10940 W ilshire B oulevard Suite 60 0 Los A ngeles, C alifornia 90 0 24 P hone : 310 .443.4191 F ax: 310 .443.4192 Em ail: info@ LineaSolutions.com IT Roadmap Presentation to FCERA Board of Retirement Barbara Scheffels, Retirement Practice Leader Akio Tagawa, Principal Linea Solutions, Inc. 4/15/2009

IT Roadmap Presentation to FCERA Board of Retirement

  • Upload
    varana

  • View
    31

  • Download
    0

Embed Size (px)

DESCRIPTION

IT Roadmap Presentation to FCERA Board of Retirement. Barbara Scheffels, Retirement Practice Leader Akio Tagawa, Principal Linea Solutions, Inc. 4/15/2009. Who we are / What we do What we did Findings / Recommendations IT Initiatives Timelines Cost Estimates. What is today’s agenda?. - PowerPoint PPT Presentation

Citation preview

Page 1: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

IT Roadmap Presentationto

FCERA Board of Retirement

Barbara Scheffels, Retirement Practice Leader

Akio Tagawa, Principal

Linea Solutions, Inc.

4/15/2009

Page 2: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

Agenda

•Who we are / What we do•What we did•Findings / Recommendations•IT Initiatives•Timelines•Cost Estimates

What is today’s agenda?

2

Page 3: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

Who we are / What we do

Linea is a Los Angeles-based firm that was founded in 1999

We focus on IT and management consulting for defined benefit plans

Our work ranges from strategic consulting to procurement projects to implementation project management

We work on various types of software systems, including document management, pension admin systems, general ledger systems, etc.

What is Linea Solutions, Inc.?

3

Page 4: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

Who we are / What we do

We have worked with 12 other 1937 Act retirement systems:

We are independent: we do not resell any software

We have consulted in virtually every kind of IT project for public retirement systems

What is Linea Solutions, Inc.?

ACERA CCCERA ICERS KCERA

OCERS MCERA (Marin)

MCERA (Merced)

SamCERA

SCERA SDCERA SJCERA VCERA

4

Page 5: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

What we did

•Linea Solutions, Inc. was selected to conduct a strategic assessment for FCERA•Assessment tried to understand feasibility of IT modernization•Looked at systems, infrastructure, people, budgets, future plans, needs, and data•Led to an IT Roadmap document

What is it that you did for FCERA?

5

Page 6: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

Findings / Recommendations

•IT costs with County ITSD are low, and service levels are good

–One change being recommended: move application servers in future to FCERA as dedicated servers–Create one additional full-time IT staff position at FCERA

•Many processes in operations are manual. More automation is both possible and recommended. Replacement systems are recommended.•Member files need to be imaged.

What are some of the key things you would recommend to FCERA?

6

Page 7: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

Key Initiatives

•An initiative is basically like a project.•It is focused on a large scale objective.•The initiatives were split into two categories:

–Primary initiatives–Secondary initiatives

•The only difference is a difference in relative criticality and scale. However, all are being recommended. •Other initiatives were considered but have been removed from recommendation for this report.

What initiatives are you recommending based on your assessment?

7

Page 8: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

Key Initiatives

Primary Initiatives:• New General Ledger Financial System• Replacement Pension Administration System• Electronic Document Management System• Disaster Recovery / Business Continuity Plan• Setup, Hiring and Training of Additional IT Staff

Member

Secondary Initiatives:• Case Management / Workflow Automation• Web Self-Service / Member Portal• Reporting system / Reporting tools initiative

What initiatives are you recommending based on your assessment?

8

Page 9: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

Key Initiatives and Timing

Overview• Assumption is that they would begin in July 2009• Much of the work is centered around the schedule

of a new Pension Administration System (PAS) to replace Pensions / Watson-Wyatt

• Many activities would be running concurrently based on the Pension Administration System schedule

• Activities span from July 2009 to June 2015• IT consultants will be necessary, or FCERA will run

the risk of not being able to complete the initiatives successfully or in this time frame

When would these initiatives be implemented?

How long will they take?

9

Page 10: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

Key Initiatives and Timing

When would these initiatives be implemented?

How long will they take?

10

Page 11: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

Estimated Costs

How much will all of this cost?

• Estimates were produced by phase and quarter and summarized in this table

• These estimates are all-inclusive for one-time expenses, including:• Estimates on software licenses,

customization• Necessary hardware• Implementation services

• They do not include ongoing costs of maintenance

• Took account of FCERA’s fiscal year of July 1 to June 30

11

Page 12: IT Roadmap Presentation to FCERA Board of Retirement

10940 Wilshire Boulevard Suite • 600 Los Angeles• , C alifornia 90024

Phone: 310.443.4191 Fax: 310.443.4192 Email: [email protected]

Estimated Costs

How much will all of this cost?

12