabove ground outside building.-150mm rigid PIR Insulation.(HighCompressive Strength)-50mm sand blinding layer oncompacted layers of suitable hardcore225mm.
Stairs:Precast concrete stairs used through out thebuilding for stairs no1+2+3. Exposed boardpanel finish on concrete. All doors 60 minutefire rated with smoke seal & automaticcloser to all stairs, opening in direction ofescape. All stairs cores to have 1m²automatic opening vent, linked to firealarm.
All 3 stairs will be fire protected up to 60minincluding any glazing incorporated into theshaft design. Stairs No.1 will lead directly toan external exit. Stairs No. 2+3 will lead into aprotected corridor and to a final exit.
All stairs are in accordance with TGD M1.2.4.1.2 - TGD L 1.1 - TGD B Part B1 (1.3).
Lift/ Lift Shaft:OTIS Gen2 Premier ED Passenger lift.3stops, Basement, Ground Floor, First Floor.Max load - 2000KG (20 People)Speed - 1m/sCar Size - 2350mm - 1700mm, Height -2200mm.Entrance door 1200mm x 2100mm, 2 panelCenter open.Shaft Width - 3050 mm x 2000mm
Lift shaft 150mm cast insitu concrete withboard panel finish externally. Internal of shaftto be coated with white paint and fitted withemergency lighting.Vent of 1m² located at top of shaft.
Basement Entrance/Exit Ramp:2400mm wide vehicle ramp to be 50mmcompacted tarmac on 150mmcompacted hardcore substrate. Rampslope to be 1:9 with 7m landing betweenrises. Head Clearance of 3000mm.One Way Traffic Lights operated system tobe applied.Water channel at basement entrance &exit to minimize water ingress, piped tothe site water attenuation tank.
Service Shaft:Service shaft to be 60mm fire resistant,metal stud construction, including allaccess panels fitted with smoke seals ataccess panels points.
Curtain Walling:APA curtain walling system, TB50 SGsystem which will also be used to supportstructurally.Double glazed Units incorporated. Alljoints to be weathered using silicone seals.
Double glazed unit sizes - 1200mm x2000mm.All curtain walling to have trench heatingbelow to aid in stopping condensation.
Doors:Internal -Protected escape routes will be 60 minute resistance.Doors will open in the direction of escape but not ontoan escape route as per TGD B2006 1.4.3.3. Escape routedoors will be fitted with an electromagnetic that willallow doors to close in the event of fire.
60 minute fire doors will be installed to all stair cores,store rooms and where needed.
Fire doors will have a vision panel to comply with TGD MDiagram 10. Intrumescent strips, smoke seals. Doorsautomatic closer's will be fitted to all fire doors.
External -The main entrance had a lobby entrance with electronicswing doors. There are activated by a sensory system. Theclear width of the opening will be 2000mm and a heightof 2200mm. The Doors will meet the requirement set outin TGD M 1.2.
Structural Glazing:The Structural glazing is a compliment to the Casa DaMusica in Portugal Designed by OMA. The curved glassfacade is deigned by ABT Arnhem.
Hot bended curved and laminated strips of glass 1200mm wide and 400 mm deep.
Good sound insulation can be achieved by placing twosheets of glass at some distance from each other,preferably over an expansion joint, 500mm.
First Floor Suspended - Hollowcore Slab
Max Span 9m, Min 50mm bearing and25mm Side bearing. All Gaps filled with leanmix concrete before insulation install. Allcolumns wrapped in compressible insulationlayer to meet screed height. Movementjoints also to be accommodated.
-150mm precast concrete floor slab withedge thickening and steel reinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete beforeinsulation install. Floor Thickening aroundperimeters of columns. Movement joints alsoto be accommodated.
-150mm concrete floor slab with edgethickening & steel reinforced, on continuousradon membrane to exit above groundoutside building.-50mm sand blinding layer on compactedlayers of suitable hardcore 225mm.
Swimming Pool:Design guidance for the swimming poolarea design and construction is taken fromthe metric handbook and various SportsEngland Documents. Both Pools share thesame filtration system but share separateheating systems. There will be a store for poolequipment in the area and the lane ropeswill be kept at the return end of the pool inthe service corridor. Lighting in pool inaccordance with Sport England ArtificialSports Lights.The both pools will have a "Poolpod" Liftinstalled to facilitate wheelchair users.
Competition Pool - 25000mm x 10000mm, 8Lane Pool. Side Lanes Kept as Margin.PoolMarking in accordance with ASA/FINAStandards following 25m Pools GeneralGuidance. Shallow 1300mm - Mid 1600mm -Deep 1900mm. Tank Colour - White.Leisure Pool - 1200mm Sloping to 1800mm.Stepped Access point using 300mm Treadsaccompanied with hand rail in accordancewith TGD L at the shallowest area and thepool slopes the width. Tank Colour - White.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughoutthe building as each zone has differentrequirements (fire) and uses. The basic buildup is a 2.5mm Plasterskim, 12.5mmPlasterboard, 100mm Steed Stud System,12.5mm Plasterboard, 2.5mm Plasterskim.10mm Shadow Gap to be incorporated onperimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium FireFrame System, with 23mm PilkingtonPyrostop Glass. This will achieve a 60Min FireRating. System to incorporate fire-ratedinsulation (Mineral Wool) as well asintumescent tape.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel35mm Thickness. Various Width and Lengths(300x300mm - 600x600mm - 900x900mm -1200x1200mm). Hidden Fix System toVertical Rail System.Proprietary Vertical Railing System securedto Steel Multichannel (CPB). (Thermal BreakIncorporated)50mm PIR Rainscreen Insulation secured toCement Particle Board 12mm, secured to200mm Multichannel. CPB Taped at joints toform air tight barrier. 200mm Space inMultichannel filled with Fire Rated MineralQuilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondarystructure. Internally Steel Channels providea 50mm service cavity for electrical Works.Required Plasterboard finish secured to steelchannels.
Accoya Timber Cladding -Vertical Accoya Cladding 50mm Width, ShiplapJoint (50year Warranty). Secured to verticalsupport system.Proprietary Vertical Railing System secured to SteelMultichannel (CPB). (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured toCement Particle Board 12mm, secured to 200mmMultichannel. CPB Taped at joints to form air tightbarrier. 200mm Space in Multichannel filled withFire Rated Mineral Quilt Insulation. Continuous Firerated Vapour barrier on inner face pf secondarystructure. Internally Steel Channels provide a50mm service cavity for electrical Works. RequiredPlasterboard finish secured to steel channels.
Roof Build Up:Green Roof Build Up- 175mm growing substrate with sedum planting.- Filter fleece to prevent any soil particles washinginto the drainage layer, dressed betweendrainage channel and growing substrate.- 60mm Bauder DSE 60 board, filled with mineraldrain material.-Root resistant layer on waterproofing under layer.-Bauder FSM 1100 protection mat, polyester &polypropylene fiber.-150mm rigid PIR insulation.-Vapor barrier layer.-75mm concrete screed.-150mm precast concrete floor slab with edgethickening and steel reinforced.
Copper Mesh Vision Panel -OkaTech Sealed Glazed ExpandedCopper Mesh Panels. This facade is acurtain wall assembly and supported byaluminium brackets at each level. Designguidance is required from Okalux for finaldeign.GL Support brackets (650x105mm)cantilevered anchor supports boltedConcrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm)in Pockets at 1200mm centres in First FloorSlab. High Steel Curtain walling supportangles (250x165x50mm).
- 8 mm low-iron outer pane with coppercoloured frit around edges to concealstructural silicone.- 2 mm cavity with expanded copper meshsecured in corners with spots of silicone.- 8 mm solar control glass with low-e coating.- 16 mm air cavity.- 10 mm laminated inner pane comprisingtwo panes 5 mm fl oat glass and 0.76 mmPVB (polyvinylbutyral) interlayer.
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed ExpandedCopper Mesh Spandrel Panels. This facadeis a curtain wall assembly and supportedby aluminium brackets at each level.Design guidance is required from Okalux forfinal deign.GL Support brackets (650x105mm)cantilevered anchor supports boltedConcrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm)in Pockets at 1200mm centres in First FloorSlab. High Steel Curtain walling supportangles (250x165x50mm).
- 8 mm low-iron outer pane with coppercoloured frit around edges to concealstructural silicone.- 2 mm cavity with expanded copper meshsecured in corners with spots of silicone.- 8 mm solar control glass with low-ecoating.- 30 mm air cavity.- 120 mm rigid insulation.- 3 mm folded aluminium backing sheet.
3000
4200
3800
8000 8000 8000 7000 8000
Training PoolService Corridor
Supports for PerimeterColumns and Structural Glazing
Bike Storage Area
Store/ Plant Room(Electrical)
Entrance ramp toUnderground
Parking Area(Grip Screed)
Pedestrian Walkway(Grip Screed)
Competition PoolService Corridor
Stairs and Lift
Main Plant RoomAccess to Service Corridors
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 09:07:14
Basement Plan
Issue Date
GA - 102
1 : 100GA - 102
Level -1 - Basment Floor1
1 : 200GA - 102
Section EE - Carpark Ramp2
Basement Level - Room Schedule
Name Number Area Floor Finish
Stairs No.3 45 21 m² Polished Concrete SrceedStaits No.1 46 28 m² Polished Concrete SrceedBasenent Store /Services
47 69 m² Non Slip Tiles
Plant Room 48 94 m² Non Slip TilesParking Area 51 589 m² Grip ScreedTraining Pool 52 253 m² Non Slip TilesLesuire Pool 53 96 m² Non Slip Tiles
Basemnet Level - Door Schedule
Name Width Height Count Mark
White Oak Door Set - Vision Panel 1000 2200 1 B-54White Oak Door Set - Vision Panel 1000 2200 1 B-55Door and Half - Vision Panel 1500 2200 1 B-56Door and Half - Vision Panel 1500 2200 1 B-57White Oak Door Set - Vision Panel 1000 2200 1 B-58White Oak Door Set - Vision Panel 1000 2200 1 B-59White Oak Door Set - Vision Panel 1000 2200 1 B-60White Oak Door Set - Vision Panel 1000 2200 1 B-61
GA - 102
GA - 3D - Basement Floor3
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252
Level 2 - Roof 2 9252
Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
Level 2 - Roof Glazing 14152
Accoya TimberVertical Cladding Existing Barrow Center
Lime Stone Rainscreen Cladding
Existing Barrow Center GlazingJoining Sports Hall to New Section
Existing Barrow CenterStructural Glazing
Existing Barrow CenterLime Stone Rainscreen Cladding
Proposed Structural GlazingTo Match and Join Existing
4000
4200
4000
1000
1000
1000
2900
1410
0
Swimming Hall Existing Barrow Center
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252
Level 2 - Roof 2 9252
Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
Level 2 - Roof Glazing 14152
BasementSteel Sheet Piles
Apartment Ground Level
Existing Barrow CenterLime Stone Rainscreen Cladding
Existing Barrow Center GlazingJoining Sports Hall to New Section
Existing Barrow CenterLime Stone Rainscreen Cladding
Proposed Structural GlazingTo Match and Join Existing Accoya Timber
Vertical Cladding
OkaTech SealedGlazed ExpandedCopper Mesh Panels
Bauder ExtensiveGreen Roof Skylight Glazing
Existing Building
Existing Barrow CenterRenter Finish
1000
1000
1000
2900
4000
4200
4000
1810
0
Exiting Barrow Center Front Entrance / Class Rooms / Changing Rooms ApartmentsExiting Barrow Center
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252Level 2 - Roof 2 9252
Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
Level 2 - Roof Glazing 14152
Basement Swimming Pool
Dri Design Copper CoatedAluminium Panel Cladding
1410
0
Proposed Structural GlazingTo Match and Join Existing
Accoya TimberVertical Cladding
Bauder ExtensiveGreen Roof
Bauder ExtensiveGreen Roof Skylight Glazing Existing Barrow Center
Structural Glazing
Existing Barrow CenterRender Accoya Timber
Vertical Cladding
4000
4200
4000
1000
1000
1000
2900
It Carlow Main Building
IT Carlow Main Building Lecture Rooms / Changing Rooms Swimming HallCourt Yard
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252
Level 2 - Roof 2 9252
Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
Level 2 - Roof Glazing 14152
Basement (Swimming Pool) Parking Entrance
Accoya TimberVertical Cladding
Proposed Structural GlazingTo Match and Join Existing
Existing Barrow CenterStructural Glazing
Existing Barrow CenterLime Stone Rainscreen Cladding
Existing Barrow CenterLime Stone Rainscreen CladdingDri Design Copper Coated
Aluminium Panel Cladding
Curved Hot BendedLaminated Structural Glazing
Bauder ExtensiveGreen RoofSkylight GlazingBauder Extensive
Green Roof
1410
0
2900
1000
1000
1000
4000
4200
4000
Apartment
Existing Barrow CenterSwimming Hall
General Design Notes:
All works to comply with all current, Relevant building regulationsand codes of Practice.
Design Guidance is taken from Sports England Documents and alsoThe Metric Handbook, TGD-B, TGD-M, BS:9999.
All works to be passed by building Control officer inspections.
Cast in-situ concrete to comply with BS 8004.
Steel reinforcement & structural steel Frame to engineer’s details &design.
All timbers to be preservative treated, Structurally graded &sourced from an fsc Managed forests
Do not scale off drawings, dimensions Shown to be used. Consultarchitect's Office for clarification.
Wall Build Up:Copper Coated Aluminium Panel -Dri Design Copper Coated Aluminium Panel 35mm Thickness.Various Width and Lengths (300x300mm - 600x600mm -900x900mm - 1200x1200mm). Hidden Fix System to Vertical RailSystem.Proprietary Vertical Railing System secured to Steel Multichannel(CPB). (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. CPB Taped atjoints to form air tight barrier. 200mm Space in Multichannel filledwith Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electricalWorks. Required Plasterboard finish secured to steel channels.
Accoya Vertical Timber Cladding -Vertical Accoya Cladding 50mm Width, Shiplap Joint (50yearWarranty). Secured to vertical support system.Proprietary Vertical Railing System secured to Steel Multichannel(CPB). (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. CPB Taped atjoints to form air tight barrier. 200mm Space in Multichannel filledwith Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electricalWorks. Required Plasterboard finish secured to steel channels.
Copper Mesh Vision Panel -OkaTech Sealed Glazed Expanded Copper Mesh Panels. Thisfacade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okaluxfor final deign.GL Support brackets (650x105mm) cantilevered anchor supportsbolted Concrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm) in Pockets at1200mm centres in First Floor Slab. High Steel Curtain wallingsupport angles (250x165x50mm).
- 8 mm low-iron outer pane with copper coloured frit aroundedges to conceal structural silicone.- 2 mm cavity with expanded copper mesh secured in cornerswith spots of silicone.- 8 mm solar control glass with low-e coating.- 16 mm air cavity.- 10 mm laminated inner pane comprising two panes 5 mm fl oatglass and 0.76 mm PVB (polyvinylbutyral) interlayer.
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh SpandrelPanels. This facade is a curtain wall assembly and supported byaluminium brackets at each level. Design guidance is requiredfrom Okalux for final deign.GL Support brackets (650x105mm) cantilevered anchor supportsbolted Concrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm) in Pockets at1200mm centres in First Floor Slab. High Steel Curtain wallingsupport angles (250x165x50mm).
- 8 mm low-iron outer pane with copper coloured frit aroundedges to conceal structural silicone.- 2 mm cavity with expanded copper mesh secured in cornerswith spots of silicone.- 8 mm solar control glass with low-e coating.- 30 mm air cavity.- 120 mm rigid insulation.- 3 mm folded aluminium backing sheet.
Roof Build Up:Green Roof Build Up- 175mm growing substrate with sedum planting.- Filter fleece to prevent any soil particles washing into thedrainage layer, dressed between drainage channel and growingsubstrate.- 60mm Bauder DSE 60 board, filled with mineral drain material.-Root resistant layer on waterproofing under layer.-Bauder FSM 1100 protection mat, polyester & polypropylenefiber.-150mm rigid PIR insulation.-Vapour barrier layer.-75mm concrete screed.-150mm precast concrete floor slab with edge thickening andsteel reinforced.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica inPortugal Designed by OMA. The curved glass facade is deignedby ABT Arnhem.
Hot bended, curved and laminated strips of glass 1200 mm wideand 400 mm deep.
Good sound insulation can be achieved by placing two sheetsof glass at some distance from each other, preferably over anexpansion joint, 500mm.
Curtain Walling:APA curtain walling system, TB50 SG system which will also beused to support structurally.Double glazed Units incorporated. All joints to be weatheredusing silicone seals.
Double glazed unit sizes - 1200mm x 2000mm. All curtain walling tohave trench heating below to aid in stopping condensation
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 08:52:59
Elevations - Finish
Issue Date
GA - 104
1 : 200GA - 104
East Elevation1
1 : 200GA - 104
North Elevation2
1 : 200GA - 104
West Elevation3
1 : 200GA - 104
South Elevation4
North View
South View
Wes
t Vie
w
East
View
Dri-Design Copper Coated Aluminium Panel
Accoya Vertical Timber Cladding
OkaTech Sealed Glazed Expanded CopperMesh Vision Panel
OkaTech Sealed Glazed Expanded CopperMesh Spandrel Panel
Bauder Extensive Green Roof Build Up
Hot bended curved Structural Glazing
APA Curtain Walling system, TB50 SG system
General Design Notes:
All works to comply with all current, Relevant building regulationsand codes of Practice.
Design Guidance is taken from Sports England Documents and alsoThe Metric Handbook, TGD-B, TGD-M, BS:9999.
All works to be passed by building Control officer inspections.
Cast in-situ concrete to comply with BS 8004.
Steel reinforcement & structural steel Frame to engineer’s details &design.
All timbers to be preservative treated, Structurally graded &sourced from an fsc Managed forests
Do not scale off drawings, dimensions Shown to be used. Consultarchitect's Office for clarification.
Wall Build Up:Copper Coated Aluminium Panel -Dri Design Copper Coated Aluminium Panel 35mm Thickness.Various Width and Lengths (300x300mm - 600x600mm -900x900mm - 1200x1200mm). Hidden Fix System to Vertical RailSystem.Proprietary Vertical Railing System secured to Steel Multichannel(CPB). (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. CPB Taped atjoints to form air tight barrier. 200mm Space in Multichannel filledwith Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electricalWorks. Required Plasterboard finish secured to steel channels.
Accoya Vertical Timber Cladding -Vertical Accoya Cladding 50mm Width, Shiplap Joint (50yearWarranty). Secured to vertical support system.Proprietary Vertical Railing System secured to Steel Multichannel(CPB). (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. CPB Taped atjoints to form air tight barrier. 200mm Space in Multichannel filledwith Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electricalWorks. Required Plasterboard finish secured to steel channels.
Copper Mesh Vision Panel -OkaTech Sealed Glazed Expanded Copper Mesh Panels. Thisfacade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okaluxfor final deign.GL Support brackets (650x105mm) cantilevered anchor supportsbolted Concrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm) in Pockets at1200mm centres in First Floor Slab. High Steel Curtain wallingsupport angles (250x165x50mm).
- 8 mm low-iron outer pane with copper coloured frit aroundedges to conceal structural silicone.- 2 mm cavity with expanded copper mesh secured in cornerswith spots of silicone.- 8 mm solar control glass with low-e coating.- 16 mm air cavity.- 10 mm laminated inner pane comprising two panes 5 mm fl oatglass and 0.76 mm PVB (polyvinylbutyral) interlayer.
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh SpandrelPanels. This facade is a curtain wall assembly and supported byaluminium brackets at each level. Design guidance is requiredfrom Okalux for final deign.GL Support brackets (650x105mm) cantilevered anchor supportsbolted Concrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm) in Pockets at1200mm centres in First Floor Slab. High Steel Curtain wallingsupport angles (250x165x50mm).
- 8 mm low-iron outer pane with copper coloured frit aroundedges to conceal structural silicone.- 2 mm cavity with expanded copper mesh secured in cornerswith spots of silicone.- 8 mm solar control glass with low-e coating.- 30 mm air cavity.- 120 mm rigid insulation.- 3 mm folded aluminium backing sheet.
Roof Build Up:Green Roof Build Up- 175mm growing substrate with sedum planting.- Filter fleece to prevent any soil particles washing into thedrainage layer, dressed between drainage channel and growingsubstrate.- 60mm Bauder DSE 60 board, filled with mineral drain material.-Root resistant layer on waterproofing under layer.-Bauder FSM 1100 protection mat, polyester & polypropylenefiber.-150mm rigid PIR insulation.-Vapour barrier layer.-75mm concrete screed.-150mm precast concrete floor slab with edge thickening andsteel reinforced.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica inPortugal Designed by OMA. The curved glass facade is deignedby ABT Arnhem.
Hot bended, curved and laminated strips of glass 1200 mm wideand 400 mm deep.
Good sound insulation can be achieved by placing two sheetsof glass at some distance from each other, preferably over anexpansion joint, 500mm.
Curtain Walling:APA curtain walling system, TB50 SG system which will also beused to support structurally.Double glazed Units incorporated. All joints to be weatheredusing silicone seals.
