IT Update

May 26, 2015

Page 2: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

UCI Office of Information Technology 2

Topics

}  Infrastructure & Core Services }  Information Security }  Educational Technology }  Research Computing }  Enterprise Application Initiatives }  OIT Organizational

Page 3: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

ESNet

CENIC HPR

Internet2

INTERNET

CalREN

Commercial Networks

10Gbps

JYY 217/2015

Two Redundant Border Routers

and Border Firewalls

Bldg B

10Gbps Fault-Tolerant Campus Backbone

Bldg A

Various small bldgs

Floor

10Gbps

1Gbps

UCInet

1Gbps

Floor

100Mbps

3

1,640 network switches tie 183 buildings 38,992 active wired connections

1,356 wireless access points

10Gbps and 6x1Gbps commodity Internet links 10Gbps and 1Gbps to

CENIC High Performance Research/Ed network

Page 4: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

4

Infrastructure & Core Services

5 year UCInet upgrade project •  Building (wired and wireless), backbone, external connectivity •  Replacing equipment no longer supported by vendor, adding capacity,

improving performance & resilience }  2014/2015:

•  Additional 10Gb external link; redundant fiber link via UCLA •  Additional 10Gb building connections in core routers •  Router upgrades in 4 buildings (Hewitt, Sprague, Croul, NatSci 1) •  Replaced aging wireless core infrastructure, 300 access points

}  Next: •  Upgrade core routers, building switches •  Upgrade data center connectivity, FacNet backbone •  Wireless enhancements to subset of campus locations

UCI Office of Information Technology

Page 5: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

5

Infrastructure & Core Services

}  Telephone System Upgrade: •  ~8,200 phones migrated to the new system •  ~800 phones remaining; target completion

by end of summer 2015 •  New voice mail system coming as well

}  Cellular service enhancement efforts are ongoing }  Email and Calendaring

•  Student accounts provided through Google Apps •  Half of UCI exchange accounts moved to Office 365 •  Long-term plans for IMAP (Thunderbird) service TBD

}  Continued data center enhancements, cloud service pilots }  Working to enhance “Disaster Recovery” capabilities

UCI Office of Information Technology

Page 6: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

6

Information Security }  Escalating threats & challenges:

•  First week in May: 3,349 hosts and 513,458,744 probes blocked •  2.2m spam emails rejected daily during 2014 •  Continuing high-impact breaches on the Internet

}  Ongoing activities •  Furthering risk assessment via Security Risk Assessment Questionnaire

(SRAQ) tool •  8 GB/day of logs sent to Splunk, 70 internal firewalls maintained •  75 vulnerability scans completed last year •  Annual “restricted data” inventory ongoing (additional outreach needed)

}  Access management initiatives •  “Duo” multi-factor authentication: response to password compromise (365

users, 445 servers/applications) •  Centralized Authorization Service (KSAMS) for more consistent access

management (currently 500 campus roles) }  Security permeates the role of the grand majority of OIT Staff

UCI Office of Information Technology

Page 7: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

7

Daily E-mail Blocked / Accepted - 2014

UCI Office of Information Technology

Page 8: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

8

Educational Technology eTech Initiative (etech.uci.edu)

}  Educational Technology Initiative Advisory Committee

•  Faculty/student/staff committee; reviews needs & priorities

}  Funding from undergraduate lecture course fee providing services and facilities in support of the courses for which the fees are paid. For example: •  Classroom and computing lab technology

•  Course Management System (EEE and piloting Canvas) •  Educational technology support staff

}  Bulk of funding goes to maintaining and incrementally improving broad-based, established services and facilities.

