MAG WIRE PLANT – CASE STUDY

WELDING – ITALY

WELDING – ITALY

Page 3: Italy MAG Wire Business case _Scada system Jan 2016 english version

BUSINESS STRATEGY

• Increase sales in Southern Europe;

The plant is located in Italy and freight cost is key cost element

Product is a commodity ( alloyed steel made as raw material)

and compete in a price driven market;

• Improve scale economy is a way to reduce cost per unit through

capacity expansion. Current demand is higher than full capacity;

• Increase productivity is a key drive to increase capacity;

• The plant process has capability to process recycled material with

low scrap level and good quality level;

• The plant has been investing in Lean Manufacturing philophy aiming

to sustain continuous improvement mind set already in place.

Page 4: Italy MAG Wire Business case _Scada system Jan 2016 english version

ORGANIZATIONAL ALIGNMENT WITH OPEX

• Vision

• Mission

• Policy Deployment

• Organizational Structure Standard Factory

Standard KPI’s

• Roles & Responsibilities Job Descriptions

Leadership

• Continued Education

• Culture / Engagement /Recognition

• Succession planning

• Change Management

Page 5: Italy MAG Wire Business case _Scada system Jan 2016 english version

” Become the best in class Mag wire

manufacturer by focusing in production

process continuous improvement, HSE

high performance and striving for

competitive cost and excellent quality

system.

PLANT VISION

Page 6: Italy MAG Wire Business case _Scada system Jan 2016 english version

Policy Deployment Matrix

Key: O = Owner T = Team A = accountable

POLICY DEPLOYMENT MATRIX FOR: Europe 2011

Revision log: Budget 2011 review T O A

Issue date: Nov'2010 Q1 Q2 Q3 Q4

Prioritise and develop Environmental Health and Safety initiatives

with the aim to achieve zero lost time injury and zero environmental

incident

O T T T T T T T T

Continuous improvement in the existing quality systemA O T T T

Terni MAG Expansion - project designA T T T T

Develop the use of low cost raw materialO T T T T

Cost Reduction ( FO-VO-WIP) O T T T T

T

Consolidate project Star A T T T

T O T

Implement lean tools and TPM A T T T O T

Coaching at each level within the organization - Increase Flexibility A T O T T T T T T

Prio

ritis

e an

d de

velo

p En

viro

nmen

tal H

ealth

and

Saf

ety

initi

ativ

es w

ith th

e ai

m to

achi

eve

zero

lost

tim

e in

jury

and

zer

o en

viro

nmen

tal i

ncid

ent

QM

S Sy

stem

dev

elop

men

t

Euro

pean

Con

sum

able

s Fo

otpr

int R

evie

w

Dri

ve O

pera

tiona

l Exc

elle

nce

road

map

on

Cost

red

uctio

n

Mee

t PPV

& c

ash

flow

with

in E

urop

ean

plan

ts

Dev

elop

men

t of p

eopl

e

Keep

Lea

n &

mod

el fa

ctor

y up

& Im

plem

ent T

PM

incr

ease

pro

duct

ion

from

20K

ton/

y to

23K

ton/

y

incr

ease

pro

duct

ion

from

23K

ton/

y to

26K

ton/

y

TPM

impl

emen

tatio

n on

all

dep

artm

ent

Impr

ove

Flex

ibili

ty

Min

i Boo

tcam

p le

an

Trai

ning

Ope

rato

rs (

3c-5

S- p

robl

em s

olvi

ng )