Double glazed unit sizes - 1200mm x 2000mm. All curtain walling tohave trench heating below to aid in stopping condensation
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252
Level 2 - Roof 2 9252
Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
Level 2 - Roof Glazing 14152
BasementSteel Sheet Piles
Apartment Ground Level
Existing Barrow CenterLime Stone Rainscreen Cladding
Existing Barrow Center GlazingJoining Sports Hall to New Section
Existing Barrow CenterLime Stone Rainscreen Cladding
Proposed Structural GlazingTo Match and Join Existing Accoya Timber
Vertical Cladding
OkaTech SealedGlazed ExpandedCopper Mesh Panels
Bauder ExtensiveGreen Roof Skylight Glazing
Existing Building
Existing Barrow CenterRenter Finish
1000
1000
1000
2900
4000
4200
4000
1810
0
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252
Level 2 - Roof 2 9252
Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
Level 2 - Roof Glazing 14152
Accoya TimberVertical Cladding Existing Barrow Center
Lime Stone Rainscreen Cladding
Existing Barrow Center GlazingJoining Sports Hall to New Section
Existing Barrow CenterStructural Glazing
Existing Barrow CenterLime Stone Rainscreen Cladding
Proposed Structural GlazingTo Match and Join Existing
4000
4200
4000
1000
1000
1000
2900
1410
0
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252
Level 2 - Roof 2 9252Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
Level 2 - Roof Glazing 14152
Basement Swimming Pool
Dri Design Copper CoatedAluminium Panel Cladding
1410
0
Proposed Structural GlazingTo Match and Join Existing
Accoya TimberVertical Cladding
Bauder ExtensiveGreen Roof
Bauder ExtensiveGreen Roof Skylight Glazing Existing Barrow Center
Structural Glazing
Existing Barrow CenterRender Accoya Timber
Vertical Cladding
4000
4200
4000
1000
1000
1000
2900
It Carlow Main Building
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252Level 2 - Roof 2 9252
Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
Level 2 - Roof Glazing 14152
Basement (Swimming Pool) Parking Entrance
Accoya TimberVertical Cladding
Proposed Structural GlazingTo Match and Join Existing
Existing Barrow CenterStructural Glazing
Existing Barrow CenterLime Stone Rainscreen Cladding
Existing Barrow CenterLime Stone Rainscreen CladdingDri Design Copper Coated
Aluminium Panel Cladding
Curved Hot BendedLaminated Structural Glazing
Bauder ExtensiveGreen RoofSkylight GlazingBauder Extensive
Green Roof
1410
0
2900
1000
1000
1000
4000
4200
4000
Apartment
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 08:58:16
Elevations - Render
Issue Date
GA - 105
North View
South View
Wes
t Vie
w
East
View
Dri-Design Copper Coated Aluminium Panel
Accoya Vertical Timber Cladding
OkaTech Sealed Glazed Expanded CopperMesh Vision Panel
OkaTech Sealed Glazed Expanded CopperMesh Spandrel Panel
Bauder Extensive Green Roof Build Up
Hot bended curved Structural Glazing
APA Curtain Walling system, TB50 SG system
1 : 200GA - 105
North Elevation - Render1
1 : 200GA - 105
East Elevation - Render2
1 : 200GA - 105
West Elevation - Render3
1 : 200GA - 105
South Elevation - Render4
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
ABCDEFGHI
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252
J
Level 2 - Roof 2 9252
Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
Level 2 - Roof Glazing 14152
4000
4200
4000
1000
1000
1000
2900
1410
0
1800 13
00
1900
6100 6100 6100 6100 6100 5500 7500 8300 6700
58700
1000
0
9400
1150
0
1400
2600
1100
2600
1500
1500
3800
3200
2600
4300
4200
2000
2000
OkaTech Sealed Glazed ExpandedCopper Mesh Panels
Ventilation StackBauder ExtensiveGreen Roof
BasementParking
Swimming Pool
Service Corridor ForPool Maintenance
Skylight Glazing(Ventilation BuiltIn)
Curved Hot BendedLaminated StructuralGlazing
GlulamColumn
Double HeightSwimming Hall
Stairs No.1DetailCC-1
TD - 107
DetailCC-3TD - 107
Detail3TD - 106
Detail3TD - 106
Detail4TD - 106
Detail1TD - 110
Detail2TD - 110
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
A B C D E F G H I
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252
J
Level 2 - Roof 2 9252
Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
Level 2 - Roof Glazing 14152
4000
4200
4000
1000
1000
1000
2900
1410
0
6700 8300 7500 5500 6100 6100 6100 6100 6100
58700
1200
1800
5900
2600
2900
360044
00
3800
3200
1000
1500
5800
3600 1800
Bauder ExtensiveGreen Roof
OkaTech SealedGlazed ExpandedCopper Mesh Panels
Balcony with Glass BalustradeSurrounding (Aid Ventilation)
Service Corridor ForPool Maintenance
Curved Hot BendedLaminated StructuralGlazing
Accoya TimberVertical Cladding
Skylight Glazing(Ventilation BuiltIn)
Basement Parking Pool Plant Room Swimming Pool
Exhibition Area
Secant Concrete PilingBarrow Center Boundry
ProposedStructuralGlazing
Balcony with Glass BalustradeSurrounding
Detail1TD - 110
Detail4TD - 110
Detail1TD - 110
Detail3TD - 109
Detail4TD - 109
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
321
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252
Level 2 - Roof 2 9252
Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
4
11100 5800 8700
25600
1120
0
4200
4000
1000
1000
1000
4000
1500
1100
3600
1300
2700
1700
1000
3800
3800
3200
Stairs No.1
800
Skylight Glazing(Ventilation BuiltIn)
Balcony with Glass BalustradeSurrounding (Aid Ventilation)
BasementStorage/ Plant
Dri Design Copper CoatedAluminium Panel Cladding
ApartmentBuilding
Existing Barrow Center
Bauder ExtensiveGreen Roof
Structural Concrete Wall(Board Pressed)
Secant Concrete Piles(Barrow Center Wall)
Barrow CenterEscape Route
DetailAA-1TD - 100
1350
DetailAA-2TD - 100
DetailAA-3TD - 100
DetailAA -4TD - 101
DetailAA -4TD - 101
DetailAA-6TD - 102
DetailAA-7TD - 102
DetailAA-8TD - 102
Level 0 - Ground Floor 52
Level 1 - First Floor 4252
3 2 1
Level -1 - Basment Floor -3948
Level 2 - Roof 1 8252
Level 2 - Roof 2 9252
Level 2 - Roof 3 10252
Level 2 - Roof 4 11252
Level 2 - Roof Glazing 14152
4
1110058008700
25600
1810
0
4000
4200
4000
1000
1000
1000
2900
3700
1300
3800
3500
8800
1300
150024
00
1000
1150
0
2600
1400
Existing Barrow Center
Basement Swimming Pool
Balcony with Glass BalustradeSurrounding
Service Corridor ForPool Maintenance
Curved Hot BendedLaminated StructuralGlazing
Proposed StructuralGlazing
BauderExtensiveGreen Roof
Skylight Glazing(Ventilation BuiltIn)
Dri DesignCopper CoatedAluminium PanelCladding
DetailBB-2TD - 104
DetailBB-1TD - 104
DetailBB-3TD - 103
DetailBB-7TD - 105
DetailBB-8TD - 105
DetailBB -2TD - 103
DetailBB -1TD - 103
DetailBB-9TD - 105
General Design Notes:
All works to comply with all current, Relevant building regulationsand codes of Practice.
Design Guidance is taken from Sports England Documents and alsoThe Metric Handbook, TGD-B, TGD-M, BS:9999.
All works to be passed by building Control officer inspections.
Cast in-situ concrete to comply with BS 8004.
Steel reinforcement & structural steel Frame to engineer’s details &design.
All timbers to be preservative treated, Structurally graded &sourced from an fsc Managed forests
Do not scale off drawings, dimensions Shown to be used. Consultarchitect's Office for clarification.
Legend
Boundary Line
30Min Fire Protected
60Min Fire Protected
90Min Fire Protected
30Min Fire Rated Door
60Min Fire Rated Door
90Min Fire Rated Door
Disabled Refuge (1.5x1.0m)
Service Shaft/ Run
1800mm Wc Turning Circle
Life Guard Stand Area
Entrance
Air Circulation / Smoke
Void Below
DR
LG
Construction SpecificationSteel Structure:All Structural Steel to have 60min fire resistance. Structuraldesign is a provisional design and needs to be consulted withStructural Engineer. All Steel reinforced and structural steel tocomply with engineers details, specs and design.
Primary Steel StructureColumns (UKC - Blue) Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red) Serial Size - 356mm x 171mm.Kg/m - 67Skylight Columns (UKC - Baby Blue) Serial Size - 203mm x203mm. Kg/m -54Structural Hollow Section (HC - Pink) Outside Diameter - 355.6.Thickness - 8mm. Kg/m - 54Beams (UKB - Yellow) Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green) Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray) Serial Size -305mm x 165mm. Kg/m- 46
Secondary Steel StructurePurlins, Rails and Channels (Orange) Kingspan Multichannelwill be advised to be used. Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for both precast and cast insitu tobe ecocem based cement. All concrete works to complywith BS:8004 and tested with BS EN 12350-1 2009. Exposedconcrete finished to comply with BS:8110. (Board Panel Finish).All Concrete construction to comply with engineers details,specs and design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting as support forconcrete beams with holding down bolts cast in to securesteel columns above.
Concrete Columns (White)Cast in-situ, steel reinforced concrete columns with cap withholding down bolts cast in to secure steel columns above,300mm x 300mm.
Concrete Beams (Purple)Transfer structure in place where structural steel column grid &basement concrete column grids do not coincide. Seating forhollow core floor slabs incorporated in beams.
Glulam Structure:Structural Engineer design to be followed with the Glulamstructure. The Steel shoes are to be designed to resist watercorrosion.
Floor Build Up:Ground Floor Suspended - Insulated Hollowcore Slab.Max Span 9m, Min 50mm bearing and 25mm Side bearing. AllGaps filled with lean mix concrete before insulation install. Allcolumns wrapped in compressible insulation layer to meetscreed height. Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickeningand steel reinforced.-150mm rigid PIR Insulation.(High Compressive Strength)-75mm Concrete Screed.- Various Floor Finish.
First Floor Suspended - Hollowcore SlabMax Span 9m, Min 50mm bearing and 25mm Side bearing. AllGaps filled with lean mix concrete before insulation install. Allcolumns wrapped in compressible insulation layer to meetscreed height. Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickeningand steel reinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete before insulation install.Floor Thickening around perimeters of columns. Movementjoints also to be accommodated.-150mm concrete floor slab with edge thickening & steelreinforced, on continuous radon membrane to exit aboveground outside building.-50mm sand blinding layer on compacted layers of suitablehardcore 225mm.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughout the building aseach zone has different requirements (fire) and uses. The basicbuild up is a 2.5mm Plasterskim, 12.5mm Plasterboard,100mm Steed Stud System, 12.5mm Plasterboard, 2.5mmPlasterskim. 10mm Shadow Gap to be incorporated onperimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium Fire Frame System,with 23mm Pilkington Pyrostop Glass. This will achieve a 60MinFire Rating. System to incorporate fire-rated insulation (MineralWool) as well as intumescent tape.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel 35mm Thickness.Various Width and Lengths (300x300mm - 600x600mm -900x900mm - 1200x1200mm). Hidden Fix System to Vertical RailSystem. Proprietary Vertical Railing System secured to SteelMultichannel (CPB). (Thermal Break Incorporated). 50mm PIRRainscreen Insulation secured to Cement Particle Board12mm, secured to 200mm Multichannel. CPB Taped at jointsto form air tight barrier. 200mm Space in Multichannel filledwith Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electricalWorks. Required Plasterboard finish secured to steel channels.
Accoya Timber Cladding -Vertical Accoya Cladding 50mm Width, Shiplap Joint (50yearWarranty). Secured to vertical support system. ProprietaryVertical Railing System secured to Steel Multichannel (CPB).(Thermal Break Incorporated) 50mm PIR Rainscreen Insulationsecured to Cement Particle Board 12mm, secured to 200mmMultichannel. CPB Taped at joints to form air tight barrier.200mm Space in Multichannel filled with Fire Rated MineralQuilt Insulation. Continuous Fire rated Vapour barrier on innerface pf secondary structure. Internally Steel Channels providea 50mm service cavity for electrical Works. RequiredPlasterboard finish secured to steel channels.
Roof Build Up:Green Roof Build Up175mm growing substrate with sedum planting. Filter fleeceto prevent any soil particles washing into the drainage layer,dressed between drainage channel and growing substrate.60mm Bauder DSE 60 board, filled with mineral drain material.Root resistant layer on waterproofing under layer. Bauder FSM1100 protection mat, polyester & polypropylene fiber. 150mmrigid PIR insulation. Vapor barrier layer. 75mm concretescreed. 150mm precast concrete floor slab with edgethickening and steel reinforced.
Copper Mesh Vision Panel -OkaTech Sealed Glazed Expanded Copper Mesh Panels. Thisfacade is a curtain wall assembly and supported byaluminium brackets at each level. Design guidance isrequired from Okalux for final deign. GL Support brackets(650x105mm) cantilevered anchor supports bolted Concreteslab at 1200mm Center's. FF and RL Support Brackets(300x160x76mm) in Pockets at 1200mm centres in First FloorSlab. High Steel Curtain walling support angles(250x165x50mm).
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh SpandrelPanels. This facade is a curtain wall assembly and supportedby aluminium brackets at each level. Design guidance isrequired from Okalux for final deign. GL Support brackets(650x105mm) cantilevered anchor supports bolted Concreteslab at 1200mm Center's. FF and RL Support Brackets(300x160x76mm) in Pockets at 1200mm centres in First FloorSlab. High Steel Curtain walling support angles(250x165x50mm).
Stairs:Precast concrete stairs used through out the building for stairsno1+2+3. Exposed board panel finish on concrete. All doors60 minute fire rated with smoke seal & automatic closer to allstairs, opening in direction of escape. All stairs cores to have1m² automatic opening vent, linked to fire alarm. All 3 stairswill be fire protected up to 60min including any glazingincorporated into the shaft design. Stairs No.1 will leaddirectly to an external exit. Stairs No. 2+3 will lead into aprotected corridor and to a final exit. All stairs are inaccordance with TGD M 1.2.4.1.2 - TGD L 1.1 - TGD B Part B1(1.3).
Lift/ Lift Shaft:OTIS Gen2 Premier ED Passenger lift. 3 stops, Basement,Ground Floor, First Floor. Max load - 2000KG (20 People).Speed - 1m/s. Car Size - 2350mm - 1700mm, Height - 2200mm.Entrance door 1200mm x 2100mm, 2 panel Center open.Shaft Width - 3050 mm x 2000mmLift shaft 150mm cast insitu concrete with board panel finishexternally. Internal of shaft to be coated with white paint andfitted with emergency lighting. Vent of 1m² located at top ofshaft.
Basement Entrance/Exit Ramp:2400mm wide vehicle ramp to be 50mm compacted tarmacon 150mm compacted hardcore substrate. Ramp slope to be1:9 with 7m landing between rises. Head Clearance of3000mm.One Way Traffic Lights operated system to be applied. Waterchannel at basement entrance & exit to minimize wateringress, piped to the site water attenuation tank.
Service Shaft:Service shaft to be 60mm fire resistant, metal studconstruction, including all access panels fitted with smokeseals at access panels points.
Curtain Walling:APA curtain walling system, TB50 SG system which will also beused to support structurally.Double glazed Units incorporated. All joints to be weatheredusing silicone seals.Double glazed unit sizes - 1200mm x 2000mm. All curtainwalling to have trench heating below to aid in stoppingcondensation.
Doors:Internal -Protected escape routes will be 60 minute resistance. Doorswill open in the direction of escape but not onto an escaperoute as per TGD B2006 1.4.3.3. Escape route doors will befitted with an electromagnetic that will allow doors to closein the event of fire. 60 minute fire doors will be installed to allstair cores, store rooms and where needed. Fire doors willhave a vision panel to comply with TGD M Diagram 10.Intrumescent strips, smoke seals. Doors automatic closer's willbe fitted to all fire doors.
External -The main entrance had a lobby entrance with electronicswing doors. There are activated by a sensory system. Theclear width of the opening will be 2000mm and a height of2200mm. The Doors will meet the requirement set out in TGDM 1.2.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musicain Portugal Designed by OMA. The curved glass facade isdeigned by ABT Arnhem. Hot bended curved and laminatedstrips of glass 1200 mm wide and 400 mm deep. Good soundinsulation can be achieved by placing two sheets of glass atsome distance from each other, preferably over an expansionjoint, 500mm.
Building Compliance Notes:
All Fire Rated construction is to comply with TGDB 2006 andwhere need be BS:9999.
All Fire Rated doors will be fitted with self closing devices,intrumescent strips and smoke seals.All Escape route fire doors will be held open on magnetic padsthat will release on fire alarm activation.
Doors Tags - B: Basement Level - G: Ground Floor Level - F: FirstFloor.
Fire doors will have a vision panel to comply with TGD B Diagram10. Intrumescent strips, smoke seals. Doors automatic closer's willbe fitted to all fire doors.
The Building will be fitted with a Type M (L4) Fire Alarm to BS9999.
Skylight windows to act as smoke vent, activated by smoke/firealarm will allow smoke to exit.( Hydraulic arm system to beinstalled on window)
1m² aov smoke vent, activated by smoke/fire alarm will allowsmoke to exit in all stair wells as well an open vet incoperatedinto lift shaft.
A Wet sprinkler, fire suppression system will be used in thebasement store and plant room.
Emergency escape lighting to be installed On all escape routesto table 9, bs 5266-1 and Bs 5266-7. (Bs 9999 - 38.4).
Escape route Signage to comply with ; Bs 5499-4:2013; safety signscode of practice For escape route signing.
Fire extinguishing installations and Equipment on premisesselection and Positioning of portable fire extinguishers to Complywith Bs 5306-8:2012.
Building Layout will comply with TGD M. All Doors are Min 1000mmWide and 2200mm High in accordance with Table 2 andDiagram 10. Door handles will be located at a height of 900 mm(preferred) above finished floor level.
Reception desk to comply with Section 1.3.3.1 TGD-M.It will beeasily identifiable. The floor surface will be slip resistant (refer to BS8300:2009 Annex E) The reception desk will be designed tofacilitate both wheelchair users and standing people.
Audible Loop listen will be installed at the reception area to aidpeople with Audible disability in compliance with TGD-M 1.6.6
Where artificial lighting is provided, it will give good colourrendering of all surfaces, and will not create glare or pools ofbright light and strong shadows, which poorly located up-lightersmay create in accordance with TGD -M 1.6.5
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 08:59:03
Building Section AA - DD
Issue Date
GA - 106
1 : 200GA - 106
Section CC1
1 : 200GA - 106
Section DD2
1 : 200GA - 106
Section AA3 1 : 200GA - 106
Section BB4
AA
BB
DD
CC
General Design Notes:
All works to comply with all current, Relevant building regulationsand codes of Practice.
Design Guidance is taken from Sports England Documents and alsoThe Metric Handbook, TGD-B, TGD-M, BS:9999.
All works to be passed by building Control officer inspections.
Cast in-situ concrete to comply with BS 8004.
Steel reinforcement & structural steel Frame to engineer’s details &design.
All timbers to be preservative treated, Structurally graded &sourced from an fsc Managed forests
Do not scale off drawings, dimensions Shown to be used. Consultarchitect's Office for clarification.
Wall Build Up:Copper Coated Aluminium Panel -Dri Design Copper Coated Aluminium Panel 35mm Thickness.Various Width and Lengths (300x300mm - 600x600mm -900x900mm - 1200x1200mm). Hidden Fix System to Vertical RailSystem.Proprietary Vertical Railing System secured to Steel Multichannel(CPB). (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. CPB Taped atjoints to form air tight barrier. 200mm Space in Multichannel filledwith Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electricalWorks. Required Plasterboard finish secured to steel channels.
Accoya Vertical Timber Cladding -Vertical Accoya Cladding 50mm Width, Shiplap Joint (50yearWarranty). Secured to vertical support system.Proprietary Vertical Railing System secured to Steel Multichannel(CPB). (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. CPB Taped atjoints to form air tight barrier. 200mm Space in Multichannel filledwith Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electricalWorks. Required Plasterboard finish secured to steel channels.
Copper Mesh Vision Panel -OkaTech Sealed Glazed Expanded Copper Mesh Panels. Thisfacade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okaluxfor final deign.GL Support brackets (650x105mm) cantilevered anchor supportsbolted Concrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm) in Pockets at1200mm centres in First Floor Slab. High Steel Curtain wallingsupport angles (250x165x50mm).
- 8 mm low-iron outer pane with copper coloured frit aroundedges to conceal structural silicone.- 2 mm cavity with expanded copper mesh secured in cornerswith spots of silicone.- 8 mm solar control glass with low-e coating.- 16 mm air cavity.- 10 mm laminated inner pane comprising two panes 5 mm fl oatglass and 0.76 mm PVB (polyvinylbutyral) interlayer.
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh SpandrelPanels. This facade is a curtain wall assembly and supported byaluminium brackets at each level. Design guidance is requiredfrom Okalux for final deign.GL Support brackets (650x105mm) cantilevered anchor supportsbolted Concrete slab at 1200mm Center's.FF and RL Support Brackets (300x160x76mm) in Pockets at1200mm centres in First Floor Slab. High Steel Curtain wallingsupport angles (250x165x50mm).
- 8 mm low-iron outer pane with copper coloured frit aroundedges to conceal structural silicone.- 2 mm cavity with expanded copper mesh secured in cornerswith spots of silicone.- 8 mm solar control glass with low-e coating.- 30 mm air cavity.- 120 mm rigid insulation.- 3 mm folded aluminium backing sheet.
Roof Build Up:Green Roof Build Up- 175mm growing substrate with sedum planting.- Filter fleece to prevent any soil particles washing into thedrainage layer, dressed between drainage channel and growingsubstrate.- 60mm Bauder DSE 60 board, filled with mineral drain material.-Root resistant layer on waterproofing under layer.-Bauder FSM 1100 protection mat, polyester & polypropylenefiber.-150mm rigid PIR insulation.-Vapour barrier layer.-75mm concrete screed.-150mm precast concrete floor slab with edge thickening andsteel reinforced.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica inPortugal Designed by OMA. The curved glass facade is deignedby ABT Arnhem.
Hot bended, curved and laminated strips of glass 1200 mm wideand 400 mm deep.
Good sound insulation can be achieved by placing two sheetsof glass at some distance from each other, preferably over anexpansion joint, 500mm.
Curtain Walling:APA curtain walling system, TB50 SG system which will also beused to support structurally.Double glazed Units incorporated. All joints to be weatheredusing silicone seals.
Double glazed unit sizes - 1200mm x 2000mm. All curtain walling tohave trench heating below to aid in stopping condensation
Legend
Boundary Line
30Min Fire Protected
60Min Fire Protected
90Min Fire Protected
30Min Fire Rated Door
60Min Fire Rated Door
90Min Fire Rated Door
Disabled Refuge (1.5x1.0m)
Service Shaft/ Run
1800mm Wc Turning Circle
Life Guard Stand Area
Entrance
Air Circulation / Smoke
Void Below
DR
LG
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
1 : 100
28/04/2015 18:44:54
3D Sections
Issue Date
GA - 109GA - 109
3D - Displaced Levels3
GA - 109
3D Model - Section AA5GA - 109
3D Model - Section BB6
GA - 109
3D Model - Section CC7
GA - 109
3D Model - Section DD8
Construction SpecificationSteel Structure:All Structural Steel to have 60min fire resistance. Structural design is aprovisional design and needs to be consulted with Structural Engineer. AllSteel reinforced and structural steel to comply with engineers details,specs and design.
