24
IT 208 Chapter 21 1 Production Control Chapter 21

IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

  • View
    212

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 1

Production Control

Chapter 21

Page 2: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 2

Competencies

Describe the difference between Jigs and Fixtures Describe the difference between CAD/CAM Define computer integrated manufacturing List essential components of robotics and describe

their function Describe the disadvantage of Just-in-time scheduling

Page 3: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 3

CHARACTERISTICS OF DIFFERENT TYPES OF FACILITIES

The most important factor in manufacturing is the rate of production, because it determines which manufacturing processes will be the most efficient for any given product. This system is driven by the customers’ demand (Pull system)

Page 4: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 4

Characteristics Of Different Types Of Facilities

Piecework Production Small Batch Production (1-20 Parts/Hr.) Large Batch Or Continuous Processes (20-200

Parts/Hr.) Mass Production (Over 200 Parts/Hr)

Page 5: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 5

Piecework Production

Defined as the fabrication of one complete unit at a time.

Utilization of equipment is not a great concern since the equipment is not usually shared or tied up continuously for the production run.

Piecework facilities are often batch processes in which products are made individually.

Page 6: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 6

Piecework Production

1. Jigs and Fixtures a) A fixture is a device that is individually designed to hold a

specific workpiece in place. Its specific job is to facilitate setup or to make holding easier. • Ex. - Use a fixture to hold a particular plug at an angle for

easier soldering.

b) A jig is a fixture that establishes certain critical location dimensions on the workpiece. • Ex. – Using a jig for the holding and drilling precise holes

(into a casting) for the shafts of a three dimensional mechanism.

c) Work holder is the general term for either a jig or a fixture. A miter box or a bench vise might be a workholder.

Page 7: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 7

Piecework Production

2. Inspection is the act of determining whether or not the size, shape, and location of all features of the workpiece are consistent with the drawings or other specifications. Inspections are performed by

machinists or operators.

Page 8: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 8

Small Batch Production (1-20 Parts/Hr.)

At this rate of production, completed parts begin to take up a significant amount of space before they can be shipped and raw materials are needed at a faster rate than they are with piecework.

Boredom becomes a concern and not only affects the quality of the product, but safety is also affected.

Page 9: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 9

Small Batch Production (1-20 Parts/Hr.)

Numerical Control is a way of controlling the action of machines by giving them a set of instructions in numerical form.

Computerized Numerical Control • Can be programmed to control several production

machines

• Can store programs and data that would allow it to track the wear of the cutting tools and automatically compensate for that wear.

• Machines were designed with a tool carrier so that tools could be changed by computer control.

Page 10: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 10

Small Batch Production (1-20 Parts/Hr.)

Some Problems of CNC

• New machines are very expensive and only 5% of the part’s total manufacturing time is it actually on the machine.

• Only profitable if it frees up time to supervise more machines or to spend time with the human activities that computers cannot do well

Page 11: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 11

Large Batch Or Continuous Processes (20-200 parts/hr.)

No longer does one person see the part from start to finish.

Scheduling is an important part of this type of manufacturing.

Inspect the parts frequently to detect trends in parts not meeting standards and take corrective action before the parts are so far from the specifications that they are scrap.

Page 12: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 12

Large Batch Or Continuous Processes (20-200 parts/hr.)

3. Computer-Aided Drafting/ Computer-Automated Manufacturing

a) Computer-Aided Drafting is a method of drafting that uses a computer to draw on the screen as instructed by an operator. The computer acts only as an “electronic drafting board”; it does not do anything on its own.

Page 13: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 13

Large Batch Or Continuous Processes (20-200 parts/hr.)

b) Computer Automated Engineering (CAE) is a system that uses a computer to make design drawings, but additionally is capable of doing engineering analysis of the designed object.

• Determine the volume and weight of the part and locate its

center of mass. • Do a complete structural analysis of the product. • Determine clearances and allowances between matching

parts. • Devise the optimum steps for the manufacture of the product. • Create the commands for the computer controlled machines

that make the product. • Keep the inventory records and other documentation for the

product

Page 14: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 14

Large Batch Or Continuous Processes (20-200 parts/hr.)

c) Computer-Automated Manufacturing is an approach to organizing a manufacturing plant so that all possible analyses, decisions, and actions are assigned to a master computer.

d)Typical Computer Operations in CAM • Control the inventory.

• Direct the transportation of raw materials, completed products, and parts at different stages during manufacture.

• Create machine maintenance schedules.

• Control the automatic inspection

• Maintain documentation

• Control the actions of robots.