UCI Office of Information Technology

Page 9: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

9

Educational Technology Classroom Technology Refresh

}  Over first 3 years, technology in 87 classrooms has been refreshed: •  New computers, blu-ray players, digital and analog laptop cables,

control and switching gear, microphones •  Rooms re-wired for stereo, new screens and projectors, more

whiteboards, additional document cameras and other equipment •  Power outlets for student use added in ELH 100, HIB 100, SSLH 100,

SSPA 1100, along with non-classroom study areas •  Additional wireless coverag

}  90 outdated computers replaced in Gateway Study Center }  24 more classrooms planned for summer 2015

•  BS3 1200, 12 rooms in DBH, EH 1200, HH 178, 3 rooms in IAB, 2 rooms in PCB, SSH 100, 3 rooms in SST

•  HH 178 and SSH 100 present challenges due to stage areas

UCI Office of Information Technology

Page 10: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

10

Educational Technology

} Canvas Pilot Project •  Pilot commercial learning management system, Instructure Canvas •  Augmenting, not replacing, EEE •  Assessing if Canvas is a good fit (including third party tool integration,

additional learning management tools & features) •  One year pilot -  Spring 2015 / Summer 2015 – invited instructor participants

-  Fall 2015 / Winter 2016 – open to all instructors opting-in undergraduate courses -  Spring 2016 – assess pilot outcome (including feedback surveys, focus groups)

•  Details and pilot project updates: https://sites.uci.edu/canvaspilot/ •  Instructure Canvas information: http://www.instructure.com/

UCI Office of Information Technology

Page 11: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

11

Research Computing

}  “HPC” condo-model shared compute cluster: •  High-performance commodity computers interconnected via high-speed

Infiniband network; over 6,000 CPU cores •  Serves 34 research groups in 5 UCI schools •  Proposed business plan to fund shared HPC hardware and software

costs and required additional support staff

}  Evaluating UCLA service for large-scale, archival storage }  Research IT mailing list and website to get word out }  Long-term “Research Cyber-Infrastructure” Vision: •  UC-wide summit on March 23rd sponsored by VCRs, CIOs, Librarians •  Discussions about UCI’s RCI vision and strategy

UCI Office of Information Technology

Page 12: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

12

Research Computing

UCI Lightpath: High-speed “Science DMZ” •  Dedicated research network funded by $500k NSF-CIE Grant •  Support “Big Data” for UCI Data-Intensive Research Groups •  10Gbps dedicated research network and external link •  Bypasses firewall to improve performance (access controlled)

} What’s connected so far: •  Campus HPC and Physical Sciences GreenPlanet clusters •  Elghobashi lab (MAE), Pritchard Lab (ESS), Sandmeyer Gene

Sequencers to ICS servers; ~300 researchers

} Researchers reporting significant performance gains

UCI Office of Information Technology

Page 13: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

ESNet

EGW 2nd fl

UCINet Backbone

CENIC HPR

6x1Gbps 1Gbps

Border Firewalls UCI Border

Routers UCI LigthPath CORE Router

UCI LigthPath Access Switch

Rowland Hall

New 10Gbps

2x10Gbps

2x10Gbps

UCI Medical Ctr Network

UCI Resnet

2x10Gbps

UCI LightPath perfSONAR

perfSONAR

perfSONAR

OITDC

perfSONAR

Backup paths

Internet2

NLR

INTERNET

Campus General Purpose Network

perfSONAR

perfSONAR

CalREN

CalREN- California Research & Education Network CalREN-HPR- CalREN High Performance Research Network

Reines Hall

Croul Hall

McGaugh Hall

Greenplanet

10Gbps 1Gbps

HPC

Sprague Hall

ICS

In progress

Current Status Of UCI Lightpath

GNO Sequencer

GNO Sequencers

DTN

10Gbps

Page 14: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

UCI Office of Information Technology 14

Enterprise Application Initiatives

}  Large-scale application software suites required to conduct university business

}  Three 30+ year old legacy systems require replacement: •  HR/Payroll, Financial Systems, Student Information Systems (SIS) •  Current systems lack functionality, do not support evolving campus needs,

are not sustainable •  UCI Kuali Financial Systems in production! Focus on reporting, priority

enhancements, building multi-year development roadmap •  UC Path and UCI SIS projects in progress

}  Highly complex, challenging projects with widespread impact •  Multiple projects with overlapping implementation schedules •  Minimal “wiggle-room” in staff workload; backfill staffing essential where

dedicated project staff are required •  Business system projects led by functional units with IT as close partner

Page 15: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

15

}  Current Systems: lack functionality; not integrated; based on antiquated technology that cannot be maintained