Primary Steel StructureColumns (UKC - Blue) Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red) Serial Size - 356mm x 171mm. Kg/m - 67Skylight Columns (UKC - Baby Blue) Serial Size - 203mm x 203mm. Kg/m -54Structural Hollow Section (HC - Pink) Outside Diameter - 355.6. Thickness -8mm. Kg/m - 54Beams (UKB - Yellow) Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green) Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray) Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange) Kingspan Multichannel will beadvised to be used. Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for both precast and cast insitu to be ecocembased cement. All concrete works to comply with BS:8004 and testedwith BS EN 12350-1 2009. Exposed concrete finished to comply withBS:8110. (Board Panel Finish). All Concrete construction to comply withengineers details, specs and design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting as support for concrete beamswith holding down bolts cast in to secure steel columns above.
Concrete Columns (White)Cast in-situ, steel reinforced concrete columns with cap with holdingdown bolts cast in to secure steel columns above, 300mm x 300mm.
Concrete Beams (Purple)Transfer structure in place where structural steel column grid & basementconcrete column grids do not coincide. Seating for hollow core floorslabs incorporated in beams.
Glulam Structure:Structural Engineer design to be followed with the Glulam structure. TheSteel shoes are to be designed to resist water corrosion.
Floor Build Up:Ground Floor Suspended - Insulated Hollowcore Slab.Max Span 9m, Min 50mm bearing and 25mm Side bearing. All Gaps filledwith lean mix concrete before insulation install. All columns wrapped incompressible insulation layer to meet screed height. Movement jointsalso to be accommodated.-150mm precast concrete floor slab with edge thickening and steelreinforced.-150mm rigid PIR Insulation.(High Compressive Strength)-75mm Concrete Screed.- Various Floor Finish.
First Floor Suspended - Hollowcore SlabMax Span 9m, Min 50mm bearing and 25mm Side bearing. All Gaps filledwith lean mix concrete before insulation install. All columns wrapped incompressible insulation layer to meet screed height. Movement jointsalso to be accommodated.-150mm precast concrete floor slab with edge thickening and steelreinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete before insulation install. FloorThickening around perimeters of columns. Movement joints also to beaccommodated.-150mm concrete floor slab with edge thickening & steel reinforced, oncontinuous radon membrane to exit above ground outside building.-50mm sand blinding layer on compacted layers of suitable hardcore225mm.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughout the building as each zonehas different requirements (fire) and uses. The basic build up is a 2.5mmPlasterskim, 12.5mm Plasterboard, 100mm Steed Stud System, 12.5mmPlasterboard, 2.5mm Plasterskim. 10mm Shadow Gap to be incorporatedon perimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium Fire Frame System, with 23mmPilkington Pyrostop Glass. This will achieve a 60Min Fire Rating. System toincorporate fire-rated insulation (Mineral Wool) as well as intumescenttape.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel 35mm Thickness. VariousWidth and Lengths (300x300mm - 600x600mm - 900x900mm -1200x1200mm). Hidden Fix System to Vertical Rail System. ProprietaryVertical Railing System secured to Steel Multichannel (CPB). (ThermalBreak Incorporated). 50mm PIR Rainscreen Insulation secured to CementParticle Board 12mm, secured to 200mm Multichannel. CPB Taped at jointsto form air tight barrier. 200mm Space in Multichannel filled with FireRated Mineral Quilt Insulation. Continuous Fire rated Vapour barrier oninner face pf secondary structure. Internally Steel Channels provide a50mm service cavity for electrical Works. Required Plasterboard finishsecured to steel channels.
Accoya Timber Cladding -Vertical Accoya Cladding 50mm Width, Shiplap Joint (50year Warranty).Secured to vertical support system. Proprietary Vertical Railing Systemsecured to Steel Multichannel (CPB). (Thermal Break Incorporated) 50mmPIR Rainscreen Insulation secured to Cement Particle Board 12mm,secured to 200mm Multichannel. CPB Taped at joints to form air tightbarrier. 200mm Space in Multichannel filled with Fire Rated Mineral QuiltInsulation. Continuous Fire rated Vapour barrier on inner face pfsecondary structure. Internally Steel Channels provide a 50mm servicecavity for electrical Works. Required Plasterboard finish secured to steelchannels.
Roof Build Up:Green Roof Build Up175mm growing substrate with sedum planting. Filter fleece to preventany soil particles washing into the drainage layer, dressed betweendrainage channel and growing substrate. 60mm Bauder DSE 60 board,filled with mineral drain material. Root resistant layer on waterproofingunder layer. Bauder FSM 1100 protection mat, polyester & polypropylenefiber. 150mm rigid PIR insulation. Vapor barrier layer. 75mm concretescreed. 150mm precast concrete floor slab with edge thickening andsteel reinforced.
Copper Mesh Vision PanelOkaTech Sealed Glazed Expanded Copper Mesh Panels. This facade is acurtain wall assembly and supported by aluminium Glazing unit at eachlevel. Design guidance is required from Okalux for final deign.
8 mm low-iron outer pane with copper coloured frit around edges toconceal structural silicone. 2 mm cavity with expanded copper meshsecured in corners with spots of silicone. 8 mm solar control glass withlow-e coating. 16 mm air cavity. 10 mm laminated inner pane comprisingtwo panes 5 mm fl oat glass and 0.76 mm PVB (polyvinylbutyral)interlayer.
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh Spandrel Panels. Thisfacade is a curtain wall assembly and supported by aluminium GalzingUnit at each level.
8 mm low-iron outer pane with copper coloured frit around edges toconceal structural silicone. 2 mm cavity with expanded copper meshsecured in corners with spots of silicone. 8 mm solar control glass withlow-e coating. 30 mm air cavity. 120 mm rigid insulation. 3 mm foldedaluminium backing sheet.
Curtain Walling:APA curtain walling system, TB50 SG system which will also be used tosupport structurally.Double glazed Units incorporated. All joints to be weathered usingsilicone seals.Double glazed unit sizes - 1200mm x 2000mm. All curtain walling to havetrench heating below to aid in stopping condensation.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica in PortugalDesigned by OMA. The curved glass facade is deigned by ABT Arnhem.Hot bended curved and laminated strips of glass 1200 mm wide and 400mm deep. Good sound insulation can be achieved by placing twosheets of glass at some distance from each other, preferably over anexpansion joint, 500mm.
Glulam Structure:Structural Engineer design to befollowed with the Glulam structure. TheSteel shoes are to be designed to resistwater corrosion.
Tire Rod Between Columns.
Primary Steel StructureStructural Hollow Section (HC -Pink) Outside Diameter - 355.6.Thickness - 8mm. Kg/m - 54
Primary Steel StructurePerimeter Columns (UKBC -Red) Serial Size - 356mm x171mm. Kg/m - 67
Primary Steel StructureBeams (UKB Green)Serial Size -254mm x146mm. Kg/m - 37
Primary Steel StructureColumns (UKC - Blue) Serial Size- 254mm x 254mm. Kg/m - 71
Primary Steel StructureBeams (UKB - Yellow)Serial Size -356mm x171mm. Kg/m - 67
Primary Steel StructurePerimeter Columns (UKBC - Red) SerialSize - 356mm x 171mm. Kg/m - 67
Primary Steel StructureBeams (UKB Green) Serial Size -254mmx 146mm. Kg/m - 37
Primary Steel StructureBeams (UKB - Yellow) Serial Size-356mm x 171mm. Kg/m - 67
Primary Steel StructureStructural Hollow Section (HC -Pink) Outside Diameter - 355.6.Thickness - 8mm. Kg/m - 54
Primary Steel StructureColumns (UKC - Blue)Serial Size - 254mm x254mm. Kg/m - 71
Primary Steel StructureBeams (UKB Green) Serial Size-254mm x 146mm. Kg/m - 37
Primary Steel StructureBeams (UKB - Yellow) Serial Size-356mm x 171mm. Kg/m - 67
Primary Steel StructurePerimeter Columns (UKBC - Red) SerialSize - 356mm x 171mm. Kg/m - 67
Primary Steel StructureSkylight Columns (UKC - Baby Blue)Serial Size - 203mm x 203mm. Kg/m-54
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall actingas support for concrete beams withholding down bolts cast in to secure steelcolumns above.
Concrete Beams (Purple)Transfer structure in place where structuralsteel column grid & basement concretecolumn grids do not coincide. Seating forhollow core floor slabs incorporated inbeams.
Concrete Beams (Purple)Transfer structure in place wherestructural steel column grid & basementconcrete column grids do not coincide.Seating for hollow core floor slabsincorporated in beams.
Concrete Columns - Glulam Base (Orange)Cast in-situ, steel reinforced concretecolumns with cap with holding down boltscast in to secure steel Glulam ColumnShoes.
Concrete Columns - Glulam Base (Orange)Cast in-situ, steel reinforced concretecolumns with cap with holding down boltscast in to secure steel Glulam ColumnShoes.
Concrete Secant Piles.To Comply with Engineers Details,Specs and Design.
Steel Perimeter ColumnsSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.Finish: Lined with Moisture Registrant plasterboardand Plaster.
To Comply with Engineers Details, Specs andDesign.
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm Plaster Skim.Moisture Resistance plasterboard.Fixing: Secured to steel stud via proprietary Clip.Finish: 2.5mm White plaster skimcoat
Proprietary Plasterboard Clip.
Steel Perimeter ColumnsSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.Finish: Lined with Moisture Registrant plasterboardand Plaster.
To Comply with Engineers Details, Specs andDesign.
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm Plaster Skim.Moisture Resistance plasterboard.Fixing: Secured to steel stud via proprietary Clip.Finish: 2.5mm White plaster skimcoat
Proprietary Plasterboard Clip.
Precast concrete floor slabSpec: 150mm thickness. With edgethickening and steel reinforced. All Gapsfilled with lean mix concrete beforeinsulation installFixing: Bearing on external retaining walland required columns. Min 50mm bearingand 25mm Side bearing.
To Comply with Engineers Details, Specsand Design.
Concrete Structural ColumnSpec: Cast in-situ, steel reinforced concretecolumns with cap with holding down bolts castin to secure steel columns above.
To Comply with Engineers Details, Specs andDesign.
150
Steel Perimeter ColumnsSpec: Serial Size - 356mm x171mm. Kg/m - 67.Fixing: Concrete Wall Belowwith holding down boltscast in to secure steelcolumns.Finish: Lined with MoistureRegistrant plasterboardand Plaster.
To Comply with EngineersDetails, Specs and Design.
350
150
75
380
Structural Column Width
Plasterboard and Plaster FinishSpec: 12.5mm thickness and2.5mm Plaster Skim. MoistureResistance plasterboard.Fixing: Secured to steel stud.Finish: 2.5mm White plasterskimcoat
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivity of 0.021W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extend to meetexternally insulation. To aid in the elimination ofthermal bridge.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Comply withEngineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
28/04/2015 17:28:31
Structural Arrangment
Issue Date
GA - 111
GA - 111
Stuctural Arrangment - Roofing Skylight3
GA - 111
Stuctural Arrangment - Glulam Structure2
GA - 111
Stuctural Arrangment - Section No.1 Structure4
GA - 111
Stuctural Arrangment - Section No.2 Structure5
GA - 111
Stuctural Arrangment - Section No.3 Structure6 1 : 5GA - 111
Structural Steel Column Encasment7 1 : 5GA - 111
Structural Steel Beam Encasment8
Steel Structure:All Structural Steel to have 60min fire resistance. Structural design is aprovisional design and needs to be consulted with Structural Engineer. AllSteel reinforced and structural steel to comply with engineers details, specsand design.
Concrete Structure:All concrete cement used for both precast and cast insitu to be ecocembased cement. All concrete works to comply with BS:8004 and tested with BSEN 12350-1 2009. Exposed concrete finished to comply with BS:8110. (BoardPanel Finish). All Concrete construction to comply with engineers details,specs and design.
1 : 5GA - 111
Structural Steel Column Base Connection9
Construction SpecificationSteel Structure:All Structural Steel to have 60min fire resistance. Structural design is aprovisional design and needs to be consulted with Structural Engineer. AllSteel reinforced and structural steel to comply with engineers details,specs and design.
Primary Steel StructureColumns (UKC - Blue) Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red) Serial Size - 356mm x 171mm. Kg/m - 67Skylight Columns (UKC - Baby Blue) Serial Size - 203mm x 203mm. Kg/m -54Structural Hollow Section (HC - Pink) Outside Diameter - 355.6. Thickness -8mm. Kg/m - 54Beams (UKB - Yellow) Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green) Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray) Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange) Kingspan Multichannel will beadvised to be used. Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for both precast and cast insitu to be ecocembased cement. All concrete works to comply with BS:8004 and testedwith BS EN 12350-1 2009. Exposed concrete finished to comply withBS:8110. (Board Panel Finish). All Concrete construction to comply withengineers details, specs and design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting as support for concrete beamswith holding down bolts cast in to secure steel columns above.
Concrete Columns (White)Cast in-situ, steel reinforced concrete columns with cap with holdingdown bolts cast in to secure steel columns above, 300mm x 300mm.
Concrete Beams (Purple)Transfer structure in place where structural steel column grid & basementconcrete column grids do not coincide. Seating for hollow core floorslabs incorporated in beams.
Glulam Structure:Structural Engineer design to be followed with the Glulam structure. TheSteel shoes are to be designed to resist water corrosion.
Floor Build Up:Ground Floor Suspended - Insulated Hollowcore Slab.Max Span 9m, Min 50mm bearing and 25mm Side bearing. All Gaps filledwith lean mix concrete before insulation install. All columns wrapped incompressible insulation layer to meet screed height. Movement jointsalso to be accommodated.-150mm precast concrete floor slab with edge thickening and steelreinforced.-150mm rigid PIR Insulation.(High Compressive Strength)-75mm Concrete Screed.- Various Floor Finish.
First Floor Suspended - Hollowcore SlabMax Span 9m, Min 50mm bearing and 25mm Side bearing. All Gaps filledwith lean mix concrete before insulation install. All columns wrapped incompressible insulation layer to meet screed height. Movement jointsalso to be accommodated.-150mm precast concrete floor slab with edge thickening and steelreinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete before insulation install. FloorThickening around perimeters of columns. Movement joints also to beaccommodated.-150mm concrete floor slab with edge thickening & steel reinforced, oncontinuous radon membrane to exit above ground outside building.-50mm sand blinding layer on compacted layers of suitable hardcore225mm.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughout the building as each zonehas different requirements (fire) and uses. The basic build up is a 2.5mmPlasterskim, 12.5mm Plasterboard, 100mm Steed Stud System, 12.5mmPlasterboard, 2.5mm Plasterskim. 10mm Shadow Gap to be incorporatedon perimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium Fire Frame System, with 23mmPilkington Pyrostop Glass. This will achieve a 60Min Fire Rating. System toincorporate fire-rated insulation (Mineral Wool) as well as intumescenttape.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel 35mm Thickness. VariousWidth and Lengths (300x300mm - 600x600mm - 900x900mm -1200x1200mm). Hidden Fix System to Vertical Rail System. ProprietaryVertical Railing System secured to Steel Multichannel (CPB). (ThermalBreak Incorporated). 50mm PIR Rainscreen Insulation secured to CementParticle Board 12mm, secured to 200mm Multichannel. CPB Taped at jointsto form air tight barrier. 200mm Space in Multichannel filled with FireRated Mineral Quilt Insulation. Continuous Fire rated Vapour barrier oninner face pf secondary structure. Internally Steel Channels provide a50mm service cavity for electrical Works. Required Plasterboard finishsecured to steel channels.
Accoya Timber Cladding -Vertical Accoya Cladding 50mm Width, Shiplap Joint (50year Warranty).Secured to vertical support system. Proprietary Vertical Railing Systemsecured to Steel Multichannel (CPB). (Thermal Break Incorporated) 50mmPIR Rainscreen Insulation secured to Cement Particle Board 12mm,secured to 200mm Multichannel. CPB Taped at joints to form air tightbarrier. 200mm Space in Multichannel filled with Fire Rated Mineral QuiltInsulation. Continuous Fire rated Vapour barrier on inner face pfsecondary structure. Internally Steel Channels provide a 50mm servicecavity for electrical Works. Required Plasterboard finish secured to steelchannels.
Roof Build Up:Green Roof Build Up175mm growing substrate with sedum planting. Filter fleece to preventany soil particles washing into the drainage layer, dressed betweendrainage channel and growing substrate. 60mm Bauder DSE 60 board,filled with mineral drain material. Root resistant layer on waterproofingunder layer. Bauder FSM 1100 protection mat, polyester & polypropylenefiber. 150mm rigid PIR insulation. Vapour barrier layer. 75mm concretescreed. 150mm precast concrete floor slab with edge thickening andsteel reinforced.
Copper Mesh Vision PanelOkaTech Sealed Glazed Expanded Copper Mesh Panels. This facade is acurtain wall assembly and supported by aluminium Glazing unit at eachlevel. Design guidance is required from Okalux for final deign.
8 mm low-iron outer pane with copper coloured frit around edges toconceal structural silicone. 2 mm cavity with expanded copper meshsecured in corners with spots of silicone. 8 mm solar control glass withlow-e coating. 16 mm air cavity. 10 mm laminated inner pane comprisingtwo panes 5 mm fl oat glass and 0.76 mm PVB (polyvinylbutyral)interlayer.
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh Spandrel Panels. Thisfacade is a curtain wall assembly and supported by aluminium GlazingUnit at each level.
8 mm low-iron outer pane with copper coloured frit around edges toconceal structural silicone. 2 mm cavity with expanded copper meshsecured in corners with spots of silicone. 8 mm solar control glass withlow-e coating. 30 mm air cavity. 120 mm rigid insulation. 3 mm foldedaluminium backing sheet.
Curtain Walling:APA curtain walling system, TB50 SG system which will also be used tosupport structurally.Double glazed Units incorporated. All joints to be weathered usingsilicone seals.Double glazed unit sizes - 1200mm x 2000mm. All curtain walling to havetrench heating below to aid in stopping condensation.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica in PortugalDesigned by OMA. The curved glass facade is deigned by ABT Arnhem.Hot bended curved and laminated strips of glass 1200 mm wide and 400mm deep. Good sound insulation can be achieved by placing twosheets of glass at some distance from each other, preferably over anexpansion joint, 500mm.
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
28/04/2015 20:01:23
Environmental Strategy
Issue Date
SS - 100
Water Consumption ConservationA wide range of water conservation measures appropriate for buildingsare suggested by the Environment Agency. These are outlined below
Bathroom SinksBathroom sinks are the most commonly used bathroom appliance, theyare also the most inefficient and inefficiently used.
Infra-red tapsInfra-red taps that can be bought from many eco-friendly appliancecompanies, are especially useful as they only turn on when the laser incrossed this can cut down on waster wastage by half as there in sowasted running water, also modern taps like this have a better partsinstalled so they do not leak like older taps.
Low-Flow aeratorsInexpensive and simple to install, low-flow shower heads and faucetaerators can reduce your home water consumption as much as 50%,and reduce your energy cost of heating the water also by as much as50%. They allow Air to enter the tap so the water is dispersed into widerand better flow.
Toilets/ UrinalsToilets use a huge amount of water when they are flushed. There ismany simple and clever ideas and deigns that help to make toiletsmore efficient, urinals also have also progressed in this manner.
Dual flushFlush typed toilet bowls are undoubtedly consumes large amount ofwater, which not friendly enough to the environment and to thehousehold. The dual flush toilet is a toilet water tank with a dual flushfeature, which includes the half flush and the full flush. The productperfect for every home all around the world, because it will let everyhousehold save from water that they flush every now and then even ifthey only just urinated, which does not need large amount of water toflush.
ShowersShowers depending on their length can use a massive amount of water.Besides our usage in the shower the biggest option that can be done isto use eco-friendly faucets and aerators to cut down on their waterconsumption.
Smart ShowerheadsThe environmentally friendly Roadrunner low-flow showerhead fromEvolve allows you to walk away while your shower gets hot, stoppingthe flow to a trickle when the water reaches a comfortable 95 degreesconserving as much as eight gallons of water for every five minuteshower. An added bonus is an auditory signal: When the flow begins totrickle, you know you can pull on the tag and begin your shower.
Benefits• Reduced water consumption
• Lower installation costs
• No flooding risk
• Reduced pipe blockage in hard water areas
• Avoidance of odorous lime scale on urinal bowls
Limitations• The cost of consumables may exceed the cost of the water saved
• The environmental cost of consumables may outweigh theenvironmental benefit of reduced water use
• Many systems require regular and correct maintenance to preventodour and blockage, or require a maintenance contract which maymake them uneconomic for smaller installations.
Heating Energy Conservation
Biomass
System DescriptionBiomass is any plant-derived organic material that renews itself over ashort period. Biomass energy systems are based on either the direct orIndirect combustion of fuels derived from those plant sources.
The most common form of biomass is the direct combustion of wood intreated or untreated forms. Other possibilities include the productionand subsequent combustion of biogas produced by either gasificationor anaerobic digestion of plant materials. Liquid biofuels such asbioethanol can also be used. The use of biomass is becomingincreasingly common in some European countries (some countriessuch as Austria are heavily dependent on biomass). The environmentalbenefits relate to the significantly lower amounts of energy used inbiomass production and processing compared to the energy releasedwhen they are burnt. This can range from a four-fold return forbiodiesel to an approximate 20-fold energy return for woody biomass.
Biomass heaters range from small, simple wood-burning stoves to largefully automated boilers intended for large commercial/publicbuildings or community heating schemes. Features of a good large-scale boiler include the following:
• Thermal efficiency greater than 85%• Emissions at full load less than 250 mg/m3 CO, 150 mg/m3 dust and 300
mg/m3 NOx• Automatic cleaning of the boiler heat-exchanger and automatic ash
removal• Remote monitoring of the boiler operating parameters.