Page 15: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 15

Large Batch Or Continuous Processes (20-200 parts/hr.)

Robotics Robots have five essential components:

1) Manipulator - the part of the machine that actually handles the tool, material, or part.

2) Actuators - respond to the signals from the controller, causing the manipulator to perform its assigned function.

3) Sensors - detect the positions of the various components of the arm and hand and feed data back to the controller.

4) Controllers - computers that send control signals to the manipulators and respond to the data fed back to them by the sensors.

5) Power supplies - provide the energy that drives the controllers, sensors, manipulators, and actuators.

Page 16: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 16

Large Batch Or Continuous Processes (20-200 parts/hr.)

Use of Robots Manipulators

• The robot manipulator must duplicate essentially every movement of the human arm and hand.

Actuators

• The “muscles” of the robot mechanism. These may be powered by air, hydraulic fluid, electricity, magnetism, or a

vacuum.

Page 17: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 17

Large Batch Or Continuous Processes (20-200 parts/hr.)

• Air-operated and vacuum-operated (pneumatic) mechanisms are usually small and limited by the amount of force they can exert, but they are inexpensive to construct and operate.

• Hydraulic mechanisms are capable of exerting large forces, are high powered, and are amazingly quick for their size. They do tend to be messy due to the inevitable leakage of hydraulic fluid.

• Electrically driven mechanisms are appropriate for light duty. They are very accurate, precise, and clean.

• Magnetically driven actuators such as solenoids are very quick but are limited by the amount of force they can exert on the workpiece.

Page 18: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 18

Large Batch Or Continuous Processes (20-200 parts/hr.)

Computer Functions• The “brain” of the robot is the computer that controls the

robot. Control System Functions

• If the computer is the ‘brain” of the robotics system, then the control system is its “nervous system.”

Robot Functions• Through its end-of-arm device (“hand”), the robot either

picks up the workpiece or does something with it.

Page 19: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 19

Quality Assurance Through Automated Inspection Quality Control (QC)

• Concerned with ensuring that the products meet their design standards

• Causes of Product Variation• Inherent Variation is the unavoidable variation in the

dimensions of a part due to such causes as flexure of the cutting tool, etc.

• Assignable Cause is an act or activity that can be identified as the reason why a workpiece deviates.

• A manufacturing process is said to be “in control” when the assignable causes have been detected and corrected so that only the inherent variation is left.

Page 20: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 20

Quality Assurance Through Automated Inspection

Statistical Quality Control • the control of the quality of the parts produced by an

analysis of the numerical data derived from measurements taken on those parts.

Meeting Drawing Tolerances • If the designer asks for tolerances that are smaller

than can be achieved with a machine, then either the tolerances need to be “loosened” or else the process needs to be done on a different machine.

Page 21: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 21

Just-in-Time Scheduling

A type of production organization in which the material for a part or assembly is delivered just in time to be used.

• Shifts responsibility for quality to the suppliers

• Reduce production costs by 20% to 40%.

• The drawback to JIT is that the production line is shut down if even one part does not come in “just in time.”

Page 22: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 22

Mass Production (over 200 parts/hr)

Constantly focused on reducing fractional costs. (Saving $.20/pc @ 300 pcs./hr. = $600,000/yr.

1. Adaptive Control • A type of feedback control that senses changes outside of

the feedback loop (temperature, pressure, vibration, etc.) and changes the instructions (to the actuators) so that the desired result is still accomplished in spite of the exterior change.

Page 23: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 23

Mass Production (over 200 parts/hr)

2. Cellular Organization• is a way of organizing a manufacturing facility so that

most of the processes are carried out by a small group of machines (the “cell”). Ex. – Combining turning, milling, and drilling operations in a machining center.

3. Flexible Manufacturing Systems (FMS)• same concept as that of the machining cell except that

the elements of the FMS are machining cells rather than machining centers. Fig. 21-34

Page 24: IT 208Chapter 211 Production Control Chapter 21. IT 208 Chapter 21 2 Competencies Describe the difference between Jigs and Fixtures Describe the difference

IT 208 Chapter 21 24

Mass Production (over 200 parts/hr)

4. Computer-Integrated Manufacturing • CIM is a methodology and a goal; it is not a collection of

equipment and software.

• Its method is to integrate all aspects of design, planning, manufacturing, distribution, and management.

• Its goal is to transform product designs and materials into saleable goods at a minimum cost in the shortest possible time.

• CIM treats manufacturing processes and plant operations and their management as a single system, not a sequential activity.