}  Replacement project scope: Admissions, Financial Aid, Registrar, Summer Session, Graduate Division and Financial Services (Student Billing)

}  Multi-year information gathering, RFP, and comprehensive evaluation process resulted in selection of Ellucian Banner Student as our new SIS

}  Ellucian is our software, implementation and long-term operation partner

}  Joining a large community that includes UC Davis, UC Riverside, UC Merced, Purdue, Dartmouth, Rice, University of Illinois, Texas A&M, University of Georgia, Georgia Tech, and University of South Carolina

UCI Office of Information Technology

Page 16: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

16

}  Project Leadership and Governance: •  Co-Owners: Brent Yunek and Dana Roode •  Project Director: Steve Noh •  Executive Steering Committee, Advisory Committee

} Tentative Project Schedule: •  2015: fit-gap/design/configuration/development •  2016: tentative Admissions go-live fall 2016 •  2017: tentative Financial Aid go-live early 2017, registration/

records go-live spring 2017, billing summer 2017 •  2018: stabilization, required enhancements

} Moratorium on changes to current systems }  Project website: sisproject.uci.edu

UCI Office of Information Technology

Page 17: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

17

Enterprise Application Initiatives

} Kuali Coeus Research Administration •  KC Negotiations deployed for improved process transparency •  KC/Cayuse 424 integration deployed for online proposal submission to

sponsors •  KC Conflict of Interest module development is well along

}  Student Analytics and Data Warehouse •  EAB Student Success Collaborative populated with UCI data; tools are in

pilot by three units •  Student Data Warehouse populated with third week “census” snapshots;

campus roll-out anticipated by summer •  Data Warehouse will need to be interfaced with new SIS •  Planning continues for an over-arching Enterprise Data Warehouse (linking

student, financial, payroll, space, other campus data)

UCI Office of Information Technology

Page 18: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

18

OIT Budget Input

}  Provided status report on each of 5 OIT strategic goals: 1.  Build Out and Maintain Scalable IT Infrastructure and Services 2.  Support academic goals through educational and research computing

initiatives and services. 3.  Partner with functional units to implement enterprise and unit

applications 4.  Evolve as an enterprise IT organization through continued

improvement 5.  Foster technology innovation and collaboration within the campus and

externally. }  Additional input: •  Funding considerations (central funding vs recharge, reallocation of

internal funds, shared service efforts) •  Build Out and Maintain Scalable IT Infrastructure and Services •  Support academic goals through educational and research computing

initiatives and services.

UCI Office of Information Technology

Page 19: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

19

OIT Realignment

UCI Office of Information Technology

Scope: Top level of the organization Objectives:

•  Create divisions that simplify/streamline client relationship management •  Create divisions that optimize the management of IT assets and resources •  Create accountability structures that are clearly defined and delineated between

IT specific domains. Outcomes:

•  Enterprise Infrastructure (Director - Brian Buckler) •  Enterprise Applications (Director - Carmen Roode) •  Central Services (Director - Marina Arseniev) •  Student and Academic Support (Director - Shohreh Bozorgmehri) •  Client Services (Director - Cheryl Watt)

Page 20: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

20

OIT Realignment

UCI Office of Information Technology

IT Service Management Scope: All campus service requests, project requests, internal processes, funding and cost management, departmental performance analytics. Objectives:

•  Unify all of OIT on a single work management platform (ServiceNow). •  Work automation that allows OIT to scale out services with less incremental

effort and reduces administration done manually today. •  Build internal controls such as electronic signoffs & approvals, change impact

analysis, electronic work request history tracking & logging. •  Define standard organizational performance metrics across all services/teams.

Outcomes: •  Enhanced internal/external communications, resulting in optimal service delivery. •  Better decision making through real-time data on resources, workload & funding. •  Create a single source of truth for all OIT work being performed. •  Continual improvement initiatives through measurements and goals.

Page 21: IT Update - UCI Sitessites.uci.edu/cio/files/2015/06/IT-Update-2015-05-shared.pdf · Continued data center enhancements, cloud service pilots ! Working to enhance “Disaster Recovery”

Questions / Comments ?

21 UCI Office of Information Technology