Benefits• Biomass-fuels can be used to produce energy on a continuous basis
(unlike renewables such as wind or solar energy)
• Biomass can be an economic alternative to fossil fuels
• Biomass is a potential source of both heat and electricity
• Biomass technology is flexible and scale able, from a single boiler to apower station
Limitations• Biomass fuels have a lower energy density compared to fossil fuels
• Biomass systems have particular design management andmaintenance requirements associated with sourcing, transportationand storage
• Biomass can be less convenient to operate than mains-supplied fuelssuch as natural gas
• Biomass systems are more management intensive and requireexpertise in facilities management
• Sources of biomass can fluctuate, so boilers should be specified tooperate on a variety of fuels without risk of overheating or tripping out
Grey water Harvesting System
Grey water is water originally supplied as potable water that hasalready been used for bathing, washing, or laundry. The waste-wateris collected, stored and treated, then used for toilet flushing orirrigation of non-edible plants.
Runoff from the roof will be run into the storage tank that will beplaced under the new car park area.
Water storageGreywater collection tanks are generally smaller than rainwatercollection tanks and can be located above ground.Packaged collection tanks are available that are supplied with afiltration and disinfection dosing system. Control systems areavailable that will automatically pump the water to the foul drainafter a preset period of no draw-off. It should also be possible tomanually drain the tank to allow for cleaning and maintenance andin response to contamination of the water.
System typesGreywater systems can be categorised as either direct-fed, wherethe greywater is stored in a storage tank and pumped directly tothe water outlets, or indirect where the greywater is supplied froma storage tank to a storage cistern before being supplied to thewater outlets.
Water treatmentA range of substances such as skin, hair, soaps, detergents andsurface cleaning agents contaminate greywater. As the greywaterwill also contain pathogenic micro-organisms, the water must betreated before use. Without this treatment health-related problemscould arise following storage of the water, as the warm, nutrient-rich water will quickly deteriorate with the multiplication ofbacteria.
Greywater must not be stored for more than 24 hours untreated andfor not more than three days after treatment.
Benefits• Re-use of waste water for toilet flushing and other non-potable uses
• Can be used for single building or communal schemes
• Wide range of water filtration techniques available
Limitations• Greywater must be treated before use
• Greywater must not be stored for more than 24 hours untreated andfor not more than three days after treatment
• Providing sufficient greywater storage capacity may presentproblems
• More suited to new build applications than retrofit
• Installation and on-going costs may not justify savings
• Pumps, filters and sensors can present operational problems
Solar Water Heating
System descriptionSolar water heating systems use the energy from the sun to heatwater, most commonly for hot water needs (such as washing andcleaning requirements). Solar heating systems use a heat collectorthat is usually mounted on a roof in which a fluid is heated by the sun.
This fluid is used to heat water that is stored in either a separate hotwater cylinder or in a twin-coil hot water cylinder (the second coil isused to provide additional heating from a boiler or other heat source).
System typeGlazed flat-plate collectorsFlat-plate collectors comprise a metal absorber in a rectangularhousing. The absorber is typically made from copper or aluminiumand coated with a special black coating which improves absorptionof solar energy and enhances heat transfer. Copper tubes areattached in parallel (or in a serpentine coil) to the absorber. Thesetubes are used to contain the heat transfer medium.
Benefits - Glazed flat-plate collectors
• Simple and robust design
• Well-developed technology
• Cheaper than alternative evacuated tube collectors
• Good price to performance ratio
• Provides a wide range of mounting options
• The flat surface is more visually appealing than the curved corrugatedsurface of evacuated tube collectors.
Limitations - Glazed flat-plate collectors
• Lower efficiency compared to evacuated tube collectors
• Requires more roof space than evacuated tube collectors
• Lower water temperature than evacuated tube collectors.
Stack ventilation
Driven by temperature differences between the hot air inoccupied spaces and cooler external air. Warm air willelevate upwards in the Atrium andexit through an Openable Vent. This air which is evacuatedfrom the building gives foundation for fresh and cooler air tobe drawn into the building through openings, such aswindows at a Lower Level.
It will be used to benifit the chaning rooms and also thelecture rooms.
The Exhibition are will be ventilated by air from the lobbierising through the void in the floor and up to the skylightwhich has built in ventilation.
Benefits• Flexibility in vent placement• Non-reliance on wind patterns• Stable air flow• Sustainability.• Temperature difference is the driving force• Effective for night time cooling with greatest differentialbetween internal and external temperature• Wind-driven ventilation for improved daytimeperformance
Limitations• Lower air flow force when compared to wind ventilation• Reliance on temperature differentials -air outside must becooler than the inside air for system to work• Design limitations regarding ceiling heights- Upper storeyfloors may overheat if there is insufficient height differencebetween those levelsand the stack ventilation shaf• A clear path is essential for air to travel with ease from lowlevel openings to the high ventilation
Infra-red tap Dual flush
Smart Showerheads Low-Flow aerators
Room For Biomass Boiler
Biomass Boiler
Glazed flat-plate collectors
Glazed flat-plate collectors
Greywater collection tank
General Design Notes:
All works to comply with all current, Relevant building regulationsand codes of Practice.
Design Guidance is taken from Sports England Documents and alsoThe Metric Handbook, TGD-B, TGD-M, BS:9999.
All works to be passed by building Control officer inspections.
Cast in-situ concrete to comply with BS 8004.
Steel reinforcement & structural steel Frame to engineer’s details &design.
All timbers to be preservative treated, Structurally graded &sourced from an fsc Managed forests
Do not scale off drawings, dimensions Shown to be used. Consultarchitect's Office for clarification.
Construction SpecificationSteel Structure:All Structural Steel to have 60min fire resistance. Structural design isa provisional design and needs to be consulted with StructuralEngineer. All Steel reinforced and structural steel to comply withengineers details, specs and design.
Primary Steel StructureColumns (UKC - Blue) Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red) Serial Size - 356mm x 171mm. Kg/m- 67Skylight Columns (UKC - Baby Blue) Serial Size - 203mm x 203mm.Kg/m -54Structural Hollow Section (HC - Pink) Outside Diameter - 355.6.Thickness - 8mm. Kg/m - 54Beams (UKB - Yellow) Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green) Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray) Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange) Kingspan Multichannel will beadvised to be used. Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for both precast and cast insitu to beecocem based cement. All concrete works to comply withBS:8004 and tested with BS EN 12350-1 2009. Exposed concretefinished to comply with BS:8110. (Board Panel Finish). All Concreteconstruction to comply with engineers details, specs and design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting as support for concretebeams with holding down bolts cast in to secure steel columnsabove.
Concrete Columns (White)Cast in-situ, steel reinforced concrete columns with cap withholding down bolts cast in to secure steel columns above, 300mmx 300mm.
Concrete Beams (Purple)Transfer structure in place where structural steel column grid &basement concrete column grids do not coincide. Seating forhollow core floor slabs incorporated in beams.
Glulam Structure:Structural Engineer design to be followed with the Glulam structure.The Steel shoes are to be designed to resist water corrosion.
Floor Build Up:Ground Floor Suspended - Insulated Hollowcore Slab.Max Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-150mm rigid PIR Insulation.(High Compressive Strength)-75mm Concrete Screed.- Various Floor Finish.
First Floor Suspended - Hollowcore SlabMax Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete before insulation install. FloorThickening around perimeters of columns. Movement joints also tobe accommodated.-150mm concrete floor slab with edge thickening & steelreinforced, on continuous radon membrane to exit above groundoutside building.-50mm sand blinding layer on compacted layers of suitablehardcore 225mm.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughout the building as eachzone has different requirements (fire) and uses. The basic build up isa 2.5mm Plasterskim, 12.5mm Plasterboard, 100mm Steed StudSystem, 12.5mm Plasterboard, 2.5mm Plasterskim. 10mm ShadowGap to be incorporated on perimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium Fire Frame System, with23mm Pilkington Pyrostop Glass. This will achieve a 60Min FireRating. System to incorporate fire-rated insulation (Mineral Wool) aswell as intumescent tape at joints.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel 35mm Thickness.Various Width and Lengths (300x300mm - 600x600mm - 900x900mm- 1200x1200mm). Proprietary Hidden Fix System Cement plasterboard. 50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. Continuous WindBarrier along external side of CPB. 200mm Space in Multichannelfilled with Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electrical Works.Required Plasterboard finish secured to steel channels.
Accoya Timber Cladding -Vertical Accoya Cladding 75mm Width, Shiplap Joint (50yearWarranty). Secured to vertical support system. Proprietary HiddenFix System Cement plaster board. . (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement Particle Board12mm, secured to 200mm Multichannel. CPB Taped at joints toform air tight barrier. 200mm Space in Multichannel filled with FireRated Mineral Quilt Insulation. Continuous Fire rated Vapour barrieron inner face pf secondary structure. Internally Steel Channelsprovide a 50mm service cavity for electrical Works. RequiredPlasterboard finish secured to steel channels.
Roof Build Up:Green Roof Build Up175mm growing substrate with sedum planting. Filter fleece toprevent any soil particles washing into the drainage layer, dressedbetween drainage channel and growing substrate. 60mm BauderDSE 60 board, filled with mineral drain material. Root resistant layeron waterproofing under layer. Bauder FSM 1100 protection mat,polyester & polypropylene fiber. 150mm rigid PIR insulation. Vapourbarrier layer. 75mm concrete screed. 150mm precast concretefloor slab with edge thickening and steel reinforced.
Copper Mesh Vision Panel -OkaTech Sealed Glazed Expanded Copper Mesh Panels. Thisfacade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh Spandrel Panels.This facade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Curtain Walling:APA curtain walling system, TB50 SG system which will also be usedto support structurally.Double glazed Units incorporated. All joints to be weathered usingsilicone seals.Double glazed unit sizes - 1200mm x 2000mm. All curtain walling tohave trench heating below to aid in stopping condensation.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica inPortugal Designed by OMA. The curved glass facade is deignedby ABT Arnhem. Hot bended curved and laminated strips of glass1200 mm wide and 400 mm deep. Good sound insulation can beachieved by placing two sheets of glass at some distance fromeach other, preferably over an expansion joint, 500mm.
1
Wall Section AA
AA-1
AA-2
AA-3
7515
0
Boun
dry
Gro
und
Leve
l to
Base
men
t Gro
und
Floor
Lev
el -
1800
mm
Grid
Line
1
Concrete ScreedSpec: 75mm Thickness. Detailed with Steel MeshReinforcement.Fixing: Layed directly ontop of Floor Slab.Finish: Polished Finish to expose aggregate.
To Comply with Engineers Details, Specs and Design.
Concrete ScreedSpec: 150mm Thickness. Detailed with FloorThickening around perimeter and perimeter ofcolumns and Steel Reinforcement. Movement jointsalso to be accommodated.Fixing: Layed directly ontop of Sand binding andHardcore.
To Comply with Engineers Details, Specs andDesign.
Boun
dary
Line
35050
Sand BlindingSpec: 50mm compacted.HardcoreSpec: 225mm compacted
Note: Concrete Slab to have Kickerincorporated into Design 225mm Risefrom Slab.
Note: Existing Neighbouring GroundLevel. Tarmac Finish.
Concrete Structural Retaining WallSpec: 300mm Thickness, Retaining wall acting assupport for concrete beams with holding downbolts cast in to secure steel columns above.Fixing: Secured to meet Slab Kicker withWaterstop cast into bother.
To Comply with Engineers Details, Specs andDesign.
Concrete Panel FinishSpec: 50mm cast in-situ concrete panel.Fixing: Secured to concrete retaining wall.Finish: Board Panel Finish.
To Comply with Engineers Details, Specsand Design.
Waterproof MembraneTo run from under kicker up to meet theground floor level.Fixing: Bonded to concrete Retaining Wall.
Delta Drain Waterproof MembraneTo run to meet the ground floor level.Fixing: Run under concrete slab. (Acting asa Radon membrane and waterproofingunder slab)
Ribbed WaterstopSpec: The Center accommodateslateral, transverse and shear movement.Fixing: Cast into concrete Retaining wall.
To Comply with Engineers Details, Specsand Design.
Seal WaterstopSpec: External Waterstop to stop moisterentering.Fixing: Cast into concrete Retaining wall.
To Comply with Engineers Details, Specs andDesign.
400500
225
50
Grid
Line
1
Boun
dary
Line
Concrete Structural Retaining WallSpec: 300mm Thickness, Retaining wall acting assupport for concrete beams with holding down boltscast in to secure steel columns above.Fixing: Secured to meet Slab Kicker with Waterstopcast into bother.
To Comply with Engineers Details, Specs and Design.
Concrete Panel FinishSpec: 50mm cast in-situ concrete panel.Fixing: Secured to concrete retaining wall.Finish: Board Panel Finish.
To Comply with Engineers Details, Specsand Design.
Waterproof MembraneRun from basement up to meet vapour barrier.Fixing: Bonded to concrete Retaining Wall and slab.
Delta Drain Waterproof MembraneRun from basement up to meet vapourbarrier.Fixing: Bonded to concrete Retaining Walland slab.
500
270
150
Steel Perimeter ColumnsSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.Finish: Lined with Moisture Registrant plasterboardand Plaster.
To Comply with Engineers Details, Specs andDesign.
350
150
75
380
50
410
Structural Column Width
15
20012.55040
150
Dri Design Copper Coated AluminiumPanel Spec: 35mm Thickness. Various Widthand Lengths (300x300mm - 600x600mm -900x900mm - 1200x1200mm).Fixing: Proprietary Hidden Fix SystemCement plaster board through PIRInsulation via Z-Girt Bracket.Finish: Natural Copper Finish.
PIR Rainscreen InsulationSpec:12.5mm Thickness. (Foil Faced)Thermal Conductivity of 0.021 W/mK,Class "O" Fire Rating. Length 2400mm xWidth 1200mmFixing: Secured to Cement Particle Boardvia proprietary fixing.
Z-Girt Fixing
Cement Particle BoardSpec: 12.5mm Thickness.Fixing: Secured to Multichannel Beam.
Breather MembraneSpec: Fire rated class 0 Membrane continuouson external of Cement Particle Board. Tapedat Joints and where needed. Airtight andWater Resistance.Fixing: To be extended to meet internal VapourBarrier.
Mineral Quilt InsulationSpec: 200mm fire resistant insulation.Thermal Conductivity of 0.041 W/mK,Class "O" Fire Rating.Fixing: Securely packed in betweenMultichannel.
Cold Rolled Steel MultichannelSpec: 200mm Width x 50mmHeight. Galvanised for resistance.Fixing: Secured to primary steelstructure.
Vapour BarrierSpec: Fire Rated Class 0 Halogen-freeflame retardant coating. Taped atJoints and where needed. Airtight andWater Resistance.
Dri Design Copper Coated Aluminium PanelSpec: 35mm Thickness. To return to meet theConcrete Panel Wall. To include ventilationholes and insect mesh.Fixing: To Cladding at top and Concrete wallvia Dri Design propriety fixing.Finish: Natural Copper Finish.
100
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm PlasterSkim. Moisture Resistance plasterboard.Fixing: Secured to steel stud.Finish: 2.5mm White plaster skimcoat
Non-Slip Ceramic TileSpec: Rise of 150mm around perimeter usingperimiter tile. Non Shrink Grout at Joints andproprietary requirement for thinset (Expansionjoints required).
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivity of 0.021W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extend to meetexternally insulation. To aid in the elimination ofthermal bridge.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Comply withEngineers Details, Specs and Design.Fixing: Poured ontop of insulation.
360
Grid
Line
1
Boun
dary
Line
500
150
Steel Perimeter ColumnsSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.
To Comply with Engineers Details, Specs andDesign.
75
225
Structural Column Width
15
20012.550
Dri Design Copper Coated AluminiumPanel Spec: 35mm Thickness. Various Widthand Lengths (300x300mm - 600x600mm -900x900mm - 1200x1200mm).Fixing: Proprietary Hidden Fix SystemCement plaster board through PIRInsulation via Z-Girt Bracket.Finish: Natural Copper Finish.
PIR Rainscreen InsulationSpec:12.5mm Thickness. (Foil Faced)Thermal Conductivity of 0.021 W/mK,Class "O" Fire Rating. Length 2400mm xWidth 1200mmFixing: Secured to Cement Particle Boardvia proprietary fixing.
Z-Girt Fixing
Cement Particle BoardSpec: 12.5mm Thickness.Fixing: Secured to Multichannel Beam.
Breather MembraneSpec: Fire rated class 0 Membrane continuouson external of Cement Particle Board. Tapedat Joints and where needed. Airtight andWater Resistance.Fixing: To be extended to meet internal VapourBarrier.
Mineral Quilt InsulationSpec: 200mm fire resistant insulation.Thermal Conductivity of 0.041 W/mK,Class "O" Fire Rating.Fixing: Securely packed in betweenMultichannel.
Cold Rolled Steel MultichannelSpec: 200mm Width x 50mmHeight. Galvanised for resistance.Fixing: Secured to primary steelstructure.
Vapour BarrierSpec: Fire Rated Class 0 Halogen-free flame retardant coating. Tapedat Joints and where needed. Airtightand Water Resistance.
100
Polished Floor ScreedSpec: The concretescreed will be polished toexpose the aggregate.
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screedheight. Movement joints also to beaccommodated. With edge thickening and steelreinforced To Comply with Engineers Details, Specsand Design.Fixing: Poured ontop of insulation.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural ColumnEngineers Connection Detail.
To Comply with Engineers Details, Specs andDesign.
Stru
ctur
al B
eam
Hei
ght
Serv
ice
Void
of 1
350m
m
30
AMF Suspended CeilingSpecs: 24mm Thickness. Thermatex Varioline Wood600x600mm Tiles System. Edge Detail Proprietary Edge SFlong side. Humidity up to 95%. (Sound Absorbing Material)
Shadow Gap BeadSpec: 20mm
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm Plaster Skim.Moisture Resistance plasterboard.Fixing: Secured to steel stud.Finish: 2.5mm White plaster skimcoat
24
100
Furring ChannelSpec: Proprietary SystemSuspending Panels.
Top Cross RailSpec: Secured to FurringChannel Via Locking Key
Suspension ChannelSpec: Top Bracket andBottom Clip
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 09:40:05
Section AA - Wall Section No.1
Issue Date
TD - 100
AA
1 : 5TD - 100
Section AA - Wall - Detail No.1 - Basement Retaining WallAA-1
1 : 5TD - 100
Section AA - Wall - Detail No.2 - Retaining Wall / First Floor JunctionAA-2
1 : 5TD - 100
Section AA - Wall - Detail No.3 - Rainscreen Cladding / First Floor JunctionAA-3
Construction SpecificationSteel Structure:All Structural Steel to have 60min fire resistance. Structural design isa provisional design and needs to be consulted with StructuralEngineer. All Steel reinforced and structural steel to comply withengineers details, specs and design.
Primary Steel StructureColumns (UKC - Blue) Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red) Serial Size - 356mm x 171mm. Kg/m- 67Skylight Columns (UKC - Baby Blue) Serial Size - 203mm x 203mm.Kg/m -54Structural Hollow Section (HC - Pink) Outside Diameter - 355.6.Thickness - 8mm. Kg/m - 54Beams (UKB - Yellow) Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green) Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray) Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange) Kingspan Multichannel will beadvised to be used. Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for both precast and cast insitu to beecocem based cement. All concrete works to comply withBS:8004 and tested with BS EN 12350-1 2009. Exposed concretefinished to comply with BS:8110. (Board Panel Finish). All Concreteconstruction to comply with engineers details, specs and design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting as support for concretebeams with holding down bolts cast in to secure steel columnsabove.
Concrete Columns (White)Cast in-situ, steel reinforced concrete columns with cap withholding down bolts cast in to secure steel columns above, 300mmx 300mm.
Concrete Beams (Purple)Transfer structure in place where structural steel column grid &basement concrete column grids do not coincide. Seating forhollow core floor slabs incorporated in beams.
Glulam Structure:Structural Engineer design to be followed with the Glulam structure.The Steel shoes are to be designed to resist water corrosion.
Floor Build Up:Ground Floor Suspended - Insulated Hollowcore Slab.Max Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-150mm rigid PIR Insulation.(High Compressive Strength)-75mm Concrete Screed.- Various Floor Finish.
First Floor Suspended - Hollowcore SlabMax Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete before insulation install. FloorThickening around perimeters of columns. Movement joints also tobe accommodated.-150mm concrete floor slab with edge thickening & steelreinforced, on continuous radon membrane to exit above groundoutside building.-50mm sand blinding layer on compacted layers of suitablehardcore 225mm.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughout the building as eachzone has different requirements (fire) and uses. The basic build up isa 2.5mm Plasterskim, 12.5mm Plasterboard, 100mm Steed StudSystem, 12.5mm Plasterboard, 2.5mm Plasterskim. 10mm ShadowGap to be incorporated on perimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium Fire Frame System, with23mm Pilkington Pyrostop Glass. This will achieve a 60Min FireRating. System to incorporate fire-rated insulation (Mineral Wool) aswell as intumescent tape at joints.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel 35mm Thickness.Various Width and Lengths (300x300mm - 600x600mm - 900x900mm- 1200x1200mm). Proprietary Hidden Fix System Cement plasterboard. 50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. Continuous WindBarrier along external side of CPB. 200mm Space in Multichannelfilled with Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electrical Works.Required Plasterboard finish secured to steel channels.
Accoya Timber Cladding -Vertical Accoya Cladding 75mm Width, Shiplap Joint (50yearWarranty). Secured to vertical support system. Proprietary HiddenFix System Cement plaster board. . (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement Particle Board12mm, secured to 200mm Multichannel. CPB Taped at joints toform air tight barrier. 200mm Space in Multichannel filled with FireRated Mineral Quilt Insulation. Continuous Fire rated Vapour barrieron inner face pf secondary structure. Internally Steel Channelsprovide a 50mm service cavity for electrical Works. RequiredPlasterboard finish secured to steel channels.
Roof Build Up:Green Roof Build Up175mm growing substrate with sedum planting. Filter fleece toprevent any soil particles washing into the drainage layer, dressedbetween drainage channel and growing substrate. 60mm BauderDSE 60 board, filled with mineral drain material. Root resistant layeron waterproofing under layer. Bauder FSM 1100 protection mat,polyester & polypropylene fiber. 150mm rigid PIR insulation. Vapourbarrier layer. 75mm concrete screed. 150mm precast concretefloor slab with edge thickening and steel reinforced.