5% y

ear

on y

ear

conv

ersi

on c

ost r

educ

tion

targ

et

Incr

ease

% o

f th

e ut

iliza

tion

LCW

Raw

Mat

eria

l

New

wir

e ba

sket

KS

300

impl

emen

ted

WIP

red

uctio

n

Qua

lity

Lab

Appl

y le

an p

rinc

iple

s an

d to

ols

in Q

ualit

y

Shar

e th

e be

st p

ract

ices

with

Qua

lity

glob

al fu

nctio

n

Upd

ate

Tern

i's 5

yea

r pl

an

Redu

ce w

aste

dis

posa

l and

impr

ove

was

te m

anag

emen

t

Trai

ning

peo

ple

to a

chiv

e 0

acci

dent

s

Incr

ease

num

ber

of n

ear

mis

s

finis

h th

e St

anda

rd fa

ctor

y m

odel

impl

emen

tatio

n

Coac

hing

at e

ach

leve

l with

in th

e or

gani

zatio

n - T

rain

the

trai

ners

Pagl

iari

Mir

ko

Elis

a Al

tobe

lli

Mas

sim

o G

hera

rdi

Fede

rico

Ros

ati

Gui

do B

alda

ssar

re

Sara

Gen

tili

Sere

na P

alen

ga

Mar

co P

erni

Lead

ersh

ift

QM

S Lost time innjury & environmental incidents zero

A

reduction of complaints ( max 300 ppm) A

98% attainment to plan A

Saving 10% in waste disposal A

5% MCC cost reduction year 2011A

Direct labour productivity improved from 180 to 200 Kgman/hA

Saving 25-50 Eur Ton using LCW Raw material A

Reduce Scap 0,3%A

Lean Audits improved until 6 score A

OWNERSHIP

PROJECTS & ACTIVITIESFor 2011

VISION: ”To become the best in class operations within 5 years by

PDM Owner: MD Terni -Pagliari Mirko

DELIVERABLESin 2011

AIMS throughto 2015

RESULTS for 2011

Key:

O = OwnerT = TeamA = accountable

Aims

Projects

Results

Deliverables

Page 7: Italy MAG Wire Business case _Scada system Jan 2016 english version

• Mass production;

• Standardized process in a repetitive serial production

• Intensive in capital;

• Three shifts 6 days a week operations model.

Italian Factory owned by a English International group to

produce solid MAG Wire to supply the whole European industry base with MAG solid wire.

Production Process Caracteristics

Page 8: Italy MAG Wire Business case _Scada system Jan 2016 english version

In order to improve plant produtivity aiming to achieve capacity increase

at same time give the plant control back to the production manager, it

was developed a Manufacturing execution system project comprised by

additional drivers interface in order to establish an automatic and reliable

Shop floor data collection system through and internet connection

Network connecting the plant equipments to a computer system.

The plant had been implementing Lean Manufacturing tools such as

Communication cells where the employee`s could discuss daily basis

the performance and come up with ideas to drive performance using

lean tools for problem solving.

BUSINESS CASE STUDY PROPOSITION

MES – Manufacturing Execution System

Page 9: Italy MAG Wire Business case _Scada system Jan 2016 english version

MES – AUTOMATIC DATA COLLECTION

MES – Manufacturing Execution System

The hardwares showed in the picture below were installed

in the eletromechanic machines and connected into a

internal network. A number of KPIs and performance

reports became available real time allowing the leadership

team take quick data driven decisions.

Page 10: Italy MAG Wire Business case _Scada system Jan 2016 english version

First step:

• Display factory supervisory: colored visual

management shows machines in downtime mode.

• Real time trend graphics: shows KPIs about machine

speed, real production, OEE, scrap and productivity

curve per machine e total plant by process.

• Various reports in real time: easy interface

configuration and customization user friendly mode;

• Statistics: promptly analysis to fast problems response

SCADA - Supervisory Control and Data Acquisition

SCADA – PILOT IMPLEMENTATION

Page 11: Italy MAG Wire Business case _Scada system Jan 2016 english version

Second step: Statistical Process Control.

Process variables such as wire diameter,

treatment bath temperature, bearings temperature.

Trend graphs were implemented to visually

control variances and displays alerts to the

leadership;

Third step:

Maintenance control activities

The operator started interacting with the machine

logging the dowtime via hardware.

Tools consumption control were introduced;

Downtime connected into ERP to feedback planning progress and production costs.

SCADA – PILOT IMPLEMENTATION

Page 12: Italy MAG Wire Business case _Scada system Jan 2016 english version

03/02/2016 12

• SCADA brought in …

– Process control back to the Management

– Reduce down time to increase capacity

– Remove manual data processing

– Respond to problems before they escalate

– Reduce scrap and optimise machine speed

– Motivate operators

– Understand your process and capability

– Improve maintenance scheduling

– Distribute information, encourage ownership

SCADA IMPLEMENTATION BENEFITS

To Connect shop floor data to ERP IT system meanwhile

feed up the plant KPI’s dashboard therefore creating the

manufacturing execution system.

Page 13: Italy MAG Wire Business case _Scada system Jan 2016 english version

RESULTS

After MES pilot implementation

Investment - € 87,000

OEE improved from 54% to 85%

Capacity increased in 160 tons per month without

any Investment

Turn over increase - €320,000 per year

Process Scrap reduction from 4% to1,5%

Implementation time: 6 meses

Page 14: Italy MAG Wire Business case _Scada system Jan 2016 english version

For more information please access

http://www.blindagemdeprocessos.com.br/

Thanks to