Copper Mesh Vision Panel -OkaTech Sealed Glazed Expanded Copper Mesh Panels. Thisfacade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh Spandrel Panels.This facade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Curtain Walling:APA curtain walling system, TB50 SG system which will also be usedto support structurally.Double glazed Units incorporated. All joints to be weathered usingsilicone seals.Double glazed unit sizes - 1200mm x 2000mm. All curtain walling tohave trench heating below to aid in stopping condensation.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica inPortugal Designed by OMA. The curved glass facade is deignedby ABT Arnhem. Hot bended curved and laminated strips of glass1200 mm wide and 400 mm deep. Good sound insulation can beachieved by placing two sheets of glass at some distance fromeach other, preferably over an expansion joint, 500mm.
321
Roof Section AA
AA - 4 AA - 5
150
PIR Rainscreen InsulationSpec:12.5mm Thickness. (Foil Faced)Thermal Conductivity of 0.021 W/mK,Class "O" Fire Rating. Length 2400mm xWidth 1200mmFixing: Secured to Cement Particle Boardvia proprietary fixing.
Cement Particle BoardSpec: 12.5mm Thickness.Fixing: Secured to Multichannel Beam.
Breather MembraneSpec: Fire rated class 0 Membranecontinuous on external of Cement ParticleBoard. Taped at Joints and where needed.Airtight and Water Resistance.Fixing: To be extended to wrap up andaround parapet.
Mineral Quilt InsulationSpec: 200mm fire resistant insulation.Thermal Conductivity of 0.041 W/mK,Class "O" Fire Rating.Fixing: Securely packed in betweenMultichannel, Run up to meet PIRRigid Insulation.
Cold Rolled Steel MultichannelSpec: 200mm Width x 50mmHeight. Galvanised for resistance.Fixing: Secured to primary steelstructure.
Vapour BarrierSpec: Fire Rated Class 0 Halogen-freeflame retardant coating. Taped atJoints and where needed. Airtight andWater Resistance.Fixing: To Run up along underside of roofinsulation.
Precast concrete floor slabSpec: 150mm thickness. With edge thickeningand steel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs andDesign.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
Stru
ctur
al B
eam
Hei
ght
50 10 200
200
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivityof 0.021 W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extendto meet externally insulation. To aid in theelimination of thermal bridge.
Structural Steel BeamsSpec: Serial Size -356mm x 171mm. Kg/m - 67Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
150
70
200
Dri Design Copper Coated Aluminium Panel Spec: 35mmThickness. Various Width and Lengths (300x300mm -600x600mm - 900x900mm - 1200x1200mm).Fixing: Proprietary Hidden Fix System to Cement plasterboard.Finish: Natural Copper Finish.
Growing substrateSpecs: 175mm Thickness. Sedumplanting
Filter fleeceSpec: To prevent any soil particles washing into thedrainage layer, dressed between drainage channeland growing substrate.
Bauder DSE 60 boardSpec: 60mm Thickness. Filled with mineral drainmaterial
Bauder FSM 1100 protection mat,Spec: polyester & polypropylene fiber, run to layunder breather membrane on parapet.
Root resistant layerSpec: On waterproofing underlay, run to layunder breather membrane on parapet.
Flashing CapSpec: Copper parapet capping , turnedup at ends to hinder water penetration.Fixing: Secured to plywood via buttstraps.
Plywod Capping SupportSpecs: 10mm Thickness. Secured toTilting fillet.
Steel Up Stand:Spec: Width 200mm. Up Stand Height200mm.Laterally Supported by 200x500mmMultichannel.Fixing: To Structural Column Below.
To Comply with Engineers Details,Specs and Design
170
80
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Complywith Engineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Galvanized Steel EdgeSpec: 5mm in Thickness. Acts as retaining for green roof.Fixing: Fixed under growing substrate.
To Comply with Engineers Details, Specs and Design.
Z-Girt Fixing
Vertical Accoya CladdingSpec: 75mm Width, Shiplap Joint, Max Lenght4800mm. Fire Rating Class C.Fixing:Proprietary Hidden Fix System Cementplaster board through PIR Insulation via Z-GirtBracket. Ressessed Fixing.Finish: Factory Finish.
150
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mix concretebefore insulation installFixing: Bearing on external retaining wall and requiredcolumns. Min 50mm bearing and 25mm Side bearing.
To Comply with Engineers Details, Specs and Design.
Stru
ctur
al B
eam
Hei
ght
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivityof 0.021 W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extend tomeet externally insulation. To aid in theelimination of thermal bridge.
Structural Steel BeamsSpec: Serial Size -356mm x 171mm. Kg/m - 67Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
Growing substrateSpecs: 175mm Thickness. Sedum planting
Filter fleeceSpec: To prevent any soil particles washing into thedrainage layer, dressed between drainage channeland growing substrate.
Bauder DSE 60 boardSpec: 60mm Thickness. Filled with mineral drainmaterial
Bauder FSM 1100 protection mat,Spec: polyester & polypropylene fiber, run to layunder breather membrane on parapet.
Root resistant layerSpec: On waterproofing underlay, run to layunder breather membrane on parapet.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Comply withEngineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Vapour BarrierSpec: Fire Rated Class 0 Halogen-free flame retardantcoating. Taped at Joints and where needed. Airtightand Water Resistance.Fixing: To Run up along underside of roof insulation andwrapped at upstand.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
Cement Particle BoardSpec: 12.5mm Thickness.Fixing: Secured to Multichannel Beam.
8015
060
170
610
Mineral Quilt InsulationSpec: 200mm fire resistant insulation. ThermalConductivity of 0.041 W/mK, Class "O" Fire Rating.Fixing: Securely packed in between Multichannel,Run up to meet PIR Rigid Insulation.
Galvanized Steel EdgeSpec: 5mm in Thickness. Acts as retaining for green roof.Fixing: Fixed under growing substrate.
To Comply with Engineers Details, Specs and Design.
Steel ColumnSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: To Structural Beam Below.
To Comply with Engineers Details, Specs andDesign.
Structural Column Width25
Structural Steel BeamsSpec: Serial Size -356mm x 171mm. Kg/m - 67Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
150
Steel Perimeter ColumnsSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.
To Comply with Engineers Details, Specs andDesign.
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
Structural Steel BeamsSpec:Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
Stru
ctur
al B
eam
Hei
ght
500
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivityof 0.021 W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extend tomeet Join Into Barrow Center as Shown.
Structural Steel BeamsSpec: Serial Size -356mm x 171mm. Kg/m - 67Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
150
70
Dri Design Copper Coated Aluminium Panel Spec: 35mmThickness. Various Width and Lengths (300x300mm -600x600mm - 900x900mm - 1200x1200mm).Fixing: Proprietary Hidden Fix System to Cement plasterboard.Finish: Natural Copper Finish.
Growing substrateSpecs: 175mm Thickness. Sedum planting
Filter fleeceSpec: To prevent any soil particles washing into thedrainage layer, dressed between drainage channeland growing substrate.
Bauder DSE 60 boardSpec: 60mm Thickness. Filled with mineral drainmaterial
Bauder FSM 1100 protection mat,Spec: polyester & polypropylene fiber, run to layunder breather membrane on parapet.
Root resistant layerSpec: On waterproofing underlay, run to layunder breather membrane on parapet.
Steel Up Stand:Spec: Width 200mm. Up Stand Height 500mmLaterally Supported by 200x50mm Multichannel.Fixing: To Structural Column Below.
To Comply with Engineers Details, Specs and Design
80
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Complywith Engineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Galvanized Steel EdgeSpec: 5mm in Thickness. Acts as retaining for green roof.Fixing: Fixed under growing substrate.
To Comply with Engineers Details, Specs and Design.
Barrow Center
Barrow Center
Barrow Center
30
80
30
160
Mineral Quilt InsulationSpec: 80mm fire resistant insulation. ThermalConductivity of 0.041 W/mK, Class "O" Fire Rating.Fixing: Securely packed in between Multichannel andExisting Barrow Center Wall , Run up to Roof Finish Level.
Mineral Quilt InsulationSpec: 200mm fire resistant insulation. ThermalConductivity of 0.041 W/mK, Class "O" Fire Rating.Fixing: Securely packed in between Multichannel andExisting Barrow Center Wall , Run up to Roof Finish Level.
Note: Existing Barrow Center Render and InsulationRemoved and Proposed Insulation Run in to Sit between.Vapour Membrane run in under proposed Insulation.
Existing Barrow Center External Insulation200mm Thickness
150
200
200
Flashing CapSpec: Copper parapet capping , turned up at endsto hinder water penetration.Fixing: Secured to plywood via butt straps, run alongplywood to existing barrow Center wall and fixed towall.
Plywood Capping SupportSpecs: 10mm Thickness. Secured to Tilting fillet.
PIR Rigid InsulationSpec:100mm x 200mm Thickness. ThermalConductivity of 0.021 W/mK, Class "O" Fire Rating.Foil Faced externally.Fixing: Fit securely under and above flashing to fillback in insulation.
100
Breather MembraneSpec: Fire rated class 0 Membrane continuous onexternal of Cement Particle Board. Taped at Jointsand where needed. Airtight and Water Resistance.Fixing: To be extended to end of flashing.
Counter - FlashingSpec: Copper flashing , turned up at ends to hinderwater penetration.Fixing: Secured between insulations.
Existing Barrow Center Construction
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 09:13:31
Section AA - Roof Section No.1
Issue Date
TD - 101
AA
1 : 5TD - 101
Section AA - Roof - Detail No.4 - Green Roof Step Up / Accoya CladdingAA -4
1 : 5TD - 101
Section AA - Roof - Detail No.5 - Green Roof / Barrow Center JunctionAA-5
Construction SpecificationSteel Structure:All Structural Steel to have 60min fire resistance. Structural design isa provisional design and needs to be consulted with StructuralEngineer. All Steel reinforced and structural steel to comply withengineers details, specs and design.
Primary Steel StructureColumns (UKC - Blue) Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red) Serial Size - 356mm x 171mm. Kg/m- 67Skylight Columns (UKC - Baby Blue) Serial Size - 203mm x 203mm.Kg/m -54Structural Hollow Section (HC - Pink) Outside Diameter - 355.6.Thickness - 8mm. Kg/m - 54Beams (UKB - Yellow) Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green) Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray) Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange) Kingspan Multichannel will beadvised to be used. Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for both precast and cast insitu to beecocem based cement. All concrete works to comply withBS:8004 and tested with BS EN 12350-1 2009. Exposed concretefinished to comply with BS:8110. (Board Panel Finish). All Concreteconstruction to comply with engineers details, specs and design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting as support for concretebeams with holding down bolts cast in to secure steel columnsabove.
Concrete Columns (White)Cast in-situ, steel reinforced concrete columns with cap withholding down bolts cast in to secure steel columns above, 300mmx 300mm.
Concrete Beams (Purple)Transfer structure in place where structural steel column grid &basement concrete column grids do not coincide. Seating forhollow core floor slabs incorporated in beams.
Glulam Structure:Structural Engineer design to be followed with the Glulam structure.The Steel shoes are to be designed to resist water corrosion.
Floor Build Up:Ground Floor Suspended - Insulated Hollowcore Slab.Max Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-150mm rigid PIR Insulation.(High Compressive Strength)-75mm Concrete Screed.- Various Floor Finish.
First Floor Suspended - Hollowcore SlabMax Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete before insulation install. FloorThickening around perimeters of columns. Movement joints also tobe accommodated.-150mm concrete floor slab with edge thickening & steelreinforced, on continuous radon membrane to exit above groundoutside building.-50mm sand blinding layer on compacted layers of suitablehardcore 225mm.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughout the building as eachzone has different requirements (fire) and uses. The basic build up isa 2.5mm Plasterskim, 12.5mm Plasterboard, 100mm Steed StudSystem, 12.5mm Plasterboard, 2.5mm Plasterskim. 10mm ShadowGap to be incorporated on perimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium Fire Frame System, with23mm Pilkington Pyrostop Glass. This will achieve a 60Min FireRating. System to incorporate fire-rated insulation (Mineral Wool) aswell as intumescent tape at joints.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel 35mm Thickness.Various Width and Lengths (300x300mm - 600x600mm - 900x900mm- 1200x1200mm). Proprietary Hidden Fix System Cement plasterboard. 50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. Continuous WindBarrier along external side of CPB. 200mm Space in Multichannelfilled with Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electrical Works.Required Plasterboard finish secured to steel channels.
Accoya Timber Cladding -Vertical Accoya Cladding 75mm Width, Shiplap Joint (50yearWarranty). Secured to vertical support system. Proprietary HiddenFix System Cement plaster board. . (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement Particle Board12mm, secured to 200mm Multichannel. CPB Taped at joints toform air tight barrier. 200mm Space in Multichannel filled with FireRated Mineral Quilt Insulation. Continuous Fire rated Vapour barrieron inner face pf secondary structure. Internally Steel Channelsprovide a 50mm service cavity for electrical Works. RequiredPlasterboard finish secured to steel channels.
Roof Build Up:Green Roof Build Up175mm growing substrate with sedum planting. Filter fleece toprevent any soil particles washing into the drainage layer, dressedbetween drainage channel and growing substrate. 60mm BauderDSE 60 board, filled with mineral drain material. Root resistant layeron waterproofing under layer. Bauder FSM 1100 protection mat,polyester & polypropylene fiber. 150mm rigid PIR insulation. Vapourbarrier layer. 75mm concrete screed. 150mm precast concretefloor slab with edge thickening and steel reinforced.
Copper Mesh Vision Panel -OkaTech Sealed Glazed Expanded Copper Mesh Panels. Thisfacade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh Spandrel Panels.This facade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Curtain Walling:APA curtain walling system, TB50 SG system which will also be usedto support structurally.Double glazed Units incorporated. All joints to be weathered usingsilicone seals.Double glazed unit sizes - 1200mm x 2000mm. All curtain walling tohave trench heating below to aid in stopping condensation.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica inPortugal Designed by OMA. The curved glass facade is deignedby ABT Arnhem. Hot bended curved and laminated strips of glass1200 mm wide and 400 mm deep. Good sound insulation can beachieved by placing two sheets of glass at some distance fromeach other, preferably over an expansion joint, 500mm.
321
Internal Section AA
AA - 6
AA - 7 AA - 8
150
Steel BeamSpec: Serial Size -254mm x 146mm. Kg/m - 37Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.
To Comply with Engineers Details, Specs andDesign.
75
225
Polished Floor ScreedSpec: The concretescreed will be polished toexpose the aggregate.
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrappedin compressible insulation layer to meetscreed height. Movement joints also to beaccommodated. With edge thickening andsteel reinforced To Comply with EngineersDetails, Specs and Design.Fixing: Poured ontop of insulation.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural ColumnEngineers Connection Detail.
To Comply with Engineers Details, Specs andDesign.
Stru
ctur
al B
eam
Hei
ght
Serv
ice
Void
of 1
350m
m
AMF Suspended CeilingSpecs: 24mm Thickness. Thermatex VariolineWood 600x600mm Tiles System. Edge DetailProprietary Edge SF long side. Humidity up to95%. (Sound Absorbing Material)
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm PlasterSkim. Sound Absorbing plasterboard.Fixing: Secured to steel stud.Finish: 2.5mm White plaster skimcoat
24
Furring ChannelSpec: Proprietary SystemSuspending Panels.
Top Cross RailSpec: Secured to FurringChannel Via Locking Key
Suspension ChannelSpec: Top Bracket andBottom Clip
100
20
Cold Rolled Steel MultichannelSpec: 100mm Width x 25mm Height.Fixing: Secured to flange on primary steelstructure.
Cold Rolled Steel MultichannelSpec: 100mm Width x 25mm Height.Fixing: Secured to concrete structure.
Steel Angle Bracket secured toStructural Beam to supportplasterboard.
Plasterboard and Plaster FinishSpec: 12.5mm thickness and SoundAbsorbing plasterboard.Fixing: Secured to steel stud and steel anglebracket.
Glazed BalustradeSpec: 20mm Toughened GlazingStainless Steel Hand Rail.Fixing: Secured by Gasket, andresting on Setting Block.
Propriety Glazing HousingFixing: Secured to ConcreteScreen and Multichannel.
Proprietary Setting Block.
Stainless Steel CoverTo be installed after balustradeinstallation to cover housing. To alsobe placed at edge.
Polished Aluminium Handle(Wanger)Spec: Extruded Aluminium TopRail, Polished Finish. Radius 50mm.Fixing: Sitting on Protective Insert.Secured by Bonding Tape.
In Accordance With Part M.
20
Dri Design Copper Coated Aluminium Panel Spec: 35mmThickness. Various Width and Lengths (300x300mm - 600x600mm- 900x900mm - 1200x1200mm).Fixing: Proprietary Hidden Fix System to Cement plaster board.Finish: Natural Copper Finish.
150 Precast concrete floor slab
Spec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mix concretebefore insulation installFixing: Bearing on external retaining wall and requiredcolumns. Min 50mm bearing and 25mm Side bearing.
To Comply with Engineers Details, Specs and Design.
Stru
ctur
al B
eam
Hei
ght
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivityof 0.021 W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extend tomeet externally insulation. To aid in theelimination of thermal bridge.
Structural Steel BeamsSpec: Serial Size -356mm x 171mm. Kg/m - 67Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
Growing substrateSpecs: 175mm Thickness. Sedum planting
Filter fleeceSpec: To prevent any soil particles washing into thedrainage layer, dressed between drainage channeland growing substrate.
Bauder DSE 60 boardSpec: 60mm Thickness. Filled with mineral drainmaterial
Bauder FSM 1100 protection mat,Spec: polyester & polypropylene fiber, run to layunder breather membrane on parapet.
Root resistant layerSpec: On waterproofing underlay, run to layunder breather membrane on parapet.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Comply withEngineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Steel Up Stand:Spec: Width 200mm. Up Stand Height 150mm.Laterally Supported by 200x500mm Multichannel.Fixing: To Structural Beam Below.
To Comply with Engineers Details, Specs and Design.
Vapour BarrierSpec: Fire Rated Class 0 Halogen-free flame retardantcoating. Taped at Joints and where needed. Airtightand Water Resistance.Fixing: To Run up along underside of roof insulation andwrapped at upstand.
Cold Rolled Steel MultichannelSpec: 200mm Width x 50mm Height. Galvanised forresistance.Fixing: Secured to primary steel structure.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm Plaster Skim.Moisture Resistance plasterboard.Fixing: Secured to steel structure behind.Finish: 2.5mm White plaster skimcoat
Cement Particle BoardSpec: 12.5mm Thickness.Fixing: Secured to Multichannel Beam.
8015
060
170
610
200
220
150
Mineral Quilt InsulationSpec: 200mm fire resistant insulation. ThermalConductivity of 0.041 W/mK, Class "O" Fire Rating.Fixing: Securely packed in between Multichannel,Run up to meet PIR Rigid Insulation.
Reynaers Curtain WallingSpecs: CW60 Double Glazed Unit - Glass thickness24mm. Insulated Framing. Transome Unit size - 60mmx 250mm. Mullion Unit Size - 60mm x 250mm.Thermal Performance in accordance with EN13947.Fixing: Secured at Top to structural steel beamabove via chemical anchor. Secured at bottem tosteel Multichannel.
Galvanized Steel EdgeSpec: 5mm in Thickness. Acts as retaining for green roof.Fixing: Fixed under growing substrate.
To Comply with Engineers Details, Specs and Design.
AMF Suspended CeilingSpecs: 24mm Thickness. Thermatex VariolineWood 600x600mm Tiles System. Edge DetailProprietary Edge SF long side. Humidity up to95%. (Sound Absorbing Material) 24
Furring ChannelSpec: Proprietary SystemSuspending Panels.
Top Cross RailSpec: Secured to FurringChannel Via Locking Key
Suspension ChannelSpec: Top Bracket andBottom Clip
Cold Rolled Steel MultichannelSpec: 90mm Width x 25mm Height.Fixing: Secured to flange on primary steelstructure.
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm PlasterSkim. Sound Absorbing plasterboard.Fixing: Secured to steel stud.Finish: 2.5mm White plaster skimcoat
Cold Rolled Steel MultichannelSpec: 100mm Width x 25mm Height.Fixing: Secured to flange on primary steelstructure.
Steel Angle Bracket secured toStructural Beam to supportplasterboard.
Serv
ice
Void
- Va
ries T
hrou
gh O
ut
20
150
Precast concrete floor slabSpec: 150mm thickness. With edge thickeningand steel reinforced. All Gaps filled with leanmix concrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and25mm Side bearing.
To Comply with Engineers Details, Specs andDesign.
Stru
ctur
al B
eam
Hei
ght
Structural Steel BeamsSpec: Serial Size -356mm x 171mm. Kg/m - 67Fixing: Connection to Structural ColumnEngineers Connection Detail.
To Comply with Engineers Details, Specs andDesign.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced
To Comply with Engineers Details, Specs and Design.
Structural Steel BeamsSpec: Serial Size -356mm x 171mm. Kg/m - 67Fixing: Connection to Structural ColumnEngineers Connection Detail.
To Comply with Engineers Details, Specs andDesign.
Cold Rolled Steel MultichannelSpec: 110mm Width x 50mm Height.Fixing: Secured to primary steel structure.
AMF Suspended CeilingSpecs: 24mm Thickness. Thermatex VariolineWood 600x600mm Tiles System. Edge DetailProprietary Edge SF long side. Humidity up to95%. (Sound Absorbing Material)
Furring ChannelSpec: Proprietary System Suspending Panels.
Top Cross RailSpec: Secured to Furring Channel Via LockingKey
Suspension ChannelSpec: Top Bracket and Bottom Clip
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm PlasterSkim. Sound Absorbing plasterboard.Fixing: Secured to steel stud.Finish: 2.5mm White plaster skimcoat
Steel Angle Bracket secured toStructural Beam to supportplasterboard.
PlasterboardSpec: 12.5mm thickness Absorbing plasterboard.Fixing: Secured to steel stud and Bracket.
75Se
rvic
e Vo
id V
arie
s 100
Cold Rolled Steel MultichannelSpec: 150mm Width x 50mm Height.Fixing: Secured to primary steel structure.
Precast concrete floor slabSpec: 150mm thickness. With edgethickening and steel reinforced. AllGaps filled with lean mix concretebefore insulation installFixing: Bearing on external retainingwall and required columns. Min 50mmbearing and 25mm Side bearing.
To Comply with Engineers Details,Specs and Design.
Structural Concrete ScreedSpec: 75mm Thickness. All columnswrapped in compressible insulation layerto meet screed height. Movement jointsalso to be accommodated. With edgethickening and steel reinforced ToComply with Engineers Details, Specsand Design.Finish: The concrete screed will bepolished to expose the aggregate.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Fixing: Connection to Structural ColumnEngineers Connection Detail.
To Comply with Engineers Details, Specs andDesign.
110
20
Cei
ling
Leve
l to
Doo
r Hea
d 38
0mm
20
Cold Rolled Steel MultichannelSpec: 150mm Width x 50mm Height.Fixing: Secured to primary steel structure. Plasterboard and Plaster Finish
Spec: 12.5mm thickness and 2.5mm Plaster Skim.Sound Absorbing plasterboard.Fixing: Secured to steel stud.Finish: 2.5mm White plaster skimcoatNote: Shadow Gap Bead 20mm
Door ArchitraveSpec: White oak Veneer Door FrameFixing: Secured to Steel Stud.
Note: Fire Stop incorporated intodesign depending on firerequirement.
White Oak Veneer Door:Protected escape routes will be 60 minuteresistance. Doors will open in the direction ofescape but not onto an escape route as perTGD B2006 1.4.3.3. Escape route doors will befitted with an electromagnetic that will allowdoors to close in the event of fire.
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 09:15:03
Section AA - Internal SectionNo.1
Issue Date
TD - 102
AA
1 : 5TD - 102
Section AA - Internal - Detail No.6 - Internal BalconyAA-6
1 : 5TD - 102
Section AA - Internal - Detail No.7 - Internal Ceiling / Skylight UpstandAA-7
1 : 5TD - 102
Section AA - Internal - Detail No.8 - Internal DoorAA-8
Construction SpecificationSteel Structure:All Structural Steel to have 60min fire resistance. Structural design isa provisional design and needs to be consulted with StructuralEngineer. All Steel reinforced and structural steel to comply withengineers details, specs and design.
Primary Steel StructureColumns (UKC - Blue) Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red) Serial Size - 356mm x 171mm. Kg/m- 67Skylight Columns (UKC - Baby Blue) Serial Size - 203mm x 203mm.Kg/m -54Structural Hollow Section (HC - Pink) Outside Diameter - 355.6.Thickness - 8mm. Kg/m - 54Beams (UKB - Yellow) Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green) Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray) Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange) Kingspan Multichannel will beadvised to be used. Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for both precast and cast insitu to beecocem based cement. All concrete works to comply withBS:8004 and tested with BS EN 12350-1 2009. Exposed concretefinished to comply with BS:8110. (Board Panel Finish). All Concreteconstruction to comply with engineers details, specs and design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting as support for concretebeams with holding down bolts cast in to secure steel columnsabove.
Concrete Columns (White)Cast in-situ, steel reinforced concrete columns with cap withholding down bolts cast in to secure steel columns above, 300mmx 300mm.
Concrete Beams (Purple)Transfer structure in place where structural steel column grid &basement concrete column grids do not coincide. Seating forhollow core floor slabs incorporated in beams.
Glulam Structure:Structural Engineer design to be followed with the Glulam structure.The Steel shoes are to be designed to resist water corrosion.
Floor Build Up:Ground Floor Suspended - Insulated Hollowcore Slab.Max Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-150mm rigid PIR Insulation.(High Compressive Strength)-75mm Concrete Screed.- Various Floor Finish.
First Floor Suspended - Hollowcore SlabMax Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete before insulation install. FloorThickening around perimeters of columns. Movement joints also tobe accommodated.-150mm concrete floor slab with edge thickening & steelreinforced, on continuous radon membrane to exit above groundoutside building.-50mm sand blinding layer on compacted layers of suitablehardcore 225mm.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughout the building as eachzone has different requirements (fire) and uses. The basic build up isa 2.5mm Plasterskim, 12.5mm Plasterboard, 100mm Steed StudSystem, 12.5mm Plasterboard, 2.5mm Plasterskim. 10mm ShadowGap to be incorporated on perimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium Fire Frame System, with23mm Pilkington Pyrostop Glass. This will achieve a 60Min FireRating. System to incorporate fire-rated insulation (Mineral Wool) aswell as intumescent tape at joints.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel 35mm Thickness.Various Width and Lengths (300x300mm - 600x600mm - 900x900mm- 1200x1200mm). Proprietary Hidden Fix System Cement plasterboard. 50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. Continuous WindBarrier along external side of CPB. 200mm Space in Multichannelfilled with Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electrical Works.Required Plasterboard finish secured to steel channels.
Accoya Timber Cladding -Vertical Accoya Cladding 75mm Width, Shiplap Joint (50yearWarranty). Secured to vertical support system. Proprietary HiddenFix System Cement plaster board. . (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement Particle Board12mm, secured to 200mm Multichannel. CPB Taped at joints toform air tight barrier. 200mm Space in Multichannel filled with FireRated Mineral Quilt Insulation. Continuous Fire rated Vapour barrieron inner face pf secondary structure. Internally Steel Channelsprovide a 50mm service cavity for electrical Works. RequiredPlasterboard finish secured to steel channels.
Roof Build Up:Green Roof Build Up175mm growing substrate with sedum planting. Filter fleece toprevent any soil particles washing into the drainage layer, dressedbetween drainage channel and growing substrate. 60mm BauderDSE 60 board, filled with mineral drain material. Root resistant layeron waterproofing under layer. Bauder FSM 1100 protection mat,polyester & polypropylene fiber. 150mm rigid PIR insulation. Vapourbarrier layer. 75mm concrete screed. 150mm precast concretefloor slab with edge thickening and steel reinforced.
Copper Mesh Vision Panel -OkaTech Sealed Glazed Expanded Copper Mesh Panels. Thisfacade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh Spandrel Panels.This facade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Curtain Walling:APA curtain walling system, TB50 SG system which will also be usedto support structurally.Double glazed Units incorporated. All joints to be weathered usingsilicone seals.Double glazed unit sizes - 1200mm x 2000mm. All curtain walling tohave trench heating below to aid in stopping condensation.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica inPortugal Designed by OMA. The curved glass facade is deignedby ABT Arnhem. Hot bended curved and laminated strips of glass1200 mm wide and 400 mm deep. Good sound insulation can beachieved by placing two sheets of glass at some distance fromeach other, preferably over an expansion joint, 500mm.
Wall Section BB
BB-3
BB-2
BB-1
7515
0
Concrete ScreedSpec: 75mm Thickness. Detailed with SteelMesh Reinforcement.Fixing: Layed directly ontop of Floor Slab.Finish: Polished Finish to expose aggregate.
To Comply with Engineers Details, Specsand Design.
Concrete ScreedSpec: 150mm Thickness. Detailed with FloorThickening around perimeter and perimeter ofcolumns and Steel Reinforcement. Movementjoints also to be accommodated.Fixing: Layed directly ontop of Sand bindingand Hardcore.
To Comply with Engineers Details, Specs andDesign.
Sand BlindingSpec: 50mm compacted.
HardcoreSpec: 225mm compacted
Concrete Secant Piles (Retaining Wall)Spec: 350mm Radius, Piles acting as support forconcrete beams with holding down bolts castin to secure steel columns above.
To Comply with Engineers Details, Specs andDesign.
Waterproof MembraneTo run up to the ground floor level.Fixing: Bonded to concrete PileRetaining Wall.
Delta Drain Waterproof MembraneTo run to meet the ground floor level.Fixing: Run under concrete slab. (Acting asa Radon membrane and waterproofingunder slab)
50
Waterproof Adhesive SpaySpec: Spay onto Secant Concrete Pilesto maintain waterproofing internally.
Concrete Panel FinishSpec: 50mm cast in-situ concrete panel.Fixing: Secured to concrete retaining wall.Finish: Board Panel Finish.
To Comply with Engineers Details, Specsand Design.
Barrow Center
350 50
400
225
Barrow Center
150
Note: Assumed Foundationof Barrow Center. FurtherInvestigation Required.
150
150
Steel Perimeter ColumnsSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.
To Comply with Engineers Details, Specs andDesign.
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
Structural Steel BeamsSpec:Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
Stru
ctur
al B
eam
Hei
ght
Structural Steel BeamsSpec: Serial Size -356mm x 171mm. Kg/m - 67Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. With edgethickening and steel reinforced To Comply with EngineersDetails, Specs and Design.
Finish: 25mm Polished Floor Screed.
Barrow Center
30200
75
Steel Perimeter ColumnsSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.Finish: Lined with Sound Absorbing plasterboardand Plaster.
To Comply with Engineers Details, Specs andDesign.
Insulated Foam PackingPlaced between Existing Barrow CenterFinish and Proposed For Construction.
On Fire Floor Must be One Hour FireRated. Continuous along Perimeter
Existing Barrow CenterExternal Insulation200mm Thickness
Existing Barrow CenterConstruction
Structural Column Width
Structural Column Width
30
200
150
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 75mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. With edgethickening and steel reinforced To Comply with EngineersDetails, Specs and Design.
Finish: 25mm Polished Floor Screed.
Barrow Center
200
75
Steel Perimeter ColumnsSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.Finish: Lined with Sound Obsorbingplasterboard and Plaster.
To Comply with Engineers Details, Specs andDesign.
Concrete Secant Piles (Retaining Wall)Spec: 350mm Radius, Piles acting as support forconcrete beams with holding down bolts castin to secure steel columns above.
To Comply with Engineers Details, Specs andDesign.
Waterproof Adhesive SpaySpec: Spay onto Secant Concrete Pilesto maintain waterproofing internally.
Concrete Panel FinishSpec: 50mm cast in-situ concrete panel.Fixing: Secured to concrete retaining wall.Finish: Board Panel Finish.
To Comply with Engineers Details, Specsand Design.
150
30
Concrete Capping for Secant Piles.To Allow column to sit directly beside Existing Barow Center.To Comply with Engineers Details, Specs and Design.
350 50
Insulated Foam PackingPlaced between Existing Barrow CenterFinish and Proposed Foor Construction.
PIR Rigid InsulationSpec:150mm Thickness. ThermalConductivity of 0.021 W/mK, Class "O"Fire Rating.Fixing: Layed ontop of concrete slab.Extend to meet externally insulation. Toaid in the elimination of thermal bridge.
150
Existing Barrow CenterExternal Insulation200mm Thickness
Existing Barrow CenterConstruction
Barrow Center
30
Structural Column Width
150
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 09:40:15
Section BB - Wall Section No.2
Issue Date
TD - 103
BB
1 : 5TD - 103
Section BB - Wall - Detail No.1 - Secant Piles / Barrow Center JunctionBB -1
1 : 5TD - 103
Section BB - Wall - Detail No.3 - First Floor / Barrow Center JunctionBB-3
1 : 5TD - 103
Section BB - Wall - Detail No.2 - Ground Floor / Barrow Center JunctionBB -2
Construction SpecificationSteel Structure:All Structural Steel to have 60min fire resistance. Structural design isa provisional design and needs to be consulted with StructuralEngineer. All Steel reinforced and structural steel to comply withengineers details, specs and design.
Primary Steel StructureColumns (UKC - Blue) Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red) Serial Size - 356mm x 171mm. Kg/m- 67Skylight Columns (UKC - Baby Blue) Serial Size - 203mm x 203mm.Kg/m -54Structural Hollow Section (HC - Pink) Outside Diameter - 355.6.Thickness - 8mm. Kg/m - 54Beams (UKB - Yellow) Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green) Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray) Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange) Kingspan Multichannel will beadvised to be used. Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for both precast and cast insitu to beecocem based cement. All concrete works to comply withBS:8004 and tested with BS EN 12350-1 2009. Exposed concretefinished to comply with BS:8110. (Board Panel Finish). All Concreteconstruction to comply with engineers details, specs and design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting as support for concretebeams with holding down bolts cast in to secure steel columnsabove.
Concrete Columns (White)Cast in-situ, steel reinforced concrete columns with cap withholding down bolts cast in to secure steel columns above, 300mmx 300mm.
Concrete Beams (Purple)Transfer structure in place where structural steel column grid &basement concrete column grids do not coincide. Seating forhollow core floor slabs incorporated in beams.
Glulam Structure:Structural Engineer design to be followed with the Glulam structure.The Steel shoes are to be designed to resist water corrosion.
Floor Build Up:Ground Floor Suspended - Insulated Hollowcore Slab.Max Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-150mm rigid PIR Insulation.(High Compressive Strength)-75mm Concrete Screed.- Various Floor Finish.
First Floor Suspended - Hollowcore SlabMax Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete before insulation install. FloorThickening around perimeters of columns. Movement joints also tobe accommodated.-150mm concrete floor slab with edge thickening & steelreinforced, on continuous radon membrane to exit above groundoutside building.-50mm sand blinding layer on compacted layers of suitablehardcore 225mm.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughout the building as eachzone has different requirements (fire) and uses. The basic build up isa 2.5mm Plasterskim, 12.5mm Plasterboard, 100mm Steed StudSystem, 12.5mm Plasterboard, 2.5mm Plasterskim. 10mm ShadowGap to be incorporated on perimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium Fire Frame System, with23mm Pilkington Pyrostop Glass. This will achieve a 60Min FireRating. System to incorporate fire-rated insulation (Mineral Wool) aswell as intumescent tape at joints.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel 35mm Thickness.Various Width and Lengths (300x300mm - 600x600mm - 900x900mm- 1200x1200mm). Proprietary Hidden Fix System Cement plasterboard. 50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. Continuous WindBarrier along external side of CPB. 200mm Space in Multichannelfilled with Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electrical Works.Required Plasterboard finish secured to steel channels.
Accoya Timber Cladding -Vertical Accoya Cladding 75mm Width, Shiplap Joint (50yearWarranty). Secured to vertical support system. Proprietary HiddenFix System Cement plaster board. . (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement Particle Board12mm, secured to 200mm Multichannel. CPB Taped at joints toform air tight barrier. 200mm Space in Multichannel filled with FireRated Mineral Quilt Insulation. Continuous Fire rated Vapour barrieron inner face pf secondary structure. Internally Steel Channelsprovide a 50mm service cavity for electrical Works. RequiredPlasterboard finish secured to steel channels.
Roof Build Up:Green Roof Build Up175mm growing substrate with sedum planting. Filter fleece toprevent any soil particles washing into the drainage layer, dressedbetween drainage channel and growing substrate. 60mm BauderDSE 60 board, filled with mineral drain material. Root resistant layeron waterproofing under layer. Bauder FSM 1100 protection mat,polyester & polypropylene fiber. 150mm rigid PIR insulation. Vapourbarrier layer. 75mm concrete screed. 150mm precast concretefloor slab with edge thickening and steel reinforced.
Copper Mesh Vision Panel -OkaTech Sealed Glazed Expanded Copper Mesh Panels. Thisfacade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh Spandrel Panels.This facade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Curtain Walling:APA curtain walling system, TB50 SG system which will also be usedto support structurally.Double glazed Units incorporated. All joints to be weathered usingsilicone seals.Double glazed unit sizes - 1200mm x 2000mm. All curtain walling tohave trench heating below to aid in stopping condensation.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica inPortugal Designed by OMA. The curved glass facade is deignedby ABT Arnhem. Hot bended curved and laminated strips of glass1200 mm wide and 400 mm deep. Good sound insulation can beachieved by placing two sheets of glass at some distance fromeach other, preferably over an expansion joint, 500mm.
Grid
Line
1
Boun
dary
Line
150
Steel Perimeter ColumnsSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.
To Comply with Engineers Details, Specs andDesign.
Dri Design Copper Coated AluminiumPanel Spec: 35mm Thickness. Various Widthand Lengths (300x300mm - 600x600mm -900x900mm - 1200x1200mm).Fixing: Proprietary Hidden Fix SystemCement plaster board through PIRInsulation via Z-Girt Bracket.Finish: Natural Copper Finish.
PIR Rainscreen InsulationSpec:12.5mm Thickness. (Foil Faced)Thermal Conductivity of 0.021 W/mK,Class "O" Fire Rating. Length 2400mm xWidth 1200mmFixing: Secured to Cement Particle Boardvia proprietary fixing.
Z-Girt Fixing
Cement Particle BoardSpec: 12.5mm Thickness.Fixing: Secured to Multichannel Beam.
Breather MembraneSpec: Fire rated class 0 Membranecontinuous on external of Cement ParticleBoard. Taped at Joints and where needed.Airtight and Water Resistance.Fixing: To be extended to wrap up andaround parapet.
Mineral Quilt InsulationSpec: 200mm fire resistant insulation.Thermal Conductivity of 0.041 W/mK,Class "O" Fire Rating.Fixing: Securely packed in betweenMultichannel, Run up to meet PIRRigid Insulation.
Cold Rolled Steel MultichannelSpec: 200mm Width x 50mmHeight. Galvanised for resistance.Fixing: Secured to primary steelstructure.
Vapour BarrierSpec: Fire Rated Class 0 Halogen-freeflame retardant coating. Taped atJoints and where needed. Airtight andWater Resistance.Fixing: To Run up along underside of roofinsulation.
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
Stru
ctur
al B
eam
Hei
ght
50035 50 12.5 200
200
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivityof 0.021 W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extendto meet externally insulation. To aid in theelimination of thermal bridge.
Structural Steel BeamsSpec: Serial Size -356mm x 171mm. Kg/m - 67Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
150
70
200
Dri Design Copper Coated Aluminium Panel Spec: 35mmThickness. Various Width and Lengths (300x300mm -600x600mm - 900x900mm - 1200x1200mm).Fixing: Proprietary Hidden Fix System to Cement plaster board.Finish: Natural Copper Finish.
Growing substrateSpecs: 175mm Thickness. Sedum planting
Filter fleeceSpec: To prevent any soil particles washing into thedrainage layer, dressed between drainage channeland growing substrate.
Bauder DSE 60 boardSpec: 60mm Thickness. Filled with mineral drainmaterial
Bauder FSM 1100 protection mat,Spec: polyester & polypropylene fiber, run to layunder breather membrane on parapet.
Root resistant layerSpec: On waterproofing underlay, run to layunder breather membrane on parapet.
Flashing CapSpec: Copper parapet capping , turnedup at ends to hinder water penetration.Fixing: Secured to plywood via buttstraps.
Plywod Capping SupportSpecs: 10mm Thickness. Secured toTilting fillet.
Dri Design Copper Coated AluminiumPanel Spec: 35mm Thickness. VariousWidth and Lengths (300x300mm -600x600mm - 900x900mm -1200x1200mm).Fixing: Proprietary Hidden Fix SystemCement plaster board through PIRInsulation via Z-Girt Bracket.Finish: Natural Copper Finish.
Steel Up Stand:Spec: Width 200mm. Up Stand Height200mm.Laterally Supported by 200x500mmMultichannel.Fixing: To Structural Column Below.
To Comply with Engineers Details,Specs and Design
170
80
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Complywith Engineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Galvanized Steel EdgeSpec: 5mm in Thickness. Acts as retaining for green roof.Fixing: Fixed under growing substrate.
To Comply with Engineers Details, Specs and Design.
Dri Design Copper Coated Aluminium Panel Spec: 35mmThickness. Various Width and Lengths (300x300mm - 600x600mm- 900x900mm - 1200x1200mm).Fixing: Proprietary Hidden Fix System to Cement plaster board.Finish: Natural Copper Finish.
150
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mix concretebefore insulation installFixing: Bearing on external retaining wall and requiredcolumns. Min 50mm bearing and 25mm Side bearing.
To Comply with Engineers Details, Specs and Design.
Stru
ctur
al B
eam
Hei
ght
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivityof 0.021 W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extend tomeet externally insulation. To aid in theelimination of thermal bridge.
Structural Steel BeamsSpec: Serial Size -356mm x 171mm. Kg/m - 67Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
Growing substrateSpecs: 175mm Thickness. Sedum planting
Filter fleeceSpec: To prevent any soil particles washing into thedrainage layer, dressed between drainage channeland growing substrate.
Bauder DSE 60 boardSpec: 60mm Thickness. Filled with mineral drainmaterial
Bauder FSM 1100 protection mat,Spec: polyester & polypropylene fiber, run to layunder breather membrane on parapet.
Root resistant layerSpec: On waterproofing underlay, run to layunder breather membrane on parapet.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Comply withEngineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Steel Up Stand:Spec: Width 200mm. Up Stand Height 150mm.Laterally Supported by 200x500mm Multichannel.Fixing: To Structural Beam Below.
To Comply with Engineers Details, Specs and Design.
Vapour BarrierSpec: Fire Rated Class 0 Halogen-free flame retardantcoating. Taped at Joints and where needed. Airtightand Water Resistance.Fixing: To Run up along underside of roof insulation andwrapped at upstand.
Cold Rolled Steel MultichannelSpec: 200mm Width x 50mm Height. Galvanised forresistance.Fixing: Secured to primary steel structure.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural Column EngineersConnection Detail.
To Comply with Engineers Details, Specs and Design.
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm Plaster Skim.Moisture Resistance plasterboard.Fixing: Secured to steel structure behind.Finish: 2.5mm White plaster skimcoat
Cement Particle BoardSpec: 12.5mm Thickness.Fixing: Secured to Multichannel Beam.
5018
080
100
150
8015
060
170
610
200
60
220
150
Dri Design Copper Coated Aluminium PanelSpec: 35mm Thickness. Various Width and Lengths (300x300mm -600x600mm - 900x900mm - 1200x1200mm).Fixing: Proprietary Hidden Fix System to Cement plaster board.Finish: Natural Copper Finish.
Flashing CapSpec: Copper parapet capping , turned up atends to hinder water penetration.Fixing: Secured to Cement Board.
Galvanized Steel EdgeSpec: 5mm in Thickness. Acts as retaining for green roof.Fixing: Secured to Structural Steel Column.
To Comply with Engineers Details, Specs and Design.
Cement Particle BoardSpec: 25mm Thickness.Fixing: Secured to galvanized steel edge.
Bauder FSM 1100 protection mat,Spec: polyester & polypropylene fiber, run to layunder breather membrane on parapet.
Root resistant layerSpec: On waterproofing underlay, run to layunder breather membrane on parapet.
Growing substrateSpecs: 175mm Thickness. Sedumplanting
Filter fleeceSpec: To prevent any soil particles washing intothe drainage layer, dressed between drainagechannel and growing substrate.
Bauder DSE 60 boardSpec: 60mm Thickness. Filled with mineral drainmaterial
Mineral Quilt InsulationSpec: 200mm fire resistant insulation. ThermalConductivity of 0.041 W/mK, Class "O" Fire Rating.Fixing: Securely packed in between Multichannel,Run up to meet PIR Rigid Insulation.
Vapour BarrierSpec: Fire Rated Class 0 Halogen-free flameretardant coating. Taped at Joints and whereneeded. Airtight and Water Resistance.Fixing: To Run along underside of roof insulationand wrapped around beam.
PIR Rigid InsulationSpec:80mm Thickness. Thermal Conductivity of 0.021 W/mK,Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extend to meetexternally insulation and backed down to meet WindowTransome.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Comply withEngineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 75mm bearing and 25mm Sidebearing.
Finish: Exposed at bottem and to have a board panelfinish.
To Comply with Engineers Details, Specs and Design.
Reynaers Curtain WallingSpecs: CW60 Double Glazed Unit - Glass thickness 24mm.Insulated Framing. Transome Unit size - 60mm x 250mm.Mullion Unit Size - 60mm x 250mm.Thermal Performance in accordance with EN13947.Fixing: Secured at Top to structural steel beam above viachemical anchor. Secured at bottem to steelMultichannel.
Reynaers Curtain WallingSpecs: CW60 Double Glazed Unit - Glass thickness24mm. Insulated Framing. Transome Unit size - 60mmx 250mm. Mullion Unit Size - 60mm x 250mm.Thermal Performance in accordance with EN13947.Fixing: Secured at Top to structural steel beamabove via chemical anchor. Secured at bottem tosteel Multichannel.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural Column Engineers Connection Detail.
To Comply with Engineers Details, Specs and Design.
560
Win
dow
Ope
Hei
ght -
750
mm
Galvanized Steel EdgeSpec: 5mm in Thickness. Acts as retaining for green roof.Fixing: Fixed under growing substrate.
To Comply with Engineers Details, Specs and Design.
Note: Drainage Spout incoprerated into Steel Edging.Cladding will require onsite modification to allow.
150Precast concrete floor slab
Spec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivityof 0.021 W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extendto meet externally insulation. To aid in theelimination of thermal bridge.
150
60
Growing substrateSpecs: 175mm Thickness. Sedum planting
Filter fleeceSpec: To prevent any soil particles washing into thedrainage layer, dressed between drainage channeland growing substrate.Bauder DSE 60 board
Spec: 60mm Thickness. Filled with mineral drainmaterial
Bauder FSM 1100 protection mat,Spec: polyester & polypropylene fiber, run to layunder breather membrane on parapet.
Root resistant layerSpec: On waterproofing underlay, run to layunder breather membrane on parapet.
170
80
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Complywith Engineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Galvanized Steel EdgeSpec: 5mm in Thickness. Acts as retaining for green roof.Fixing: Fixed under growing substrate.
To Comply with Engineers Details, Specs and Design.Edge /Parapet
Harmer Roof DrainSpecs: Pipe Diameter outlet side 75mm. Flow Rate 4.97 L/s.Holes for Pipework to be allowed for in concrete slab andscreed.Membranes to be secured to drain using proprietaryconnection systems. All Drainage to be linked to WaterRetention System.Fixing: Run along column and enclosed by plasterboardhousing.
Edge /Parapet
3 2 14
Roof Section BB
BB - 1
BB-2
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 09:00:39
Section BB - Roof Section No.2
Issue Date
TD - 104 1 : 5TD - 104
Section BB - Roof - Detail No.5 - Rainscreen Cladding Parapet / Green Roof JunctionBB-1
1 : 5TD - 104
Section BB - Roof- Detail No.6 - Green Roof / Skylight Upstand JunctionBB-2
1 : 5TD - 104
Green Roof Detail - Drain2
BB
Construction SpecificationSteel Structure:All Structural Steel to have 60min fire resistance. Structural design is aprovisional design and needs to be consulted with Structural Engineer.All Steel reinforced and structural steel to comply with engineers details,specs and design.
Primary Steel StructureColumns (UKC - Blue) Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red) Serial Size - 356mm x 171mm. Kg/m - 67Skylight Columns (UKC - Baby Blue) Serial Size - 203mm x 203mm. Kg/m -54Structural Hollow Section (HC - Pink) Outside Diameter - 355.6. Thickness -8mm. Kg/m - 54Beams (UKB - Yellow) Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green) Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray) Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange) Kingspan Multichannel will beadvised to be used. Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for both precast and cast insitu to beecocem based cement. All concrete works to comply with BS:8004 andtested with BS EN 12350-1 2009. Exposed concrete finished to complywith BS:8110. (Board Panel Finish). All Concrete construction to complywith engineers details, specs and design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting as support for concrete beamswith holding down bolts cast in to secure steel columns above.
Concrete Columns (White)Cast in-situ, steel reinforced concrete columns with cap with holdingdown bolts cast in to secure steel columns above, 300mm x 300mm.
Concrete Beams (Purple)Transfer structure in place where structural steel column grid &basement concrete column grids do not coincide. Seating for hollowcore floor slabs incorporated in beams.
Glulam Structure:Structural Engineer design to be followed with the Glulam structure. TheSteel shoes are to be designed to resist water corrosion.
Floor Build Up:Ground Floor Suspended - Insulated Hollowcore Slab.Max Span 9m, Min 50mm bearing and 25mm Side bearing. All Gaps filledwith lean mix concrete before insulation install. All columns wrapped incompressible insulation layer to meet screed height. Movement jointsalso to be accommodated.-150mm precast concrete floor slab with edge thickening and steelreinforced.-150mm rigid PIR Insulation.(High Compressive Strength)-75mm Concrete Screed.- Various Floor Finish.
First Floor Suspended - Hollowcore SlabMax Span 9m, Min 50mm bearing and 25mm Side bearing. All Gaps filledwith lean mix concrete before insulation install. All columns wrapped incompressible insulation layer to meet screed height. Movement jointsalso to be accommodated.-150mm precast concrete floor slab with edge thickening and steelreinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete before insulation install. FloorThickening around perimeters of columns. Movement joints also to beaccommodated.-150mm concrete floor slab with edge thickening & steel reinforced, oncontinuous radon membrane to exit above ground outside building.-50mm sand blinding layer on compacted layers of suitable hardcore225mm.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughout the building as each zonehas different requirements (fire) and uses. The basic build up is a 2.5mmPlasterskim, 12.5mm Plasterboard, 100mm Steed Stud System, 12.5mmPlasterboard, 2.5mm Plasterskim. 10mm Shadow Gap to be incorporatedon perimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium Fire Frame System, with 23mmPilkington Pyrostop Glass. This will achieve a 60Min Fire Rating. System toincorporate fire-rated insulation (Mineral Wool) as well as intumescenttape.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel 35mm Thickness. VariousWidth and Lengths (300x300mm - 600x600mm - 900x900mm -1200x1200mm). Hidden Fix System to Vertical Rail System. ProprietaryVertical Railing System secured to Steel Multichannel (CPB). (ThermalBreak Incorporated). 50mm PIR Rainscreen Insulation secured toCement Particle Board 12mm, secured to 200mm Multichannel. CPBTaped at joints to form air tight barrier. 200mm Space in Multichannelfilled with Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. Internally SteelChannels provide a 50mm service cavity for electrical Works. RequiredPlasterboard finish secured to steel channels.
Accoya Timber Cladding -Vertical Accoya Cladding 50mm Width, Shiplap Joint (50year Warranty).Secured to vertical support system. Proprietary Vertical Railing Systemsecured to Steel Multichannel (CPB). (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement Particle Board12mm, secured to 200mm Multichannel. CPB Taped at joints to form airtight barrier. 200mm Space in Multichannel filled with Fire Rated MineralQuilt Insulation. Continuous Fire rated Vapour barrier on inner face pfsecondary structure. Internally Steel Channels provide a 50mm servicecavity for electrical Works. Required Plasterboard finish secured to steelchannels.
Roof Build Up:Green Roof Build Up175mm growing substrate with sedum planting. Filter fleece to preventany soil particles washing into the drainage layer, dressed betweendrainage channel and growing substrate. 60mm Bauder DSE 60 board,filled with mineral drain material. Root resistant layer on waterproofingunder layer. Bauder FSM 1100 protection mat, polyester & polypropylenefiber. 150mm rigid PIR insulation. Vapor barrier layer. 75mm concretescreed. 150mm precast concrete floor slab with edge thickening andsteel reinforced.
Copper Mesh Vision Panel -OkaTech Sealed Glazed Expanded Copper Mesh Panels. This facade is acurtain wall assembly and supported by aluminium brackets at eachlevel. Design guidance is required from Okalux for final deign. GL Supportbrackets (650x105mm) cantilevered anchor supports bolted Concreteslab at 1200mm Center's. FF and RL Support Brackets (300x160x76mm) inPockets at 1200mm centres in First Floor Slab. High Steel Curtain wallingsupport angles (250x165x50mm).
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh Spandrel Panels. Thisfacade is a curtain wall assembly and supported by aluminium bracketsat each level. Design guidance is required from Okalux for final deign. GLSupport brackets (650x105mm) cantilevered anchor supports boltedConcrete slab at 1200mm Center's. FF and RL Support Brackets(300x160x76mm) in Pockets at 1200mm centres in First Floor Slab. HighSteel Curtain walling support angles (250x165x50mm).
Curtain Walling:APA curtain walling system, TB50 SG system which will also be used tosupport structurally.Double glazed Units incorporated. All joints to be weathered usingsilicone seals.Double glazed unit sizes - 1200mm x 2000mm. All curtain walling to havetrench heating below to aid in stopping condensation.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica inPortugal Designed by OMA. The curved glass facade is deigned by ABTArnhem. Hot bended curved and laminated strips of glass 1200 mmwide and 400 mm deep. Good sound insulation can be achieved byplacing two sheets of glass at some distance from each other, preferablyover an expansion joint, 500mm.
3 2 14Internal Section BB
BB-7
BB-8
BB-9
150
Steel BeamSpec: Serial Size -254mm x 146mm. Kg/m - 37Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.
To Comply with Engineers Details, Specs andDesign.
75
225
Polished Floor ScreedSpec: The concretescreed will be polished toexpose the aggregate.
Precast concrete floor slabSpec: 150mm thickness. With edgethickening and steel reinforced. All Gapsfilled with lean mix concrete beforeinsulation installFixing: Bearing on external retaining walland required columns. Min 50mm bearingand 25mm Side bearing.
To Comply with Engineers Details, Specsand Design.
Structural Concrete ScreedSpec: 75mm Thickness. All columnswrapped in compressible insulationlayer to meet screed height. Movementjoints also to be accommodated. Withedge thickening and steel reinforced ToComply with Engineers Details, Specsand Design.Fixing: Poured ontop of insulation.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural ColumnEngineers Connection Detail.
To Comply with Engineers Details, Specs andDesign.
Stru
ctur
al B
eam
Hei
ght
Serv
ice
Void
of 1
350m
m
AMF Suspended CeilingSpecs: 24mm Thickness. Thermatex VariolineWood 600x600mm Tiles System. Edge DetailProprietary Edge SF long side. Humidity up to95%. (Sound Absorbing Material)
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm PlasterSkim. Sound Absorbing plasterboard.Fixing: Secured to steel stud.Finish: 2.5mm White plaster skimcoat
24
Furring ChannelSpec: Proprietary SystemSuspending Panels.
Top Cross RailSpec: Secured to FurringChannel Via Locking Key
Suspension ChannelSpec: Top Bracket and Bottom Clip
100
20
Cold Rolled Steel MultichannelSpec: 100mm Width x 25mm Height.Fixing: Secured to concrete structure.
Steel Angle Bracket secured toStructural Beam to supportplasterboard.
Plasterboard and Plaster FinishSpec: 12.5mm thickness and SoundAbsorbing plasterboard.Fixing: Secured to steel stud and steel anglebracket.
Glazed BalustradeSpec: 20mm Toughened GlazingStainless Steel Hand Rail.Fixing: Secured by Gasket, andresting on Setting Block.
Propriety Glazing HousingFixing: Secured to ConcreteScreen and Multichannel.
Proprietary Setting Block.
Stainless Steel CoverTo be installed after balustradeinstallation to cover housing. To alsobe placed at edge.
Polished Aluminium Handle(Wanger)Spec: Extruded Aluminium TopRail, Polished Finish. Radius 50mm.Fixing: Sitting on Protective Insert.Secured by Bonding Tape.
In Accordance With Part M.
20
Steel Angle BracketSpec: To protrude through Plasterboard.Plasterboard and Plaster to be finishedaround bracket.Fixing: Secured Structural Steel Beam
To Comply with Engineers Details, Specsand Design.
Steel Suspension WireSpec: High Tensile Steel Suspension Wire,Copper Coasted for Water Resistance.Fixing: Bottom Fix - Secured to Bracket onSteel Angle Bracket. Top Fix - Secured toGlulam Structure.
To Comply with Engineers Details, Specsand Design.
Glulam Structural BeamSpec: 1250mm Depth x 250mm Thickness.Designed in accordance with Eurocode 5.High Resistance to Chemicals. Fire Resistancein accordance with BS 5268-4.1
To Comply with Engineers Details, Specs andDesign.
Steel BracketSecured to Steel Angle Bracket withtie to Suspention Wire.
Steel BracketSecured to Steel Angle Bracketwith tie to Suspention Wire.
Concrete Structural Retaining WallSpec: Cast in-situ, steel reinforced concrete columnswith cap with holding down bolts cast in to secure steelGlulam Seat, 1200mm x 300mm.
Fixing: Holding down bolts cast in to secure SteelGlulam Base Plate.
To Comply with Engineers Details, Specs and Design.
150
150
75
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivity of 0.021W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extend to meetexternally insulation. To aid in the elimination ofthermal bridge.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Comply withEngineers Details, Specs and Design.Fixing: Poured ontop of insulation.
1200
375
Note: Polite Hole Designed into Glulam
Note: Glulam Stainless Steel Seat
To Comply with Engineers Details,Specs and Design.
Note: Holding down bolts cast in tosecure steel Glulam Seat.
To Comply with Engineers Details, Specsand Design.
Glulam Structural BeamSpec: 1250mm Depth x 250mm Thickness.Designed in accordance with Eurocode 5.High Resistance to Chemicals. Fire Resistancein accordance with BS 5268-4.1
To Comply with Engineers Details, Specs andDesign.
75 75
1050
Note: Insulation To be placedbetween Glulam Column Seat.
Note: Glulam Column Side Plate.550mm Radius.
Vapour BarrierSpec: Fire Rated Class 0 Halogen-free flameretardant coating. Taped at Joints and whereneeded. Airtight and Water Resistance.
Note: Face Plate Bolts
Grid No.2
150
60210
80
150
8015
060
170
610
Glu
lam
Col
umn
Wid
th 1
250m
m
Glulam Structural BeamSpec: 1250mm Depth x 250mm Thickness.Designed in accordance with Eurocode 5.High Resistance to Chemicals. FireResistance in accordance with BS 5268-4.1
To Comply with Engineers Details, Specsand Design.
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mm Sidebearing.
To Comply with Engineers Details, Specs and Design.PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivity of 0.021W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extend to meetexternally insulation. To aid in the elimination ofthermal bridge.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Comply withEngineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Vapour BarrierSpec: Fire Rated Class 0 Halogen-free flameretardant coating. Taped at Joints and whereneeded. Airtight and Water Resistance.
Note: Wall Detail Ref: Section AA -Roof - Detail No.4 - Green Roof StepUp / Accoya Cladding
Glelam Steel Connection PlateSpec: Slot Connection from Beam to Column.
To Comply with Engineers Details, Specs and Design.
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 09:10:49
Section BB - Internal Section No.2
Issue Date
TD - 105
BB
1 : 5TD - 105
Section BB - Internal - Detail No.7 - Balcony SuspensionBB-7
1 : 5TD - 105
Section BB - Internal - Detail No.8 - Glulam Column Base SeatBB-8
1 : 5TD - 105
Section BB - Internal - Detail No.9 - Glulam Column HeadBB-9
Construction SpecificationSteel Structure:All Structural Steel to have 60min fire resistance. Structural designis a provisional design and needs to be consulted with StructuralEngineer. All Steel reinforced and structural steel to comply withengineers details, specs and design.
Primary Steel StructureColumns (UKC - Blue) Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red) Serial Size - 356mm x 171mm. Kg/m- 67Skylight Columns (UKC - Baby Blue) Serial Size - 203mm x 203mm.Kg/m -54Structural Hollow Section (HC - Pink) Outside Diameter - 355.6.Thickness - 8mm. Kg/m - 54Beams (UKB - Yellow) Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green) Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray) Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange) Kingspan Multichannel will beadvised to be used. Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for both precast and cast insitu to beecocem based cement. All concrete works to comply withBS:8004 and tested with BS EN 12350-1 2009. Exposed concretefinished to comply with BS:8110. (Board Panel Finish). All Concreteconstruction to comply with engineers details, specs and design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting as support for concretebeams with holding down bolts cast in to secure steel columnsabove.
Concrete Columns (White)Cast in-situ, steel reinforced concrete columns with cap withholding down bolts cast in to secure steel columns above, 300mmx 300mm.
Concrete Beams (Purple)Transfer structure in place where structural steel column grid &basement concrete column grids do not coincide. Seating forhollow core floor slabs incorporated in beams.
Glulam Structure:Structural Engineer design to be followed with the Glulamstructure. The Steel shoes are to be designed to resist watercorrosion.
Floor Build Up:Ground Floor Suspended - Insulated Hollowcore Slab.Max Span 9m, Min 50mm bearing and 25mm Side bearing. AllGaps filled with lean mix concrete before insulation install. Allcolumns wrapped in compressible insulation layer to meet screedheight. Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-150mm rigid PIR Insulation.(High Compressive Strength)-75mm Concrete Screed.- Various Floor Finish.
First Floor Suspended - Hollowcore SlabMax Span 9m, Min 50mm bearing and 25mm Side bearing. AllGaps filled with lean mix concrete before insulation install. Allcolumns wrapped in compressible insulation layer to meet screedheight. Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete before insulation install. FloorThickening around perimeters of columns. Movement joints also tobe accommodated.-150mm concrete floor slab with edge thickening & steelreinforced, on continuous radon membrane to exit above groundoutside building.-50mm sand blinding layer on compacted layers of suitablehardcore 225mm.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughout the building as eachzone has different requirements (fire) and uses. The basic build upis a 2.5mm Plasterskim, 12.5mm Plasterboard, 100mm Steed StudSystem, 12.5mm Plasterboard, 2.5mm Plasterskim. 10mm ShadowGap to be incorporated on perimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium Fire Frame System, with23mm Pilkington Pyrostop Glass. This will achieve a 60Min FireRating. System to incorporate fire-rated insulation (Mineral Wool)as well as intumescent tape at joints.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel 35mm Thickness.Various Width and Lengths (300x300mm - 600x600mm - 900x900mm -1200x1200mm). Proprietary Hidden Fix System Cement plasterboard. 50mm PIR Rainscreen Insulation secured to CementParticle Board 12mm, secured to 200mm Multichannel. ContinuousWind Barrier along external side of CPB. 200mm Space inMultichannel filled with Fire Rated Mineral Quilt Insulation.Continuous Fire rated Vapour barrier on inner face pf secondarystructure. Internally Steel Channels provide a 50mm service cavityfor electrical Works. Required Plasterboard finish secured to steelchannels.
Accoya Timber Cladding -Vertical Accoya Cladding 75mm Width, Shiplap Joint (50yearWarranty). Secured to vertical support system. Proprietary HiddenFix System Cement plaster board. . (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement Particle Board12mm, secured to 200mm Multichannel. CPB Taped at joints toform air tight barrier. 200mm Space in Multichannel filled with FireRated Mineral Quilt Insulation. Continuous Fire rated Vapourbarrier on inner face pf secondary structure. Internally SteelChannels provide a 50mm service cavity for electrical Works.Required Plasterboard finish secured to steel channels.
Roof Build Up:Green Roof Build Up175mm growing substrate with sedum planting. Filter fleece toprevent any soil particles washing into the drainage layer,dressed between drainage channel and growing substrate.60mm Bauder DSE 60 board, filled with mineral drain material. Rootresistant layer on waterproofing under layer. Bauder FSM 1100protection mat, polyester & polypropylene fiber. 150mm rigid PIRinsulation. Vapour barrier layer. 75mm concrete screed. 150mmprecast concrete floor slab with edge thickening and steelreinforced.
Copper Mesh Vision PanelOkaTech Sealed Glazed Expanded Copper Mesh Panels. Thisfacade is a curtain wall assembly and supported by aluminiumGlazing unit at each level. Design guidance is required fromOkalux for final deign.
8 mm low-iron outer pane with copper coloured frit aroundedges to conceal structural silicone. 2 mm cavity with expandedcopper mesh secured in corners with spots of silicone. 8 mm solarcontrol glass with low-e coating. 16 mm air cavity. 10 mmlaminated inner pane comprising two panes 5 mm fl oat glass and0.76 mm PVB (polyvinylbutyral) interlayer.
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh SpandrelPanels. This facade is a curtain wall assembly and supported byaluminium Galzing Unit at each level.
8 mm low-iron outer pane with copper coloured frit aroundedges to conceal structural silicone. 2 mm cavity with expandedcopper mesh secured in corners with spots of silicone. 8 mm solarcontrol glass with low-e coating. 30 mm air cavity. 120 mm rigidinsulation. 3 mm folded aluminium backing sheet.
Curtain Walling:APA curtain walling system, TB50 SG system which will also be usedto support structurally.Double glazed Units incorporated. All joints to be weatheredusing silicone seals.Double glazed unit sizes - 1200mm x 2000mm. All curtain walling tohave trench heating below to aid in stopping condensation.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica inPortugal Designed by OMA. The curved glass facade is deignedby ABT Arnhem. Hot bended curved and laminated strips of glass1200 mm wide and 400 mm deep. Good sound insulation can beachieved by placing two sheets of glass at some distance fromeach other, preferably over an expansion joint, 500mm.
A
Wall Section CC
CC -4
CC -5
CC -6
150
150
75
380
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivity of0.021 W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extend tomeet externally insulation. To aid in the eliminationof thermal bridge.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Comply withEngineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Concrete Secant Piles (Retaining Wall)Spec: 350mm Radius, Piles acting as support forconcrete beams with holding down bolts castin to secure steel columns above.
To Comply with Engineers Details, Specs andDesign.
Waterproof MembraneTo run up to the ground floor level.Fixing: Bonded to concrete PileRetaining Wall.
Waterproof Adhesive SpaySpec: Spay onto Secant Concrete Pilesto maintain waterproofing internally.
Concrete Panel FinishSpec: 50mm cast in-situ concrete panel.Fixing: Secured to concrete retaining wall.Finish: Board Panel Finish.
To Comply with Engineers Details, Specsand Design.
35050400
Proprietary Glazing Spacer
Proprietary Glazing Setting Back
Copper Pressure PlateSpec: Proprietary pressureplate required to have copperfinish to match Panel Frit.
Aluminium Curtain Wall FramingSpec: Thermal Break incorporatedinto design. Drainage ProvisionIncorporated. Cill incorporatedinto Framing Transome.Fixing: Secured to Concrete Slabvia thermally broken anchors.
80
220
Permeable Paving
Stone PebblesSpec: Around Perimeter
100
70
Precast Concrete Edging
Vapour BarrierSpec: Fire Rated Class 0 Halogen-free flame retardant coating.Taped at Joints and whereneeded. Airtight and WaterResistance.
Copper Mesh Vision PanelOkaTech Sealed Glazed Expanded CopperMesh Panels. This facade is a curtain wallassembly and supported by aluminiumGlazing unit at each level. Design guidanceis required from Okalux for final deign.
150
Steel Perimeter ColumnsSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.
To Comply with Engineers Details, Specs andDesign.
75
225
Polished Floor ScreedSpec: The concretescreed will be polished toexpose the aggregate.
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screedheight. Movement joints also to beaccommodated. With edge thickening and steelreinforced To Comply with Engineers Details, Specsand Design.Fixing: Poured ontop of insulation.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural ColumnEngineers Connection Detail.
To Comply with Engineers Details, Specs andDesign.
Stru
ctur
al B
eam
Hei
ght
Serv
ice
Void
of 1
350m
m
AMF Suspended CeilingSpecs: 24mm Thickness. Thermatex Varioline Wood600x600mm Tiles System. Edge Detail Proprietary Edge SFlong side. Humidity up to 95%. (Sound Absorbing Material)
Shadow Gap BeadSpec: 20mm
24
Furring ChannelSpec: Proprietary System Suspending Panels.
Top Cross RailSpec: Secured to FurringChannel Via Locking Key
Suspension ChannelSpec: Top Bracket andBottom Clip
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm Plaster Skim.Moisture Resistance plasterboard.Fixing: Secured to steel stud. Enclosing Column.Finish: 2.5mm White plaster skimcoat
Proprietary Glazing Spacer
Proprietary Glazing Setting Back
Copper Pressure PlateSpec: Proprietary pressureplate required to have copperfinish to match Panel Frit.
Aluminium Curtain Wall FramingSpec: Thermal Break incorporatedinto design. Drainage ProvisionIncorporated. Cill incorporatedinto Framing Transome.Fixing: Secured to Concrete Slabvia thermally broken anchors.
Structural Steel Column Width
Copper Mesh Spandrel PanelOkaTech Sealed Glazed ExpandedCopper Mesh Spandrel Panels. Thisfacade is a curtain wall assembly andsupported by aluminium Galzing Unit ateach level.
Low-iron outer paneSpec: 8mm Thickness. Copper colouredfrit around edges to conceal structuralsilicone.
Copper MeshSpec: 2mm Thickness. secured in cornerswith spots of silicone.Placed in Cavity Between Planes.
Solar Control GlassSpec: 8mm Thickness. Low E Coating.
Air Cavity 30mm
PIR Rigid InsulationSpec:150mm Thickness. ThermalConductivity of 0.021 W/mK, Class"O" Fire Rating.
Aluminium Backing Sheet3mm Thickness.
Low-iron outer paneSpec: 8mm Thickness. Copper colouredfrit around edges to conceal structuralsilicone.
Copper MeshSpec: 2mm Thickness. secured in cornerswith spots of silicone.Placed in Cavity Between Planes.
Solar Control GlassSpec: 8mm Thickness. Low E Coating.
Air Cavity 16mm
Laminated inner paneSpec: comprising two panes 5 mmfloat glass and 0.76 mm PVB(polyvinylbutyral) interlayer
150
Steel Perimeter ColumnsSpec: Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Concrete Wall Below with holding downbolts cast in to secure steel columns.
To Comply with Engineers Details, Specs andDesign.
75
225
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Comply withEngineers Details, Specs and Design.Fixing: Poured ontop of insulation.
Structural Steel BeamsSpec: Serial Size -254mm x 146mm. Kg/m - 37Serial Size - 356mm x 171mm. Kg/m - 67.Fixing: Connection to Structural ColumnEngineers Connection Detail.
To Comply with Engineers Details, Specs andDesign.
Stru
ctur
al B
eam
Hei
ght
Serv
ice
Void
of 1
350m
m
AMF Suspended CeilingSpecs: 24mm Thickness. Thermatex Varioline Wood600x600mm Tiles System. Edge Detail Proprietary Edge SFlong side. Humidity up to 95%. (Sound Absorbing Material)
Shadow Gap BeadSpec: 20mm
24
Furring ChannelSpec: Proprietary System Suspending Panels.
Top Cross RailSpec: Secured to FurringChannel Via Locking Key
Suspension ChannelSpec: Top Bracket andBottom Clip
Plasterboard and Plaster FinishSpec: 12.5mm thickness and 2.5mm Plaster Skim.Moisture Resistance plasterboard.Fixing: Secured to steel stud. Enclosing Column.Finish: 2.5mm White plaster skimcoat
Proprietary Glazing Spacer
Proprietary Glazing Setting Back
Copper Pressure PlateSpec: Proprietary pressureplate required to have copperfinish to match Panel Frit.
Aluminium Curtain Wall FramingSpec: Thermal Break incorporatedinto design. Drainage ProvisionIncorporated. Cill incorporatedinto Framing Transome.Fixing: Secured to Concrete Slabvia thermally broken anchors.
Copper Mesh Spandrel PanelOkaTech Sealed Glazed ExpandedCopper Mesh Spandrel Panels. Thisfacade is a curtain wall assembly andsupported by aluminium Galzing Unit ateach level.
Low-iron outer paneSpec: 8mm Thickness. Copper colouredfrit around edges to conceal structuralsilicone.
Copper MeshSpec: 2mm Thickness. secured in cornerswith spots of silicone.Placed in Cavity Between Planes.
Solar Control GlassSpec: 8mm Thickness. Low E Coating.
Air Cavity 30mm
PIR Rigid InsulationSpec:150mm Thickness. ThermalConductivity of 0.021 W/mK, Class"O" Fire Rating.
Aluminium Backing Sheet3mm Thickness.
Low-iron outer paneSpec: 8mm Thickness. Copper colouredfrit around edges to conceal structuralsilicone.
Copper MeshSpec: 2mm Thickness. secured in cornerswith spots of silicone.Placed in Cavity Between Planes.
Solar Control GlassSpec: 8mm Thickness. Low E Coating.
Air Cavity 16mm
Laminated inner paneSpec: comprising two panes 5 mmfloat glass and 0.76 mm PVB(polyvinylbutyral) interlayer
200
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivityof 0.021 W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extendto meet externally insulation. To aid in theelimination of thermal bridge.15
060
Dri Design Copper Coated Aluminium PanelSpec: 35mm Thickness. Various Width andLengths (300x300mm - 600x600mm -900x900mm - 1200x1200mm).Fixing: Proprietary Hidden Fix System toCement plaster board.Finish: Natural Copper Finish.
Growing substrateSpecs: 175mm Thickness. Sedum planting
Filter fleeceSpec: To prevent any soil particles washing into thedrainage layer, dressed between drainage channeland growing substrate.
Bauder DSE 60 boardSpec: 60mm Thickness. Filled with mineral drainmaterial
Bauder FSM 1100 protection mat,Spec: polyester & polypropylene fiber, run to layunder breather membrane on parapet.
Root resistant layerSpec: On waterproofing underlay, run to layunder breather membrane on parapet.
Flashing CapSpec: Copper parapet capping , turnedup at ends to hinder water penetration.Fixing: Secured to plywood via buttstraps.
Plywod Capping SupportSpecs: 10mm Thickness. Secured toTilting fillet.
Steel Up Stand:Spec: Width 120mm. Up Stand Height200mm.Laterally Supported by 150x25mmMultichannel.Fixing: To Structural Column Below.
To Comply with Engineers Details, Specsand Design
170
Galvanized Steel EdgeSpec: 5mm in Thickness. Acts as retaining for green roof.Fixing: Fixed under growing substrate.
To Comply with Engineers Details, Specs and Design.
390
Aluminium Backing Sheet3mm Thickness.
Vapour BarrierSpec: Fire Rated Class 0 Halogen-free flame retardantcoating. Taped at Joints and where needed. Airtight andWater Resistance.
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 16:17:15
Section CC - Wall Section No.3
Issue Date
TD - 106
CC
1 : 5TD - 106
Section CC - Wall - Detail No.4 - Glass Panels / Ground Floor JunctionCC-4
1 : 5TD - 106
Section CC - Wall - Detail No.5 - Glass Panels / First Floor JunctionCC-5
1 : 5TD - 106
Section CC - Wall - Detail No.6 - Glass Panels / Roof JunctionCC-6
Concrete Structural Retaining WallSpec: 300mm Thickness, Retaining wall acting as support for concrete beams with holdingdown bolts cast in to secure steel columns above.Fixing: Secured to meet Slab Kicker with Waterstop cast into bother.
To Comply with Engineers Details, Specs and Design.
Concrete Panel FinishSpec: 50mm cast in-situ concrete panel. Fixing: Secured to concrete retaining wall. Finish: BoardPanel Finish. To Comply with Engineers Details, Specs and Design.
Waterproof MembraneSpec: Run from basement up to meet vapour barrier. Fixing: Bonded to concreteRetaining Wall and slab.
Delta Drain Waterproof MembraneSpec: Run from basement up to meet vapour barrier. Fixing: Bonded to concreteRetaining Wall and slab.
150
150
7538
0
50410
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
PIR Rigid InsulationSpec:150mm Thickness. Thermal Conductivity of 0.021W/mK, Class "O" Fire Rating.Fixing: Layed ontop of concrete slab. Extend to meetexternally insulation. To aid in the elimination ofthermal bridge.
Structural Concrete ScreedSpec: 75mm Thickness. All columns wrapped incompressible insulation layer to meet screed height.Movement joints also to be accommodated. Withedge thickening and steel reinforced To Comply withEngineers Details, Specs and Design.Fixing: Poured ontop of insulation.
350
Note: The curved glass facade is deigned byABT Arnhem. Hot bended curved andlaminated strips of glass 1200 mm wide.
To Comply with Engineers Details, Specs andDesign.To Comply with Glazing Expert Details, Specsand Design.
Curved TransomeSpec: Curved Insulated Transome suppliedby ABT Arnhem. Finish to be Brushed Steel.Fixing: Secured to Precast ConcreteHollowcore Slab.
Proprietary Structural Silicone Sealant
Proprietary Glazing Spacer
Proprietary Glazing Setting BackPilkington Toughened GlazingSpec: 40mm Thickness.To Comply with Engineers Details,Specs and Design
Copper Flashing and CillSpec: Secured to StructuralGlazing Transome. CillSecured to Concrete Panelunder Flashing.
Hollowcore Steel Circular Column.Spec: Serial Size - 350. Kg/m - 67. Copper Coated Finish.Fixing: Concrete Tranfer Beam. Below with holding downbolts cast in to secure steel columns.
To Comply with Engineers Details, Specs and Design.
Concrete Structural Transfer BeamSpec: 300mm x 500mm , Holding down bolts cast in tosecure steel columns above.Fixing: Supported at either side.
To Comply with Engineers Details, Specs and Design.
30
140 350500 40 100 40 500
Construction SpecificationSteel Structure:All Structural Steel to have 60min fire resistance. Structural design isa provisional design and needs to be consulted with StructuralEngineer. All Steel reinforced and structural steel to comply withengineers details, specs and design.
Primary Steel StructureColumns (UKC - Blue) Serial Size - 254mm x 254mm. Kg/m - 71Perimeter Columns (UKBC - Red) Serial Size - 356mm x 171mm. Kg/m- 67Skylight Columns (UKC - Baby Blue) Serial Size - 203mm x 203mm.Kg/m -54Structural Hollow Section (HC - Pink) Outside Diameter - 355.6.Thickness - 8mm. Kg/m - 54Beams (UKB - Yellow) Serial Size -356mm x 171mm. Kg/m - 67Beams (UKB Green) Serial Size -254mm x 146mm. Kg/m - 37Skylight Beams (UKB - Gray) Serial Size -305mm x 165mm. Kg/m - 46
Secondary Steel StructurePurlins, Rails and Channels (Orange) Kingspan Multichannel will beadvised to be used. Width - 205mm. Thickness - 65mm
Concrete Structure:All concrete cement used for both precast and cast insitu to beecocem based cement. All concrete works to comply withBS:8004 and tested with BS EN 12350-1 2009. Exposed concretefinished to comply with BS:8110. (Board Panel Finish). All Concreteconstruction to comply with engineers details, specs and design.
Concrete Retaining Wall (Bright Green)600mm thickness, retaining wall acting as support for concretebeams with holding down bolts cast in to secure steel columnsabove.
Concrete Columns (White)Cast in-situ, steel reinforced concrete columns with cap withholding down bolts cast in to secure steel columns above, 300mmx 300mm.
Concrete Beams (Purple)Transfer structure in place where structural steel column grid &basement concrete column grids do not coincide. Seating forhollow core floor slabs incorporated in beams.
Glulam Structure:Structural Engineer design to be followed with the Glulam structure.The Steel shoes are to be designed to resist water corrosion.
Floor Build Up:Ground Floor Suspended - Insulated Hollowcore Slab.Max Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-150mm rigid PIR Insulation.(High Compressive Strength)-75mm Concrete Screed.- Various Floor Finish.
First Floor Suspended - Hollowcore SlabMax Span 9m, Min 50mm bearing and 25mm Side bearing. All Gapsfilled with lean mix concrete before insulation install. All columnswrapped in compressible insulation layer to meet screed height.Movement joints also to be accommodated.-150mm precast concrete floor slab with edge thickening andsteel reinforced.-75mm Concrete Screed.- Various Floor Finish.
Basement Floor Bearing - Concrete SlabAll Gaps filled with lean mix concrete before insulation install. FloorThickening around perimeters of columns. Movement joints also tobe accommodated.-150mm concrete floor slab with edge thickening & steelreinforced, on continuous radon membrane to exit above groundoutside building.-50mm sand blinding layer on compacted layers of suitablehardcore 225mm.
Wall Build Up:Internal Partition Solid -The Plasterboard and finish varies throughout the building as eachzone has different requirements (fire) and uses. The basic build up isa 2.5mm Plasterskim, 12.5mm Plasterboard, 100mm Steed StudSystem, 12.5mm Plasterboard, 2.5mm Plasterskim. 10mm ShadowGap to be incorporated on perimeter.
Internal Partition Glazed -Internal Glazing will be a TGP Aluminium Fire Frame System, with23mm Pilkington Pyrostop Glass. This will achieve a 60Min FireRating. System to incorporate fire-rated insulation (Mineral Wool) aswell as intumescent tape at joints.
Copper Panel Rainscreen Cladding -Dri Design Copper Coated Aluminium Panel 35mm Thickness.Various Width and Lengths (300x300mm - 600x600mm - 900x900mm- 1200x1200mm). Proprietary Hidden Fix System Cement plasterboard. 50mm PIR Rainscreen Insulation secured to Cement ParticleBoard 12mm, secured to 200mm Multichannel. Continuous WindBarrier along external side of CPB. 200mm Space in Multichannelfilled with Fire Rated Mineral Quilt Insulation. Continuous Fire ratedVapour barrier on inner face pf secondary structure. InternallySteel Channels provide a 50mm service cavity for electrical Works.Required Plasterboard finish secured to steel channels.
Accoya Timber Cladding -Vertical Accoya Cladding 75mm Width, Shiplap Joint (50yearWarranty). Secured to vertical support system. Proprietary HiddenFix System Cement plaster board. . (Thermal Break Incorporated)50mm PIR Rainscreen Insulation secured to Cement Particle Board12mm, secured to 200mm Multichannel. CPB Taped at joints toform air tight barrier. 200mm Space in Multichannel filled with FireRated Mineral Quilt Insulation. Continuous Fire rated Vapour barrieron inner face pf secondary structure. Internally Steel Channelsprovide a 50mm service cavity for electrical Works. RequiredPlasterboard finish secured to steel channels.
Roof Build Up:Green Roof Build Up175mm growing substrate with sedum planting. Filter fleece toprevent any soil particles washing into the drainage layer, dressedbetween drainage channel and growing substrate. 60mm BauderDSE 60 board, filled with mineral drain material. Root resistant layeron waterproofing under layer. Bauder FSM 1100 protection mat,polyester & polypropylene fiber. 150mm rigid PIR insulation. Vapourbarrier layer. 75mm concrete screed. 150mm precast concretefloor slab with edge thickening and steel reinforced.
Copper Mesh Vision Panel -OkaTech Sealed Glazed Expanded Copper Mesh Panels. Thisfacade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Copper Mesh Spandrel Panel -OkaTech Sealed Glazed Expanded Copper Mesh Spandrel Panels.This facade is a curtain wall assembly and supported by aluminiumbrackets at each level. Design guidance is required from Okalux forfinal deign. GL Support brackets (650x105mm) cantilevered anchorsupports bolted Concrete slab at 1200mm Center's. FF and RLSupport Brackets (300x160x76mm) in Pockets at 1200mm centres inFirst Floor Slab. High Steel Curtain walling support angles(250x165x50mm).
Curtain Walling:APA curtain walling system, TB50 SG system which will also be usedto support structurally.Double glazed Units incorporated. All joints to be weathered usingsilicone seals.Double glazed unit sizes - 1200mm x 2000mm. All curtain walling tohave trench heating below to aid in stopping condensation.
Structural Glazing:The Structural glazing is a compliment to the Casa Da Musica inPortugal Designed by OMA. The curved glass facade is deignedby ABT Arnhem. Hot bended curved and laminated strips of glass1200 mm wide and 400 mm deep. Good sound insulation can beachieved by placing two sheets of glass at some distance fromeach other, preferably over an expansion joint, 500mm.
IJ
CC - 2
CC - 3
CC - 1
Structural Glazing - Section CC
Precast concrete floor slabSpec: 150mm thickness. With edge thickening andsteel reinforced. All Gaps filled with lean mixconcrete before insulation installFixing: Bearing on external retaining wall andrequired columns. Min 50mm bearing and 25mmSide bearing.
To Comply with Engineers Details, Specs and Design.
Proprietary Structural Silicone Sealant
Proprietary Glazing Spacer
Proprietary Glazing Setting Back
Pilkington Toughened GlazingSpec: 40mm Thickness.To Comply with Engineers Details,Specs and Design
500 40 100 40 500 150 350
Note: Angle Pre Designedonto Steel HollowcoreColumn.
Note: The curved glass facade is deigned byABT Arnhem. Hot bended curved andlaminated strips of glass 1200 mm wide.
To Comply with Engineers Details, Specs andDesign.To Comply with Glazing Expert Details, Specsand Design.
Curved TransomeSpec: Curved Insulated Transome supplied byABT Arnhem. Finish to be Brushed Steel.Fixing: Secured to Precast ConcreteHollowcore Slab.
Hollowcore Steel Circular Column.Spec: Serial Size - 350. Kg/m - 67. Copper Coated Finish.Fixing: Concrete Tranfer Beam. Below with holding downbolts cast in to secure steel columns.
To Comply with Engineers Details, Specs and Design.
Note: The curved glass facade isdeigned by ABT Arnhem. Hotbended curved and laminated stripsof glass 1200 mm wide.
To Comply with Engineers Details,Specs and Design.To Comply with Glazing ExpertDetails, Specs and Design.
Proprietary Structural Silicone Sealant
Proprietary Glazing Spacer
Proprietary Glazing Setting BackPilkington Toughened GlazingSpec: 30mm Thickness.To Comply with Engineers Details, Specs and Design
Proprietary Structural Silicone Sealant
Proprietary Glazing Spacer
Proprietary Glazing Setting Back
Pilkington Toughened GlazingSpec: 30mm Thickness.To Comply with Engineers Details, Specs and Design
Hollowcore Steel Circular Column.Spec: Serial Size - 350. Kg/m - 67.Copper Coated Finish.Fixing: Concrete Transfer Beam. Belowwith holding down bolts cast in tosecure steel columns.
To Comply with Engineers Details, Specsand Design.
350150
Curved TransomeSpec: Curved InsulatedTransome supplied by ABTArnhem. Finish to be BrushedSteel.Fixing: Secured to PrecastConcrete Hollowcore Slab.
500 40 100 40 500
500
Note: Angle Pre Designedonto Steel HollowcoreColumn.
Scale
Drawn by
Date
Technical Design and DetailingYear 3
Project No.3 - Thesis
Mark Grincell
Dan O'Sullivan / Noel Dunne
As indicated
23/04/2015 09:17:47
Section CC - Structural Glazing
Issue Date
TD - 107 1 : 5TD - 107
Section CC - Structural Glazing - Detail No.1 - Structural Glazing BaseCC-1
CC
TD - 107
Curved Structural Glazing - External View3
TD - 107
Curved Structural Glazing - Internal View4
TD - 107
Curved Structural Glazing - Plan View5
1 : 5TD - 107
Section CC - Structural Glazing - Detail No.3 - Structural Glazing HeadCC-3
1 : 5TD - 107
Section CC - Structural Glazing - Detail No.2 - Structural Glazing Mid JointCC-2